Here is my timeline with fees incurred 2012
April 21- IELTS Passed (British Council Sg S$310)/ April-March -requirements for VETASSES, CTC 4 copies,DHL etc. (S$600)/March 19- Apply VETASSES online ($1150 aud)/June 06, 2012 - VETASSES (Architectural Draftsman) feedback positive /August 08- Apply EOI visa 190 at 70 points/September 11- Resubmit EOI (Was asked to change EOI form)/November 22- Apply for SS in WA (arch draftsman still available)/November 22- Resubmit EOI (changed the State from Victoria to WA)/December 05- Initial Contact by DIAC saying WA is interested./December 07- WA SS approved December 10- DIAC Invitation received (1 week down ecomm) December 14- Lodged Visa $3050aud (plus technical issues of ecom visa was "lodged" December 21 daw)/ Dec 28 - Medicals (frontload)/January 8 -CO Assigned/January 23-PCC/ JANUARY 23---VISA GRANT!!!!!!!!!!
SG-based Members; drop by here! (",)
most recent by Ozdrims
Are you Waiting for an Invite this FY 2023-2024?
most recent by Ozdrims
most recent by Hassan
most recent by koalala
Tourist Visa with Australia employment contract
most recent by Hassan
How long did it take you to get a job?
most recent by nicbag
The longest running Pinoy-Australian Forum site in the history. We are connecting Pinoys "in" and "to" Australia since 2010! If you want to join in, click one of these buttons!