most recent by eel_kram025
The Best Vegan Eats in San Diego: El Avocado
most recent by RosieHockm
VICTORIA STATES SPONSORSHIP 2024-2025
most recent by Ozdrims
QUEENSLAND STATES SPONSORSHIP FY 2024-2025
most recent by Ozdrims
Australian Computer Society Skills Application
most recent by Ozdrims
most recent by Cerberus13
NSW STATE SPONSORSHIP 2024~2025
most recent by Ozdrims
Highly suggested Migration Agency
most recent by Marionittes40
most recent by Marionittes40
The longest running Pinoy-Australian Forum site in the history. We are connecting Pinoys "in" and "to" Australia since 2010! If you want to join in, click one of these buttons!
Comments
Posts: 527Member
Joined: May 15, 2013
ANZSCO code 263111: Computer Network and System Engineer
April 11, 2013 - lodge 189 visa - 75pts
April 19, 2013 - CO allocated, Brisbane Team33
May 6, 2013 - Medical submitted by SATA
May 15, 2013 - uploaded NBI, SG PCC and Form 80
June 19, 2013 - Visa Granted. Thank you Lord!
September 2013 - Hubby got a Job (while we are still in SG)
October 2013 - Flight to Brisbane
Posts: 32Member
Joined: Oct 21, 2013
Visa 190
Lodge: May 2013
CO: Last week of May 2013. Team 34 Brisbane
Grant ???
Posts: 459Member
Joined: Jan 25, 2013
Occupation: Software Engineer (ANZSCO Code 261313)
Feb 02, 2012 - Skill Assessment submission to ACS
Mar 23, 2013 - IELTS Result - Competent
Apr 03, 2013 - ACS Assessment Positive
Apr 06, 2013 - Submitted EOI (190)
Apr 11, 2013 - Submitted NSW SS (190)
Apr 16, 2013 - NSW SS Acknowledgment email received
July 01, 2013 - NSW SS approval letter received
July 03, 2013 - Skillselect Invite received
Aug 14, 2013 - Lodged Visa 190
Aug 16, 2013 - Upload Docs (including NBI Clearance)
Aug 25, 2013 - Gave Birth
Sep 20, 2013 - CO Allocated (GSM Adelaide Team 06)
Sep 22, 2013 - Informed CO of additional dependent (Baby)
Oct 04, 2013 - Hubby's Medical Uploaded
Oct 12, 2013 - Medical Uploaded
Oct 16, 2013 - SG PCC Collected and Uploaded
Oct 17, 2013 - Form 1022, Baby's Birth Certificate and Passport sent to CO
Oct 23, 2013 - Baby is included in eVisa
Oct 30, 2013 - Baby's Medical Uploaded
Nov 21, 2013 - VISA GRANT (IED: Aug 2014)
Feb 08, 2014 - Hubby's initial entry
Feb 13, 2014 - Hubby's Job Offer
Feb 18, 2014 - Hubby's First Day High
Apr 23, 2014 - Initial Entry (Baby and Me)
Feb 04, 2015 - My First day high (Home-based perm position)
Thank you, thank you so much Lord. Life is indeed beautiful
Posts: 471Member
Joined: Jun 24, 2013
@moonwitchbleu sis, Kamusta na sa inyo?
Nov 2012 ACS Assessment positive results (analyst programmer)
Dec 2012 IELTS results
July 4, 2013 Sent docs thru courier (door to door)
July 8, 2013 received ack letter from nsw
July 29, 2013 received skillselect invitation
July 31, 2013 received ss approval
Aug 11, 2013 lodged visa
Aug 22, 2013 medicals slec global (uploaded: Aug 24 Son; Aug 27 wife; Aug 28 primary applicant)
Sept 2, 2013 completed upload of docs including NBI clearances, Forms 80 and 1221
Sept. 12, 2013 CO assigned from Adelaide (Team 6, MB)
Sept. 13, 2013 (Uploaded additional docs: diploma of secondary applicant)
Sept 18, 2013 medicals referred to MOC according to CO
Sept 24, 2013 medicals finalised
Sept 25, 2013 visa grant (IED Aug 23, 2014)! Thank you Lord!
Do your best and God will do the rest
Posts: 459Member
Joined: Jan 25, 2013
Occupation: Software Engineer (ANZSCO Code 261313)
Feb 02, 2012 - Skill Assessment submission to ACS
Mar 23, 2013 - IELTS Result - Competent
Apr 03, 2013 - ACS Assessment Positive
Apr 06, 2013 - Submitted EOI (190)
Apr 11, 2013 - Submitted NSW SS (190)
Apr 16, 2013 - NSW SS Acknowledgment email received
July 01, 2013 - NSW SS approval letter received
July 03, 2013 - Skillselect Invite received
Aug 14, 2013 - Lodged Visa 190
Aug 16, 2013 - Upload Docs (including NBI Clearance)
Aug 25, 2013 - Gave Birth
Sep 20, 2013 - CO Allocated (GSM Adelaide Team 06)
Sep 22, 2013 - Informed CO of additional dependent (Baby)
Oct 04, 2013 - Hubby's Medical Uploaded
Oct 12, 2013 - Medical Uploaded
Oct 16, 2013 - SG PCC Collected and Uploaded
Oct 17, 2013 - Form 1022, Baby's Birth Certificate and Passport sent to CO
Oct 23, 2013 - Baby is included in eVisa
Oct 30, 2013 - Baby's Medical Uploaded
Nov 21, 2013 - VISA GRANT (IED: Aug 2014)
Feb 08, 2014 - Hubby's initial entry
Feb 13, 2014 - Hubby's Job Offer
Feb 18, 2014 - Hubby's First Day High
Apr 23, 2014 - Initial Entry (Baby and Me)
Feb 04, 2015 - My First day high (Home-based perm position)
Thank you, thank you so much Lord. Life is indeed beautiful
Posts: 758Member
Joined: Apr 08, 2013
CPA Australia 040912 : NSW SS 030812 : EOI first lodged 081312 : 1st Invitation 083112 : Updated EOI 110812 : 2nd Invitation 032713 : Lodged App 040213 : CO 042213 : medicals: 050213...visa granted (thank YOU LORD!) 060513 ... IED to NSW 03XX14 ??
Posts: 758Member
Joined: Apr 08, 2013
CPA Australia 040912 : NSW SS 030812 : EOI first lodged 081312 : 1st Invitation 083112 : Updated EOI 110812 : 2nd Invitation 032713 : Lodged App 040213 : CO 042213 : medicals: 050213...visa granted (thank YOU LORD!) 060513 ... IED to NSW 03XX14 ??
Posts: 471Member
Joined: Jun 24, 2013
@staycool haha oo pasyal muna bago sabak down undah hahah ako mga november na ako formally magpasa ng resignation letter ko.
Nov 2012 ACS Assessment positive results (analyst programmer)
Dec 2012 IELTS results
July 4, 2013 Sent docs thru courier (door to door)
July 8, 2013 received ack letter from nsw
July 29, 2013 received skillselect invitation
July 31, 2013 received ss approval
Aug 11, 2013 lodged visa
Aug 22, 2013 medicals slec global (uploaded: Aug 24 Son; Aug 27 wife; Aug 28 primary applicant)
Sept 2, 2013 completed upload of docs including NBI clearances, Forms 80 and 1221
Sept. 12, 2013 CO assigned from Adelaide (Team 6, MB)
Sept. 13, 2013 (Uploaded additional docs: diploma of secondary applicant)
Sept 18, 2013 medicals referred to MOC according to CO
Sept 24, 2013 medicals finalised
Sept 25, 2013 visa grant (IED Aug 23, 2014)! Thank you Lord!
Do your best and God will do the rest
Posts: 738Member
Joined: Aug 07, 2012
i was asked to submit additional health requirements... ngayon namroblema na ako... i already went to a physician regarding the additional tests na pinapagawa nla... however, aalis ako on monday october 28 for a business trip again and kung meron pa additional tests d ko na xa magagawa until pagbalik ko... and i think d ko na ma-meet yung timeframe na binigay nla to submit the documents... nag email na ako sa CO ko regarding my situation.. nagbibigay ba cla ng extension? guys, kung meron naka-experience.. pa-share naman... d kac mareply ang CO ko...
Skilled Migration (261112 Systems Analyst)
November 20, 2013 - Visa Grant (IED: July 22, 2014)
April 19, 2014 - Arrived in Melbourne
May 2, 2014 - Job offer
May 7, 2014 - First day of work
It is only through GOD that we can achieve success..
Posts: 816Member
Joined: Mar 19, 2013
06-01-11: Arrived Australia (457 visa dependent on my dad)
28-05-12: Lodged RSMS 857 visa (seperate from my dad already)
28-06-12: Done Medical check
30-10-12: Submit AFP check
07-11-12: Went home on a bridging visa B for holiday and wedding..:)
12-01-13: CO allocated and nomination approved
18-01-13: CO asked documents of my husband to be included on my application as migrating dependent..Thank u LORD!
15-02-13: Husband completed all requirements (police check, medical, english requirements and joint statement)
15-02-13: CO issued pre-grant letter instructing hubby to apply tourist visa to enter Australia in order our 857 visa to be granted.
27-02-13: Hubby applied Subclass 676 tourist visa.
06-03-13: Hubby's tourist visa approved.
16-03-13: Hubby arrived Australia.
18-03-13: Our RSMS 857 visa granted.. (nothing to ask more)
Posts: 39Member
Joined: Jan 07, 2013
since, hindi kame magkasabay ng hubby ko (secondary appli), hindi po ba siya magkaron ng problem pag siya na po ang magEnter? hindi po ba siya hahanapin sa akin pag ngEnter ako sa AU?
Thank you in advance po
March 2014 - Big Move to Down Under
Posts: 5,037Member, De-activated
Joined: Feb 23, 2012
also, make sure na walang visa condition ang secondary applicant..
kung meron, make sure na mauna or sabay mag entry ang primary..
kung wala, then wala namang problem kung sino mauna or hindi sabay ..
Sep 24, 2011 - IELTS (L-8 R-8 W-8 S-7.5 : OBS-8)
Jan 04, 2012 - EA application submitted | Feb 23, 2012 - EA assessment result (IE ANZSCO 233511)
May 8, 2012 - Lodged GSM 175 online application | June 4, 2012 - CO Allocated
June 22, 2012 - Medicals Finalized | Aug 30, 2012 - PCCs Completed (PH, UAE, USA)
Sep 3, 2012 - Visa Granted (IED Jun 11, 2013) Thank You Lord!
Oct 16-28, 2012 - Initial Entry Completed - Sydney
July 28, 2013 - Final move to Perth
Sep 9, 2013 - Started work with the same company i worked for in UAE/USA
Oct 28, 2013 - Moved to another company..
Posts: 56Member
Joined: Sep 16, 2013
Mechanical Engineer 233512
4/23/13 - CDR sent to EA
9/03/13 - Received favorable letter from EA
9/16/13 - EOI
9/17/13 - Dubai Police Clearance and NBI Clearance
10/07/13 - Receive invitation Visa Subclass 189
10/09/13 - Lodge Visa Subclass 189
10/22/13 - Medical Test done
11/20/13 - CO Allocated (Team 23 Adelaide)
12/03/13 - NBI Clearance uploaded
12/09/13 - Visa Grant... Praise the Lord
05/12/14 - IED... (excited!)
HE is truly gracious...
Posts: 738Member
Joined: Aug 07, 2012
bale two weeks ako mawawala... nag email na ako kay CO at tnawagan ko na din ang SLEC about it... sana nga bigyan ako... ang mahirap pa dun is pag may further tests... iba kac yung case ko... hinihingan ako ng prognosis for the next 5-10 years dahil sa breast masses ko... ang hirap pa wala ako agent... ako lang lahat ng gumagawa.. nde ko alam ang process...
Skilled Migration (261112 Systems Analyst)
November 20, 2013 - Visa Grant (IED: July 22, 2014)
April 19, 2014 - Arrived in Melbourne
May 2, 2014 - Job offer
May 7, 2014 - First day of work
It is only through GOD that we can achieve success..
Posts: 39Member
Joined: Jan 07, 2013
March 2014 - Big Move to Down Under
Posts: 816Member
Joined: Mar 19, 2013
06-01-11: Arrived Australia (457 visa dependent on my dad)
28-05-12: Lodged RSMS 857 visa (seperate from my dad already)
28-06-12: Done Medical check
30-10-12: Submit AFP check
07-11-12: Went home on a bridging visa B for holiday and wedding..:)
12-01-13: CO allocated and nomination approved
18-01-13: CO asked documents of my husband to be included on my application as migrating dependent..Thank u LORD!
15-02-13: Husband completed all requirements (police check, medical, english requirements and joint statement)
15-02-13: CO issued pre-grant letter instructing hubby to apply tourist visa to enter Australia in order our 857 visa to be granted.
27-02-13: Hubby applied Subclass 676 tourist visa.
06-03-13: Hubby's tourist visa approved.
16-03-13: Hubby arrived Australia.
18-03-13: Our RSMS 857 visa granted.. (nothing to ask more)
Posts: 39Member
Joined: Jan 07, 2013
NIL means none po, tama po ba?
Applicant Type Secondary Applicant
Visa Grant Number 0051600101507
Visa Grant Date 30 May 2013
Must Make First Entry to
Australia Before 27 March 2014
Must Not Arrive After 30 May 2018
Stay Period Indefinite
Travel Facility Multiple
Visa Conditions NIL
March 2014 - Big Move to Down Under
Posts: 5,037Member, De-activated
Joined: Feb 23, 2012
normally ganito nakalagay pag hindi pwede mauna ang ang secondary:
"Visa Condition; XXXX - must not enter before primary visa holder"
Sep 24, 2011 - IELTS (L-8 R-8 W-8 S-7.5 : OBS-8)
Jan 04, 2012 - EA application submitted | Feb 23, 2012 - EA assessment result (IE ANZSCO 233511)
May 8, 2012 - Lodged GSM 175 online application | June 4, 2012 - CO Allocated
June 22, 2012 - Medicals Finalized | Aug 30, 2012 - PCCs Completed (PH, UAE, USA)
Sep 3, 2012 - Visa Granted (IED Jun 11, 2013) Thank You Lord!
Oct 16-28, 2012 - Initial Entry Completed - Sydney
July 28, 2013 - Final move to Perth
Sep 9, 2013 - Started work with the same company i worked for in UAE/USA
Oct 28, 2013 - Moved to another company..
Posts: 7Member
Joined: Jun 01, 2013
Good luck po sa ating lahat
18-Aug 2012 - IELTS [ L-7.5 R-8 W-7 S-7 ]
23-Jan 2013 - Submitted CDR
12-Jun 2013 - EA positive assessment
19-Jun 2013 - EOI submitted [65pts]
01-Jul 2013 - Invited to lodge
08-Jul 2013 - Lodged visa 189
13-Sep 2013 - CO allocated
19-Sep 2013 -Medical exams
07-Oct 2013 - NBI and SG COC uploaded
18-Oct 2013 - Visa granted!
Posts: 527Member
Joined: May 15, 2013
ANZSCO code 263111: Computer Network and System Engineer
April 11, 2013 - lodge 189 visa - 75pts
April 19, 2013 - CO allocated, Brisbane Team33
May 6, 2013 - Medical submitted by SATA
May 15, 2013 - uploaded NBI, SG PCC and Form 80
June 19, 2013 - Visa Granted. Thank you Lord!
September 2013 - Hubby got a Job (while we are still in SG)
October 2013 - Flight to Brisbane
Posts: 326Member
Joined: Jun 12, 2013
Construction Project Manager 13311 (Hubby main applicant) 60 points, Visa 189
17 Jul 13 : Positive skills assessment
26 Jul 13 : Submitted EOI
19 Aug 13 : Invitation to lodge visa 189 ( 60 points)
23 Aug 13 : Lodge Visa
30 Aug 13 : Medical ( Sata AMK), wife, 5 yrs old, 1 yr
6 Sept 13 : Medical uploaded (No health examination required)
30 Sept 13 : SG PCC application
22 Oct 13 : SG PCC uploaded
DIRECT GRANT: 30 Oct 2013 (GSM Brisbane T34)
---- Thank you God for this wonderful blessing ----
Posts: 7Member
Joined: Jun 01, 2013
@rachelle_gan2 - Adelaide team7 po kame GD ang initials ng CO namen.. Good luck po, malapit na po yang sa inyo
18-Aug 2012 - IELTS [ L-7.5 R-8 W-7 S-7 ]
23-Jan 2013 - Submitted CDR
12-Jun 2013 - EA positive assessment
19-Jun 2013 - EOI submitted [65pts]
01-Jul 2013 - Invited to lodge
08-Jul 2013 - Lodged visa 189
13-Sep 2013 - CO allocated
19-Sep 2013 -Medical exams
07-Oct 2013 - NBI and SG COC uploaded
18-Oct 2013 - Visa granted!
Posts: 738Member
Joined: Aug 07, 2012
Skilled Migration (261112 Systems Analyst)
November 20, 2013 - Visa Grant (IED: July 22, 2014)
April 19, 2014 - Arrived in Melbourne
May 2, 2014 - Job offer
May 7, 2014 - First day of work
It is only through GOD that we can achieve success..
Posts: 738Member
Joined: Aug 07, 2012
Skilled Migration (261112 Systems Analyst)
November 20, 2013 - Visa Grant (IED: July 22, 2014)
April 19, 2014 - Arrived in Melbourne
May 2, 2014 - Job offer
May 7, 2014 - First day of work
It is only through GOD that we can achieve success..
Posts: 501Member
Joined: Jan 22, 2013
Occupation: Architectural Drafstperson (ANZSCO Code 312111)
Feb 2013 - Started collecting Vetassess requirements; March 29, 2013 - Lodged for Vetassess skills assessment; June 8, 2013 - took IELTS (BC, UAE); June 14, 2013 - received VETASSESS positive skills assessment; June 21, 2013 - got ielts results OBS 7.0 (l-7.5, r-7, w-7, s-7); June 24, 2013 - submitted EOI; June 27, 2013 - submitted WA state sponsorship application; July 03, 2013 - WA state sponsorship application approved; July 05, 2013 - received from DIAC invitation to lodge; July 14, 2013 - lodge visa application; August 13, 2013 - CO allocated, Team 7 GSM Adelaide; August 20, 2013 - submitted Form 80, NBI, PCC, bank statements for me, hubby and daughter and additional docs for hubby in lieu of Saudi PCC (statutory declaration, exit visa and end of service contract); August 22, 2013 - Medical check done; August 26, 2013 - uploaded hubby's Saudi PCC.... finally!; Sept 27, 2013 - visa grant daw but unofficial, hindi namin alam granted na pala.... long story…; Oct 10, 2013 - when we learned that our case was granted but no official confirmation.; Oct 11, 2013 - Official VISA Grant! Finally!!!! Thank God. End of the 1st journey, start of the new beginning; July 10, 2014 - IED
You may not always understand why God allows certain things to happen, but you can be certain that God is not making any mistakes.
Proverbs 3:5-6
"Trust in the Lord with all your heart and lean not on your own understanding; in all your ways submit to him, and he will make your paths straight
Posts: 471Member
Joined: Jun 24, 2013
Nov 2012 ACS Assessment positive results (analyst programmer)
Dec 2012 IELTS results
July 4, 2013 Sent docs thru courier (door to door)
July 8, 2013 received ack letter from nsw
July 29, 2013 received skillselect invitation
July 31, 2013 received ss approval
Aug 11, 2013 lodged visa
Aug 22, 2013 medicals slec global (uploaded: Aug 24 Son; Aug 27 wife; Aug 28 primary applicant)
Sept 2, 2013 completed upload of docs including NBI clearances, Forms 80 and 1221
Sept. 12, 2013 CO assigned from Adelaide (Team 6, MB)
Sept. 13, 2013 (Uploaded additional docs: diploma of secondary applicant)
Sept 18, 2013 medicals referred to MOC according to CO
Sept 24, 2013 medicals finalised
Sept 25, 2013 visa grant (IED Aug 23, 2014)! Thank you Lord!
Do your best and God will do the rest
Posts: 738Member
Joined: Aug 07, 2012
Skilled Migration (261112 Systems Analyst)
November 20, 2013 - Visa Grant (IED: July 22, 2014)
April 19, 2014 - Arrived in Melbourne
May 2, 2014 - Job offer
May 7, 2014 - First day of work
It is only through GOD that we can achieve success..
Posts: 7Member
Joined: Jun 01, 2013
@cchamyl thanks po, sunod na po ang sa inyo
18-Aug 2012 - IELTS [ L-7.5 R-8 W-7 S-7 ]
23-Jan 2013 - Submitted CDR
12-Jun 2013 - EA positive assessment
19-Jun 2013 - EOI submitted [65pts]
01-Jul 2013 - Invited to lodge
08-Jul 2013 - Lodged visa 189
13-Sep 2013 - CO allocated
19-Sep 2013 -Medical exams
07-Oct 2013 - NBI and SG COC uploaded
18-Oct 2013 - Visa granted!
Posts: 5,037Member, De-activated
Joined: Feb 23, 2012
saan at kelan lipad sir?
Sep 24, 2011 - IELTS (L-8 R-8 W-8 S-7.5 : OBS-8)
Jan 04, 2012 - EA application submitted | Feb 23, 2012 - EA assessment result (IE ANZSCO 233511)
May 8, 2012 - Lodged GSM 175 online application | June 4, 2012 - CO Allocated
June 22, 2012 - Medicals Finalized | Aug 30, 2012 - PCCs Completed (PH, UAE, USA)
Sep 3, 2012 - Visa Granted (IED Jun 11, 2013) Thank You Lord!
Oct 16-28, 2012 - Initial Entry Completed - Sydney
July 28, 2013 - Final move to Perth
Sep 9, 2013 - Started work with the same company i worked for in UAE/USA
Oct 28, 2013 - Moved to another company..
Posts: 7Member
Joined: Jun 01, 2013
salamat po ulet sa pagshare ng sample cdr mo
18-Aug 2012 - IELTS [ L-7.5 R-8 W-7 S-7 ]
23-Jan 2013 - Submitted CDR
12-Jun 2013 - EA positive assessment
19-Jun 2013 - EOI submitted [65pts]
01-Jul 2013 - Invited to lodge
08-Jul 2013 - Lodged visa 189
13-Sep 2013 - CO allocated
19-Sep 2013 -Medical exams
07-Oct 2013 - NBI and SG COC uploaded
18-Oct 2013 - Visa granted!