@TheDreamer got answers for you ---- based on tracking (Feb to Aug)
75 of 99 entries lang yung may info about PCC/Medical Dates
3 of 67 lang sa mga visa grants ang nag frontload; sergz126(190), netzkeenet(190), Ashok (189)
Dun sa 3 na yung timeline nila from lodge to grant average is 3.24 months
Dun sa 2 na 190 timeline average is 3.65 months; Dun sa isang 189 timeline is 2.43 months
<b>Conclusion: Di enough yung data natin to conclude na mas mabilis ang frontload or not. It is showing the same TAT for the very limited samples (3 frontloads). Actually based on tracking, out of 75 na merong info on PCC and Medicals, 5 lang yung nag frontload. </b>
Hope this helps. Kitakits.
<blockquote rel="TheDreamer">@rareking, yung 2.4months for 189 is front loaded docs/medicals karamihan nun or mix?</blockquote>