Major update has been completed. Please help to report any abnormality that you are facing (in case there is any) to [email protected] . Thank you for your continued support guys!
Visa 189/190 Tracker (Please click and key in your updates): http://goo.gl/HdIYoG
ANZSCO 233111 Chemical Engineer [Visa 189]
27.APR.2013___IELTS GT Exam - British Council [Result: 10-Points Eligible]
19.JUL.2013___Submitted CDR to Engineers Australia (EA) via DHL
16.OCT.2013___Received Notice of Shortcoming (EA) via email
21.OCT.2013___Responded to EA via email
26.NOV.2013___Received Positive Assessment Result from EA via snail mail dated 11.Nov.2013 (Praise Jah!)
03.FEB.2014___EOI Submitted Online [60 points only]
28.APR.2014___Received Invitation to Lodge Skilled-Independent Permanent Visa Application (Praise Jah!)
12.JUN.2014___Lodged Visa Application; Uploaded Required Documents / Frontloaded NBI / Police Clearance / Etc.
05.JUL.2014___Completed Medical Requirements at Nationwide Health (3-5 working days to DIBP)
12.JUL.2014___Frontloaded Form 80
17.JUL.2014___Complete Medical Report Uploaded to DIBP: 'Organise your health examinations' was changed to 'No health examinations are required for this person for this visa subclass based on the information provided to the Department of Immigration and Border Protection.' (Praise Jah!)
06.AUG.2014___CO Allocation (Team 23 GSM Adelaide; CO Initials EO) [55 Days From Lodgement] (Praise Jah!)
18.AUG.2014___Visa Grant (Golden Email Received from new CO: MD) [67 Days From Lodgement] [IED July2015] (Praise Jah!) GOAL! THANK YOU LORD!
==============
|Padayon| Keep a stronger faith| All is well|
retakeNorth Ryde Posts: 152Member Joined: Mar 13, 2014
Mga tol, may na-allocate-an na ng CO sa Visa 189 applicant na nag-lodge last June 23 dun sa kabilang forum:
Visa 189 Application Timeline - Year 2014
Software Engineer (261313 ) Location: Singapore
23-Jan - Booked for IELTS exam at British Council SG.
15-Feb - IELTS Exam Take #1 (Writing Test)
18-Feb - Requested for Certificate of Employment from my present employer.
19-Feb - IELTS Exam Take #1 (Speaking Test)
05-Mar - Received IELTS Take #1 Exam Result = Failed! (L:6 R:8 W:7 S:7.5)
**Mar-Apr - For 2 months, requested former employers for COE.
05-Apr - IELTS Take #2 Writing Test.
10-Apr - IELTS Take #2 Speaking Test.
14-Apr - Submitted application to Australian Computer Society (ACS).
16-Apr - Booked for another IELTS (Take #3) at IDP. (Just in case that my Take #2 failed.)
17-Apr - Received an email from ACS, asking for "Certified True Copies" (CTC) of my documents.
23-Apr - IELTS Take #3 Speaking @IDP
24-Apr - IELTS Take #3 Writing @IDP
25-Apr - Received IELTS Take #2 Result = Good! (L:7 R:7.5 W:8 S:7)
30-Apr - Uploaded additional docs to my ACS account.
10-May - Received IELTS Take #3 Result = Bad! Got 6 on Listening, but that's okay as Take#2 is good!
12-Jun - Received ACS Result (Positive!). Lodged EOI Visa 189 in SkillSelect later that day (65 points)
13-Jun - Filled-out NBI Online Application.
17-Jun - Got cedula & Applied for Police Clearance (sa Munisipyo)
18-Jun - Received Police Clearance. Also got my NBI Clearance that day. (Online Application is indeed helpful!)
22-Jun - Received Invitation to Lodge Visa 189
23-Jun - Lodged and Paid for Visa 189.
25-Jun - Uploaded Documents to immiAccount
27-Jun - Applied for SG Certificate of Clearance (Acknowledgement Letter lang ng Visa 189 ang dinala ko) / Printed out eMedicalReferral Letter
7-Jul - Completed Medical Exam at Point Medical, Orchard.
10-Jul - Point Medical sent medical result to DIBP.
14-Jul - Frontloaded Form 80.
18-Jul - Received SG Certificate of Clearance.
7-Aug - Last Day of Work (SG)
15-Aug - Flight back to Pinas
< Spent time with family, relatives & friends before the move >
3-Sept - CO Allocation (Called DIBP)
18 -Sept - CO asked for confirmation to deduct 5 points.
22 -Sept - Visa Grant!
23 -Sept - Attended CFO-PDOS
27 -Sept - Flight to Sydney.
28 -Sept - TouchDown Sydney!
< 1 month job hunting >
24 - Oct - Job Offer.
29 - Oct - First Day at Work!
25 Dec - Jan 1 = First Christmas and New Year Down Under!
retakeNorth Ryde Posts: 152Member Joined: Mar 13, 2014
ni-frontload ko na rin ang Bank account statement ko pati Certificate ng Stock account ko sa COL Financial.
Visa 189 Application Timeline - Year 2014
Software Engineer (261313 ) Location: Singapore
23-Jan - Booked for IELTS exam at British Council SG.
15-Feb - IELTS Exam Take #1 (Writing Test)
18-Feb - Requested for Certificate of Employment from my present employer.
19-Feb - IELTS Exam Take #1 (Speaking Test)
05-Mar - Received IELTS Take #1 Exam Result = Failed! (L:6 R:8 W:7 S:7.5)
**Mar-Apr - For 2 months, requested former employers for COE.
05-Apr - IELTS Take #2 Writing Test.
10-Apr - IELTS Take #2 Speaking Test.
14-Apr - Submitted application to Australian Computer Society (ACS).
16-Apr - Booked for another IELTS (Take #3) at IDP. (Just in case that my Take #2 failed.)
17-Apr - Received an email from ACS, asking for "Certified True Copies" (CTC) of my documents.
23-Apr - IELTS Take #3 Speaking @IDP
24-Apr - IELTS Take #3 Writing @IDP
25-Apr - Received IELTS Take #2 Result = Good! (L:7 R:7.5 W:8 S:7)
30-Apr - Uploaded additional docs to my ACS account.
10-May - Received IELTS Take #3 Result = Bad! Got 6 on Listening, but that's okay as Take#2 is good!
12-Jun - Received ACS Result (Positive!). Lodged EOI Visa 189 in SkillSelect later that day (65 points)
13-Jun - Filled-out NBI Online Application.
17-Jun - Got cedula & Applied for Police Clearance (sa Munisipyo)
18-Jun - Received Police Clearance. Also got my NBI Clearance that day. (Online Application is indeed helpful!)
22-Jun - Received Invitation to Lodge Visa 189
23-Jun - Lodged and Paid for Visa 189.
25-Jun - Uploaded Documents to immiAccount
27-Jun - Applied for SG Certificate of Clearance (Acknowledgement Letter lang ng Visa 189 ang dinala ko) / Printed out eMedicalReferral Letter
7-Jul - Completed Medical Exam at Point Medical, Orchard.
10-Jul - Point Medical sent medical result to DIBP.
14-Jul - Frontloaded Form 80.
18-Jul - Received SG Certificate of Clearance.
7-Aug - Last Day of Work (SG)
15-Aug - Flight back to Pinas
< Spent time with family, relatives & friends before the move >
3-Sept - CO Allocation (Called DIBP)
18 -Sept - CO asked for confirmation to deduct 5 points.
22 -Sept - Visa Grant!
23 -Sept - Attended CFO-PDOS
27 -Sept - Flight to Sydney.
28 -Sept - TouchDown Sydney!
< 1 month job hunting >
24 - Oct - Job Offer.
29 - Oct - First Day at Work!
25 Dec - Jan 1 = First Christmas and New Year Down Under!
@retake haha.. minamaximize mo talaga ang 60 docs na allowable ma-upload ah! on a side note.. pano pala mag-generate ng certificate sa COL acct? malapit na yang sayo.. God bless!
Electronics Engineer 233411
2013
Oct - Made long overdue decision!
21-Nov - IELTS Results (L-8.5/R-8.0/W-7.0/S-7.0)
Dec - CDR preparations / Holiday Mode
2014
16-Jan - EA skills assessment receipt date
24-Jun - Received EA assessment result from our mailbox
25-Jun - Submitted EOI
28-Jul - Received invitation to apply visa 189
30-Jul - NBI Fingerprinting @ Cantonment Police/Authentication @ PH Embassy SG
1-Aug - Lodged Visa 189 application (w/ wife and 2 kids)
14-Aug - All Medicals Cleared
22-Sep - Uploaded last doc (SG COC)
9-Oct - Assigned CO - Adelaide T4 (Sent requested SG PCC which I already uploaded last Sep22)
10- Oct - Visa Grant! Thank you Lord!
retakeNorth Ryde Posts: 152Member Joined: Mar 13, 2014
Visa 189 Application Timeline - Year 2014
Software Engineer (261313 ) Location: Singapore
23-Jan - Booked for IELTS exam at British Council SG.
15-Feb - IELTS Exam Take #1 (Writing Test)
18-Feb - Requested for Certificate of Employment from my present employer.
19-Feb - IELTS Exam Take #1 (Speaking Test)
05-Mar - Received IELTS Take #1 Exam Result = Failed! (L:6 R:8 W:7 S:7.5)
**Mar-Apr - For 2 months, requested former employers for COE.
05-Apr - IELTS Take #2 Writing Test.
10-Apr - IELTS Take #2 Speaking Test.
14-Apr - Submitted application to Australian Computer Society (ACS).
16-Apr - Booked for another IELTS (Take #3) at IDP. (Just in case that my Take #2 failed.)
17-Apr - Received an email from ACS, asking for "Certified True Copies" (CTC) of my documents.
23-Apr - IELTS Take #3 Speaking @IDP
24-Apr - IELTS Take #3 Writing @IDP
25-Apr - Received IELTS Take #2 Result = Good! (L:7 R:7.5 W:8 S:7)
30-Apr - Uploaded additional docs to my ACS account.
10-May - Received IELTS Take #3 Result = Bad! Got 6 on Listening, but that's okay as Take#2 is good!
12-Jun - Received ACS Result (Positive!). Lodged EOI Visa 189 in SkillSelect later that day (65 points)
13-Jun - Filled-out NBI Online Application.
17-Jun - Got cedula & Applied for Police Clearance (sa Munisipyo)
18-Jun - Received Police Clearance. Also got my NBI Clearance that day. (Online Application is indeed helpful!)
22-Jun - Received Invitation to Lodge Visa 189
23-Jun - Lodged and Paid for Visa 189.
25-Jun - Uploaded Documents to immiAccount
27-Jun - Applied for SG Certificate of Clearance (Acknowledgement Letter lang ng Visa 189 ang dinala ko) / Printed out eMedicalReferral Letter
7-Jul - Completed Medical Exam at Point Medical, Orchard.
10-Jul - Point Medical sent medical result to DIBP.
14-Jul - Frontloaded Form 80.
18-Jul - Received SG Certificate of Clearance.
7-Aug - Last Day of Work (SG)
15-Aug - Flight back to Pinas
< Spent time with family, relatives & friends before the move >
3-Sept - CO Allocation (Called DIBP)
18 -Sept - CO asked for confirmation to deduct 5 points.
22 -Sept - Visa Grant!
23 -Sept - Attended CFO-PDOS
27 -Sept - Flight to Sydney.
28 -Sept - TouchDown Sydney!
< 1 month job hunting >
24 - Oct - Job Offer.
29 - Oct - First Day at Work!
25 Dec - Jan 1 = First Christmas and New Year Down Under!
@retake maraming salamat po sa info.. malapit ka na ma-direct grant!
Electronics Engineer 233411
2013
Oct - Made long overdue decision!
21-Nov - IELTS Results (L-8.5/R-8.0/W-7.0/S-7.0)
Dec - CDR preparations / Holiday Mode
2014
16-Jan - EA skills assessment receipt date
24-Jun - Received EA assessment result from our mailbox
25-Jun - Submitted EOI
28-Jul - Received invitation to apply visa 189
30-Jul - NBI Fingerprinting @ Cantonment Police/Authentication @ PH Embassy SG
1-Aug - Lodged Visa 189 application (w/ wife and 2 kids)
14-Aug - All Medicals Cleared
22-Sep - Uploaded last doc (SG COC)
9-Oct - Assigned CO - Adelaide T4 (Sent requested SG PCC which I already uploaded last Sep22)
10- Oct - Visa Grant! Thank you Lord!
cholleSydney Posts: 403Member Joined: Nov 21, 2013
Hintay hintay lang, malapit na rin yan! Pero yung naisip ko nga, nakakadagdag sa delay yung pagupload ng docs na hindi naman necessary. Oras din ng CO yan eh pag tinitignan isa-isa. Delay ng onti para sa lahat ng applicants na irereview niya dapat. Dapat yung tamang docs lang. Just my two cents.
Occupation: Other Spatial Scientist (ANZSCO Code 232214)
30 Nov 2013 - IELTS Academic R8.5 W8 L8.5 S9 / Overall 8.5
10 Feb 2014 - Skills Assessment (VETASSESS)
23 May 2014 - VETASSESS Outcome: Positive
27 May 2014 - EOI (70 points)
9 Jun 2014 - Visa invitation received, application lodged (SI189)
2 Jul 2014 - CO allocation
6 Aug 2014 - Visa granted (IED 4 Jul 2015)
11 Oct 2014 - Moved to Sydney
20 Oct 2014 - Job offer
29 Oct 2014 - Start of work
17-26 Dec 2014 - Dog at Sydney quarantine
24 Dec 2014 - Partner's initial entry (Maligayang Pasko!)
16 May 2017 - Purchase first property
17 Oct 2018 - Citizenship application lodged (Council: City of Sydney)
8 Jul 2019: Test invite
20 Aug 2019: Test: (originally 20/9/19)
21 Aug 2019: Citizenship Approved
31 October 2019: Citizenship Ceremony 🇦🇺
araeadMelbourne Posts: 40Member Joined: Jun 09, 2014
@retake salamat sa pag share ng info. it gives hope. next week na tayo!!!
ANZSCO 261313 Software Engineer
mar 25 submitted acs
apr 5 ielts exam
apr 21 ielts results (L=9.5, R=8.5, WS=7.5 overall 8.0)
may 20 acs results suitable
may 20 Submitted SS application for VIC
may 20 Submitted EOI for Visa 189
may 21 Updated EOI for Visa 189
may 27 Updated EOI to include Visa 190
jun 23 Got invited to apply for Visa 189
jun 23 Applied for My Health Declarations
jun 24 Lodged Visa 189 application
jul 9 NBI Finger Printing done and Sent to Philippines
jul 12 Health Exam Completed
jul 22 Release of Certificate of Clearance
jul 24 Uploaded: NBI Clearance, SG Police Clearance, eMedical Information Sheet, Spouse Proof of Functional English -IELTS
jul 27 Uploaded: Form 80
sep 4 Direct Grant (Team 2 GSM Adelaide)
TO GOD BE ALL GLORY
johnvangieMelbourne Posts: 686Member Joined: Oct 14, 2013
@BoyPintados daymate kelan ang big move? Sa melbourne ka din ba?
Nominated Occupation : Production or Plant Engineer 233513
12/15/13 - IELTS IDP [ L : 9.0 I R :8.0 I S : 7.5 I W : 6.5 ]
01/17/14 - Submit CDR to Engineers Australia.
02/15/14 - IELTS IDP [ L : 9.0 I R :9.0 I S : 7.5 I W : 7.0 ]
05/29/14 - EA positive assessment as Production or Plant Engineer 233513
06/02/14 - EA Letter Received. Lodge EOI 65points.
06/09/14 - Received invitation to lodge Visa 189.
06/12/14 - Lodge Visa 189. Upload Docs/Form 80.
07/14/14 - Medicals @ SLEC Global.
07/15/14 - Upload NBI. (NBI Valid until July 4, 2015).
07/17/14 - CO Allocated. Team 7 GSM Adelaide ( CO : LM )
07/21/14 - VISA GRANT! Thank You Lord! IED : 07/04/15
02/06/15 - Hubby in Melbourne (Jobhunting)
03/27/15 - Me and my son in Melbourne
04/07/15 - Hubby 1st day of job
08/24/15 - My 1st day in BP, Thank you Lord God Jesus!
Enjoying the wonderful life in Oz, abundant blessings indeed :-)
buyanyanSingapore Posts: 64Member Joined: Jan 20, 2014
@bie0110 salamat sa reply. Usually ba yung spouse as dependent, ielts pinapasa nyo as functional english requirement?
Yung wife ko kase graduate din sa university pero di lahat ng subject sa TOR were in english also yung turo sa university not all in english, magbibigay kaya yung university ng letter na yung medium of instruction is english? And tatanggapin kaya yun ng case officer? Just want to know para kung sakali di na magtake ng ielts si misis.
Thanks in advance!
retakeNorth Ryde Posts: 152Member Joined: Mar 13, 2014
@cholle - thanks sa advice! binabalance ko kasi, baka may makalimutan akong i-frontload. Not sure kung need ba yung bank statements pero may nabasa ako before na humingi yung CO ng ganito.
Visa 189 Application Timeline - Year 2014
Software Engineer (261313 ) Location: Singapore
23-Jan - Booked for IELTS exam at British Council SG.
15-Feb - IELTS Exam Take #1 (Writing Test)
18-Feb - Requested for Certificate of Employment from my present employer.
19-Feb - IELTS Exam Take #1 (Speaking Test)
05-Mar - Received IELTS Take #1 Exam Result = Failed! (L:6 R:8 W:7 S:7.5)
**Mar-Apr - For 2 months, requested former employers for COE.
05-Apr - IELTS Take #2 Writing Test.
10-Apr - IELTS Take #2 Speaking Test.
14-Apr - Submitted application to Australian Computer Society (ACS).
16-Apr - Booked for another IELTS (Take #3) at IDP. (Just in case that my Take #2 failed.)
17-Apr - Received an email from ACS, asking for "Certified True Copies" (CTC) of my documents.
23-Apr - IELTS Take #3 Speaking @IDP
24-Apr - IELTS Take #3 Writing @IDP
25-Apr - Received IELTS Take #2 Result = Good! (L:7 R:7.5 W:8 S:7)
30-Apr - Uploaded additional docs to my ACS account.
10-May - Received IELTS Take #3 Result = Bad! Got 6 on Listening, but that's okay as Take#2 is good!
12-Jun - Received ACS Result (Positive!). Lodged EOI Visa 189 in SkillSelect later that day (65 points)
13-Jun - Filled-out NBI Online Application.
17-Jun - Got cedula & Applied for Police Clearance (sa Munisipyo)
18-Jun - Received Police Clearance. Also got my NBI Clearance that day. (Online Application is indeed helpful!)
22-Jun - Received Invitation to Lodge Visa 189
23-Jun - Lodged and Paid for Visa 189.
25-Jun - Uploaded Documents to immiAccount
27-Jun - Applied for SG Certificate of Clearance (Acknowledgement Letter lang ng Visa 189 ang dinala ko) / Printed out eMedicalReferral Letter
7-Jul - Completed Medical Exam at Point Medical, Orchard.
10-Jul - Point Medical sent medical result to DIBP.
14-Jul - Frontloaded Form 80.
18-Jul - Received SG Certificate of Clearance.
7-Aug - Last Day of Work (SG)
15-Aug - Flight back to Pinas
< Spent time with family, relatives & friends before the move >
3-Sept - CO Allocation (Called DIBP)
18 -Sept - CO asked for confirmation to deduct 5 points.
22 -Sept - Visa Grant!
23 -Sept - Attended CFO-PDOS
27 -Sept - Flight to Sydney.
28 -Sept - TouchDown Sydney!
< 1 month job hunting >
24 - Oct - Job Offer.
29 - Oct - First Day at Work!
25 Dec - Jan 1 = First Christmas and New Year Down Under!
netzkeenetSydney Posts: 448Member Joined: Mar 30, 2014
@bie0110 salamat sa reply. Usually ba yung spouse as dependent, ielts pinapasa nyo as functional english requirement?
Yung wife ko kase graduate din sa university pero di lahat ng subject sa TOR were in english also yung turo sa university not all in english, magbibigay kaya yung university ng letter na yung medium of instruction is english? And tatanggapin kaya yun ng case officer? Just want to know para kung sakali di na magtake ng ielts si misis.
Thanks in advance!
Yes they will give kahit hindi lahat ng subjects taught in english. Naka request na ako ng ganito and nagbigay naman yung school
26.05.12 - IELTS Academic (L-8.5, R-7, S-7, W-7, OBS-7.5)
31.05.13 to 25.08.13 - Bridging Program for Nurses
04.09.13 - Registered with AHPRA
12.12.13 - Lodged Skills assessment ANMAC
17.03.14 - Positive skills assessment (Registered Nurse: Medical)
29.03.14 - Lodged SS SA and EOI
07.04.14 - NBI clearance
01.05.14 - Approved SS SA and Invited to Apply for 190
02.06.14 - Lodged visa application 190 and uploaded docs
10.06.14 - Medicals at Nationwide
15.09.14 - Direct Grant 190 visa (IED: June 10, 2015)
22.10.14 - Touchdown Adelaide
~whatever you ask for in prayer, believe that you have received it and it will be yours~
buyanyanSingapore Posts: 64Member Joined: Jan 20, 2014
@netzkeenet if I may ask, from which school did you request it? Si misis kase sa PUP..
netzkeenetSydney Posts: 448Member Joined: Mar 30, 2014
26.05.12 - IELTS Academic (L-8.5, R-7, S-7, W-7, OBS-7.5)
31.05.13 to 25.08.13 - Bridging Program for Nurses
04.09.13 - Registered with AHPRA
12.12.13 - Lodged Skills assessment ANMAC
17.03.14 - Positive skills assessment (Registered Nurse: Medical)
29.03.14 - Lodged SS SA and EOI
07.04.14 - NBI clearance
01.05.14 - Approved SS SA and Invited to Apply for 190
02.06.14 - Lodged visa application 190 and uploaded docs
10.06.14 - Medicals at Nationwide
15.09.14 - Direct Grant 190 visa (IED: June 10, 2015)
22.10.14 - Touchdown Adelaide
~whatever you ask for in prayer, believe that you have received it and it will be yours~
@buyanyan PUP din misis ko at pwedeng-pwede po huming ni english certification sa kanila. 2-3 weeks nga lng ata yung processing time.
Electronics Engineer 233411
2013
Oct - Made long overdue decision!
21-Nov - IELTS Results (L-8.5/R-8.0/W-7.0/S-7.0)
Dec - CDR preparations / Holiday Mode
2014
16-Jan - EA skills assessment receipt date
24-Jun - Received EA assessment result from our mailbox
25-Jun - Submitted EOI
28-Jul - Received invitation to apply visa 189
30-Jul - NBI Fingerprinting @ Cantonment Police/Authentication @ PH Embassy SG
1-Aug - Lodged Visa 189 application (w/ wife and 2 kids)
14-Aug - All Medicals Cleared
22-Sep - Uploaded last doc (SG COC)
9-Oct - Assigned CO - Adelaide T4 (Sent requested SG PCC which I already uploaded last Sep22)
10- Oct - Visa Grant! Thank you Lord!
araeadMelbourne Posts: 40Member Joined: Jun 09, 2014
@buyanyan in our case we uploaded a certificate from school that instruction is in english. but then i read from another forum that somehow the CO still requested for proof of functional english even when the school documents eg diploma plus certification had already been submitted. so they took ielts. we did the same. both husband and wife took ielts. non primary applicant only need to get an average score of 4.5 in all the four components
ANZSCO 261313 Software Engineer
mar 25 submitted acs
apr 5 ielts exam
apr 21 ielts results (L=9.5, R=8.5, WS=7.5 overall 8.0)
may 20 acs results suitable
may 20 Submitted SS application for VIC
may 20 Submitted EOI for Visa 189
may 21 Updated EOI for Visa 189
may 27 Updated EOI to include Visa 190
jun 23 Got invited to apply for Visa 189
jun 23 Applied for My Health Declarations
jun 24 Lodged Visa 189 application
jul 9 NBI Finger Printing done and Sent to Philippines
jul 12 Health Exam Completed
jul 22 Release of Certificate of Clearance
jul 24 Uploaded: NBI Clearance, SG Police Clearance, eMedical Information Sheet, Spouse Proof of Functional English -IELTS
jul 27 Uploaded: Form 80
sep 4 Direct Grant (Team 2 GSM Adelaide)
TO GOD BE ALL GLORY
bie0110Woolloongabba Posts: 17Member Joined: Jan 24, 2013
@bie0110 salamat sa reply. Usually ba yung spouse as dependent, ielts pinapasa nyo as functional english requirement?
Yung wife ko kase graduate din sa university pero di lahat ng subject sa TOR were in english also yung turo sa university not all in english, magbibigay kaya yung university ng letter na yung medium of instruction is english? And tatanggapin kaya yun ng case officer? Just want to know para kung sakali di na magtake ng ielts si misis.
Thanks in advance!
@buyanyan - PUP din ako and tinanggap naman siya ng CO. =D>
ANZCO 221213
30/11/2013 - IELTS BC (L-8.5, R-8.5, W-7, S-7)
26/03/2014 - Submitted docs to CPAA
01/05/2014 - Additional docs sent to CPAA
14/05/2014 - Received positive assessment
30/05/2014 - Submitted EOI
31/05/2014 - Received invitation to lodge
02/06/2014 - Lodged visa 189 & uploaded documents
23/06/2014 - CO assigned (Team 7)
30/06/2014 - Applied for SG COC
04/07/2014 - Medical at Paragon
21/07/2014 - Sent additional docs (SG COC etc)
29/07/2014 - VISA GRANT (IED - 06/13/2015)
***Praise GOD!!!
quesoboyQuezon City Posts: 56Member Joined: Dec 03, 2013
Congrats on your visa grant, @BoyPintados! Natapos din ang waiting game. Best of luck in Australia!
My Timeline:
28 Mar 2014 - Submitted ACS Skills Assessment
10 May 2014 - Took IELTS (General)
26 May 2014 - Received ACS Skills Assessment Result: Suitable
27 May 2014 - IELTS Results (L: 8.5; R: 9; W: 7; S: 8.5; OBS: 8.5)
28 May 2014 - Submitted EOI for Visa 189
23 Jun 2014 - Received Invitation for Visa Application
26 Jun 2014 - Lodged Visa 189 Application
15 Sep 2014 - Direct Visa Grant
buyanyanSingapore Posts: 64Member Joined: Jan 20, 2014
@bie0110@araead@mistakenidentity thanks sa mga info. Dami din pala PUP dito hehe. Buti nalang nasabi nyo ng maaga, muntik ko na ipasched ng maaga si misis for IELTS.
@johnvangie hi daymate!!! yup sa melb din ako.. hehe nextyr pa big move ko kase April2015 pa ko magrresign from current work... when nga kayo alis daymate? ;-)
@BoyPintados daymate kelan ang big move? Sa melbourne ka din ba?
Visa 189/190 Tracker (Please click and key in your updates): http://goo.gl/HdIYoG
ANZSCO 233111 Chemical Engineer [Visa 189]
27.APR.2013___IELTS GT Exam - British Council [Result: 10-Points Eligible]
19.JUL.2013___Submitted CDR to Engineers Australia (EA) via DHL
16.OCT.2013___Received Notice of Shortcoming (EA) via email
21.OCT.2013___Responded to EA via email
26.NOV.2013___Received Positive Assessment Result from EA via snail mail dated 11.Nov.2013 (Praise Jah!)
03.FEB.2014___EOI Submitted Online [60 points only]
28.APR.2014___Received Invitation to Lodge Skilled-Independent Permanent Visa Application (Praise Jah!)
12.JUN.2014___Lodged Visa Application; Uploaded Required Documents / Frontloaded NBI / Police Clearance / Etc.
05.JUL.2014___Completed Medical Requirements at Nationwide Health (3-5 working days to DIBP)
12.JUL.2014___Frontloaded Form 80
17.JUL.2014___Complete Medical Report Uploaded to DIBP: 'Organise your health examinations' was changed to 'No health examinations are required for this person for this visa subclass based on the information provided to the Department of Immigration and Border Protection.' (Praise Jah!)
06.AUG.2014___CO Allocation (Team 23 GSM Adelaide; CO Initials EO) [55 Days From Lodgement] (Praise Jah!)
18.AUG.2014___Visa Grant (Golden Email Received from new CO: MD) [67 Days From Lodgement] [IED July2015] (Praise Jah!) GOAL! THANK YOU LORD!
==============
|Padayon| Keep a stronger faith| All is well|
@quesoboy Bro! thank you very much! yihman! hehe... malapit ka na din bro! All the best! ;-)
Congrats on your visa grant, @BoyPintados! Natapos din ang waiting game. Best of luck in Australia!
Visa 189/190 Tracker (Please click and key in your updates): http://goo.gl/HdIYoG
ANZSCO 233111 Chemical Engineer [Visa 189]
27.APR.2013___IELTS GT Exam - British Council [Result: 10-Points Eligible]
19.JUL.2013___Submitted CDR to Engineers Australia (EA) via DHL
16.OCT.2013___Received Notice of Shortcoming (EA) via email
21.OCT.2013___Responded to EA via email
26.NOV.2013___Received Positive Assessment Result from EA via snail mail dated 11.Nov.2013 (Praise Jah!)
03.FEB.2014___EOI Submitted Online [60 points only]
28.APR.2014___Received Invitation to Lodge Skilled-Independent Permanent Visa Application (Praise Jah!)
12.JUN.2014___Lodged Visa Application; Uploaded Required Documents / Frontloaded NBI / Police Clearance / Etc.
05.JUL.2014___Completed Medical Requirements at Nationwide Health (3-5 working days to DIBP)
12.JUL.2014___Frontloaded Form 80
17.JUL.2014___Complete Medical Report Uploaded to DIBP: 'Organise your health examinations' was changed to 'No health examinations are required for this person for this visa subclass based on the information provided to the Department of Immigration and Border Protection.' (Praise Jah!)
06.AUG.2014___CO Allocation (Team 23 GSM Adelaide; CO Initials EO) [55 Days From Lodgement] (Praise Jah!)
18.AUG.2014___Visa Grant (Golden Email Received from new CO: MD) [67 Days From Lodgement] [IED July2015] (Praise Jah!) GOAL! THANK YOU LORD!
==============
|Padayon| Keep a stronger faith| All is well|
araeadMelbourne Posts: 40Member Joined: Jun 09, 2014
guys, is it ok to call DIBP to follow up? i am especially concerned on my health requirements kasi organize your health pa rin ang status
ANZSCO 261313 Software Engineer
mar 25 submitted acs
apr 5 ielts exam
apr 21 ielts results (L=9.5, R=8.5, WS=7.5 overall 8.0)
may 20 acs results suitable
may 20 Submitted SS application for VIC
may 20 Submitted EOI for Visa 189
may 21 Updated EOI for Visa 189
may 27 Updated EOI to include Visa 190
jun 23 Got invited to apply for Visa 189
jun 23 Applied for My Health Declarations
jun 24 Lodged Visa 189 application
jul 9 NBI Finger Printing done and Sent to Philippines
jul 12 Health Exam Completed
jul 22 Release of Certificate of Clearance
jul 24 Uploaded: NBI Clearance, SG Police Clearance, eMedical Information Sheet, Spouse Proof of Functional English -IELTS
jul 27 Uploaded: Form 80
sep 4 Direct Grant (Team 2 GSM Adelaide)
TO GOD BE ALL GLORY
kenshuseiMelbourne Posts: 121Member Joined: Feb 13, 2014
edited August 2014
@araead did you check na your emedical account? If you generate the Info sheet makita mo yung status nung each and every exam na tinake mo. Also sa pinakataas nakalagay yung overall status mo. If completed na ang nakasulat:
"Your eMedical case has been submitted to the Department of Immigration and Border Protection (DIBP). This letter outlines the immigration health examinations that you have completed."
** Edited** Nakita ko nag My Health declaration ka pala. Baka since wala ka pang CO, di pa talaga siguro maguupdate yung "organize your health" part ng immiaccount mo.
261313 Software Engineer
05/03/2014 - ACS application
05/04/2014 - IELTS exam
18/04/2014 - IELTS results (R/W:7.5 L/S:8 OBS:8)
28/04/2014 - ACS results (Suitable)
29/04/2014 - EOI submitted (65pts)
12/05/2014 - Received invite (Visa189)
21/05/2014 - Lodged and paid (Visa189)
13/06/2014 - CO Assigned (Adelaide GSM Team 6)
20/06/2014 - Medical
07/07/2014 - Medical Referred to MOC
06/08/2014 - Visa Grant (IED: 03/07/2015)
araeadMelbourne Posts: 40Member Joined: Jun 09, 2014
@kenshusei ganun na nga cguro ang CO na ang maguupdate. completed na ang status eh and submitted to DIBP last July 15 pa. i have uploaded the medical info sheet na rin. nakakainip na ang waiting game. thanks @kenshusei!
ANZSCO 261313 Software Engineer
mar 25 submitted acs
apr 5 ielts exam
apr 21 ielts results (L=9.5, R=8.5, WS=7.5 overall 8.0)
may 20 acs results suitable
may 20 Submitted SS application for VIC
may 20 Submitted EOI for Visa 189
may 21 Updated EOI for Visa 189
may 27 Updated EOI to include Visa 190
jun 23 Got invited to apply for Visa 189
jun 23 Applied for My Health Declarations
jun 24 Lodged Visa 189 application
jul 9 NBI Finger Printing done and Sent to Philippines
jul 12 Health Exam Completed
jul 22 Release of Certificate of Clearance
jul 24 Uploaded: NBI Clearance, SG Police Clearance, eMedical Information Sheet, Spouse Proof of Functional English -IELTS
jul 27 Uploaded: Form 80
sep 4 Direct Grant (Team 2 GSM Adelaide)
TO GOD BE ALL GLORY
retakeNorth Ryde Posts: 152Member Joined: Mar 13, 2014
Visa 189 Application Timeline - Year 2014
Software Engineer (261313 ) Location: Singapore
23-Jan - Booked for IELTS exam at British Council SG.
15-Feb - IELTS Exam Take #1 (Writing Test)
18-Feb - Requested for Certificate of Employment from my present employer.
19-Feb - IELTS Exam Take #1 (Speaking Test)
05-Mar - Received IELTS Take #1 Exam Result = Failed! (L:6 R:8 W:7 S:7.5)
**Mar-Apr - For 2 months, requested former employers for COE.
05-Apr - IELTS Take #2 Writing Test.
10-Apr - IELTS Take #2 Speaking Test.
14-Apr - Submitted application to Australian Computer Society (ACS).
16-Apr - Booked for another IELTS (Take #3) at IDP. (Just in case that my Take #2 failed.)
17-Apr - Received an email from ACS, asking for "Certified True Copies" (CTC) of my documents.
23-Apr - IELTS Take #3 Speaking @IDP
24-Apr - IELTS Take #3 Writing @IDP
25-Apr - Received IELTS Take #2 Result = Good! (L:7 R:7.5 W:8 S:7)
30-Apr - Uploaded additional docs to my ACS account.
10-May - Received IELTS Take #3 Result = Bad! Got 6 on Listening, but that's okay as Take#2 is good!
12-Jun - Received ACS Result (Positive!). Lodged EOI Visa 189 in SkillSelect later that day (65 points)
13-Jun - Filled-out NBI Online Application.
17-Jun - Got cedula & Applied for Police Clearance (sa Munisipyo)
18-Jun - Received Police Clearance. Also got my NBI Clearance that day. (Online Application is indeed helpful!)
22-Jun - Received Invitation to Lodge Visa 189
23-Jun - Lodged and Paid for Visa 189.
25-Jun - Uploaded Documents to immiAccount
27-Jun - Applied for SG Certificate of Clearance (Acknowledgement Letter lang ng Visa 189 ang dinala ko) / Printed out eMedicalReferral Letter
7-Jul - Completed Medical Exam at Point Medical, Orchard.
10-Jul - Point Medical sent medical result to DIBP.
14-Jul - Frontloaded Form 80.
18-Jul - Received SG Certificate of Clearance.
7-Aug - Last Day of Work (SG)
15-Aug - Flight back to Pinas
< Spent time with family, relatives & friends before the move >
3-Sept - CO Allocation (Called DIBP)
18 -Sept - CO asked for confirmation to deduct 5 points.
22 -Sept - Visa Grant!
23 -Sept - Attended CFO-PDOS
27 -Sept - Flight to Sydney.
28 -Sept - TouchDown Sydney!
< 1 month job hunting >
24 - Oct - Job Offer.
29 - Oct - First Day at Work!
25 Dec - Jan 1 = First Christmas and New Year Down Under!
kenshuseiMelbourne Posts: 121Member Joined: Feb 13, 2014
@araead if completed na then for sure maupdate yan once magka-co ka na. best case direct grant na you can wait and keep yourself busy for the meantime (i know the waiting game is a bummer) or as @retake suggested, for peace of mind, pwede mo din sila icontact on the status of your medical or application as a whole. Godbless!
261313 Software Engineer
05/03/2014 - ACS application
05/04/2014 - IELTS exam
18/04/2014 - IELTS results (R/W:7.5 L/S:8 OBS:8)
28/04/2014 - ACS results (Suitable)
29/04/2014 - EOI submitted (65pts)
12/05/2014 - Received invite (Visa189)
21/05/2014 - Lodged and paid (Visa189)
13/06/2014 - CO Assigned (Adelaide GSM Team 6)
20/06/2014 - Medical
07/07/2014 - Medical Referred to MOC
06/08/2014 - Visa Grant (IED: 03/07/2015)
retakeNorth Ryde Posts: 152Member Joined: Mar 13, 2014
@araead - tol, ni-check ko ulet immi account ko at mukhang may changes ulet sila:
Meeting the health requirement This person may be required to undergo health examinations as part of this visa application process. The message on this page should continue to be monitored for any updates.
Note: Updates to health information will not occur until a case officer investigates the person's case in line with published processing times for the visa that has been applied for. There is no need to contact the department at this time concerning this matter.
ganito rin ba yung sa iyo? Kung ganito rin, I think okay na yata yan. Marami kasing changes sa system nila lately.
Visa 189 Application Timeline - Year 2014
Software Engineer (261313 ) Location: Singapore
23-Jan - Booked for IELTS exam at British Council SG.
15-Feb - IELTS Exam Take #1 (Writing Test)
18-Feb - Requested for Certificate of Employment from my present employer.
19-Feb - IELTS Exam Take #1 (Speaking Test)
05-Mar - Received IELTS Take #1 Exam Result = Failed! (L:6 R:8 W:7 S:7.5)
**Mar-Apr - For 2 months, requested former employers for COE.
05-Apr - IELTS Take #2 Writing Test.
10-Apr - IELTS Take #2 Speaking Test.
14-Apr - Submitted application to Australian Computer Society (ACS).
16-Apr - Booked for another IELTS (Take #3) at IDP. (Just in case that my Take #2 failed.)
17-Apr - Received an email from ACS, asking for "Certified True Copies" (CTC) of my documents.
23-Apr - IELTS Take #3 Speaking @IDP
24-Apr - IELTS Take #3 Writing @IDP
25-Apr - Received IELTS Take #2 Result = Good! (L:7 R:7.5 W:8 S:7)
30-Apr - Uploaded additional docs to my ACS account.
10-May - Received IELTS Take #3 Result = Bad! Got 6 on Listening, but that's okay as Take#2 is good!
12-Jun - Received ACS Result (Positive!). Lodged EOI Visa 189 in SkillSelect later that day (65 points)
13-Jun - Filled-out NBI Online Application.
17-Jun - Got cedula & Applied for Police Clearance (sa Munisipyo)
18-Jun - Received Police Clearance. Also got my NBI Clearance that day. (Online Application is indeed helpful!)
22-Jun - Received Invitation to Lodge Visa 189
23-Jun - Lodged and Paid for Visa 189.
25-Jun - Uploaded Documents to immiAccount
27-Jun - Applied for SG Certificate of Clearance (Acknowledgement Letter lang ng Visa 189 ang dinala ko) / Printed out eMedicalReferral Letter
7-Jul - Completed Medical Exam at Point Medical, Orchard.
10-Jul - Point Medical sent medical result to DIBP.
14-Jul - Frontloaded Form 80.
18-Jul - Received SG Certificate of Clearance.
7-Aug - Last Day of Work (SG)
15-Aug - Flight back to Pinas
< Spent time with family, relatives & friends before the move >
3-Sept - CO Allocation (Called DIBP)
18 -Sept - CO asked for confirmation to deduct 5 points.
22 -Sept - Visa Grant!
23 -Sept - Attended CFO-PDOS
27 -Sept - Flight to Sydney.
28 -Sept - TouchDown Sydney!
< 1 month job hunting >
24 - Oct - Job Offer.
29 - Oct - First Day at Work!
25 Dec - Jan 1 = First Christmas and New Year Down Under!
iamnurse08North Ryde Posts: 12Member Joined: Aug 01, 2014
hello po may question lng po sana ako....tinatwagan po ba isa-isa ng dibp ang previous employers ntn jan sa pinas??? salamat po.
The longest running Pinoy-Australian Forum site in the history. We are connecting Pinoys "in" and "to" Australia since 2010! If you want to join in, click one of these buttons!
Comments
Posts: 64Member
Joined: Jan 20, 2014
Posts: 17Member
Joined: Jan 24, 2013
ANZCO 221213
30/11/2013 - IELTS BC (L-8.5, R-8.5, W-7, S-7)
26/03/2014 - Submitted docs to CPAA
01/05/2014 - Additional docs sent to CPAA
14/05/2014 - Received positive assessment
30/05/2014 - Submitted EOI
31/05/2014 - Received invitation to lodge
02/06/2014 - Lodged visa 189 & uploaded documents
23/06/2014 - CO assigned (Team 7)
30/06/2014 - Applied for SG COC
04/07/2014 - Medical at Paragon
21/07/2014 - Sent additional docs (SG COC etc)
29/07/2014 - VISA GRANT (IED - 06/13/2015)
***Praise GOD!!!
Posts: 629Member
Joined: Jul 03, 2013
Visa 189/190 Tracker (Please click and key in your updates): http://goo.gl/HdIYoG
ANZSCO 233111 Chemical Engineer [Visa 189]
27.APR.2013___IELTS GT Exam - British Council [Result: 10-Points Eligible]
19.JUL.2013___Submitted CDR to Engineers Australia (EA) via DHL
16.OCT.2013___Received Notice of Shortcoming (EA) via email
21.OCT.2013___Responded to EA via email
26.NOV.2013___Received Positive Assessment Result from EA via snail mail dated 11.Nov.2013 (Praise Jah!)
03.FEB.2014___EOI Submitted Online [60 points only]
28.APR.2014___Received Invitation to Lodge Skilled-Independent Permanent Visa Application (Praise Jah!)
12.JUN.2014___Lodged Visa Application; Uploaded Required Documents / Frontloaded NBI / Police Clearance / Etc.
05.JUL.2014___Completed Medical Requirements at Nationwide Health (3-5 working days to DIBP)
12.JUL.2014___Frontloaded Form 80
17.JUL.2014___Complete Medical Report Uploaded to DIBP: 'Organise your health examinations' was changed to 'No health examinations are required for this person for this visa subclass based on the information provided to the Department of Immigration and Border Protection.' (Praise Jah!)
06.AUG.2014___CO Allocation (Team 23 GSM Adelaide; CO Initials EO) [55 Days From Lodgement] (Praise Jah!)
18.AUG.2014___Visa Grant (Golden Email Received from new CO: MD) [67 Days From Lodgement] [IED July2015] (Praise Jah!) GOAL! THANK YOU LORD!
==============
|Padayon| Keep a stronger faith| All is well|
Posts: 152Member
Joined: Mar 13, 2014
http://www.expatforum.com/expats/australia-expat-forum-expats-living-australia/196210-189-190-visa-applicants-6384.html#post4999273
Hopefully, mabigyan na rin tayo by next week or sa first week ng September.
#TiwalaLang
Visa Tracker: https://docs.google.com/spreadsheets/d/18d1OUvt_9wyGxVrUu-12aoo8evhMKwGFHrf2smAaoU4/edit?pli=1#gid=0
Visa 189 Application Timeline - Year 2014
Software Engineer (261313 ) Location: Singapore
23-Jan - Booked for IELTS exam at British Council SG.
15-Feb - IELTS Exam Take #1 (Writing Test)
18-Feb - Requested for Certificate of Employment from my present employer.
19-Feb - IELTS Exam Take #1 (Speaking Test)
05-Mar - Received IELTS Take #1 Exam Result = Failed! (L:6 R:8 W:7 S:7.5)
**Mar-Apr - For 2 months, requested former employers for COE.
05-Apr - IELTS Take #2 Writing Test.
10-Apr - IELTS Take #2 Speaking Test.
14-Apr - Submitted application to Australian Computer Society (ACS).
16-Apr - Booked for another IELTS (Take #3) at IDP. (Just in case that my Take #2 failed.)
17-Apr - Received an email from ACS, asking for "Certified True Copies" (CTC) of my documents.
23-Apr - IELTS Take #3 Speaking @IDP
24-Apr - IELTS Take #3 Writing @IDP
25-Apr - Received IELTS Take #2 Result = Good! (L:7 R:7.5 W:8 S:7)
30-Apr - Uploaded additional docs to my ACS account.
10-May - Received IELTS Take #3 Result = Bad! Got 6 on Listening, but that's okay as Take#2 is good!
12-Jun - Received ACS Result (Positive!). Lodged EOI Visa 189 in SkillSelect later that day (65 points)
13-Jun - Filled-out NBI Online Application.
17-Jun - Got cedula & Applied for Police Clearance (sa Munisipyo)
18-Jun - Received Police Clearance. Also got my NBI Clearance that day. (Online Application is indeed helpful!)
22-Jun - Received Invitation to Lodge Visa 189
23-Jun - Lodged and Paid for Visa 189.
25-Jun - Uploaded Documents to immiAccount
27-Jun - Applied for SG Certificate of Clearance (Acknowledgement Letter lang ng Visa 189 ang dinala ko) / Printed out eMedicalReferral Letter
7-Jul - Completed Medical Exam at Point Medical, Orchard.
10-Jul - Point Medical sent medical result to DIBP.
14-Jul - Frontloaded Form 80.
18-Jul - Received SG Certificate of Clearance.
7-Aug - Last Day of Work (SG)
15-Aug - Flight back to Pinas
< Spent time with family, relatives & friends before the move >
3-Sept - CO Allocation (Called DIBP)
18 -Sept - CO asked for confirmation to deduct 5 points.
22 -Sept - Visa Grant!
23 -Sept - Attended CFO-PDOS
27 -Sept - Flight to Sydney.
28 -Sept - TouchDown Sydney!
< 1 month job hunting >
24 - Oct - Job Offer.
29 - Oct - First Day at Work!
25 Dec - Jan 1 = First Christmas and New Year Down Under!
Posts: 152Member
Joined: Mar 13, 2014
Wala na ako talagang ma-frontload pang iba hehe.
Visa Tracker: https://docs.google.com/spreadsheets/d/18d1OUvt_9wyGxVrUu-12aoo8evhMKwGFHrf2smAaoU4/edit?pli=1#gid=0
Visa 189 Application Timeline - Year 2014
Software Engineer (261313 ) Location: Singapore
23-Jan - Booked for IELTS exam at British Council SG.
15-Feb - IELTS Exam Take #1 (Writing Test)
18-Feb - Requested for Certificate of Employment from my present employer.
19-Feb - IELTS Exam Take #1 (Speaking Test)
05-Mar - Received IELTS Take #1 Exam Result = Failed! (L:6 R:8 W:7 S:7.5)
**Mar-Apr - For 2 months, requested former employers for COE.
05-Apr - IELTS Take #2 Writing Test.
10-Apr - IELTS Take #2 Speaking Test.
14-Apr - Submitted application to Australian Computer Society (ACS).
16-Apr - Booked for another IELTS (Take #3) at IDP. (Just in case that my Take #2 failed.)
17-Apr - Received an email from ACS, asking for "Certified True Copies" (CTC) of my documents.
23-Apr - IELTS Take #3 Speaking @IDP
24-Apr - IELTS Take #3 Writing @IDP
25-Apr - Received IELTS Take #2 Result = Good! (L:7 R:7.5 W:8 S:7)
30-Apr - Uploaded additional docs to my ACS account.
10-May - Received IELTS Take #3 Result = Bad! Got 6 on Listening, but that's okay as Take#2 is good!
12-Jun - Received ACS Result (Positive!). Lodged EOI Visa 189 in SkillSelect later that day (65 points)
13-Jun - Filled-out NBI Online Application.
17-Jun - Got cedula & Applied for Police Clearance (sa Munisipyo)
18-Jun - Received Police Clearance. Also got my NBI Clearance that day. (Online Application is indeed helpful!)
22-Jun - Received Invitation to Lodge Visa 189
23-Jun - Lodged and Paid for Visa 189.
25-Jun - Uploaded Documents to immiAccount
27-Jun - Applied for SG Certificate of Clearance (Acknowledgement Letter lang ng Visa 189 ang dinala ko) / Printed out eMedicalReferral Letter
7-Jul - Completed Medical Exam at Point Medical, Orchard.
10-Jul - Point Medical sent medical result to DIBP.
14-Jul - Frontloaded Form 80.
18-Jul - Received SG Certificate of Clearance.
7-Aug - Last Day of Work (SG)
15-Aug - Flight back to Pinas
< Spent time with family, relatives & friends before the move >
3-Sept - CO Allocation (Called DIBP)
18 -Sept - CO asked for confirmation to deduct 5 points.
22 -Sept - Visa Grant!
23 -Sept - Attended CFO-PDOS
27 -Sept - Flight to Sydney.
28 -Sept - TouchDown Sydney!
< 1 month job hunting >
24 - Oct - Job Offer.
29 - Oct - First Day at Work!
25 Dec - Jan 1 = First Christmas and New Year Down Under!
Posts: 263Member
Joined: Oct 09, 2013
on a side note.. pano pala mag-generate ng certificate sa COL acct?
malapit na yang sayo.. God bless!
Electronics Engineer 233411
2013
Oct - Made long overdue decision!
21-Nov - IELTS Results (L-8.5/R-8.0/W-7.0/S-7.0)
Dec - CDR preparations / Holiday Mode
2014
16-Jan - EA skills assessment receipt date
24-Jun - Received EA assessment result from our mailbox
25-Jun - Submitted EOI
28-Jul - Received invitation to apply visa 189
30-Jul - NBI Fingerprinting @ Cantonment Police/Authentication @ PH Embassy SG
1-Aug - Lodged Visa 189 application (w/ wife and 2 kids)
14-Aug - All Medicals Cleared
22-Sep - Uploaded last doc (SG COC)
9-Oct - Assigned CO - Adelaide T4 (Sent requested SG PCC which I already uploaded last Sep22)
10- Oct - Visa Grant! Thank you Lord!
Posts: 152Member
Joined: Mar 13, 2014
Login ka lang sa COL then sa Home -> Downloads, nandun yung form. Ito yung direct link: https://www.colfinancial.com/ape/Final2/home/pdfs/Certification Request.pdf
pag na-inip inip ako, pati itong stocks account certificate ko sa SG ( Phillip Capital / POEMS) eh i-a-upload ko na rin!
Visa Tracker: https://docs.google.com/spreadsheets/d/18d1OUvt_9wyGxVrUu-12aoo8evhMKwGFHrf2smAaoU4/edit?pli=1#gid=0
Visa 189 Application Timeline - Year 2014
Software Engineer (261313 ) Location: Singapore
23-Jan - Booked for IELTS exam at British Council SG.
15-Feb - IELTS Exam Take #1 (Writing Test)
18-Feb - Requested for Certificate of Employment from my present employer.
19-Feb - IELTS Exam Take #1 (Speaking Test)
05-Mar - Received IELTS Take #1 Exam Result = Failed! (L:6 R:8 W:7 S:7.5)
**Mar-Apr - For 2 months, requested former employers for COE.
05-Apr - IELTS Take #2 Writing Test.
10-Apr - IELTS Take #2 Speaking Test.
14-Apr - Submitted application to Australian Computer Society (ACS).
16-Apr - Booked for another IELTS (Take #3) at IDP. (Just in case that my Take #2 failed.)
17-Apr - Received an email from ACS, asking for "Certified True Copies" (CTC) of my documents.
23-Apr - IELTS Take #3 Speaking @IDP
24-Apr - IELTS Take #3 Writing @IDP
25-Apr - Received IELTS Take #2 Result = Good! (L:7 R:7.5 W:8 S:7)
30-Apr - Uploaded additional docs to my ACS account.
10-May - Received IELTS Take #3 Result = Bad! Got 6 on Listening, but that's okay as Take#2 is good!
12-Jun - Received ACS Result (Positive!). Lodged EOI Visa 189 in SkillSelect later that day (65 points)
13-Jun - Filled-out NBI Online Application.
17-Jun - Got cedula & Applied for Police Clearance (sa Munisipyo)
18-Jun - Received Police Clearance. Also got my NBI Clearance that day. (Online Application is indeed helpful!)
22-Jun - Received Invitation to Lodge Visa 189
23-Jun - Lodged and Paid for Visa 189.
25-Jun - Uploaded Documents to immiAccount
27-Jun - Applied for SG Certificate of Clearance (Acknowledgement Letter lang ng Visa 189 ang dinala ko) / Printed out eMedicalReferral Letter
7-Jul - Completed Medical Exam at Point Medical, Orchard.
10-Jul - Point Medical sent medical result to DIBP.
14-Jul - Frontloaded Form 80.
18-Jul - Received SG Certificate of Clearance.
7-Aug - Last Day of Work (SG)
15-Aug - Flight back to Pinas
< Spent time with family, relatives & friends before the move >
3-Sept - CO Allocation (Called DIBP)
18 -Sept - CO asked for confirmation to deduct 5 points.
22 -Sept - Visa Grant!
23 -Sept - Attended CFO-PDOS
27 -Sept - Flight to Sydney.
28 -Sept - TouchDown Sydney!
< 1 month job hunting >
24 - Oct - Job Offer.
29 - Oct - First Day at Work!
25 Dec - Jan 1 = First Christmas and New Year Down Under!
Posts: 263Member
Joined: Oct 09, 2013
Electronics Engineer 233411
2013
Oct - Made long overdue decision!
21-Nov - IELTS Results (L-8.5/R-8.0/W-7.0/S-7.0)
Dec - CDR preparations / Holiday Mode
2014
16-Jan - EA skills assessment receipt date
24-Jun - Received EA assessment result from our mailbox
25-Jun - Submitted EOI
28-Jul - Received invitation to apply visa 189
30-Jul - NBI Fingerprinting @ Cantonment Police/Authentication @ PH Embassy SG
1-Aug - Lodged Visa 189 application (w/ wife and 2 kids)
14-Aug - All Medicals Cleared
22-Sep - Uploaded last doc (SG COC)
9-Oct - Assigned CO - Adelaide T4 (Sent requested SG PCC which I already uploaded last Sep22)
10- Oct - Visa Grant! Thank you Lord!
Posts: 403Member
Joined: Nov 21, 2013
Occupation: Other Spatial Scientist (ANZSCO Code 232214)
30 Nov 2013 - IELTS Academic R8.5 W8 L8.5 S9 / Overall 8.5
10 Feb 2014 - Skills Assessment (VETASSESS)
23 May 2014 - VETASSESS Outcome: Positive
27 May 2014 - EOI (70 points)
9 Jun 2014 - Visa invitation received, application lodged (SI189)
2 Jul 2014 - CO allocation
6 Aug 2014 - Visa granted (IED 4 Jul 2015)
11 Oct 2014 - Moved to Sydney
20 Oct 2014 - Job offer
29 Oct 2014 - Start of work
17-26 Dec 2014 - Dog at Sydney quarantine
24 Dec 2014 - Partner's initial entry (Maligayang Pasko!)
16 May 2017 - Purchase first property
17 Oct 2018 - Citizenship application lodged (Council: City of Sydney)
8 Jul 2019: Test invite
20 Aug 2019: Test: (originally 20/9/19)
21 Aug 2019: Citizenship Approved
31 October 2019: Citizenship Ceremony 🇦🇺
Posts: 40Member
Joined: Jun 09, 2014
ANZSCO 261313 Software Engineer
mar 25 submitted acs
apr 5 ielts exam
apr 21 ielts results (L=9.5, R=8.5, WS=7.5 overall 8.0)
may 20 acs results suitable
may 20 Submitted SS application for VIC
may 20 Submitted EOI for Visa 189
may 21 Updated EOI for Visa 189
may 27 Updated EOI to include Visa 190
jun 23 Got invited to apply for Visa 189
jun 23 Applied for My Health Declarations
jun 24 Lodged Visa 189 application
jul 9 NBI Finger Printing done and Sent to Philippines
jul 12 Health Exam Completed
jul 22 Release of Certificate of Clearance
jul 24 Uploaded: NBI Clearance, SG Police Clearance, eMedical Information Sheet, Spouse Proof of Functional English -IELTS
jul 27 Uploaded: Form 80
sep 4 Direct Grant (Team 2 GSM Adelaide)
TO GOD BE ALL GLORY
Posts: 686Member
Joined: Oct 14, 2013
Nominated Occupation : Production or Plant Engineer 233513
12/15/13 - IELTS IDP [ L : 9.0 I R :8.0 I S : 7.5 I W : 6.5 ]
01/17/14 - Submit CDR to Engineers Australia.
02/15/14 - IELTS IDP [ L : 9.0 I R :9.0 I S : 7.5 I W : 7.0 ]
05/29/14 - EA positive assessment as Production or Plant Engineer 233513
06/02/14 - EA Letter Received. Lodge EOI 65points.
06/09/14 - Received invitation to lodge Visa 189.
06/12/14 - Lodge Visa 189. Upload Docs/Form 80.
07/14/14 - Medicals @ SLEC Global.
07/15/14 - Upload NBI. (NBI Valid until July 4, 2015).
07/17/14 - CO Allocated. Team 7 GSM Adelaide ( CO : LM )
07/21/14 - VISA GRANT! Thank You Lord! IED : 07/04/15
02/06/15 - Hubby in Melbourne (Jobhunting)
03/27/15 - Me and my son in Melbourne
04/07/15 - Hubby 1st day of job
08/24/15 - My 1st day in BP, Thank you Lord God Jesus!
Enjoying the wonderful life in Oz, abundant blessings indeed :-)
Posts: 64Member
Joined: Jan 20, 2014
Yung wife ko kase graduate din sa university pero di lahat ng subject sa TOR were in english also yung turo sa university not all in english, magbibigay kaya yung university ng letter na yung medium of instruction is english? And tatanggapin kaya yun ng case officer? Just want to know para kung sakali di na magtake ng ielts si misis.
Thanks in advance!
Posts: 152Member
Joined: Mar 13, 2014
Visa Tracker: https://docs.google.com/spreadsheets/d/18d1OUvt_9wyGxVrUu-12aoo8evhMKwGFHrf2smAaoU4/edit?pli=1#gid=0
Visa 189 Application Timeline - Year 2014
Software Engineer (261313 ) Location: Singapore
23-Jan - Booked for IELTS exam at British Council SG.
15-Feb - IELTS Exam Take #1 (Writing Test)
18-Feb - Requested for Certificate of Employment from my present employer.
19-Feb - IELTS Exam Take #1 (Speaking Test)
05-Mar - Received IELTS Take #1 Exam Result = Failed! (L:6 R:8 W:7 S:7.5)
**Mar-Apr - For 2 months, requested former employers for COE.
05-Apr - IELTS Take #2 Writing Test.
10-Apr - IELTS Take #2 Speaking Test.
14-Apr - Submitted application to Australian Computer Society (ACS).
16-Apr - Booked for another IELTS (Take #3) at IDP. (Just in case that my Take #2 failed.)
17-Apr - Received an email from ACS, asking for "Certified True Copies" (CTC) of my documents.
23-Apr - IELTS Take #3 Speaking @IDP
24-Apr - IELTS Take #3 Writing @IDP
25-Apr - Received IELTS Take #2 Result = Good! (L:7 R:7.5 W:8 S:7)
30-Apr - Uploaded additional docs to my ACS account.
10-May - Received IELTS Take #3 Result = Bad! Got 6 on Listening, but that's okay as Take#2 is good!
12-Jun - Received ACS Result (Positive!). Lodged EOI Visa 189 in SkillSelect later that day (65 points)
13-Jun - Filled-out NBI Online Application.
17-Jun - Got cedula & Applied for Police Clearance (sa Munisipyo)
18-Jun - Received Police Clearance. Also got my NBI Clearance that day. (Online Application is indeed helpful!)
22-Jun - Received Invitation to Lodge Visa 189
23-Jun - Lodged and Paid for Visa 189.
25-Jun - Uploaded Documents to immiAccount
27-Jun - Applied for SG Certificate of Clearance (Acknowledgement Letter lang ng Visa 189 ang dinala ko) / Printed out eMedicalReferral Letter
7-Jul - Completed Medical Exam at Point Medical, Orchard.
10-Jul - Point Medical sent medical result to DIBP.
14-Jul - Frontloaded Form 80.
18-Jul - Received SG Certificate of Clearance.
7-Aug - Last Day of Work (SG)
15-Aug - Flight back to Pinas
< Spent time with family, relatives & friends before the move >
3-Sept - CO Allocation (Called DIBP)
18 -Sept - CO asked for confirmation to deduct 5 points.
22 -Sept - Visa Grant!
23 -Sept - Attended CFO-PDOS
27 -Sept - Flight to Sydney.
28 -Sept - TouchDown Sydney!
< 1 month job hunting >
24 - Oct - Job Offer.
29 - Oct - First Day at Work!
25 Dec - Jan 1 = First Christmas and New Year Down Under!
Posts: 448Member
Joined: Mar 30, 2014
26.05.12 - IELTS Academic (L-8.5, R-7, S-7, W-7, OBS-7.5)
31.05.13 to 25.08.13 - Bridging Program for Nurses
04.09.13 - Registered with AHPRA
12.12.13 - Lodged Skills assessment ANMAC
17.03.14 - Positive skills assessment (Registered Nurse: Medical)
29.03.14 - Lodged SS SA and EOI
07.04.14 - NBI clearance
01.05.14 - Approved SS SA and Invited to Apply for 190
02.06.14 - Lodged visa application 190 and uploaded docs
10.06.14 - Medicals at Nationwide
15.09.14 - Direct Grant 190 visa (IED: June 10, 2015)
22.10.14 - Touchdown Adelaide
~whatever you ask for in prayer, believe that you have received it and it will be yours~
Posts: 64Member
Joined: Jan 20, 2014
Posts: 448Member
Joined: Mar 30, 2014
26.05.12 - IELTS Academic (L-8.5, R-7, S-7, W-7, OBS-7.5)
31.05.13 to 25.08.13 - Bridging Program for Nurses
04.09.13 - Registered with AHPRA
12.12.13 - Lodged Skills assessment ANMAC
17.03.14 - Positive skills assessment (Registered Nurse: Medical)
29.03.14 - Lodged SS SA and EOI
07.04.14 - NBI clearance
01.05.14 - Approved SS SA and Invited to Apply for 190
02.06.14 - Lodged visa application 190 and uploaded docs
10.06.14 - Medicals at Nationwide
15.09.14 - Direct Grant 190 visa (IED: June 10, 2015)
22.10.14 - Touchdown Adelaide
~whatever you ask for in prayer, believe that you have received it and it will be yours~
Posts: 263Member
Joined: Oct 09, 2013
Electronics Engineer 233411
2013
Oct - Made long overdue decision!
21-Nov - IELTS Results (L-8.5/R-8.0/W-7.0/S-7.0)
Dec - CDR preparations / Holiday Mode
2014
16-Jan - EA skills assessment receipt date
24-Jun - Received EA assessment result from our mailbox
25-Jun - Submitted EOI
28-Jul - Received invitation to apply visa 189
30-Jul - NBI Fingerprinting @ Cantonment Police/Authentication @ PH Embassy SG
1-Aug - Lodged Visa 189 application (w/ wife and 2 kids)
14-Aug - All Medicals Cleared
22-Sep - Uploaded last doc (SG COC)
9-Oct - Assigned CO - Adelaide T4 (Sent requested SG PCC which I already uploaded last Sep22)
10- Oct - Visa Grant! Thank you Lord!
Posts: 40Member
Joined: Jun 09, 2014
ANZSCO 261313 Software Engineer
mar 25 submitted acs
apr 5 ielts exam
apr 21 ielts results (L=9.5, R=8.5, WS=7.5 overall 8.0)
may 20 acs results suitable
may 20 Submitted SS application for VIC
may 20 Submitted EOI for Visa 189
may 21 Updated EOI for Visa 189
may 27 Updated EOI to include Visa 190
jun 23 Got invited to apply for Visa 189
jun 23 Applied for My Health Declarations
jun 24 Lodged Visa 189 application
jul 9 NBI Finger Printing done and Sent to Philippines
jul 12 Health Exam Completed
jul 22 Release of Certificate of Clearance
jul 24 Uploaded: NBI Clearance, SG Police Clearance, eMedical Information Sheet, Spouse Proof of Functional English -IELTS
jul 27 Uploaded: Form 80
sep 4 Direct Grant (Team 2 GSM Adelaide)
TO GOD BE ALL GLORY
Posts: 17Member
Joined: Jan 24, 2013
ANZCO 221213
30/11/2013 - IELTS BC (L-8.5, R-8.5, W-7, S-7)
26/03/2014 - Submitted docs to CPAA
01/05/2014 - Additional docs sent to CPAA
14/05/2014 - Received positive assessment
30/05/2014 - Submitted EOI
31/05/2014 - Received invitation to lodge
02/06/2014 - Lodged visa 189 & uploaded documents
23/06/2014 - CO assigned (Team 7)
30/06/2014 - Applied for SG COC
04/07/2014 - Medical at Paragon
21/07/2014 - Sent additional docs (SG COC etc)
29/07/2014 - VISA GRANT (IED - 06/13/2015)
***Praise GOD!!!
Posts: 56Member
Joined: Dec 03, 2013
My Timeline:
28 Mar 2014 - Submitted ACS Skills Assessment
10 May 2014 - Took IELTS (General)
26 May 2014 - Received ACS Skills Assessment Result: Suitable
27 May 2014 - IELTS Results (L: 8.5; R: 9; W: 7; S: 8.5; OBS: 8.5)
28 May 2014 - Submitted EOI for Visa 189
23 Jun 2014 - Received Invitation for Visa Application
26 Jun 2014 - Lodged Visa 189 Application
15 Sep 2014 - Direct Visa Grant
Posts: 64Member
Joined: Jan 20, 2014
Posts: 629Member
Joined: Jul 03, 2013
Visa 189/190 Tracker (Please click and key in your updates): http://goo.gl/HdIYoG
ANZSCO 233111 Chemical Engineer [Visa 189]
27.APR.2013___IELTS GT Exam - British Council [Result: 10-Points Eligible]
19.JUL.2013___Submitted CDR to Engineers Australia (EA) via DHL
16.OCT.2013___Received Notice of Shortcoming (EA) via email
21.OCT.2013___Responded to EA via email
26.NOV.2013___Received Positive Assessment Result from EA via snail mail dated 11.Nov.2013 (Praise Jah!)
03.FEB.2014___EOI Submitted Online [60 points only]
28.APR.2014___Received Invitation to Lodge Skilled-Independent Permanent Visa Application (Praise Jah!)
12.JUN.2014___Lodged Visa Application; Uploaded Required Documents / Frontloaded NBI / Police Clearance / Etc.
05.JUL.2014___Completed Medical Requirements at Nationwide Health (3-5 working days to DIBP)
12.JUL.2014___Frontloaded Form 80
17.JUL.2014___Complete Medical Report Uploaded to DIBP: 'Organise your health examinations' was changed to 'No health examinations are required for this person for this visa subclass based on the information provided to the Department of Immigration and Border Protection.' (Praise Jah!)
06.AUG.2014___CO Allocation (Team 23 GSM Adelaide; CO Initials EO) [55 Days From Lodgement] (Praise Jah!)
18.AUG.2014___Visa Grant (Golden Email Received from new CO: MD) [67 Days From Lodgement] [IED July2015] (Praise Jah!) GOAL! THANK YOU LORD!
==============
|Padayon| Keep a stronger faith| All is well|
Posts: 629Member
Joined: Jul 03, 2013
Visa 189/190 Tracker (Please click and key in your updates): http://goo.gl/HdIYoG
ANZSCO 233111 Chemical Engineer [Visa 189]
27.APR.2013___IELTS GT Exam - British Council [Result: 10-Points Eligible]
19.JUL.2013___Submitted CDR to Engineers Australia (EA) via DHL
16.OCT.2013___Received Notice of Shortcoming (EA) via email
21.OCT.2013___Responded to EA via email
26.NOV.2013___Received Positive Assessment Result from EA via snail mail dated 11.Nov.2013 (Praise Jah!)
03.FEB.2014___EOI Submitted Online [60 points only]
28.APR.2014___Received Invitation to Lodge Skilled-Independent Permanent Visa Application (Praise Jah!)
12.JUN.2014___Lodged Visa Application; Uploaded Required Documents / Frontloaded NBI / Police Clearance / Etc.
05.JUL.2014___Completed Medical Requirements at Nationwide Health (3-5 working days to DIBP)
12.JUL.2014___Frontloaded Form 80
17.JUL.2014___Complete Medical Report Uploaded to DIBP: 'Organise your health examinations' was changed to 'No health examinations are required for this person for this visa subclass based on the information provided to the Department of Immigration and Border Protection.' (Praise Jah!)
06.AUG.2014___CO Allocation (Team 23 GSM Adelaide; CO Initials EO) [55 Days From Lodgement] (Praise Jah!)
18.AUG.2014___Visa Grant (Golden Email Received from new CO: MD) [67 Days From Lodgement] [IED July2015] (Praise Jah!) GOAL! THANK YOU LORD!
==============
|Padayon| Keep a stronger faith| All is well|
Posts: 40Member
Joined: Jun 09, 2014
ANZSCO 261313 Software Engineer
mar 25 submitted acs
apr 5 ielts exam
apr 21 ielts results (L=9.5, R=8.5, WS=7.5 overall 8.0)
may 20 acs results suitable
may 20 Submitted SS application for VIC
may 20 Submitted EOI for Visa 189
may 21 Updated EOI for Visa 189
may 27 Updated EOI to include Visa 190
jun 23 Got invited to apply for Visa 189
jun 23 Applied for My Health Declarations
jun 24 Lodged Visa 189 application
jul 9 NBI Finger Printing done and Sent to Philippines
jul 12 Health Exam Completed
jul 22 Release of Certificate of Clearance
jul 24 Uploaded: NBI Clearance, SG Police Clearance, eMedical Information Sheet, Spouse Proof of Functional English -IELTS
jul 27 Uploaded: Form 80
sep 4 Direct Grant (Team 2 GSM Adelaide)
TO GOD BE ALL GLORY
Posts: 121Member
Joined: Feb 13, 2014
"Your eMedical case has been submitted to the Department of Immigration and Border Protection (DIBP). This letter outlines the immigration health examinations that you have completed."
** Edited**
Nakita ko nag My Health declaration ka pala. Baka since wala ka pang CO, di pa talaga siguro maguupdate yung "organize your health" part ng immiaccount mo.
261313 Software Engineer
05/03/2014 - ACS application
05/04/2014 - IELTS exam
18/04/2014 - IELTS results (R/W:7.5 L/S:8 OBS:8)
28/04/2014 - ACS results (Suitable)
29/04/2014 - EOI submitted (65pts)
12/05/2014 - Received invite (Visa189)
21/05/2014 - Lodged and paid (Visa189)
13/06/2014 - CO Assigned (Adelaide GSM Team 6)
20/06/2014 - Medical
07/07/2014 - Medical Referred to MOC
06/08/2014 - Visa Grant (IED: 03/07/2015)
Posts: 40Member
Joined: Jun 09, 2014
ANZSCO 261313 Software Engineer
mar 25 submitted acs
apr 5 ielts exam
apr 21 ielts results (L=9.5, R=8.5, WS=7.5 overall 8.0)
may 20 acs results suitable
may 20 Submitted SS application for VIC
may 20 Submitted EOI for Visa 189
may 21 Updated EOI for Visa 189
may 27 Updated EOI to include Visa 190
jun 23 Got invited to apply for Visa 189
jun 23 Applied for My Health Declarations
jun 24 Lodged Visa 189 application
jul 9 NBI Finger Printing done and Sent to Philippines
jul 12 Health Exam Completed
jul 22 Release of Certificate of Clearance
jul 24 Uploaded: NBI Clearance, SG Police Clearance, eMedical Information Sheet, Spouse Proof of Functional English -IELTS
jul 27 Uploaded: Form 80
sep 4 Direct Grant (Team 2 GSM Adelaide)
TO GOD BE ALL GLORY
Posts: 152Member
Joined: Mar 13, 2014
Visa Tracker: https://docs.google.com/spreadsheets/d/18d1OUvt_9wyGxVrUu-12aoo8evhMKwGFHrf2smAaoU4/edit?pli=1#gid=0
Visa 189 Application Timeline - Year 2014
Software Engineer (261313 ) Location: Singapore
23-Jan - Booked for IELTS exam at British Council SG.
15-Feb - IELTS Exam Take #1 (Writing Test)
18-Feb - Requested for Certificate of Employment from my present employer.
19-Feb - IELTS Exam Take #1 (Speaking Test)
05-Mar - Received IELTS Take #1 Exam Result = Failed! (L:6 R:8 W:7 S:7.5)
**Mar-Apr - For 2 months, requested former employers for COE.
05-Apr - IELTS Take #2 Writing Test.
10-Apr - IELTS Take #2 Speaking Test.
14-Apr - Submitted application to Australian Computer Society (ACS).
16-Apr - Booked for another IELTS (Take #3) at IDP. (Just in case that my Take #2 failed.)
17-Apr - Received an email from ACS, asking for "Certified True Copies" (CTC) of my documents.
23-Apr - IELTS Take #3 Speaking @IDP
24-Apr - IELTS Take #3 Writing @IDP
25-Apr - Received IELTS Take #2 Result = Good! (L:7 R:7.5 W:8 S:7)
30-Apr - Uploaded additional docs to my ACS account.
10-May - Received IELTS Take #3 Result = Bad! Got 6 on Listening, but that's okay as Take#2 is good!
12-Jun - Received ACS Result (Positive!). Lodged EOI Visa 189 in SkillSelect later that day (65 points)
13-Jun - Filled-out NBI Online Application.
17-Jun - Got cedula & Applied for Police Clearance (sa Munisipyo)
18-Jun - Received Police Clearance. Also got my NBI Clearance that day. (Online Application is indeed helpful!)
22-Jun - Received Invitation to Lodge Visa 189
23-Jun - Lodged and Paid for Visa 189.
25-Jun - Uploaded Documents to immiAccount
27-Jun - Applied for SG Certificate of Clearance (Acknowledgement Letter lang ng Visa 189 ang dinala ko) / Printed out eMedicalReferral Letter
7-Jul - Completed Medical Exam at Point Medical, Orchard.
10-Jul - Point Medical sent medical result to DIBP.
14-Jul - Frontloaded Form 80.
18-Jul - Received SG Certificate of Clearance.
7-Aug - Last Day of Work (SG)
15-Aug - Flight back to Pinas
< Spent time with family, relatives & friends before the move >
3-Sept - CO Allocation (Called DIBP)
18 -Sept - CO asked for confirmation to deduct 5 points.
22 -Sept - Visa Grant!
23 -Sept - Attended CFO-PDOS
27 -Sept - Flight to Sydney.
28 -Sept - TouchDown Sydney!
< 1 month job hunting >
24 - Oct - Job Offer.
29 - Oct - First Day at Work!
25 Dec - Jan 1 = First Christmas and New Year Down Under!
Posts: 121Member
Joined: Feb 13, 2014
261313 Software Engineer
05/03/2014 - ACS application
05/04/2014 - IELTS exam
18/04/2014 - IELTS results (R/W:7.5 L/S:8 OBS:8)
28/04/2014 - ACS results (Suitable)
29/04/2014 - EOI submitted (65pts)
12/05/2014 - Received invite (Visa189)
21/05/2014 - Lodged and paid (Visa189)
13/06/2014 - CO Assigned (Adelaide GSM Team 6)
20/06/2014 - Medical
07/07/2014 - Medical Referred to MOC
06/08/2014 - Visa Grant (IED: 03/07/2015)
Posts: 152Member
Joined: Mar 13, 2014
Meeting the health requirement
This person may be required to undergo health examinations as part of this visa application process. The message on this page should continue to be monitored for any updates.
Note: Updates to health information will not occur until a case officer investigates the person's case in line with published processing times for the visa that has been applied for. There is no need to contact the department at this time concerning this matter.
ganito rin ba yung sa iyo? Kung ganito rin, I think okay na yata yan. Marami kasing changes sa system nila lately.
Visa Tracker: https://docs.google.com/spreadsheets/d/18d1OUvt_9wyGxVrUu-12aoo8evhMKwGFHrf2smAaoU4/edit?pli=1#gid=0
Visa 189 Application Timeline - Year 2014
Software Engineer (261313 ) Location: Singapore
23-Jan - Booked for IELTS exam at British Council SG.
15-Feb - IELTS Exam Take #1 (Writing Test)
18-Feb - Requested for Certificate of Employment from my present employer.
19-Feb - IELTS Exam Take #1 (Speaking Test)
05-Mar - Received IELTS Take #1 Exam Result = Failed! (L:6 R:8 W:7 S:7.5)
**Mar-Apr - For 2 months, requested former employers for COE.
05-Apr - IELTS Take #2 Writing Test.
10-Apr - IELTS Take #2 Speaking Test.
14-Apr - Submitted application to Australian Computer Society (ACS).
16-Apr - Booked for another IELTS (Take #3) at IDP. (Just in case that my Take #2 failed.)
17-Apr - Received an email from ACS, asking for "Certified True Copies" (CTC) of my documents.
23-Apr - IELTS Take #3 Speaking @IDP
24-Apr - IELTS Take #3 Writing @IDP
25-Apr - Received IELTS Take #2 Result = Good! (L:7 R:7.5 W:8 S:7)
30-Apr - Uploaded additional docs to my ACS account.
10-May - Received IELTS Take #3 Result = Bad! Got 6 on Listening, but that's okay as Take#2 is good!
12-Jun - Received ACS Result (Positive!). Lodged EOI Visa 189 in SkillSelect later that day (65 points)
13-Jun - Filled-out NBI Online Application.
17-Jun - Got cedula & Applied for Police Clearance (sa Munisipyo)
18-Jun - Received Police Clearance. Also got my NBI Clearance that day. (Online Application is indeed helpful!)
22-Jun - Received Invitation to Lodge Visa 189
23-Jun - Lodged and Paid for Visa 189.
25-Jun - Uploaded Documents to immiAccount
27-Jun - Applied for SG Certificate of Clearance (Acknowledgement Letter lang ng Visa 189 ang dinala ko) / Printed out eMedicalReferral Letter
7-Jul - Completed Medical Exam at Point Medical, Orchard.
10-Jul - Point Medical sent medical result to DIBP.
14-Jul - Frontloaded Form 80.
18-Jul - Received SG Certificate of Clearance.
7-Aug - Last Day of Work (SG)
15-Aug - Flight back to Pinas
< Spent time with family, relatives & friends before the move >
3-Sept - CO Allocation (Called DIBP)
18 -Sept - CO asked for confirmation to deduct 5 points.
22 -Sept - Visa Grant!
23 -Sept - Attended CFO-PDOS
27 -Sept - Flight to Sydney.
28 -Sept - TouchDown Sydney!
< 1 month job hunting >
24 - Oct - Job Offer.
29 - Oct - First Day at Work!
25 Dec - Jan 1 = First Christmas and New Year Down Under!
Posts: 12Member
Joined: Aug 01, 2014
salamat po.