Major update has been completed. Please help to report any abnormality that you are facing (in case there is any) to [email protected] . Thank you for your continued support guys!
Requirements before Australian Citizenship Application
TasBurrfootOsaka Posts: 4,336Member Joined: Feb 24, 2011
edited March 2016
I will be cleared to apply for citizenship this coming mid-June 2016 and below are facts regarding my circumstance.
1) Applied for Tourist Visa in May 2012 and was granted 1-yr multiple entry. 2) Entered Australia as a Tourist in mid-June 2012. 3) Went back to Singapore four days after #2 above - take note that I still have a valid Australian visa (albeit the tourist type). 4) Was granted a PR by Nov 2012. 5) Immigated to Australia on April 2013.
Despite being on a tourist visa - the people from immigration considered June 2012 as the start of my four years of living in Australia on a valid Australian visa. There was continuity until the 4th year which will be this coming June.
04 Aug 2012 - IELTS (Academic Module)
07 Aug 2012 - IELTS (Academic Module) Speaking Part
17 Aug 2012 - IELTS Results (L: 8.5 R: 8.5 W: 7.0 S: 7.5 OBS: 8.0)
24 Aug 2012 - CPAA Submitted (docs mailed same day via SG EMS)
25 Sep 2012 - Received +Skills Assessment from CPAA
25 Sep 2012 - Lodged EOI Application with 70pts
30 Sep 2012 - Invited by DIAC to apply for 189 Visa
01 Oct 2012 - Submitted 189 Visa Application
20 Oct 2012 - Medical Examinations
23 Oct 2012 - CO Assigned; Team 7 - SA
05 Nov 2012 - Submitted SG PCC and NBI Clearance
06 Nov 2012 - Visa Granted (IED: 23/10/2013)
03 Apr 2013 - Flight to MEL
03 Jun 2013 - started work
12 Jun 2013 - wife started work
15 Jun 2016 - applied for citizenship
29 Jul 2016 - citizenship examination
20 Oct 2016 - Aussie, Aussie, Aussie Oi Oi Oi!!
se29mPerth Posts: 2,144Member, Moderator Joined: Sep 14, 2015
@TasBurrfoot wow good to know! I went to Australia on a tourist visa last year. So, I just need to monitor the 12 months within 4 years and 90 days sa last 12 months. Thanks for sharing. Good stuff.
233211 Civil Engineer
30/09/15 - VETASSESS Lodged - 133112 Project Builder
09/10/15 - IELTS Results: L-7.5, R-7.0, W-6.0, S-7.5 OBS-7.0
19/10/15 - PTE A Results: L-82, R-74, S-90, W-76 OAS-79
26/11/15 - Obtained NBI Clearance
09/12/15 - VETASSESS Results - NEGATIVE!!!
12/01/16 - Submitted CDR to Engineers Australia
22/01/16 - EA Positive Results - Bachelor's Degree with 4 years 8 months skilled employment
22/01/16 - Lodged EOI 189 (60pts)
03/02/16 - Received 189 ITA
11/02/16 - Health Clearance Provided - No Action Required
18/02/16 - Obtained SG CoC
26/02/16 - Lodged 189 Visa
15/03/16 - Direct Grant - IED 11/02/2017
25/05/16 - Big Move Perth!
16/06/16 - Started Casual Work
11/07/16 - Permanent Full-time Work
Now for the Citizenship Journey
26/08/2019 - Applied and acknowledgement letter received
27/09/2019 - Test Email Invite for 19/12/2019
01/10/2019 - Actual Test/Interview Date
01/10/2019 - Approval Date (received the approval letter from the post 11/10/2019)
05/02/2020 - Ceremony Date (received the email 10/01/2020)
KillerQTLos Angeles Posts: 45Member Joined: Feb 16, 2015
tiggerooMandaluyong Posts: 246Member Joined: Dec 08, 2015
@TasBurrfoot sir to clarify, the tourist visa should still be valid at the time you get the PR grant to qualify for this scenario? Thanks!
261313 Software Engineer (with partner)
09.17.15 Submitted ACS docs for assessment
09.28.15 ACS results for partner and me - 2 yrs deduction; 5 yrs work exp
11.07.15 IELTS exam @ British Council
11.20.15 IELTS results: partner OBS 8, mine OBS 7.5
11.21.15 EOI Submitted for 189 visa (70 pts)
11.22.15 Received Invitation to Apply
12.03.15 Medicals at St. Lukes BGC
12.07.15 NBI Clearance - Hit
12.11.15 Processing of tourist visa withdrawal
12.14.15 Lodged visa 189 application
12.22.15 Claim NBI; MOC request for sputum tests and repeat x-ray
01.13.16 CO allocated - request for payslips; Uploaded payslips
03.07.16 Repeat x-ray 2
06.07.16 Repeat x-ray 3
06.15.16 Medicals finalized
07.04.16 Visa Grant! IED 12.11.16
MiyawskiMelbourne Posts: 81Member Joined: Mar 17, 2016
Awww... sayang, I missed the boat by a few days L-)
Visa Grant: Nov 2013 Initial Entry: June 8 - 12, 2014 (in SG by 13 Jun) Move In: June 28, 2015
Kung napaaga pala kami ng konti, earliest date we can apply eh June 2018.
Sayang. )
prcandMelbourne Posts: 490Member Joined: Feb 25, 2016
eto rin ung gusto ko malaman. kasi may tourist visa ako valid from Feb 2014 to Feb 2015. tapos ung PR timeline ko is in my signature. so how? LOL
@TasBurrfoot sir to clarify, the tourist visa should still be valid at the time you get the PR grant to qualify for this scenario? Thanks!
Jan 26, 2016: 189 Lodged
Feb 9, 2016: CO Assigned
Feb 23, 2016: Submitted Required Docs
March 18, 2016: Visa Grant
April 28, 2016: Initial Entry (Bank Opening, Medicare, TFN, etc)
July 7, 2016: Big Move!
IslanderndCityAdelaide Posts: 2,274Member, Moderator Joined: Mar 30, 2013
WOW! The intro of Tourist Visa subject here adds interesting discussion about Australian Citizenship Application. I think now ko lang din 'to narinig. Nice...
04 Aug 2012 - IELTS (Academic Module)
07 Aug 2012 - IELTS (Academic Module) Speaking Part
17 Aug 2012 - IELTS Results (L: 8.5 R: 8.5 W: 7.0 S: 7.5 OBS: 8.0)
24 Aug 2012 - CPAA Submitted (docs mailed same day via SG EMS)
25 Sep 2012 - Received +Skills Assessment from CPAA
25 Sep 2012 - Lodged EOI Application with 70pts
30 Sep 2012 - Invited by DIAC to apply for 189 Visa
01 Oct 2012 - Submitted 189 Visa Application
20 Oct 2012 - Medical Examinations
23 Oct 2012 - CO Assigned; Team 7 - SA
05 Nov 2012 - Submitted SG PCC and NBI Clearance
06 Nov 2012 - Visa Granted (IED: 23/10/2013)
03 Apr 2013 - Flight to MEL
03 Jun 2013 - started work
12 Jun 2013 - wife started work
15 Jun 2016 - applied for citizenship
29 Jul 2016 - citizenship examination
20 Oct 2016 - Aussie, Aussie, Aussie Oi Oi Oi!!
TasBurrfootOsaka Posts: 4,336Member Joined: Feb 24, 2011
eto rin ung gusto ko malaman. kasi may tourist visa ako valid from Feb 2014 to Feb 2015. tapos ung PR timeline ko is in my signature. so how? LOL
@TasBurrfoot sir to clarify, the tourist visa should still be valid at the time you get the PR grant to qualify for this scenario? Thanks!
04 Aug 2012 - IELTS (Academic Module)
07 Aug 2012 - IELTS (Academic Module) Speaking Part
17 Aug 2012 - IELTS Results (L: 8.5 R: 8.5 W: 7.0 S: 7.5 OBS: 8.0)
24 Aug 2012 - CPAA Submitted (docs mailed same day via SG EMS)
25 Sep 2012 - Received +Skills Assessment from CPAA
25 Sep 2012 - Lodged EOI Application with 70pts
30 Sep 2012 - Invited by DIAC to apply for 189 Visa
01 Oct 2012 - Submitted 189 Visa Application
20 Oct 2012 - Medical Examinations
23 Oct 2012 - CO Assigned; Team 7 - SA
05 Nov 2012 - Submitted SG PCC and NBI Clearance
06 Nov 2012 - Visa Granted (IED: 23/10/2013)
03 Apr 2013 - Flight to MEL
03 Jun 2013 - started work
12 Jun 2013 - wife started work
15 Jun 2016 - applied for citizenship
29 Jul 2016 - citizenship examination
20 Oct 2016 - Aussie, Aussie, Aussie Oi Oi Oi!!
TasBurrfootOsaka Posts: 4,336Member Joined: Feb 24, 2011
@TasBurrfoot wow good to know! I went to Australia on a tourist visa last year. So, I just need to monitor the 12 months within 4 years and 90 days sa last 12 months. Thanks for sharing. Good stuff.
@se29m - just make sure your tourist visa overlapped with when you got your PR; in other words, dapat valid pa tourist visa mo just at the time of PR grant.
04 Aug 2012 - IELTS (Academic Module)
07 Aug 2012 - IELTS (Academic Module) Speaking Part
17 Aug 2012 - IELTS Results (L: 8.5 R: 8.5 W: 7.0 S: 7.5 OBS: 8.0)
24 Aug 2012 - CPAA Submitted (docs mailed same day via SG EMS)
25 Sep 2012 - Received +Skills Assessment from CPAA
25 Sep 2012 - Lodged EOI Application with 70pts
30 Sep 2012 - Invited by DIAC to apply for 189 Visa
01 Oct 2012 - Submitted 189 Visa Application
20 Oct 2012 - Medical Examinations
23 Oct 2012 - CO Assigned; Team 7 - SA
05 Nov 2012 - Submitted SG PCC and NBI Clearance
06 Nov 2012 - Visa Granted (IED: 23/10/2013)
03 Apr 2013 - Flight to MEL
03 Jun 2013 - started work
12 Jun 2013 - wife started work
15 Jun 2016 - applied for citizenship
29 Jul 2016 - citizenship examination
20 Oct 2016 - Aussie, Aussie, Aussie Oi Oi Oi!!
tiggerooMandaluyong Posts: 246Member Joined: Dec 08, 2015
@TasBurrfoot thanks for the info! And this will apply per individual na pala and not based sa mabibigay sa primary applicant as with the case ni misis. Sayang nga kasi panay single entry or 6mos/1yr lang sila magbigay ng tourist visa. Interesting... Goodluck sir!
261313 Software Engineer (with partner)
09.17.15 Submitted ACS docs for assessment
09.28.15 ACS results for partner and me - 2 yrs deduction; 5 yrs work exp
11.07.15 IELTS exam @ British Council
11.20.15 IELTS results: partner OBS 8, mine OBS 7.5
11.21.15 EOI Submitted for 189 visa (70 pts)
11.22.15 Received Invitation to Apply
12.03.15 Medicals at St. Lukes BGC
12.07.15 NBI Clearance - Hit
12.11.15 Processing of tourist visa withdrawal
12.14.15 Lodged visa 189 application
12.22.15 Claim NBI; MOC request for sputum tests and repeat x-ray
01.13.16 CO allocated - request for payslips; Uploaded payslips
03.07.16 Repeat x-ray 2
06.07.16 Repeat x-ray 3
06.15.16 Medicals finalized
07.04.16 Visa Grant! IED 12.11.16
se29mPerth Posts: 2,144Member, Moderator Joined: Sep 14, 2015
@TasBurrfoot swerte ko hehe di pa expired yung tv.. Congrats nga pala sir in advance for your citizenship..
233211 Civil Engineer
30/09/15 - VETASSESS Lodged - 133112 Project Builder
09/10/15 - IELTS Results: L-7.5, R-7.0, W-6.0, S-7.5 OBS-7.0
19/10/15 - PTE A Results: L-82, R-74, S-90, W-76 OAS-79
26/11/15 - Obtained NBI Clearance
09/12/15 - VETASSESS Results - NEGATIVE!!!
12/01/16 - Submitted CDR to Engineers Australia
22/01/16 - EA Positive Results - Bachelor's Degree with 4 years 8 months skilled employment
22/01/16 - Lodged EOI 189 (60pts)
03/02/16 - Received 189 ITA
11/02/16 - Health Clearance Provided - No Action Required
18/02/16 - Obtained SG CoC
26/02/16 - Lodged 189 Visa
15/03/16 - Direct Grant - IED 11/02/2017
25/05/16 - Big Move Perth!
16/06/16 - Started Casual Work
11/07/16 - Permanent Full-time Work
Now for the Citizenship Journey
26/08/2019 - Applied and acknowledgement letter received
27/09/2019 - Test Email Invite for 19/12/2019
01/10/2019 - Actual Test/Interview Date
01/10/2019 - Approval Date (received the approval letter from the post 11/10/2019)
05/02/2020 - Ceremony Date (received the email 10/01/2020)
prcandMelbourne Posts: 490Member Joined: Feb 25, 2016
@se29m kung alam ko lang na pwede pala to, eh di sana renew lang ng renew ng tourist visa, hanggang naka process ung 189
Jan 26, 2016: 189 Lodged
Feb 9, 2016: CO Assigned
Feb 23, 2016: Submitted Required Docs
March 18, 2016: Visa Grant
April 28, 2016: Initial Entry (Bank Opening, Medicare, TFN, etc)
July 7, 2016: Big Move!
engineer20Sydney Posts: 1,719Member, Moderator Joined: Jun 09, 2011
@prcand kaso baka dun ka naman sa not more than 12 months outside Au na requirements di pumasa unless regularly kang papasyal sa Au.
29May2015: Submitted Online Application to VETASSESS (312112 Building Associate)
02Jun2015: Lodged Date at VETASSESS
28Aug2015: VETASSESS Assessment Completed (312112 Building Associate) - POSITIVE
17Oct2015: PTE-A taken at SG
19Oct2015: PTE-A Result: L-83, R-90, S-76, W-90 OAS-87
19Oct2015: Submitted EOI Visa 190 (65 points plus SS 5 points if granted)
19Oct2015: Submitted VIC SS Online Application Visa 190
20Oct2015: VIC acknowledged SS application and gave Reference Number
02Nov2015: VIC SS Application Rejected
05Nov2015: Submitted Online Reassessment to VETASSESS (312212 Civil Engineering Technician) 08Feb2016: VETASSESS Outcome POSITIVE
07Nov2015: Updated EOI to select NSW (312112)
18Dec2015: Received NSW SS Invitation Stream 2
21Dec2015: Lodged NSW SS Application
12Jan2016: NSW SS Approved / Visa 190 ITA Received
29Jan2016: SG PCC (Me) / Medical (Me, Wife and Kid)
01Feb2016: Medicals Cleared
05Feb2016: Lodged Visa 190
18Feb2016: NBI Clearance Applied (Me and Wife) - HIT
29Feb2016: SG PCC (Wife)
03Mar2016: Collected and Uploaded NBI Clearance
04Mar2016: Direct Grant
07May2016: Initial Entry (Sydney)
16Jul2017: Big Move
Oct2020: Lodged Citizenship Application
May2021: Citizenship Interview and Test
TBA: Citizenship Ceremony
TasBurrfootOsaka Posts: 4,336Member Joined: Feb 24, 2011
@prcand kaso baka dun ka naman sa not more than 12 months outside Au na requirements di pumasa unless regularly kang papasyal sa Au.
Exactly - out of Australia for more than 12 months...
04 Aug 2012 - IELTS (Academic Module)
07 Aug 2012 - IELTS (Academic Module) Speaking Part
17 Aug 2012 - IELTS Results (L: 8.5 R: 8.5 W: 7.0 S: 7.5 OBS: 8.0)
24 Aug 2012 - CPAA Submitted (docs mailed same day via SG EMS)
25 Sep 2012 - Received +Skills Assessment from CPAA
25 Sep 2012 - Lodged EOI Application with 70pts
30 Sep 2012 - Invited by DIAC to apply for 189 Visa
01 Oct 2012 - Submitted 189 Visa Application
20 Oct 2012 - Medical Examinations
23 Oct 2012 - CO Assigned; Team 7 - SA
05 Nov 2012 - Submitted SG PCC and NBI Clearance
06 Nov 2012 - Visa Granted (IED: 23/10/2013)
03 Apr 2013 - Flight to MEL
03 Jun 2013 - started work
12 Jun 2013 - wife started work
15 Jun 2016 - applied for citizenship
29 Jul 2016 - citizenship examination
20 Oct 2016 - Aussie, Aussie, Aussie Oi Oi Oi!!
prcandMelbourne Posts: 490Member Joined: Feb 25, 2016
Jan 26, 2016: 189 Lodged
Feb 9, 2016: CO Assigned
Feb 23, 2016: Submitted Required Docs
March 18, 2016: Visa Grant
April 28, 2016: Initial Entry (Bank Opening, Medicare, TFN, etc)
July 7, 2016: Big Move!
KillerQTLos Angeles Posts: 45Member Joined: Feb 16, 2015
What if umabot ka ng 13 months outside OZ? What will gonna happen? You just need to cover another 1 month to be eligible?
TasBurrfootOsaka Posts: 4,336Member Joined: Feb 24, 2011
04 Aug 2012 - IELTS (Academic Module)
07 Aug 2012 - IELTS (Academic Module) Speaking Part
17 Aug 2012 - IELTS Results (L: 8.5 R: 8.5 W: 7.0 S: 7.5 OBS: 8.0)
24 Aug 2012 - CPAA Submitted (docs mailed same day via SG EMS)
25 Sep 2012 - Received +Skills Assessment from CPAA
25 Sep 2012 - Lodged EOI Application with 70pts
30 Sep 2012 - Invited by DIAC to apply for 189 Visa
01 Oct 2012 - Submitted 189 Visa Application
20 Oct 2012 - Medical Examinations
23 Oct 2012 - CO Assigned; Team 7 - SA
05 Nov 2012 - Submitted SG PCC and NBI Clearance
06 Nov 2012 - Visa Granted (IED: 23/10/2013)
03 Apr 2013 - Flight to MEL
03 Jun 2013 - started work
12 Jun 2013 - wife started work
15 Jun 2016 - applied for citizenship
29 Jul 2016 - citizenship examination
20 Oct 2016 - Aussie, Aussie, Aussie Oi Oi Oi!!
IslanderndCityAdelaide Posts: 2,274Member, Moderator Joined: Mar 30, 2013
04 Aug 2012 - IELTS (Academic Module)
07 Aug 2012 - IELTS (Academic Module) Speaking Part
17 Aug 2012 - IELTS Results (L: 8.5 R: 8.5 W: 7.0 S: 7.5 OBS: 8.0)
24 Aug 2012 - CPAA Submitted (docs mailed same day via SG EMS)
25 Sep 2012 - Received +Skills Assessment from CPAA
25 Sep 2012 - Lodged EOI Application with 70pts
30 Sep 2012 - Invited by DIAC to apply for 189 Visa
01 Oct 2012 - Submitted 189 Visa Application
20 Oct 2012 - Medical Examinations
23 Oct 2012 - CO Assigned; Team 7 - SA
05 Nov 2012 - Submitted SG PCC and NBI Clearance
06 Nov 2012 - Visa Granted (IED: 23/10/2013)
03 Apr 2013 - Flight to MEL
03 Jun 2013 - started work
12 Jun 2013 - wife started work
15 Jun 2016 - applied for citizenship
29 Jul 2016 - citizenship examination
20 Oct 2016 - Aussie, Aussie, Aussie Oi Oi Oi!!
kittykitkat18Sydney Posts: 908Member Joined: May 13, 2015
Computer network and systems engineer (263111) - Hubby is main applicant - Mapua (BS-ECE)
07.23.15 - submitted ACS
07.27.15 - ACS result - suitable..AQF Bachelor. 2 yrs deduction. 5yrs and 10 mos credited
09.28.15 - PTE scheduled exam (Sg)
09.29.15 - PTE Results. L - 90, R - 86, S - 90, W - 86. Overall = 90
09.30.15 - Submitted EOI Visa 189 - 70 pts
10.09.15 - Invitation received
10.28.15 - medicals (me & hubby) @ Point Medical Sg
11.11.15 - NBI (me, hubby and mother)
11.16.15 - medicals of mother @ St Lukes BGC
11.22.15 - Lodged Visa
11.25.15 - Frontloaded docs and requested SG CoC
12.01.15 - CO Allocated. Request form 47a for mother
12.02.15 - Frontloaded SG CoC (me & hubby) and form 47a
02.09.16 - called GSM Adelaide for follow-up (71 days from CO contact)
02.15.16 - granted! Thank you for the Blessings
Dependent parent rejected. CO not satisfied with one of the requirements for dependency (part of household unit)
07.28.16 - Big move! Sydney here we go!
09.19.16 - Start of work
09.22.16 - Hubby start of work
06.19.17 - Hubby's new work
11.16.17 - hello Baby! Jesus, I Trust In You
IslanderndCityAdelaide Posts: 2,274Member, Moderator Joined: Mar 30, 2013
@TasBurrfoot malapit na, Goodbye Pilipinas passport na
...sharpening my core gifts now...
...working on new, better goals...
Bless those who curse you, pray for those who mistreat you. ~Luke 6:28~
CasseyMelbourne, Australia Posts: 2,812Member, Moderator Joined: Sep 07, 2015
@TasBurrfoot Nung nagstart pa lang kami on student visa before that was 3 years ago, nakikita ko na name mo lagi sa thread. Parang kelan lang and ngayon for citizenship na kayo, Goodluck, im sure you'll get the citizenship.
June 16, 2013 Arrival in Melbourne (AGED CARE)
Nov 12, 2014 Changed Visa Subclass (572->573) and Course
Nov 13, 2014 573 Visa Approved
Mar 2015 Nursing Conversion Course (Deakin Uni) started
April 13, 2016 Lodged EOI thru Skill Select
April 27, 2016 Received invitation to apply for Visa 189 (Nurse)
May 2, 2016 Lodged application for 189 Visa (Onshore)
May 11, 2016 CO contacted for Form 80/Medicals of daughter
June 17, 2016 189 VISA GRANTED Thank you my amazing God
Dec14, 2017 Citizenship application
March 21, 2019 Citizenship Ceremony
"Happy is the person who learns to wait as he prays and never loses his patience, for God's time is the best time."
Hello mga kapatid! Question lang, yung napasukan ko company dito sa Au pnpdala ako madalas outside the country for business trips. Mkk-apekto ba yun sa citizenship application ko in the future? TIA
ANZSCO 233211 (Civil Engineer)
July - Aug 2014 Completed all docs
Sept. 4, 2014 IELTS Speaking Test - IDP Makati
Sept. 6, 2014 Sat IELTS Test GT (L, R, W) - Dusit Thani Hotel
Sept. 15, 2014 Sent CDR to EA via LBC
Sept. 18, 2014 EA received CDR confirmed thru LBC Tracking
Sept. 19, 2014 EA charged my Prepaid Card Php35,705 (CDR + Skilled Employment)
Sept. 19, 2014 Got IELTS Results (L 8.0 R 8.5 W 6.5 S 7.0) ok for EA Assessment, need to re-take though
Jan. 9 & 10, 2015 IELTS 2nd Take
Jan. 22, 2015 Asked EA CO for a scanned copy of my outcome letter, Professional Engineer + 3 yrs work experience
Jan. 23, 2015 IELTS Take 2 Result: L 7.5 R 8.0 S 8.0 W 6.5 (Failed, need to sit IELTS for the 3rd time, will also try remarking)
Feb. 7, 2015 IELTS Take 3 @ IDP Tagaytay
Feb. 10, 2015 Submitted IELTS take 2 remarking
Feb. 13, 2015 Received positive EA result via mail
Feb. 20, 2015 IELTS Take 3 Result: L 8.5 R 8.5 S 6.5 W 7.0 (Failed Again, will just wait for remarking result)
March 24, 2015 Got IELTS take 2 remarking result, W 6.5 changed to 7.0 (Glory be to God!)
March 25, 2015 Submitted EOI (Visa 189)
May 8, 2015 Received Invitation to Apply
June 3, 2015 Lodged Visa 189 Application, paid P126,255 thru EON Card
June 20, 2015 My Medical at Nationwide Health Makati
June 25, 2015 My Medicals finalized
July 23, 2015 CO Allocated, requesting medical and docs of hubby and kids (non-migrating dependents)
Aug 5, 2015 Submitted requested docs thru immiaccount and CO's email
Aug 15, 2015 Kids' medical at Nationwide
Aug 18, 2015 Kids' medical finalized
Aug 19, 2015 Hubby medical at Nationwide
Aug 25, 2015 Hubby medical finalized
Aug 31, 2015 Visa Grant
Oct 29, 2015 Touched down Sydney :-)
Nov 17, 2015 Day 1 at Casual Job - still on permanent job hunting mode
Nov 24, 2015 Got a full time job as Learning and Development Officer Thank you Lord
Hello mga kapatid! Question lang, yung napasukan ko company dito sa Au pnpdala ako madalas outside the country for business trips. Mkk-apekto ba yun sa citizenship application ko in the future? TIA
ANZSCO 233211 (Civil Engineer)
July - Aug 2014 Completed all docs
Sept. 4, 2014 IELTS Speaking Test - IDP Makati
Sept. 6, 2014 Sat IELTS Test GT (L, R, W) - Dusit Thani Hotel
Sept. 15, 2014 Sent CDR to EA via LBC
Sept. 18, 2014 EA received CDR confirmed thru LBC Tracking
Sept. 19, 2014 EA charged my Prepaid Card Php35,705 (CDR + Skilled Employment)
Sept. 19, 2014 Got IELTS Results (L 8.0 R 8.5 W 6.5 S 7.0) ok for EA Assessment, need to re-take though
Jan. 9 & 10, 2015 IELTS 2nd Take
Jan. 22, 2015 Asked EA CO for a scanned copy of my outcome letter, Professional Engineer + 3 yrs work experience
Jan. 23, 2015 IELTS Take 2 Result: L 7.5 R 8.0 S 8.0 W 6.5 (Failed, need to sit IELTS for the 3rd time, will also try remarking)
Feb. 7, 2015 IELTS Take 3 @ IDP Tagaytay
Feb. 10, 2015 Submitted IELTS take 2 remarking
Feb. 13, 2015 Received positive EA result via mail
Feb. 20, 2015 IELTS Take 3 Result: L 8.5 R 8.5 S 6.5 W 7.0 (Failed Again, will just wait for remarking result)
March 24, 2015 Got IELTS take 2 remarking result, W 6.5 changed to 7.0 (Glory be to God!)
March 25, 2015 Submitted EOI (Visa 189)
May 8, 2015 Received Invitation to Apply
June 3, 2015 Lodged Visa 189 Application, paid P126,255 thru EON Card
June 20, 2015 My Medical at Nationwide Health Makati
June 25, 2015 My Medicals finalized
July 23, 2015 CO Allocated, requesting medical and docs of hubby and kids (non-migrating dependents)
Aug 5, 2015 Submitted requested docs thru immiaccount and CO's email
Aug 15, 2015 Kids' medical at Nationwide
Aug 18, 2015 Kids' medical finalized
Aug 19, 2015 Hubby medical at Nationwide
Aug 25, 2015 Hubby medical finalized
Aug 31, 2015 Visa Grant
Oct 29, 2015 Touched down Sydney :-)
Nov 17, 2015 Day 1 at Casual Job - still on permanent job hunting mode
Nov 24, 2015 Got a full time job as Learning and Development Officer Thank you Lord
July - Aug 2014 Completed all docs
Sept. 4, 2014 IELTS Speaking Test - IDP Makati
Sept. 6, 2014 Sat IELTS Test GT (L, R, W) - Dusit Thani Hotel
Sept. 15, 2014 Sent CDR to EA via LBC
Sept. 18, 2014 EA received CDR confirmed thru LBC Tracking
Sept. 19, 2014 EA charged my Prepaid Card Php35,705 (CDR + Skilled Employment)
Sept. 19, 2014 Got IELTS Results (L 8.0 R 8.5 W 6.5 S 7.0) ok for EA Assessment, need to re-take though
Jan. 9 & 10, 2015 IELTS 2nd Take
Jan. 22, 2015 Asked EA CO for a scanned copy of my outcome letter, Professional Engineer + 3 yrs work experience
Jan. 23, 2015 IELTS Take 2 Result: L 7.5 R 8.0 S 8.0 W 6.5 (Failed, need to sit IELTS for the 3rd time, will also try remarking)
Feb. 7, 2015 IELTS Take 3 @ IDP Tagaytay
Feb. 10, 2015 Submitted IELTS take 2 remarking
Feb. 13, 2015 Received positive EA result via mail
Feb. 20, 2015 IELTS Take 3 Result: L 8.5 R 8.5 S 6.5 W 7.0 (Failed Again, will just wait for remarking result)
March 24, 2015 Got IELTS take 2 remarking result, W 6.5 changed to 7.0 (Glory be to God!)
March 25, 2015 Submitted EOI (Visa 189)
May 8, 2015 Received Invitation to Apply
June 3, 2015 Lodged Visa 189 Application, paid P126,255 thru EON Card
June 20, 2015 My Medical at Nationwide Health Makati
June 25, 2015 My Medicals finalized
July 23, 2015 CO Allocated, requesting medical and docs of hubby and kids (non-migrating dependents)
Aug 5, 2015 Submitted requested docs thru immiaccount and CO's email
Aug 15, 2015 Kids' medical at Nationwide
Aug 18, 2015 Kids' medical finalized
Aug 19, 2015 Hubby medical at Nationwide
Aug 25, 2015 Hubby medical finalized
Aug 31, 2015 Visa Grant
Oct 29, 2015 Touched down Sydney :-)
Nov 17, 2015 Day 1 at Casual Job - still on permanent job hunting mode
Nov 24, 2015 Got a full time job as Learning and Development Officer Thank you Lord
TasBurrfootOsaka Posts: 4,336Member Joined: Feb 24, 2011
@TasBurrfoot Nung nagstart pa lang kami on student visa before that was 3 years ago, nakikita ko na name mo lagi sa thread. Parang kelan lang and ngayon for citizenship na kayo, Goodluck, im sure you'll get the citizenship.
04 Aug 2012 - IELTS (Academic Module)
07 Aug 2012 - IELTS (Academic Module) Speaking Part
17 Aug 2012 - IELTS Results (L: 8.5 R: 8.5 W: 7.0 S: 7.5 OBS: 8.0)
24 Aug 2012 - CPAA Submitted (docs mailed same day via SG EMS)
25 Sep 2012 - Received +Skills Assessment from CPAA
25 Sep 2012 - Lodged EOI Application with 70pts
30 Sep 2012 - Invited by DIAC to apply for 189 Visa
01 Oct 2012 - Submitted 189 Visa Application
20 Oct 2012 - Medical Examinations
23 Oct 2012 - CO Assigned; Team 7 - SA
05 Nov 2012 - Submitted SG PCC and NBI Clearance
06 Nov 2012 - Visa Granted (IED: 23/10/2013)
03 Apr 2013 - Flight to MEL
03 Jun 2013 - started work
12 Jun 2013 - wife started work
15 Jun 2016 - applied for citizenship
29 Jul 2016 - citizenship examination
20 Oct 2016 - Aussie, Aussie, Aussie Oi Oi Oi!!
TasBurrfootOsaka Posts: 4,336Member Joined: Feb 24, 2011
I got my approval letter today and it was dated 29th July - same day as when I took the test...
04 Aug 2012 - IELTS (Academic Module)
07 Aug 2012 - IELTS (Academic Module) Speaking Part
17 Aug 2012 - IELTS Results (L: 8.5 R: 8.5 W: 7.0 S: 7.5 OBS: 8.0)
24 Aug 2012 - CPAA Submitted (docs mailed same day via SG EMS)
25 Sep 2012 - Received +Skills Assessment from CPAA
25 Sep 2012 - Lodged EOI Application with 70pts
30 Sep 2012 - Invited by DIAC to apply for 189 Visa
01 Oct 2012 - Submitted 189 Visa Application
20 Oct 2012 - Medical Examinations
23 Oct 2012 - CO Assigned; Team 7 - SA
05 Nov 2012 - Submitted SG PCC and NBI Clearance
06 Nov 2012 - Visa Granted (IED: 23/10/2013)
03 Apr 2013 - Flight to MEL
03 Jun 2013 - started work
12 Jun 2013 - wife started work
15 Jun 2016 - applied for citizenship
29 Jul 2016 - citizenship examination
20 Oct 2016 - Aussie, Aussie, Aussie Oi Oi Oi!!
The longest running Pinoy-Australian Forum site in the history. We are connecting Pinoys "in" and "to" Australia since 2010! If you want to join in, click one of these buttons!
Comments
Posts: 4,336Member
Joined: Feb 24, 2011
1) Applied for Tourist Visa in May 2012 and was granted 1-yr multiple entry.
2) Entered Australia as a Tourist in mid-June 2012.
3) Went back to Singapore four days after #2 above - take note that I still have a valid Australian visa (albeit the tourist type).
4) Was granted a PR by Nov 2012.
5) Immigated to Australia on April 2013.
Despite being on a tourist visa - the people from immigration considered June 2012 as the start of my four years of living in Australia on a valid Australian visa. There was continuity until the 4th year which will be this coming June.
Sana mapasa ko ang exam... Ahahaha!
Primary Applicant: Wife
Accountant (General): 221111
04 Aug 2012 - IELTS (Academic Module)
07 Aug 2012 - IELTS (Academic Module) Speaking Part
17 Aug 2012 - IELTS Results (L: 8.5 R: 8.5 W: 7.0 S: 7.5 OBS: 8.0)
24 Aug 2012 - CPAA Submitted (docs mailed same day via SG EMS)
25 Sep 2012 - Received +Skills Assessment from CPAA
25 Sep 2012 - Lodged EOI Application with 70pts
30 Sep 2012 - Invited by DIAC to apply for 189 Visa
01 Oct 2012 - Submitted 189 Visa Application
20 Oct 2012 - Medical Examinations
23 Oct 2012 - CO Assigned; Team 7 - SA
05 Nov 2012 - Submitted SG PCC and NBI Clearance
06 Nov 2012 - Visa Granted (IED: 23/10/2013)
03 Apr 2013 - Flight to MEL
03 Jun 2013 - started work
12 Jun 2013 - wife started work
15 Jun 2016 - applied for citizenship
29 Jul 2016 - citizenship examination
20 Oct 2016 - Aussie, Aussie, Aussie Oi Oi Oi!!
Posts: 2,144Member, Moderator
Joined: Sep 14, 2015
233211 Civil Engineer
30/09/15 - VETASSESS Lodged - 133112 Project Builder
09/10/15 - IELTS Results: L-7.5, R-7.0, W-6.0, S-7.5 OBS-7.0
19/10/15 - PTE A Results: L-82, R-74, S-90, W-76 OAS-79
26/11/15 - Obtained NBI Clearance
09/12/15 - VETASSESS Results - NEGATIVE!!!
12/01/16 - Submitted CDR to Engineers Australia
22/01/16 - EA Positive Results - Bachelor's Degree with 4 years 8 months skilled employment
22/01/16 - Lodged EOI 189 (60pts)
03/02/16 - Received 189 ITA
11/02/16 - Health Clearance Provided - No Action Required
18/02/16 - Obtained SG CoC
26/02/16 - Lodged 189 Visa
15/03/16 - Direct Grant - IED 11/02/2017
25/05/16 - Big Move Perth!
16/06/16 - Started Casual Work
11/07/16 - Permanent Full-time Work
Now for the Citizenship Journey
26/08/2019 - Applied and acknowledgement letter received
27/09/2019 - Test Email Invite for 19/12/2019
01/10/2019 - Actual Test/Interview Date
01/10/2019 - Approval Date (received the approval letter from the post 11/10/2019)
05/02/2020 - Ceremony Date (received the email 10/01/2020)
Posts: 45Member
Joined: Feb 16, 2015
Posts: 45Member
Joined: Feb 16, 2015
Posts: 246Member
Joined: Dec 08, 2015
261313 Software Engineer (with partner)
09.17.15 Submitted ACS docs for assessment
09.28.15 ACS results for partner and me - 2 yrs deduction; 5 yrs work exp
11.07.15 IELTS exam @ British Council
11.20.15 IELTS results: partner OBS 8, mine OBS 7.5
11.21.15 EOI Submitted for 189 visa (70 pts)
11.22.15 Received Invitation to Apply
12.03.15 Medicals at St. Lukes BGC
12.07.15 NBI Clearance - Hit
12.11.15 Processing of tourist visa withdrawal
12.14.15 Lodged visa 189 application
12.22.15 Claim NBI; MOC request for sputum tests and repeat x-ray
01.13.16 CO allocated - request for payslips; Uploaded payslips
03.07.16 Repeat x-ray 2
06.07.16 Repeat x-ray 3
06.15.16 Medicals finalized
07.04.16 Visa Grant! IED 12.11.16
Posts: 81Member
Joined: Mar 17, 2016
Visa Grant: Nov 2013
Initial Entry: June 8 - 12, 2014 (in SG by 13 Jun)
Move In: June 28, 2015
Kung napaaga pala kami ng konti, earliest date we can apply eh June 2018.
Sayang. )
Posts: 490Member
Joined: Feb 25, 2016
Jan 26, 2016: 189 Lodged
Feb 9, 2016: CO Assigned
Feb 23, 2016: Submitted Required Docs
March 18, 2016: Visa Grant
April 28, 2016: Initial Entry (Bank Opening, Medicare, TFN, etc)
July 7, 2016: Big Move!
Posts: 2,274Member, Moderator
Joined: Mar 30, 2013
Assessed Occupation: Industrial Engineer (IE 233511)
Achieved Goal: Australia PR (Permanent Resident). Thanks God!
...sharpening my core gifts now...
...working on new, better goals...
Bless those who curse you, pray for those who mistreat you. ~Luke 6:28~
Posts: 4,336Member
Joined: Feb 24, 2011
Missis ko not be able to apply in June 2016 unfortunately as her tourist visa was only single entry and it expired before we got the 189 visa.
Primary Applicant: Wife
Accountant (General): 221111
04 Aug 2012 - IELTS (Academic Module)
07 Aug 2012 - IELTS (Academic Module) Speaking Part
17 Aug 2012 - IELTS Results (L: 8.5 R: 8.5 W: 7.0 S: 7.5 OBS: 8.0)
24 Aug 2012 - CPAA Submitted (docs mailed same day via SG EMS)
25 Sep 2012 - Received +Skills Assessment from CPAA
25 Sep 2012 - Lodged EOI Application with 70pts
30 Sep 2012 - Invited by DIAC to apply for 189 Visa
01 Oct 2012 - Submitted 189 Visa Application
20 Oct 2012 - Medical Examinations
23 Oct 2012 - CO Assigned; Team 7 - SA
05 Nov 2012 - Submitted SG PCC and NBI Clearance
06 Nov 2012 - Visa Granted (IED: 23/10/2013)
03 Apr 2013 - Flight to MEL
03 Jun 2013 - started work
12 Jun 2013 - wife started work
15 Jun 2016 - applied for citizenship
29 Jul 2016 - citizenship examination
20 Oct 2016 - Aussie, Aussie, Aussie Oi Oi Oi!!
Posts: 4,336Member
Joined: Feb 24, 2011
Your tourist visa has expired more than a year before you were granted a PR visa so this will never have a bearing.
Primary Applicant: Wife
Accountant (General): 221111
04 Aug 2012 - IELTS (Academic Module)
07 Aug 2012 - IELTS (Academic Module) Speaking Part
17 Aug 2012 - IELTS Results (L: 8.5 R: 8.5 W: 7.0 S: 7.5 OBS: 8.0)
24 Aug 2012 - CPAA Submitted (docs mailed same day via SG EMS)
25 Sep 2012 - Received +Skills Assessment from CPAA
25 Sep 2012 - Lodged EOI Application with 70pts
30 Sep 2012 - Invited by DIAC to apply for 189 Visa
01 Oct 2012 - Submitted 189 Visa Application
20 Oct 2012 - Medical Examinations
23 Oct 2012 - CO Assigned; Team 7 - SA
05 Nov 2012 - Submitted SG PCC and NBI Clearance
06 Nov 2012 - Visa Granted (IED: 23/10/2013)
03 Apr 2013 - Flight to MEL
03 Jun 2013 - started work
12 Jun 2013 - wife started work
15 Jun 2016 - applied for citizenship
29 Jul 2016 - citizenship examination
20 Oct 2016 - Aussie, Aussie, Aussie Oi Oi Oi!!
Posts: 4,336Member
Joined: Feb 24, 2011
Primary Applicant: Wife
Accountant (General): 221111
04 Aug 2012 - IELTS (Academic Module)
07 Aug 2012 - IELTS (Academic Module) Speaking Part
17 Aug 2012 - IELTS Results (L: 8.5 R: 8.5 W: 7.0 S: 7.5 OBS: 8.0)
24 Aug 2012 - CPAA Submitted (docs mailed same day via SG EMS)
25 Sep 2012 - Received +Skills Assessment from CPAA
25 Sep 2012 - Lodged EOI Application with 70pts
30 Sep 2012 - Invited by DIAC to apply for 189 Visa
01 Oct 2012 - Submitted 189 Visa Application
20 Oct 2012 - Medical Examinations
23 Oct 2012 - CO Assigned; Team 7 - SA
05 Nov 2012 - Submitted SG PCC and NBI Clearance
06 Nov 2012 - Visa Granted (IED: 23/10/2013)
03 Apr 2013 - Flight to MEL
03 Jun 2013 - started work
12 Jun 2013 - wife started work
15 Jun 2016 - applied for citizenship
29 Jul 2016 - citizenship examination
20 Oct 2016 - Aussie, Aussie, Aussie Oi Oi Oi!!
Posts: 246Member
Joined: Dec 08, 2015
261313 Software Engineer (with partner)
09.17.15 Submitted ACS docs for assessment
09.28.15 ACS results for partner and me - 2 yrs deduction; 5 yrs work exp
11.07.15 IELTS exam @ British Council
11.20.15 IELTS results: partner OBS 8, mine OBS 7.5
11.21.15 EOI Submitted for 189 visa (70 pts)
11.22.15 Received Invitation to Apply
12.03.15 Medicals at St. Lukes BGC
12.07.15 NBI Clearance - Hit
12.11.15 Processing of tourist visa withdrawal
12.14.15 Lodged visa 189 application
12.22.15 Claim NBI; MOC request for sputum tests and repeat x-ray
01.13.16 CO allocated - request for payslips; Uploaded payslips
03.07.16 Repeat x-ray 2
06.07.16 Repeat x-ray 3
06.15.16 Medicals finalized
07.04.16 Visa Grant! IED 12.11.16
Posts: 2,144Member, Moderator
Joined: Sep 14, 2015
233211 Civil Engineer
30/09/15 - VETASSESS Lodged - 133112 Project Builder
09/10/15 - IELTS Results: L-7.5, R-7.0, W-6.0, S-7.5 OBS-7.0
19/10/15 - PTE A Results: L-82, R-74, S-90, W-76 OAS-79
26/11/15 - Obtained NBI Clearance
09/12/15 - VETASSESS Results - NEGATIVE!!!
12/01/16 - Submitted CDR to Engineers Australia
22/01/16 - EA Positive Results - Bachelor's Degree with 4 years 8 months skilled employment
22/01/16 - Lodged EOI 189 (60pts)
03/02/16 - Received 189 ITA
11/02/16 - Health Clearance Provided - No Action Required
18/02/16 - Obtained SG CoC
26/02/16 - Lodged 189 Visa
15/03/16 - Direct Grant - IED 11/02/2017
25/05/16 - Big Move Perth!
16/06/16 - Started Casual Work
11/07/16 - Permanent Full-time Work
Now for the Citizenship Journey
26/08/2019 - Applied and acknowledgement letter received
27/09/2019 - Test Email Invite for 19/12/2019
01/10/2019 - Actual Test/Interview Date
01/10/2019 - Approval Date (received the approval letter from the post 11/10/2019)
05/02/2020 - Ceremony Date (received the email 10/01/2020)
Posts: 490Member
Joined: Feb 25, 2016
Jan 26, 2016: 189 Lodged
Feb 9, 2016: CO Assigned
Feb 23, 2016: Submitted Required Docs
March 18, 2016: Visa Grant
April 28, 2016: Initial Entry (Bank Opening, Medicare, TFN, etc)
July 7, 2016: Big Move!
Posts: 1,719Member, Moderator
Joined: Jun 09, 2011
29May2015: Submitted Online Application to VETASSESS (312112 Building Associate)
02Jun2015: Lodged Date at VETASSESS
28Aug2015: VETASSESS Assessment Completed (312112 Building Associate) - POSITIVE
17Oct2015: PTE-A taken at SG
19Oct2015: PTE-A Result: L-83, R-90, S-76, W-90 OAS-87
19Oct2015: Submitted EOI Visa 190 (65 points plus SS 5 points if granted)
19Oct2015: Submitted VIC SS Online Application Visa 190
20Oct2015: VIC acknowledged SS application and gave Reference Number
02Nov2015: VIC SS Application Rejected
05Nov2015: Submitted Online Reassessment to VETASSESS (312212 Civil Engineering Technician) 08Feb2016: VETASSESS Outcome POSITIVE
07Nov2015: Updated EOI to select NSW (312112)
18Dec2015: Received NSW SS Invitation Stream 2
21Dec2015: Lodged NSW SS Application
12Jan2016: NSW SS Approved / Visa 190 ITA Received
29Jan2016: SG PCC (Me) / Medical (Me, Wife and Kid)
01Feb2016: Medicals Cleared
05Feb2016: Lodged Visa 190
18Feb2016: NBI Clearance Applied (Me and Wife) - HIT
29Feb2016: SG PCC (Wife)
03Mar2016: Collected and Uploaded NBI Clearance
04Mar2016: Direct Grant
07May2016: Initial Entry (Sydney)
16Jul2017: Big Move
Oct2020: Lodged Citizenship Application
May2021: Citizenship Interview and Test
TBA: Citizenship Ceremony
Posts: 4,336Member
Joined: Feb 24, 2011
Primary Applicant: Wife
Accountant (General): 221111
04 Aug 2012 - IELTS (Academic Module)
07 Aug 2012 - IELTS (Academic Module) Speaking Part
17 Aug 2012 - IELTS Results (L: 8.5 R: 8.5 W: 7.0 S: 7.5 OBS: 8.0)
24 Aug 2012 - CPAA Submitted (docs mailed same day via SG EMS)
25 Sep 2012 - Received +Skills Assessment from CPAA
25 Sep 2012 - Lodged EOI Application with 70pts
30 Sep 2012 - Invited by DIAC to apply for 189 Visa
01 Oct 2012 - Submitted 189 Visa Application
20 Oct 2012 - Medical Examinations
23 Oct 2012 - CO Assigned; Team 7 - SA
05 Nov 2012 - Submitted SG PCC and NBI Clearance
06 Nov 2012 - Visa Granted (IED: 23/10/2013)
03 Apr 2013 - Flight to MEL
03 Jun 2013 - started work
12 Jun 2013 - wife started work
15 Jun 2016 - applied for citizenship
29 Jul 2016 - citizenship examination
20 Oct 2016 - Aussie, Aussie, Aussie Oi Oi Oi!!
Posts: 490Member
Joined: Feb 25, 2016
Jan 26, 2016: 189 Lodged
Feb 9, 2016: CO Assigned
Feb 23, 2016: Submitted Required Docs
March 18, 2016: Visa Grant
April 28, 2016: Initial Entry (Bank Opening, Medicare, TFN, etc)
July 7, 2016: Big Move!
Posts: 45Member
Joined: Feb 16, 2015
Posts: 4,336Member
Joined: Feb 24, 2011
Primary Applicant: Wife
Accountant (General): 221111
04 Aug 2012 - IELTS (Academic Module)
07 Aug 2012 - IELTS (Academic Module) Speaking Part
17 Aug 2012 - IELTS Results (L: 8.5 R: 8.5 W: 7.0 S: 7.5 OBS: 8.0)
24 Aug 2012 - CPAA Submitted (docs mailed same day via SG EMS)
25 Sep 2012 - Received +Skills Assessment from CPAA
25 Sep 2012 - Lodged EOI Application with 70pts
30 Sep 2012 - Invited by DIAC to apply for 189 Visa
01 Oct 2012 - Submitted 189 Visa Application
20 Oct 2012 - Medical Examinations
23 Oct 2012 - CO Assigned; Team 7 - SA
05 Nov 2012 - Submitted SG PCC and NBI Clearance
06 Nov 2012 - Visa Granted (IED: 23/10/2013)
03 Apr 2013 - Flight to MEL
03 Jun 2013 - started work
12 Jun 2013 - wife started work
15 Jun 2016 - applied for citizenship
29 Jul 2016 - citizenship examination
20 Oct 2016 - Aussie, Aussie, Aussie Oi Oi Oi!!
Posts: 2,274Member, Moderator
Joined: Mar 30, 2013
Assessed Occupation: Industrial Engineer (IE 233511)
Achieved Goal: Australia PR (Permanent Resident). Thanks God!
...sharpening my core gifts now...
...working on new, better goals...
Bless those who curse you, pray for those who mistreat you. ~Luke 6:28~
Posts: 4,336Member
Joined: Feb 24, 2011
Hopefully before Australia Day.
Primary Applicant: Wife
Accountant (General): 221111
04 Aug 2012 - IELTS (Academic Module)
07 Aug 2012 - IELTS (Academic Module) Speaking Part
17 Aug 2012 - IELTS Results (L: 8.5 R: 8.5 W: 7.0 S: 7.5 OBS: 8.0)
24 Aug 2012 - CPAA Submitted (docs mailed same day via SG EMS)
25 Sep 2012 - Received +Skills Assessment from CPAA
25 Sep 2012 - Lodged EOI Application with 70pts
30 Sep 2012 - Invited by DIAC to apply for 189 Visa
01 Oct 2012 - Submitted 189 Visa Application
20 Oct 2012 - Medical Examinations
23 Oct 2012 - CO Assigned; Team 7 - SA
05 Nov 2012 - Submitted SG PCC and NBI Clearance
06 Nov 2012 - Visa Granted (IED: 23/10/2013)
03 Apr 2013 - Flight to MEL
03 Jun 2013 - started work
12 Jun 2013 - wife started work
15 Jun 2016 - applied for citizenship
29 Jul 2016 - citizenship examination
20 Oct 2016 - Aussie, Aussie, Aussie Oi Oi Oi!!
Posts: 908Member
Joined: May 13, 2015
Computer network and systems engineer (263111) - Hubby is main applicant - Mapua (BS-ECE)
07.23.15 - submitted ACS
07.27.15 - ACS result - suitable..AQF Bachelor. 2 yrs deduction. 5yrs and 10 mos credited
09.28.15 - PTE scheduled exam (Sg)
09.29.15 - PTE Results. L - 90, R - 86, S - 90, W - 86. Overall = 90
09.30.15 - Submitted EOI Visa 189 - 70 pts
10.09.15 - Invitation received
10.28.15 - medicals (me & hubby) @ Point Medical Sg
11.11.15 - NBI (me, hubby and mother)
11.16.15 - medicals of mother @ St Lukes BGC
11.22.15 - Lodged Visa
11.25.15 - Frontloaded docs and requested SG CoC
12.01.15 - CO Allocated. Request form 47a for mother
12.02.15 - Frontloaded SG CoC (me & hubby) and form 47a
02.09.16 - called GSM Adelaide for follow-up (71 days from CO contact)
02.15.16 - granted! Thank you for the Blessings
Dependent parent rejected. CO not satisfied with one of the requirements for dependency (part of household unit)
07.28.16 - Big move! Sydney here we go!
09.19.16 - Start of work
09.22.16 - Hubby start of work
06.19.17 - Hubby's new work
11.16.17 - hello Baby!
Jesus, I Trust In You
Posts: 2,274Member, Moderator
Joined: Mar 30, 2013
Assessed Occupation: Industrial Engineer (IE 233511)
Achieved Goal: Australia PR (Permanent Resident). Thanks God!
...sharpening my core gifts now...
...working on new, better goals...
Bless those who curse you, pray for those who mistreat you. ~Luke 6:28~
Posts: 2,812Member, Moderator
Joined: Sep 07, 2015
June 16, 2013 Arrival in Melbourne (AGED CARE)
Nov 12, 2014 Changed Visa Subclass (572->573) and Course
Nov 13, 2014 573 Visa Approved
Mar 2015 Nursing Conversion Course (Deakin Uni) started
April 13, 2016 Lodged EOI thru Skill Select
April 27, 2016 Received invitation to apply for Visa 189 (Nurse)
May 2, 2016 Lodged application for 189 Visa (Onshore)
May 11, 2016 CO contacted for Form 80/Medicals of daughter
June 17, 2016 189 VISA GRANTED Thank you my amazing God
Dec14, 2017 Citizenship application
March 21, 2019 Citizenship Ceremony
"Happy is the person who learns to wait as he prays and never loses his patience, for God's time is the best time."
Posts: 179Member
Joined: Jul 28, 2014
ANZSCO 233211 (Civil Engineer)
July - Aug 2014 Completed all docs
Sept. 4, 2014 IELTS Speaking Test - IDP Makati
Sept. 6, 2014 Sat IELTS Test GT (L, R, W) - Dusit Thani Hotel
Sept. 15, 2014 Sent CDR to EA via LBC
Sept. 18, 2014 EA received CDR confirmed thru LBC Tracking
Sept. 19, 2014 EA charged my Prepaid Card Php35,705 (CDR + Skilled Employment)
Sept. 19, 2014 Got IELTS Results (L 8.0 R 8.5 W 6.5 S 7.0) ok for EA Assessment, need to re-take though
Jan. 9 & 10, 2015 IELTS 2nd Take
Jan. 22, 2015 Asked EA CO for a scanned copy of my outcome letter, Professional Engineer + 3 yrs work experience
Jan. 23, 2015 IELTS Take 2 Result: L 7.5 R 8.0 S 8.0 W 6.5 (Failed, need to sit IELTS for the 3rd time, will also try remarking)
Feb. 7, 2015 IELTS Take 3 @ IDP Tagaytay
Feb. 10, 2015 Submitted IELTS take 2 remarking
Feb. 13, 2015 Received positive EA result via mail
Feb. 20, 2015 IELTS Take 3 Result: L 8.5 R 8.5 S 6.5 W 7.0 (Failed Again, will just wait for remarking result)
March 24, 2015 Got IELTS take 2 remarking result, W 6.5 changed to 7.0 (Glory be to God!)
March 25, 2015 Submitted EOI (Visa 189)
May 8, 2015 Received Invitation to Apply
June 3, 2015 Lodged Visa 189 Application, paid P126,255 thru EON Card
June 20, 2015 My Medical at Nationwide Health Makati
June 25, 2015 My Medicals finalized
July 23, 2015 CO Allocated, requesting medical and docs of hubby and kids (non-migrating dependents)
Aug 5, 2015 Submitted requested docs thru immiaccount and CO's email
Aug 15, 2015 Kids' medical at Nationwide
Aug 18, 2015 Kids' medical finalized
Aug 19, 2015 Hubby medical at Nationwide
Aug 25, 2015 Hubby medical finalized
Aug 31, 2015 Visa Grant
Oct 29, 2015 Touched down Sydney :-)
Nov 17, 2015 Day 1 at Casual Job - still on permanent job hunting mode
Nov 24, 2015 Got a full time job as Learning and Development Officer Thank you Lord
Posts: 179Member
Joined: Jul 28, 2014
ANZSCO 233211 (Civil Engineer)
July - Aug 2014 Completed all docs
Sept. 4, 2014 IELTS Speaking Test - IDP Makati
Sept. 6, 2014 Sat IELTS Test GT (L, R, W) - Dusit Thani Hotel
Sept. 15, 2014 Sent CDR to EA via LBC
Sept. 18, 2014 EA received CDR confirmed thru LBC Tracking
Sept. 19, 2014 EA charged my Prepaid Card Php35,705 (CDR + Skilled Employment)
Sept. 19, 2014 Got IELTS Results (L 8.0 R 8.5 W 6.5 S 7.0) ok for EA Assessment, need to re-take though
Jan. 9 & 10, 2015 IELTS 2nd Take
Jan. 22, 2015 Asked EA CO for a scanned copy of my outcome letter, Professional Engineer + 3 yrs work experience
Jan. 23, 2015 IELTS Take 2 Result: L 7.5 R 8.0 S 8.0 W 6.5 (Failed, need to sit IELTS for the 3rd time, will also try remarking)
Feb. 7, 2015 IELTS Take 3 @ IDP Tagaytay
Feb. 10, 2015 Submitted IELTS take 2 remarking
Feb. 13, 2015 Received positive EA result via mail
Feb. 20, 2015 IELTS Take 3 Result: L 8.5 R 8.5 S 6.5 W 7.0 (Failed Again, will just wait for remarking result)
March 24, 2015 Got IELTS take 2 remarking result, W 6.5 changed to 7.0 (Glory be to God!)
March 25, 2015 Submitted EOI (Visa 189)
May 8, 2015 Received Invitation to Apply
June 3, 2015 Lodged Visa 189 Application, paid P126,255 thru EON Card
June 20, 2015 My Medical at Nationwide Health Makati
June 25, 2015 My Medicals finalized
July 23, 2015 CO Allocated, requesting medical and docs of hubby and kids (non-migrating dependents)
Aug 5, 2015 Submitted requested docs thru immiaccount and CO's email
Aug 15, 2015 Kids' medical at Nationwide
Aug 18, 2015 Kids' medical finalized
Aug 19, 2015 Hubby medical at Nationwide
Aug 25, 2015 Hubby medical finalized
Aug 31, 2015 Visa Grant
Oct 29, 2015 Touched down Sydney :-)
Nov 17, 2015 Day 1 at Casual Job - still on permanent job hunting mode
Nov 24, 2015 Got a full time job as Learning and Development Officer Thank you Lord
Posts: 179Member
Joined: Jul 28, 2014
ANZSCO 233211 (Civil Engineer)
July - Aug 2014 Completed all docs
Sept. 4, 2014 IELTS Speaking Test - IDP Makati
Sept. 6, 2014 Sat IELTS Test GT (L, R, W) - Dusit Thani Hotel
Sept. 15, 2014 Sent CDR to EA via LBC
Sept. 18, 2014 EA received CDR confirmed thru LBC Tracking
Sept. 19, 2014 EA charged my Prepaid Card Php35,705 (CDR + Skilled Employment)
Sept. 19, 2014 Got IELTS Results (L 8.0 R 8.5 W 6.5 S 7.0) ok for EA Assessment, need to re-take though
Jan. 9 & 10, 2015 IELTS 2nd Take
Jan. 22, 2015 Asked EA CO for a scanned copy of my outcome letter, Professional Engineer + 3 yrs work experience
Jan. 23, 2015 IELTS Take 2 Result: L 7.5 R 8.0 S 8.0 W 6.5 (Failed, need to sit IELTS for the 3rd time, will also try remarking)
Feb. 7, 2015 IELTS Take 3 @ IDP Tagaytay
Feb. 10, 2015 Submitted IELTS take 2 remarking
Feb. 13, 2015 Received positive EA result via mail
Feb. 20, 2015 IELTS Take 3 Result: L 8.5 R 8.5 S 6.5 W 7.0 (Failed Again, will just wait for remarking result)
March 24, 2015 Got IELTS take 2 remarking result, W 6.5 changed to 7.0 (Glory be to God!)
March 25, 2015 Submitted EOI (Visa 189)
May 8, 2015 Received Invitation to Apply
June 3, 2015 Lodged Visa 189 Application, paid P126,255 thru EON Card
June 20, 2015 My Medical at Nationwide Health Makati
June 25, 2015 My Medicals finalized
July 23, 2015 CO Allocated, requesting medical and docs of hubby and kids (non-migrating dependents)
Aug 5, 2015 Submitted requested docs thru immiaccount and CO's email
Aug 15, 2015 Kids' medical at Nationwide
Aug 18, 2015 Kids' medical finalized
Aug 19, 2015 Hubby medical at Nationwide
Aug 25, 2015 Hubby medical finalized
Aug 31, 2015 Visa Grant
Oct 29, 2015 Touched down Sydney :-)
Nov 17, 2015 Day 1 at Casual Job - still on permanent job hunting mode
Nov 24, 2015 Got a full time job as Learning and Development Officer Thank you Lord
Posts: 4,336Member
Joined: Feb 24, 2011
Primary Applicant: Wife
Accountant (General): 221111
04 Aug 2012 - IELTS (Academic Module)
07 Aug 2012 - IELTS (Academic Module) Speaking Part
17 Aug 2012 - IELTS Results (L: 8.5 R: 8.5 W: 7.0 S: 7.5 OBS: 8.0)
24 Aug 2012 - CPAA Submitted (docs mailed same day via SG EMS)
25 Sep 2012 - Received +Skills Assessment from CPAA
25 Sep 2012 - Lodged EOI Application with 70pts
30 Sep 2012 - Invited by DIAC to apply for 189 Visa
01 Oct 2012 - Submitted 189 Visa Application
20 Oct 2012 - Medical Examinations
23 Oct 2012 - CO Assigned; Team 7 - SA
05 Nov 2012 - Submitted SG PCC and NBI Clearance
06 Nov 2012 - Visa Granted (IED: 23/10/2013)
03 Apr 2013 - Flight to MEL
03 Jun 2013 - started work
12 Jun 2013 - wife started work
15 Jun 2016 - applied for citizenship
29 Jul 2016 - citizenship examination
20 Oct 2016 - Aussie, Aussie, Aussie Oi Oi Oi!!
Posts: 4,336Member
Joined: Feb 24, 2011
The long wait begins!
Primary Applicant: Wife
Accountant (General): 221111
04 Aug 2012 - IELTS (Academic Module)
07 Aug 2012 - IELTS (Academic Module) Speaking Part
17 Aug 2012 - IELTS Results (L: 8.5 R: 8.5 W: 7.0 S: 7.5 OBS: 8.0)
24 Aug 2012 - CPAA Submitted (docs mailed same day via SG EMS)
25 Sep 2012 - Received +Skills Assessment from CPAA
25 Sep 2012 - Lodged EOI Application with 70pts
30 Sep 2012 - Invited by DIAC to apply for 189 Visa
01 Oct 2012 - Submitted 189 Visa Application
20 Oct 2012 - Medical Examinations
23 Oct 2012 - CO Assigned; Team 7 - SA
05 Nov 2012 - Submitted SG PCC and NBI Clearance
06 Nov 2012 - Visa Granted (IED: 23/10/2013)
03 Apr 2013 - Flight to MEL
03 Jun 2013 - started work
12 Jun 2013 - wife started work
15 Jun 2016 - applied for citizenship
29 Jul 2016 - citizenship examination
20 Oct 2016 - Aussie, Aussie, Aussie Oi Oi Oi!!
Posts: 386Member
Joined: Apr 29, 2015
342314: Electronic Instrument Trades Worker (General)
Primary Applicant
16.08.2015 - Skills Assessment submitted to TRA
24.08.2015 - PTE-Acad L66/R76/S62/W69
21.10.2015 - TRA Skills Assessment Successful :-)
14.11.2015 - PTE-Acad L65/R90/S60/W79
14.12.2015 - PTE-Acad L59/R84/S69/W72
27.01.2016 - PTE-Acad L64/R74/S66/W60
16.02.2016 - PTE-Acad L64/R76/S68/W75
25.04.2016 - PTE-Acad L69/R83/S66/W84 :-) Thanks God!
27.04.2016 - Submitted EOI 189 60pts
28.04.2016 - Submitted EOI 190 65pts (NSW)
09.05.2016 - Arranged NBI Fingerprint
10.05.2016 - Received ITA for Visa189
11.05.2016 - Generate HAP ID/e-Medical Referrals ( immiaccount )
20.05.2016 - Received NBI Clearance
30.05.2016 - Health Clearance Provided for dependent 2x sons ( Nationwide Makati )
30.05.2016 - Referral for dependent wife ( Sputum Test @ St. Lukes )
01.06.2016 - Collected SG PCC
04.06.2016 - Health Clearance Provided ( Primary Applicant )
13.06.2016 - Lodged / Paid Visa. Wait for CO Allocation
06.07.2016 - 1st CO contact GSM Adelaide, requested Form80/Proof of Functional English/Spouse
22.07.2016 - Wife started PTB Treatment ( End 7-Mar-2017 )
26.07.2016 - 2nd CO contact, requested SG PCC for wife
17.08.2016 - 3rd CO contact , awaiting finalised medical for wife
16.03.2017 - Health Clearance Provided for wife ( front load emedical / Form 815 )
30.03.2017 - Grant! Thanks be to God! IED 18-May-2017