@chuella, ano yung 3 TORS? 3 pages or 3 types talaga?
Systems Administrator (ANZSCO: 262113)
01Aug2012: Docs Preparation
11Sep2012: ACS Assessment Submission
15Oct2012: ACS Assessment Positive Result
17Nov2012: IELTS Exam
30Nov2012: IELTS Results L:6.5 WRS:7.0 OB:7.0, EOI Creation and NSW SS Submission
19Mar2013: NSW SS Acknowledgement Letter Received
01May2013: NSW SS Approval Email Received, SkillSelect Invite Received
29May2013: Visa 190 Lodgement (LORD MARAMING SALAMAT Po, wag nyo po muna ako kukunin sa dami ng Blessings nyo! ;-))
01June2013: NBI Clearance Application
03June2013: Mailed NBI Clearance Application Received by Ms. JM
06June2013: Medical Examination
12June2013: CO allocated Adelaide GSM Team 6
13June2013: SG PCC Applied
14June2013: Evidence of Income Submitted
17June2013: Medical Results Uploaded
19June2013: Form 80 and 1221 Uploaded
25June2013: NBI Clearance received from Mother Land ;-)
Uploaded
03July2013: SG PCC Released and Uploaded
05July2013: VISA Grant (with de facto)!!! SALAMAT LORD!!!!
Oct2013: EID Completed.
Oct2013: Job Offer received; SALAMAT LORD!!!!
Jan2014: Starting a life in Down Under, Corporate Slave doing the rat race!!!
chuellaIligan City Posts: 41Member Joined: Oct 17, 2012
@legato09, yes 3 TORs talaga. I BSCS, 1 MSIS then MIT from University of Sydney. Sana yung BSCS na degree nlng sinubmit ko...I assumed kasi na makatulong yung dalawang Masters degree ko...
Occupation: Developer Programmer
Lodge Visa 189: January 28, 2013
CO: March 20, 2013 (Team 33 Brisbane, CO Initials DC)
Grant: March 25, 2013
Opo, papasok po yun tama po ang ginawa nyo. Meron na pala kayo Masters eh, pasok po yan. Wait lang po kayo, kasi 3 beses nila i assess kasi dami nyo pala qualification hehehehe Yung sa University of Sydney for sure malaki ang maitutulong hehehehe
Check mo yung email nyo, sa junk and etc kung meron sila additional info na required, katulad ko mali yung selected ANZCO Code so nag suggest sila, after ko mag confirm 4 days meron na result, pero all in all 32 days ako inabot.
Systems Administrator (ANZSCO: 262113)
01Aug2012: Docs Preparation
11Sep2012: ACS Assessment Submission
15Oct2012: ACS Assessment Positive Result
17Nov2012: IELTS Exam
30Nov2012: IELTS Results L:6.5 WRS:7.0 OB:7.0, EOI Creation and NSW SS Submission
19Mar2013: NSW SS Acknowledgement Letter Received
01May2013: NSW SS Approval Email Received, SkillSelect Invite Received
29May2013: Visa 190 Lodgement (LORD MARAMING SALAMAT Po, wag nyo po muna ako kukunin sa dami ng Blessings nyo! ;-))
01June2013: NBI Clearance Application
03June2013: Mailed NBI Clearance Application Received by Ms. JM
06June2013: Medical Examination
12June2013: CO allocated Adelaide GSM Team 6
13June2013: SG PCC Applied
14June2013: Evidence of Income Submitted
17June2013: Medical Results Uploaded
19June2013: Form 80 and 1221 Uploaded
25June2013: NBI Clearance received from Mother Land ;-)
Uploaded
03July2013: SG PCC Released and Uploaded
05July2013: VISA Grant (with de facto)!!! SALAMAT LORD!!!!
Oct2013: EID Completed.
Oct2013: Job Offer received; SALAMAT LORD!!!!
Jan2014: Starting a life in Down Under, Corporate Slave doing the rat race!!!
chuellaIligan City Posts: 41Member Joined: Oct 17, 2012
@legato09, check ako ng check na email ko hehehe, wala naman eh...Fingers crossed! Sana soon meron na...Nakaka down lang kasi everybody has received their results na, mine wala parin..:( OK lang maghintay ng matagal basta positive.
Occupation: Developer Programmer
Lodge Visa 189: January 28, 2013
CO: March 20, 2013 (Team 33 Brisbane, CO Initials DC)
Grant: March 25, 2013
@chuella sa akin pong palagay ang nagpatagal dyan eh yung masters, bina-validate po siguro nila ng mabuti lalo na yung sa Univ of Sydney hehehe, pero for sure pasok po yan!!!!
btw, ano pong ANZCO Code and nominated nyo?
Systems Administrator (ANZSCO: 262113)
01Aug2012: Docs Preparation
11Sep2012: ACS Assessment Submission
15Oct2012: ACS Assessment Positive Result
17Nov2012: IELTS Exam
30Nov2012: IELTS Results L:6.5 WRS:7.0 OB:7.0, EOI Creation and NSW SS Submission
19Mar2013: NSW SS Acknowledgement Letter Received
01May2013: NSW SS Approval Email Received, SkillSelect Invite Received
29May2013: Visa 190 Lodgement (LORD MARAMING SALAMAT Po, wag nyo po muna ako kukunin sa dami ng Blessings nyo! ;-))
01June2013: NBI Clearance Application
03June2013: Mailed NBI Clearance Application Received by Ms. JM
06June2013: Medical Examination
12June2013: CO allocated Adelaide GSM Team 6
13June2013: SG PCC Applied
14June2013: Evidence of Income Submitted
17June2013: Medical Results Uploaded
19June2013: Form 80 and 1221 Uploaded
25June2013: NBI Clearance received from Mother Land ;-)
Uploaded
03July2013: SG PCC Released and Uploaded
05July2013: VISA Grant (with de facto)!!! SALAMAT LORD!!!!
Oct2013: EID Completed.
Oct2013: Job Offer received; SALAMAT LORD!!!!
Jan2014: Starting a life in Down Under, Corporate Slave doing the rat race!!!
chuellaIligan City Posts: 41Member Joined: Oct 17, 2012
@legato09, siguro nga noh...especially nakuha ko yun pero employed parin ako dito sa Phils. Bale on study leave lang ako for a year, nung natapos ko is balik work ulit ako...Developer Programmer and nominated occupation ko.
Occupation: Developer Programmer
Lodge Visa 189: January 28, 2013
CO: March 20, 2013 (Team 33 Brisbane, CO Initials DC)
Grant: March 25, 2013
@Chuella prior po sa MS nyo, sang University po kayo graduate sa PINAS?
Systems Administrator (ANZSCO: 262113)
01Aug2012: Docs Preparation
11Sep2012: ACS Assessment Submission
15Oct2012: ACS Assessment Positive Result
17Nov2012: IELTS Exam
30Nov2012: IELTS Results L:6.5 WRS:7.0 OB:7.0, EOI Creation and NSW SS Submission
19Mar2013: NSW SS Acknowledgement Letter Received
01May2013: NSW SS Approval Email Received, SkillSelect Invite Received
29May2013: Visa 190 Lodgement (LORD MARAMING SALAMAT Po, wag nyo po muna ako kukunin sa dami ng Blessings nyo! ;-))
01June2013: NBI Clearance Application
03June2013: Mailed NBI Clearance Application Received by Ms. JM
06June2013: Medical Examination
12June2013: CO allocated Adelaide GSM Team 6
13June2013: SG PCC Applied
14June2013: Evidence of Income Submitted
17June2013: Medical Results Uploaded
19June2013: Form 80 and 1221 Uploaded
25June2013: NBI Clearance received from Mother Land ;-)
Uploaded
03July2013: SG PCC Released and Uploaded
05July2013: VISA Grant (with de facto)!!! SALAMAT LORD!!!!
Oct2013: EID Completed.
Oct2013: Job Offer received; SALAMAT LORD!!!!
Jan2014: Starting a life in Down Under, Corporate Slave doing the rat race!!!
chuellaIligan City Posts: 41Member Joined: Oct 17, 2012
@legato09 - University of the Immaculate Conception, Davao City... Just now, Nag In-Progress na!!! waaah...kinabahan ako bigla! lapit na sana, Praying for a POSITIVE Assessment!
Occupation: Developer Programmer
Lodge Visa 189: January 28, 2013
CO: March 20, 2013 (Team 33 Brisbane, CO Initials DC)
Grant: March 25, 2013
@chuella Hahahahha see, 2 days and you have the result hehehehehe
Systems Administrator (ANZSCO: 262113)
01Aug2012: Docs Preparation
11Sep2012: ACS Assessment Submission
15Oct2012: ACS Assessment Positive Result
17Nov2012: IELTS Exam
30Nov2012: IELTS Results L:6.5 WRS:7.0 OB:7.0, EOI Creation and NSW SS Submission
19Mar2013: NSW SS Acknowledgement Letter Received
01May2013: NSW SS Approval Email Received, SkillSelect Invite Received
29May2013: Visa 190 Lodgement (LORD MARAMING SALAMAT Po, wag nyo po muna ako kukunin sa dami ng Blessings nyo! ;-))
01June2013: NBI Clearance Application
03June2013: Mailed NBI Clearance Application Received by Ms. JM
06June2013: Medical Examination
12June2013: CO allocated Adelaide GSM Team 6
13June2013: SG PCC Applied
14June2013: Evidence of Income Submitted
17June2013: Medical Results Uploaded
19June2013: Form 80 and 1221 Uploaded
25June2013: NBI Clearance received from Mother Land ;-)
Uploaded
03July2013: SG PCC Released and Uploaded
05July2013: VISA Grant (with de facto)!!! SALAMAT LORD!!!!
Oct2013: EID Completed.
Oct2013: Job Offer received; SALAMAT LORD!!!!
Jan2014: Starting a life in Down Under, Corporate Slave doing the rat race!!!
chuellaIligan City Posts: 41Member Joined: Oct 17, 2012
@legato09- hehehe...sobrang paranoid masyado eh...Thanks for understanding my feelings..hehehe
Occupation: Developer Programmer
Lodge Visa 189: January 28, 2013
CO: March 20, 2013 (Team 33 Brisbane, CO Initials DC)
Grant: March 25, 2013
@chuella wow talaga? nag in progress na? check mo maya maya ksi pwede din lumabas yung result. yung sa akin umaga nag in progress at hapon lumabas result. good luck.
ACS
Nominated Occupation: Analyst Programmer (261311)
Submitted: Sept 18, 2012
Stage 4: Sept 19, 2012
in progress:Oct 19 8am
Case finalised: Oct 19 3pm (Thank you Lord)
IELTS Exam: Jan 12, 2013 (failed)
EOI visa (489 Regional) 60 pts:Oct 1, 2013
chuellaIligan City Posts: 41Member Joined: Oct 17, 2012
@stynx, yes! ganito pala ang feeling noh! Sana positive din, check ko mamaya ulit baka meron na...hehehe, halatang excited masyado pero may halong kaba na di ko maintindihan...
Occupation: Developer Programmer
Lodge Visa 189: January 28, 2013
CO: March 20, 2013 (Team 33 Brisbane, CO Initials DC)
Grant: March 25, 2013
Hello. Gusto ko lang po hingin opinion nyo. Magkakaproblem kaya sa ACS or DIAC kapag ang position title na nakalagay sa COE is not the same as the one in your Employment Contract. Isasubmit ko rin kasi sa ACS/DIAC yun Employment Contract ko as supporting documents. Yun title kasi na nakalagay sa Contract ko is Test Engineer then sa standard COE naman na binigay ng previous employer ko is QA Analyst.
Gumagawa na kasi ako ng draft na ipapakita ko sa employer ko and napapaisip ako kun anong better job title ang ilalagay ko na hindi magkakaproblem in the future both sa ACS and DIAC. Thanks.
chuellaIligan City Posts: 41Member Joined: Oct 17, 2012
Hi All! I received ACS Positive Skill Assessment!!! Yeheeyyy!!! Thanks sa lahat ng info dito sa forum at sa inyong lahat...On to the next steps...
Occupation: Developer Programmer
Lodge Visa 189: January 28, 2013
CO: March 20, 2013 (Team 33 Brisbane, CO Initials DC)
Grant: March 25, 2013
Hi All! I received ACS Positive Skill Assessment!!! Yeheeyyy!!! Thanks sa lahat ng info dito sa forum at sa inyong lahat...On to the next steps...
Congrats!!! ang bilis!!!!
Was it an AQF Bachelors Degree?
Systems Administrator (ANZSCO: 262113)
01Aug2012: Docs Preparation
11Sep2012: ACS Assessment Submission
15Oct2012: ACS Assessment Positive Result
17Nov2012: IELTS Exam
30Nov2012: IELTS Results L:6.5 WRS:7.0 OB:7.0, EOI Creation and NSW SS Submission
19Mar2013: NSW SS Acknowledgement Letter Received
01May2013: NSW SS Approval Email Received, SkillSelect Invite Received
29May2013: Visa 190 Lodgement (LORD MARAMING SALAMAT Po, wag nyo po muna ako kukunin sa dami ng Blessings nyo! ;-))
01June2013: NBI Clearance Application
03June2013: Mailed NBI Clearance Application Received by Ms. JM
06June2013: Medical Examination
12June2013: CO allocated Adelaide GSM Team 6
13June2013: SG PCC Applied
14June2013: Evidence of Income Submitted
17June2013: Medical Results Uploaded
19June2013: Form 80 and 1221 Uploaded
25June2013: NBI Clearance received from Mother Land ;-)
Uploaded
03July2013: SG PCC Released and Uploaded
05July2013: VISA Grant (with de facto)!!! SALAMAT LORD!!!!
Oct2013: EID Completed.
Oct2013: Job Offer received; SALAMAT LORD!!!!
Jan2014: Starting a life in Down Under, Corporate Slave doing the rat race!!!
Primary Applicant: Hubby
Nominated Skill: Software Engineer (ANZSCO Code: 261313)
Sept 23 2012 - Collating documents for ACS
Oct 5 2012 - Lodge ACS skill assessment
Nov 7 2012 - Positive ACS result (AQF Bachelor Degree; 5yr & 4mos)
Nov 21 2012 - IELTS Result L:8.0 R/S:6.5 W:7.0 OBS:7.0
Nov 22 2012 - Sent NSW SS application via Fedex
Nov 26 2012 - NSW application received
Mar 5 2012 - NSW Acknowledgement
Apr 17 2013 - NSW Approval
Apr 17 2013 - Lodge Visa 190
Apr 25 2013 - Medical at St Lukes (me & husband)
Apr 29 2013 - CO Allocated, Team 6 Adelaide - JH (Requested for PCC, Medicals and Form 80)
Apr 29 2013 - Uploaded Form 80 and husband's PCC & Medical
Apr 30 2013 - Uploaded my PCC and my medical was referred to MOC
May 13 2013 - Uploaded Health Undertaking Form 815 requested by CO
May 13 2013 - Received email from CO stating "application is under routine processing"
May 14 2013 - CO requested for Form 1022, ITR and bank statement from (2008-2013)
May 14 2013 - Uploaded Form 1022 and bank statement (lastest 3mos only)
May 15 2013 - Uploaded ITR from 2008-2012
May 21 2013 - VISA GRANT (Initial Entry: Nov 12, 2013)
wow bilis ah. hehe congrats batchmate. nakapag ielts k n b?
ACS
Nominated Occupation: Analyst Programmer (261311)
Submitted: Sept 18, 2012
Stage 4: Sept 19, 2012
in progress:Oct 19 8am
Case finalised: Oct 19 3pm (Thank you Lord)
IELTS Exam: Jan 12, 2013 (failed)
EOI visa (489 Regional) 60 pts:Oct 1, 2013
chuellaIligan City Posts: 41Member Joined: Oct 17, 2012
@stynx, oo nga eh nagulat ako after ko maglunch may email agad ako from ACS...Thank You Lord! Yes nauna yung IELTS ko last August 25 pa, OBS 8 pero 7 lang ang speaking ko...OK NA OK pa rin...
Occupation: Developer Programmer
Lodge Visa 189: January 28, 2013
CO: March 20, 2013 (Team 33 Brisbane, CO Initials DC)
Grant: March 25, 2013
stolich18Sydney Posts: 993Member Joined: Feb 15, 2012
Feb.15.2012 - started working on ACS requirements
Mar.02.2012 - submitted online ACS application and sent documents to ACS via Fedex
Mar.05.2012 - ACS acknowledged actual documents
Mar.21.2012 - ACS finalised assessment: Suitable
Mar.31.2012 - IELTS exam with BC
Apr.13.2012 - IELTS Results (L:8.5 R:7 W: 7 S: 8 OB: 7.5) Thank you LORD!
Apr.14.2012 - Lodged 175 Online Application
Apr.20.2012 - Completed Online Attachments
May.24.2012 - "Application being processed further"
May.29.2012 - CO Assigned :-)
Jun.07.2012 - Uploaded NBI Clearance
Jun.13.2012 - Medical/Health Requirements Finalised
Jun.14.2012 - VISA GRANT! Thank you, LORD! :-)
Jun.07.2013 - Initial Entry Date Deadline
Apr.28.2013 - Initial Entry (Sydney)
Jun.28.2013 - Verbal Job Offer (Melbourne)
Jul.08.2013 - First day of Work and first day of child care for my son (Melbourne)
Aug.21.2013 - First day of Work in Sydney
"Great is the LORD and most worthy of praise; his greatness no one can fathom." Psalm 145:3
chuellaIligan City Posts: 41Member Joined: Oct 17, 2012
@stolich18, thanks po!!! Wow Visa Grant na pala kayo as per your timeline, akin mahaba habang lakaran pa, hehehe
Occupation: Developer Programmer
Lodge Visa 189: January 28, 2013
CO: March 20, 2013 (Team 33 Brisbane, CO Initials DC)
Grant: March 25, 2013
aba at pwede ka na pla magsubmit ng eoi. hehe. ilang points ka?
ACS
Nominated Occupation: Analyst Programmer (261311)
Submitted: Sept 18, 2012
Stage 4: Sept 19, 2012
in progress:Oct 19 8am
Case finalised: Oct 19 3pm (Thank you Lord)
IELTS Exam: Jan 12, 2013 (failed)
EOI visa (489 Regional) 60 pts:Oct 1, 2013
chuellaIligan City Posts: 41Member Joined: Oct 17, 2012
@legato09 - Thanks!!! yes, naka enumerate yung 3 degrees ko...yung sa Uni Sydney is AQF Masters Degree, isang MS - AQF Graduate Diploma then yung BSCS ko AQF Bachelors degree. @stynx - hindi pa pwede eh siguro by december pa kasi balak ko sa feb na mag lodge (for monetary reasons). 65 points ako...
Occupation: Developer Programmer
Lodge Visa 189: January 28, 2013
CO: March 20, 2013 (Team 33 Brisbane, CO Initials DC)
Grant: March 25, 2013
Hello. Gusto ko lang po hingin opinion nyo. Magkakaproblem kaya sa ACS or DIAC kapag ang position title na nakalagay sa COE is not the same as the one in your Employment Contract. Isasubmit ko rin kasi sa ACS/DIAC yun Employment Contract ko as supporting documents. Yun title kasi na nakalagay sa Contract ko is Test Engineer then sa standard COE naman na binigay ng previous employer ko is QA Analyst.
Gumagawa na kasi ako ng draft na ipapakita ko sa employer ko and napapaisip ako kun anong better job title ang ilalagay ko na hindi magkakaproblem in the future both sa ACS and DIAC. Thanks.
blackroseDallas Posts: 44Member Joined: Oct 19, 2012
edited October 2012
@legato09, thanks po for replying and yes sana may makahelp saken mag advice kung tama ba interpretation ko. i also emailed [email protected] regarding my dilemma. auto generated reply pa lang nareceive ko stating that due to the bulk of queries narereceive nila baka matagalan na magrespond sa tanong ko. hehe
261314 Software Tester
Dec 5 2012 - ACS submission under General Skills
Jan 5 2013 - IELTS L:6.5 R:7.5 W:7 S:6.5 = OBS: 7
Jan 29 2013 - ACS advise to apply under RPL (30days to submit)
March 18 2013 - received ACS Suitable 6.9 yrs Work Experience
Apr 5 2014 - IELTS L:8 R:7 W:6.5 S:6.5 = OBS: 7
Hello. Gusto ko lang po hingin opinion nyo. Magkakaproblem kaya sa ACS or DIAC kapag ang position title na nakalagay sa COE is not the same as the one in your Employment Contract. Isasubmit ko rin kasi sa ACS/DIAC yun Employment Contract ko as supporting documents. Yun title kasi na nakalagay sa Contract ko is Test Engineer then sa standard COE naman na binigay ng previous employer ko is QA Analyst.
Gumagawa na kasi ako ng draft na ipapakita ko sa employer ko and napapaisip ako kun anong better job title ang ilalagay ko na hindi magkakaproblem in the future both sa ACS and DIAC. Thanks.
@eischied_21, I think wala naman magiging problema for as long as parehas ang company header, nangyayari po talaga na sa HR iba ang position sa Job Offer pero pagdating sa assignment mo iba din. Pero, dapat po parehas ng content in terms of the job des against dun sa applyan mo na ANZCO Code.
Systems Administrator (ANZSCO: 262113)
01Aug2012: Docs Preparation
11Sep2012: ACS Assessment Submission
15Oct2012: ACS Assessment Positive Result
17Nov2012: IELTS Exam
30Nov2012: IELTS Results L:6.5 WRS:7.0 OB:7.0, EOI Creation and NSW SS Submission
19Mar2013: NSW SS Acknowledgement Letter Received
01May2013: NSW SS Approval Email Received, SkillSelect Invite Received
29May2013: Visa 190 Lodgement (LORD MARAMING SALAMAT Po, wag nyo po muna ako kukunin sa dami ng Blessings nyo! ;-))
01June2013: NBI Clearance Application
03June2013: Mailed NBI Clearance Application Received by Ms. JM
06June2013: Medical Examination
12June2013: CO allocated Adelaide GSM Team 6
13June2013: SG PCC Applied
14June2013: Evidence of Income Submitted
17June2013: Medical Results Uploaded
19June2013: Form 80 and 1221 Uploaded
25June2013: NBI Clearance received from Mother Land ;-)
Uploaded
03July2013: SG PCC Released and Uploaded
05July2013: VISA Grant (with de facto)!!! SALAMAT LORD!!!!
Oct2013: EID Completed.
Oct2013: Job Offer received; SALAMAT LORD!!!!
Jan2014: Starting a life in Down Under, Corporate Slave doing the rat race!!!
dreambigSingapore Posts: 143Member Joined: Aug 02, 2012
@chuella Congrats! Good to know your long wait is over!
@eischied_21, I think wala naman magiging problema for as long as parehas ang company header, nangyayari po talaga na sa HR iba ang position sa Job Offer pero pagdating sa assignment mo iba din. Pero, dapat po parehas ng content in terms of the job des against dun sa applyan mo na ANZCO Code.
Thanks @legato09. Yes, same naman yun job desc against sa ANZCO. Magkaiba lang talaga yun job title sa Employment Contract and COE. Thanks again sa pagreply.
@eischied_21 no worries. Everything will turn out positive and in your favor basta yung content eh pasok sa ANZCo Code na selected mo.
Systems Administrator (ANZSCO: 262113)
01Aug2012: Docs Preparation
11Sep2012: ACS Assessment Submission
15Oct2012: ACS Assessment Positive Result
17Nov2012: IELTS Exam
30Nov2012: IELTS Results L:6.5 WRS:7.0 OB:7.0, EOI Creation and NSW SS Submission
19Mar2013: NSW SS Acknowledgement Letter Received
01May2013: NSW SS Approval Email Received, SkillSelect Invite Received
29May2013: Visa 190 Lodgement (LORD MARAMING SALAMAT Po, wag nyo po muna ako kukunin sa dami ng Blessings nyo! ;-))
01June2013: NBI Clearance Application
03June2013: Mailed NBI Clearance Application Received by Ms. JM
06June2013: Medical Examination
12June2013: CO allocated Adelaide GSM Team 6
13June2013: SG PCC Applied
14June2013: Evidence of Income Submitted
17June2013: Medical Results Uploaded
19June2013: Form 80 and 1221 Uploaded
25June2013: NBI Clearance received from Mother Land ;-)
Uploaded
03July2013: SG PCC Released and Uploaded
05July2013: VISA Grant (with de facto)!!! SALAMAT LORD!!!!
Oct2013: EID Completed.
Oct2013: Job Offer received; SALAMAT LORD!!!!
Jan2014: Starting a life in Down Under, Corporate Slave doing the rat race!!!
chuellaIligan City Posts: 41Member Joined: Oct 17, 2012
The longest running Pinoy-Australian Forum site in the history. We are connecting Pinoys "in" and "to" Australia since 2010! If you want to join in, click one of these buttons!
Comments
Posts: 41Member
Joined: Oct 17, 2012
Occupation: Developer Programmer
Lodge Visa 189: January 28, 2013
CO: March 20, 2013 (Team 33 Brisbane, CO Initials DC)
Grant: March 25, 2013
Posts: 766Member
Joined: Jul 31, 2012
Systems Administrator (ANZSCO: 262113)
01Aug2012: Docs Preparation
11Sep2012: ACS Assessment Submission
15Oct2012: ACS Assessment Positive Result
17Nov2012: IELTS Exam
30Nov2012: IELTS Results L:6.5 WRS:7.0 OB:7.0, EOI Creation and NSW SS Submission
19Mar2013: NSW SS Acknowledgement Letter Received
01May2013: NSW SS Approval Email Received, SkillSelect Invite Received
29May2013: Visa 190 Lodgement (LORD MARAMING SALAMAT Po, wag nyo po muna ako kukunin sa dami ng Blessings nyo! ;-))
01June2013: NBI Clearance Application
03June2013: Mailed NBI Clearance Application Received by Ms. JM
06June2013: Medical Examination
12June2013: CO allocated Adelaide GSM Team 6
13June2013: SG PCC Applied
14June2013: Evidence of Income Submitted
17June2013: Medical Results Uploaded
19June2013: Form 80 and 1221 Uploaded
25June2013: NBI Clearance received from Mother Land ;-)
Uploaded
03July2013: SG PCC Released and Uploaded
05July2013: VISA Grant (with de facto)!!! SALAMAT LORD!!!!
Oct2013: EID Completed.
Oct2013: Job Offer received; SALAMAT LORD!!!!
Jan2014: Starting a life in Down Under, Corporate Slave doing the rat race!!!
Posts: 41Member
Joined: Oct 17, 2012
Occupation: Developer Programmer
Lodge Visa 189: January 28, 2013
CO: March 20, 2013 (Team 33 Brisbane, CO Initials DC)
Grant: March 25, 2013
Posts: 766Member
Joined: Jul 31, 2012
Wait lang po kayo, kasi 3 beses nila i assess kasi dami nyo pala qualification hehehehe Yung sa University of Sydney for sure malaki ang maitutulong hehehehe
Check mo yung email nyo, sa junk and etc kung meron sila additional info na required, katulad ko mali yung selected ANZCO Code so nag suggest sila, after ko mag confirm 4 days meron na result, pero all in all 32 days ako inabot.
Systems Administrator (ANZSCO: 262113)
01Aug2012: Docs Preparation
11Sep2012: ACS Assessment Submission
15Oct2012: ACS Assessment Positive Result
17Nov2012: IELTS Exam
30Nov2012: IELTS Results L:6.5 WRS:7.0 OB:7.0, EOI Creation and NSW SS Submission
19Mar2013: NSW SS Acknowledgement Letter Received
01May2013: NSW SS Approval Email Received, SkillSelect Invite Received
29May2013: Visa 190 Lodgement (LORD MARAMING SALAMAT Po, wag nyo po muna ako kukunin sa dami ng Blessings nyo! ;-))
01June2013: NBI Clearance Application
03June2013: Mailed NBI Clearance Application Received by Ms. JM
06June2013: Medical Examination
12June2013: CO allocated Adelaide GSM Team 6
13June2013: SG PCC Applied
14June2013: Evidence of Income Submitted
17June2013: Medical Results Uploaded
19June2013: Form 80 and 1221 Uploaded
25June2013: NBI Clearance received from Mother Land ;-)
Uploaded
03July2013: SG PCC Released and Uploaded
05July2013: VISA Grant (with de facto)!!! SALAMAT LORD!!!!
Oct2013: EID Completed.
Oct2013: Job Offer received; SALAMAT LORD!!!!
Jan2014: Starting a life in Down Under, Corporate Slave doing the rat race!!!
Posts: 41Member
Joined: Oct 17, 2012
Occupation: Developer Programmer
Lodge Visa 189: January 28, 2013
CO: March 20, 2013 (Team 33 Brisbane, CO Initials DC)
Grant: March 25, 2013
Posts: 766Member
Joined: Jul 31, 2012
btw, ano pong ANZCO Code and nominated nyo?
Systems Administrator (ANZSCO: 262113)
01Aug2012: Docs Preparation
11Sep2012: ACS Assessment Submission
15Oct2012: ACS Assessment Positive Result
17Nov2012: IELTS Exam
30Nov2012: IELTS Results L:6.5 WRS:7.0 OB:7.0, EOI Creation and NSW SS Submission
19Mar2013: NSW SS Acknowledgement Letter Received
01May2013: NSW SS Approval Email Received, SkillSelect Invite Received
29May2013: Visa 190 Lodgement (LORD MARAMING SALAMAT Po, wag nyo po muna ako kukunin sa dami ng Blessings nyo! ;-))
01June2013: NBI Clearance Application
03June2013: Mailed NBI Clearance Application Received by Ms. JM
06June2013: Medical Examination
12June2013: CO allocated Adelaide GSM Team 6
13June2013: SG PCC Applied
14June2013: Evidence of Income Submitted
17June2013: Medical Results Uploaded
19June2013: Form 80 and 1221 Uploaded
25June2013: NBI Clearance received from Mother Land ;-)
Uploaded
03July2013: SG PCC Released and Uploaded
05July2013: VISA Grant (with de facto)!!! SALAMAT LORD!!!!
Oct2013: EID Completed.
Oct2013: Job Offer received; SALAMAT LORD!!!!
Jan2014: Starting a life in Down Under, Corporate Slave doing the rat race!!!
Posts: 41Member
Joined: Oct 17, 2012
Occupation: Developer Programmer
Lodge Visa 189: January 28, 2013
CO: March 20, 2013 (Team 33 Brisbane, CO Initials DC)
Grant: March 25, 2013
Posts: 766Member
Joined: Jul 31, 2012
Systems Administrator (ANZSCO: 262113)
01Aug2012: Docs Preparation
11Sep2012: ACS Assessment Submission
15Oct2012: ACS Assessment Positive Result
17Nov2012: IELTS Exam
30Nov2012: IELTS Results L:6.5 WRS:7.0 OB:7.0, EOI Creation and NSW SS Submission
19Mar2013: NSW SS Acknowledgement Letter Received
01May2013: NSW SS Approval Email Received, SkillSelect Invite Received
29May2013: Visa 190 Lodgement (LORD MARAMING SALAMAT Po, wag nyo po muna ako kukunin sa dami ng Blessings nyo! ;-))
01June2013: NBI Clearance Application
03June2013: Mailed NBI Clearance Application Received by Ms. JM
06June2013: Medical Examination
12June2013: CO allocated Adelaide GSM Team 6
13June2013: SG PCC Applied
14June2013: Evidence of Income Submitted
17June2013: Medical Results Uploaded
19June2013: Form 80 and 1221 Uploaded
25June2013: NBI Clearance received from Mother Land ;-)
Uploaded
03July2013: SG PCC Released and Uploaded
05July2013: VISA Grant (with de facto)!!! SALAMAT LORD!!!!
Oct2013: EID Completed.
Oct2013: Job Offer received; SALAMAT LORD!!!!
Jan2014: Starting a life in Down Under, Corporate Slave doing the rat race!!!
Posts: 41Member
Joined: Oct 17, 2012
Just now, Nag In-Progress na!!! waaah...kinabahan ako bigla! lapit na sana, Praying for a POSITIVE Assessment!
Occupation: Developer Programmer
Lodge Visa 189: January 28, 2013
CO: March 20, 2013 (Team 33 Brisbane, CO Initials DC)
Grant: March 25, 2013
Posts: 766Member
Joined: Jul 31, 2012
Systems Administrator (ANZSCO: 262113)
01Aug2012: Docs Preparation
11Sep2012: ACS Assessment Submission
15Oct2012: ACS Assessment Positive Result
17Nov2012: IELTS Exam
30Nov2012: IELTS Results L:6.5 WRS:7.0 OB:7.0, EOI Creation and NSW SS Submission
19Mar2013: NSW SS Acknowledgement Letter Received
01May2013: NSW SS Approval Email Received, SkillSelect Invite Received
29May2013: Visa 190 Lodgement (LORD MARAMING SALAMAT Po, wag nyo po muna ako kukunin sa dami ng Blessings nyo! ;-))
01June2013: NBI Clearance Application
03June2013: Mailed NBI Clearance Application Received by Ms. JM
06June2013: Medical Examination
12June2013: CO allocated Adelaide GSM Team 6
13June2013: SG PCC Applied
14June2013: Evidence of Income Submitted
17June2013: Medical Results Uploaded
19June2013: Form 80 and 1221 Uploaded
25June2013: NBI Clearance received from Mother Land ;-)
Uploaded
03July2013: SG PCC Released and Uploaded
05July2013: VISA Grant (with de facto)!!! SALAMAT LORD!!!!
Oct2013: EID Completed.
Oct2013: Job Offer received; SALAMAT LORD!!!!
Jan2014: Starting a life in Down Under, Corporate Slave doing the rat race!!!
Posts: 41Member
Joined: Oct 17, 2012
Occupation: Developer Programmer
Lodge Visa 189: January 28, 2013
CO: March 20, 2013 (Team 33 Brisbane, CO Initials DC)
Grant: March 25, 2013
Posts: 82Member
Joined: Jul 31, 2012
ACS
Nominated Occupation: Analyst Programmer (261311)
Submitted: Sept 18, 2012
Stage 4: Sept 19, 2012
in progress:Oct 19 8am
Case finalised: Oct 19 3pm (Thank you Lord)
IELTS Exam: Jan 12, 2013 (failed)
EOI visa (489 Regional) 60 pts:Oct 1, 2013
Posts: 41Member
Joined: Oct 17, 2012
Occupation: Developer Programmer
Lodge Visa 189: January 28, 2013
CO: March 20, 2013 (Team 33 Brisbane, CO Initials DC)
Grant: March 25, 2013
Posts: 241Member
Joined: Sep 12, 2012
Gumagawa na kasi ako ng draft na ipapakita ko sa employer ko and napapaisip ako kun anong better job title ang ilalagay ko na hindi magkakaproblem in the future both sa ACS and DIAC. Thanks.
Posts: 41Member
Joined: Oct 17, 2012
Occupation: Developer Programmer
Lodge Visa 189: January 28, 2013
CO: March 20, 2013 (Team 33 Brisbane, CO Initials DC)
Grant: March 25, 2013
Posts: 766Member
Joined: Jul 31, 2012
Was it an AQF Bachelors Degree?
Systems Administrator (ANZSCO: 262113)
01Aug2012: Docs Preparation
11Sep2012: ACS Assessment Submission
15Oct2012: ACS Assessment Positive Result
17Nov2012: IELTS Exam
30Nov2012: IELTS Results L:6.5 WRS:7.0 OB:7.0, EOI Creation and NSW SS Submission
19Mar2013: NSW SS Acknowledgement Letter Received
01May2013: NSW SS Approval Email Received, SkillSelect Invite Received
29May2013: Visa 190 Lodgement (LORD MARAMING SALAMAT Po, wag nyo po muna ako kukunin sa dami ng Blessings nyo! ;-))
01June2013: NBI Clearance Application
03June2013: Mailed NBI Clearance Application Received by Ms. JM
06June2013: Medical Examination
12June2013: CO allocated Adelaide GSM Team 6
13June2013: SG PCC Applied
14June2013: Evidence of Income Submitted
17June2013: Medical Results Uploaded
19June2013: Form 80 and 1221 Uploaded
25June2013: NBI Clearance received from Mother Land ;-)
Uploaded
03July2013: SG PCC Released and Uploaded
05July2013: VISA Grant (with de facto)!!! SALAMAT LORD!!!!
Oct2013: EID Completed.
Oct2013: Job Offer received; SALAMAT LORD!!!!
Jan2014: Starting a life in Down Under, Corporate Slave doing the rat race!!!
Posts: 157Member
Joined: Sep 21, 2012
Primary Applicant: Hubby
Nominated Skill: Software Engineer (ANZSCO Code: 261313)
Sept 23 2012 - Collating documents for ACS
Oct 5 2012 - Lodge ACS skill assessment
Nov 7 2012 - Positive ACS result (AQF Bachelor Degree; 5yr & 4mos)
Nov 21 2012 - IELTS Result L:8.0 R/S:6.5 W:7.0 OBS:7.0
Nov 22 2012 - Sent NSW SS application via Fedex
Nov 26 2012 - NSW application received
Mar 5 2012 - NSW Acknowledgement
Apr 17 2013 - NSW Approval
Apr 17 2013 - Lodge Visa 190
Apr 25 2013 - Medical at St Lukes (me & husband)
Apr 29 2013 - CO Allocated, Team 6 Adelaide - JH (Requested for PCC, Medicals and Form 80)
Apr 29 2013 - Uploaded Form 80 and husband's PCC & Medical
Apr 30 2013 - Uploaded my PCC and my medical was referred to MOC
May 13 2013 - Uploaded Health Undertaking Form 815 requested by CO
May 13 2013 - Received email from CO stating "application is under routine processing"
May 14 2013 - CO requested for Form 1022, ITR and bank statement from (2008-2013)
May 14 2013 - Uploaded Form 1022 and bank statement (lastest 3mos only)
May 15 2013 - Uploaded ITR from 2008-2012
May 21 2013 - VISA GRANT (Initial Entry: Nov 12, 2013)
Thank you Lord!!!
Posts: 82Member
Joined: Jul 31, 2012
ACS
Nominated Occupation: Analyst Programmer (261311)
Submitted: Sept 18, 2012
Stage 4: Sept 19, 2012
in progress:Oct 19 8am
Case finalised: Oct 19 3pm (Thank you Lord)
IELTS Exam: Jan 12, 2013 (failed)
EOI visa (489 Regional) 60 pts:Oct 1, 2013
Posts: 41Member
Joined: Oct 17, 2012
Occupation: Developer Programmer
Lodge Visa 189: January 28, 2013
CO: March 20, 2013 (Team 33 Brisbane, CO Initials DC)
Grant: March 25, 2013
Posts: 993Member
Joined: Feb 15, 2012
261313 (Software Engineer)
Feb.15.2012 - started working on ACS requirements
Mar.02.2012 - submitted online ACS application and sent documents to ACS via Fedex
Mar.05.2012 - ACS acknowledged actual documents
Mar.21.2012 - ACS finalised assessment: Suitable
Mar.31.2012 - IELTS exam with BC
Apr.13.2012 - IELTS Results (L:8.5 R:7 W: 7 S: 8 OB: 7.5) Thank you LORD!
Apr.14.2012 - Lodged 175 Online Application
Apr.20.2012 - Completed Online Attachments
May.24.2012 - "Application being processed further"
May.29.2012 - CO Assigned :-)
Jun.07.2012 - Uploaded NBI Clearance
Jun.13.2012 - Medical/Health Requirements Finalised
Jun.14.2012 - VISA GRANT! Thank you, LORD! :-)
Jun.07.2013 - Initial Entry Date Deadline
Apr.28.2013 - Initial Entry (Sydney)
Jun.28.2013 - Verbal Job Offer (Melbourne)
Jul.08.2013 - First day of Work and first day of child care for my son (Melbourne)
Aug.21.2013 - First day of Work in Sydney
"Great is the LORD and most worthy of praise; his greatness no one can fathom." Psalm 145:3
Posts: 41Member
Joined: Oct 17, 2012
Occupation: Developer Programmer
Lodge Visa 189: January 28, 2013
CO: March 20, 2013 (Team 33 Brisbane, CO Initials DC)
Grant: March 25, 2013
Posts: 82Member
Joined: Jul 31, 2012
ACS
Nominated Occupation: Analyst Programmer (261311)
Submitted: Sept 18, 2012
Stage 4: Sept 19, 2012
in progress:Oct 19 8am
Case finalised: Oct 19 3pm (Thank you Lord)
IELTS Exam: Jan 12, 2013 (failed)
EOI visa (489 Regional) 60 pts:Oct 1, 2013
Posts: 41Member
Joined: Oct 17, 2012
@stynx - hindi pa pwede eh siguro by december pa kasi balak ko sa feb na mag lodge (for monetary reasons). 65 points ako...
Occupation: Developer Programmer
Lodge Visa 189: January 28, 2013
CO: March 20, 2013 (Team 33 Brisbane, CO Initials DC)
Grant: March 25, 2013
Posts: 241Member
Joined: Sep 12, 2012
Posts: 44Member
Joined: Oct 19, 2012
261314 Software Tester
Dec 5 2012 - ACS submission under General Skills
Jan 5 2013 - IELTS L:6.5 R:7.5 W:7 S:6.5 = OBS: 7
Jan 29 2013 - ACS advise to apply under RPL (30days to submit)
March 18 2013 - received ACS Suitable 6.9 yrs Work Experience
Apr 5 2014 - IELTS L:8 R:7 W:6.5 S:6.5 = OBS: 7
Posts: 766Member
Joined: Jul 31, 2012
Systems Administrator (ANZSCO: 262113)
01Aug2012: Docs Preparation
11Sep2012: ACS Assessment Submission
15Oct2012: ACS Assessment Positive Result
17Nov2012: IELTS Exam
30Nov2012: IELTS Results L:6.5 WRS:7.0 OB:7.0, EOI Creation and NSW SS Submission
19Mar2013: NSW SS Acknowledgement Letter Received
01May2013: NSW SS Approval Email Received, SkillSelect Invite Received
29May2013: Visa 190 Lodgement (LORD MARAMING SALAMAT Po, wag nyo po muna ako kukunin sa dami ng Blessings nyo! ;-))
01June2013: NBI Clearance Application
03June2013: Mailed NBI Clearance Application Received by Ms. JM
06June2013: Medical Examination
12June2013: CO allocated Adelaide GSM Team 6
13June2013: SG PCC Applied
14June2013: Evidence of Income Submitted
17June2013: Medical Results Uploaded
19June2013: Form 80 and 1221 Uploaded
25June2013: NBI Clearance received from Mother Land ;-)
Uploaded
03July2013: SG PCC Released and Uploaded
05July2013: VISA Grant (with de facto)!!! SALAMAT LORD!!!!
Oct2013: EID Completed.
Oct2013: Job Offer received; SALAMAT LORD!!!!
Jan2014: Starting a life in Down Under, Corporate Slave doing the rat race!!!
Posts: 143Member
Joined: Aug 02, 2012
Accountant (General) (221111)
Posts: 241Member
Joined: Sep 12, 2012
Posts: 766Member
Joined: Jul 31, 2012
Systems Administrator (ANZSCO: 262113)
01Aug2012: Docs Preparation
11Sep2012: ACS Assessment Submission
15Oct2012: ACS Assessment Positive Result
17Nov2012: IELTS Exam
30Nov2012: IELTS Results L:6.5 WRS:7.0 OB:7.0, EOI Creation and NSW SS Submission
19Mar2013: NSW SS Acknowledgement Letter Received
01May2013: NSW SS Approval Email Received, SkillSelect Invite Received
29May2013: Visa 190 Lodgement (LORD MARAMING SALAMAT Po, wag nyo po muna ako kukunin sa dami ng Blessings nyo! ;-))
01June2013: NBI Clearance Application
03June2013: Mailed NBI Clearance Application Received by Ms. JM
06June2013: Medical Examination
12June2013: CO allocated Adelaide GSM Team 6
13June2013: SG PCC Applied
14June2013: Evidence of Income Submitted
17June2013: Medical Results Uploaded
19June2013: Form 80 and 1221 Uploaded
25June2013: NBI Clearance received from Mother Land ;-)
Uploaded
03July2013: SG PCC Released and Uploaded
05July2013: VISA Grant (with de facto)!!! SALAMAT LORD!!!!
Oct2013: EID Completed.
Oct2013: Job Offer received; SALAMAT LORD!!!!
Jan2014: Starting a life in Down Under, Corporate Slave doing the rat race!!!
Posts: 41Member
Joined: Oct 17, 2012
Occupation: Developer Programmer
Lodge Visa 189: January 28, 2013
CO: March 20, 2013 (Team 33 Brisbane, CO Initials DC)
Grant: March 25, 2013