most recent by plasticeye
most recent by kimgilbie
most recent by Caathy
most recent by fasih
General Skilled Immigration Visa - Step By Step Process
most recent by mathilde9
The Best Vegan Eats in San Diego: El Avocado
most recent by RosieHockm
VICTORIA STATES SPONSORSHIP 2024-2025
most recent by Ozdrims
The longest running Pinoy-Australian Forum site in the history. We are connecting Pinoys "in" and "to" Australia since 2010! If you want to join in, click one of these buttons!
Comments
Posts: 37Member
Joined: Aug 29, 2015
Posts: 141Member
Joined: Sep 11, 2014
January 2015 - IELTS 6.5
Feb 2015 - Submitted CDR
April 2015 - PTE Academic (7)
April 29 2015 - EA Positive Outcome
May 6, 2015 - Lodged EOI - 65pts
May 7, 2015 - Invited
May 14, 2015 - Visa Lodgement
July 6, 2015 - CO allocated, requesting for police certs and medical
July 23, 2015 - uploaded police certs and finalised medical
Aug 6, 2015 - Visa Grant
Joined: Jul 17, 2015
Hubby transferred po kasi to a new company after the assesment.
Please advice po. thanks!
Hubby is the applicant
Anzco 261313 - Software Engineer
July 3, 2015 - Submitted Docs for ACS
July 9, 2015 - Received suitable results (thank you Lord)
August 20, 2015 - PTE
Posts: 147Member
Joined: Dec 12, 2014
praise God
Posts: 682Member
Joined: May 19, 2014
As of now wala pa ding golden email.. hintay hintay pa ng konti.. sana this week meron na..
Main Applicant: Medical Laboratory Scientist (Phil)
Dependent: Software Developer (Syria)
21 May 15 - Lodged Visa App (Visa 189)
16 July 15 - CO Allocated, Add'l Docs (3rd PCC, Form 1221, Form 80)
27 Aug 15 - Last Docs submitted
02 Sep 15 - Docs sent for Ext Security Check
07 Jul 16 - new PCC and Medical Exam requested
18 Aug 16 - Visa Grant
26 Aug 16 - Secured a job interview
03 Sep 16 - First entry to Oz
Waiting period - 1 year & 1.5 mos..
❀❀❀❀❀❀❀❀❀❀❀❀❀❀❀❀❀❀❀❀❀❀❀❀❀❀❀❀❀❀❀❀❀❀❀❀❀❀❀❀❀❀❀❀❀❀❀❀❀❀
Branded Children's Clothes
VISIT our Website: www.glamkidz.net
Posts: 80Member
Joined: Sep 19, 2013
Architectural Draftsperson (ANZSCO 312111)
VISA 190
March 2, 2015 - ACT State Sponsorship application submitted
April 21, 2015 - CO assigned
May 6, 2015 - CO asked for further employment research
May 18, 2015 - State Sponsorship application approved
May 24, 2015 - Lodged Visa 190 Application
July 21, 2015 - CO contact
July 28, 2015 - submitted all required documents
September 18, 2015 - Visa Grant!!!
Posts: 185Member
Joined: Nov 08, 2012
Accountant (General): 221111
Primary Applicant: Husband
01/29/2013 - IELTS results L-8.5 R-8.0 W-8.0 S-9.0
05/26/2014 - CPA AU Professional Title granted by CPA Australia
06/02/2014 - Submitted and paid CPAA Migration Assessment
07/04/2014 - Assessment by CPAA 11/12 (Questioning about Accounting Theory)
08/04/2014 - Sent Appeal Letter with all the supporting Documents to CPAA
08/29/2014 - Received Complete CPAA Assessment Result 12/12 (Academically Suitable for Migration)
12/12/2014 - Received CPAA Skilled Employment Assessment
03/26/2015 - Submitted EOI for 189 (75pts)
03/27/2015 - Invited to apply Visa 189
04/06/2015 - Lodged Visa 189
05/02/2015 - Medicals at Gulf X-ray and Laboratories Doha
05/06/2015 - Medicals Uploaded
05/12/2015 - Received NBI from Representative in PH. Uploaded NBI
05/18/2015 - CO Allocated. Same day Uploaded additional Docs.
05/22/2015 - Received Delay Email
07/02/2015 - VISA GRANT! Thank you Lord!
08/21/2015 - Initial Entry Completed (Melbourne)
May 2016 - Husband got a Job Offer
June 2016 - Big Move Melbourne
All for the Greater Glory of GOD!!!
Proverbs 16:3 Commit your work to the Lord, and your plans will be established.
Posts: 682Member
Joined: May 19, 2014
Main Applicant: Medical Laboratory Scientist (Phil)
Dependent: Software Developer (Syria)
21 May 15 - Lodged Visa App (Visa 189)
16 July 15 - CO Allocated, Add'l Docs (3rd PCC, Form 1221, Form 80)
27 Aug 15 - Last Docs submitted
02 Sep 15 - Docs sent for Ext Security Check
07 Jul 16 - new PCC and Medical Exam requested
18 Aug 16 - Visa Grant
26 Aug 16 - Secured a job interview
03 Sep 16 - First entry to Oz
Waiting period - 1 year & 1.5 mos..
❀❀❀❀❀❀❀❀❀❀❀❀❀❀❀❀❀❀❀❀❀❀❀❀❀❀❀❀❀❀❀❀❀❀❀❀❀❀❀❀❀❀❀❀❀❀❀❀❀❀
Branded Children's Clothes
VISIT our Website: www.glamkidz.net
Posts: 81Member
Joined: Jun 09, 2014
2014.04.07 - Starts Preparing Documents
2014.05.02 - Submitted ACS Skills Assessment
2014.06.06 - ACS assessed skills as suitable
2014.12.13 - IELTS L-8.5, R-9, W-7.5, S-7
2015.03.11 - EOI Submission (NSW SS)
2015.04.02 - NSW SS Invitation (Withdrew due to and pursue 189)
2015.04.24 - 189 Invitation
2015.05.25 - 189 Application Submitted
2015.07.04 - Medical Completed
2015.07.05 - Apply NBI at PCC
2015.07.13 - Received NBI application in PH
2015.07.14 - First CO contact
2015.07.15 - Apply PCC
2015.08.03 - Uploaded Form 80 and NBI Clearance
2015.08.05 - Police sent CNCC to AU
2015.08.25 - Visa Grant
Posts: 36Member
Joined: Oct 24, 2013
Posts: 185Member
Joined: Nov 08, 2012
Kaya ginagamit namin pancheck is Visa Grant number nalang hehehe. I wonder bakit kaya ganun baka sa system nila or dahil iisa ang TRN ng dependent and ng primary.
Accountant (General): 221111
Primary Applicant: Husband
01/29/2013 - IELTS results L-8.5 R-8.0 W-8.0 S-9.0
05/26/2014 - CPA AU Professional Title granted by CPA Australia
06/02/2014 - Submitted and paid CPAA Migration Assessment
07/04/2014 - Assessment by CPAA 11/12 (Questioning about Accounting Theory)
08/04/2014 - Sent Appeal Letter with all the supporting Documents to CPAA
08/29/2014 - Received Complete CPAA Assessment Result 12/12 (Academically Suitable for Migration)
12/12/2014 - Received CPAA Skilled Employment Assessment
03/26/2015 - Submitted EOI for 189 (75pts)
03/27/2015 - Invited to apply Visa 189
04/06/2015 - Lodged Visa 189
05/02/2015 - Medicals at Gulf X-ray and Laboratories Doha
05/06/2015 - Medicals Uploaded
05/12/2015 - Received NBI from Representative in PH. Uploaded NBI
05/18/2015 - CO Allocated. Same day Uploaded additional Docs.
05/22/2015 - Received Delay Email
07/02/2015 - VISA GRANT! Thank you Lord!
08/21/2015 - Initial Entry Completed (Melbourne)
May 2016 - Husband got a Job Offer
June 2016 - Big Move Melbourne
All for the Greater Glory of GOD!!!
Proverbs 16:3 Commit your work to the Lord, and your plans will be established.
Posts: 4Member
Joined: Aug 22, 2015
Posts: 682Member
Joined: May 19, 2014
Main Applicant: Medical Laboratory Scientist (Phil)
Dependent: Software Developer (Syria)
21 May 15 - Lodged Visa App (Visa 189)
16 July 15 - CO Allocated, Add'l Docs (3rd PCC, Form 1221, Form 80)
27 Aug 15 - Last Docs submitted
02 Sep 15 - Docs sent for Ext Security Check
07 Jul 16 - new PCC and Medical Exam requested
18 Aug 16 - Visa Grant
26 Aug 16 - Secured a job interview
03 Sep 16 - First entry to Oz
Waiting period - 1 year & 1.5 mos..
❀❀❀❀❀❀❀❀❀❀❀❀❀❀❀❀❀❀❀❀❀❀❀❀❀❀❀❀❀❀❀❀❀❀❀❀❀❀❀❀❀❀❀❀❀❀❀❀❀❀
Branded Children's Clothes
VISIT our Website: www.glamkidz.net
Posts: 197Member
Joined: Jun 24, 2015
Posts: 80Member
Joined: Aug 01, 2012
@JuanPeron Congratulations mate!
342314 (Electronic Instrument Tradesperson - General)
01/08/2014 - submitted docs to TRA
16/08/2014 - IELTS exam
27/08/2014 - IELTS result L-8.5 R-8.5 W-6.5 S-7 (i can't bilibid!)
01/09/2014 - request for remarking
27/10/2014 - TRA unsuccessful (aray ko kuya eddie!)
28/11/2014 - successful remarking for Writing- 6.5 to 7 (Yesh!)
16/01/2015 - submitted docs to TRA again (if first you don't succeed, pay them another $1000)
21/04/2015 - received TRA successful (Thank you Lord!)
22/04/2015 - lodge EOI (60 pts)
07/05/2015 - medical at SATA AMK thru "My health declaration"
12/05/2015 - uploaded medical
22/05/2015 - received ITA (To God be the glory!)
23/05/2015 - lodge visa application 189 (with wife and son) and frontloaded docs
03/06/2015 - uploaded Singapore COC
16/06/2015 - uploaded NBI Clearance
03/08/2015 - FINISH LINE! Thank you Lord.
Posts: 185Member
Joined: Nov 08, 2012
Accountant (General): 221111
Primary Applicant: Husband
01/29/2013 - IELTS results L-8.5 R-8.0 W-8.0 S-9.0
05/26/2014 - CPA AU Professional Title granted by CPA Australia
06/02/2014 - Submitted and paid CPAA Migration Assessment
07/04/2014 - Assessment by CPAA 11/12 (Questioning about Accounting Theory)
08/04/2014 - Sent Appeal Letter with all the supporting Documents to CPAA
08/29/2014 - Received Complete CPAA Assessment Result 12/12 (Academically Suitable for Migration)
12/12/2014 - Received CPAA Skilled Employment Assessment
03/26/2015 - Submitted EOI for 189 (75pts)
03/27/2015 - Invited to apply Visa 189
04/06/2015 - Lodged Visa 189
05/02/2015 - Medicals at Gulf X-ray and Laboratories Doha
05/06/2015 - Medicals Uploaded
05/12/2015 - Received NBI from Representative in PH. Uploaded NBI
05/18/2015 - CO Allocated. Same day Uploaded additional Docs.
05/22/2015 - Received Delay Email
07/02/2015 - VISA GRANT! Thank you Lord!
08/21/2015 - Initial Entry Completed (Melbourne)
May 2016 - Husband got a Job Offer
June 2016 - Big Move Melbourne
All for the Greater Glory of GOD!!!
Proverbs 16:3 Commit your work to the Lord, and your plans will be established.
Posts: 682Member
Joined: May 19, 2014
Nag-email ung CO today.. same lng din sinabi dun sa npg-usapan nmin sa phone nung Monday.. may iniintay pa silang checks from other agencies.. pero lahat nmn daw ng documents na kailangan nila nareceive n nila..
Sana this month lumabas na..
Main Applicant: Medical Laboratory Scientist (Phil)
Dependent: Software Developer (Syria)
21 May 15 - Lodged Visa App (Visa 189)
16 July 15 - CO Allocated, Add'l Docs (3rd PCC, Form 1221, Form 80)
27 Aug 15 - Last Docs submitted
02 Sep 15 - Docs sent for Ext Security Check
07 Jul 16 - new PCC and Medical Exam requested
18 Aug 16 - Visa Grant
26 Aug 16 - Secured a job interview
03 Sep 16 - First entry to Oz
Waiting period - 1 year & 1.5 mos..
❀❀❀❀❀❀❀❀❀❀❀❀❀❀❀❀❀❀❀❀❀❀❀❀❀❀❀❀❀❀❀❀❀❀❀❀❀❀❀❀❀❀❀❀❀❀❀❀❀❀
Branded Children's Clothes
VISIT our Website: www.glamkidz.net
Posts: 147Member
Joined: Dec 12, 2014
praise God
Posts: 682Member
Joined: May 19, 2014
Mabait naman yung CO.. sabi nia alam nila na ng-cause ng worry sa amin ung delay sa pagfinalize ng visa.. pero as soon as possible daw inform agad nila kami sa results.. may mga checks lang daw na ginagawa.. ibang agency daw ung gumagawa nung iba kaya di nia masabi ung timeframe kung kelan matatapos..
Main Applicant: Medical Laboratory Scientist (Phil)
Dependent: Software Developer (Syria)
21 May 15 - Lodged Visa App (Visa 189)
16 July 15 - CO Allocated, Add'l Docs (3rd PCC, Form 1221, Form 80)
27 Aug 15 - Last Docs submitted
02 Sep 15 - Docs sent for Ext Security Check
07 Jul 16 - new PCC and Medical Exam requested
18 Aug 16 - Visa Grant
26 Aug 16 - Secured a job interview
03 Sep 16 - First entry to Oz
Waiting period - 1 year & 1.5 mos..
❀❀❀❀❀❀❀❀❀❀❀❀❀❀❀❀❀❀❀❀❀❀❀❀❀❀❀❀❀❀❀❀❀❀❀❀❀❀❀❀❀❀❀❀❀❀❀❀❀❀
Branded Children's Clothes
VISIT our Website: www.glamkidz.net
Posts: 80Member
Joined: Sep 19, 2013
Buti ka pa sis @raspberry0707, meron update.. sa akin, wala pa din..
Architectural Draftsperson (ANZSCO 312111)
VISA 190
March 2, 2015 - ACT State Sponsorship application submitted
April 21, 2015 - CO assigned
May 6, 2015 - CO asked for further employment research
May 18, 2015 - State Sponsorship application approved
May 24, 2015 - Lodged Visa 190 Application
July 21, 2015 - CO contact
July 28, 2015 - submitted all required documents
September 18, 2015 - Visa Grant!!!
Posts: 682Member
Joined: May 19, 2014
Main Applicant: Medical Laboratory Scientist (Phil)
Dependent: Software Developer (Syria)
21 May 15 - Lodged Visa App (Visa 189)
16 July 15 - CO Allocated, Add'l Docs (3rd PCC, Form 1221, Form 80)
27 Aug 15 - Last Docs submitted
02 Sep 15 - Docs sent for Ext Security Check
07 Jul 16 - new PCC and Medical Exam requested
18 Aug 16 - Visa Grant
26 Aug 16 - Secured a job interview
03 Sep 16 - First entry to Oz
Waiting period - 1 year & 1.5 mos..
❀❀❀❀❀❀❀❀❀❀❀❀❀❀❀❀❀❀❀❀❀❀❀❀❀❀❀❀❀❀❀❀❀❀❀❀❀❀❀❀❀❀❀❀❀❀❀❀❀❀
Branded Children's Clothes
VISIT our Website: www.glamkidz.net
Posts: 80Member
Joined: Sep 19, 2013
Architectural Draftsperson (ANZSCO 312111)
VISA 190
March 2, 2015 - ACT State Sponsorship application submitted
April 21, 2015 - CO assigned
May 6, 2015 - CO asked for further employment research
May 18, 2015 - State Sponsorship application approved
May 24, 2015 - Lodged Visa 190 Application
July 21, 2015 - CO contact
July 28, 2015 - submitted all required documents
September 18, 2015 - Visa Grant!!!
Posts: 36Member
Joined: Oct 24, 2013
Posts: 141Member
Joined: Sep 11, 2014
January 2015 - IELTS 6.5
Feb 2015 - Submitted CDR
April 2015 - PTE Academic (7)
April 29 2015 - EA Positive Outcome
May 6, 2015 - Lodged EOI - 65pts
May 7, 2015 - Invited
May 14, 2015 - Visa Lodgement
July 6, 2015 - CO allocated, requesting for police certs and medical
July 23, 2015 - uploaded police certs and finalised medical
Aug 6, 2015 - Visa Grant
Posts: 185Member
Joined: Nov 08, 2012
Accountant (General): 221111
Primary Applicant: Husband
01/29/2013 - IELTS results L-8.5 R-8.0 W-8.0 S-9.0
05/26/2014 - CPA AU Professional Title granted by CPA Australia
06/02/2014 - Submitted and paid CPAA Migration Assessment
07/04/2014 - Assessment by CPAA 11/12 (Questioning about Accounting Theory)
08/04/2014 - Sent Appeal Letter with all the supporting Documents to CPAA
08/29/2014 - Received Complete CPAA Assessment Result 12/12 (Academically Suitable for Migration)
12/12/2014 - Received CPAA Skilled Employment Assessment
03/26/2015 - Submitted EOI for 189 (75pts)
03/27/2015 - Invited to apply Visa 189
04/06/2015 - Lodged Visa 189
05/02/2015 - Medicals at Gulf X-ray and Laboratories Doha
05/06/2015 - Medicals Uploaded
05/12/2015 - Received NBI from Representative in PH. Uploaded NBI
05/18/2015 - CO Allocated. Same day Uploaded additional Docs.
05/22/2015 - Received Delay Email
07/02/2015 - VISA GRANT! Thank you Lord!
08/21/2015 - Initial Entry Completed (Melbourne)
May 2016 - Husband got a Job Offer
June 2016 - Big Move Melbourne
All for the Greater Glory of GOD!!!
Proverbs 16:3 Commit your work to the Lord, and your plans will be established.
Posts: 682Member
Joined: May 19, 2014
Ang IED range from 1 week to almost 1 year.. depende sa expiry ng Police Clearance at Medical Exam..
Main Applicant: Medical Laboratory Scientist (Phil)
Dependent: Software Developer (Syria)
21 May 15 - Lodged Visa App (Visa 189)
16 July 15 - CO Allocated, Add'l Docs (3rd PCC, Form 1221, Form 80)
27 Aug 15 - Last Docs submitted
02 Sep 15 - Docs sent for Ext Security Check
07 Jul 16 - new PCC and Medical Exam requested
18 Aug 16 - Visa Grant
26 Aug 16 - Secured a job interview
03 Sep 16 - First entry to Oz
Waiting period - 1 year & 1.5 mos..
❀❀❀❀❀❀❀❀❀❀❀❀❀❀❀❀❀❀❀❀❀❀❀❀❀❀❀❀❀❀❀❀❀❀❀❀❀❀❀❀❀❀❀❀❀❀❀❀❀❀
Branded Children's Clothes
VISIT our Website: www.glamkidz.net
Posts: 682Member
Joined: May 19, 2014
Main Applicant: Medical Laboratory Scientist (Phil)
Dependent: Software Developer (Syria)
21 May 15 - Lodged Visa App (Visa 189)
16 July 15 - CO Allocated, Add'l Docs (3rd PCC, Form 1221, Form 80)
27 Aug 15 - Last Docs submitted
02 Sep 15 - Docs sent for Ext Security Check
07 Jul 16 - new PCC and Medical Exam requested
18 Aug 16 - Visa Grant
26 Aug 16 - Secured a job interview
03 Sep 16 - First entry to Oz
Waiting period - 1 year & 1.5 mos..
❀❀❀❀❀❀❀❀❀❀❀❀❀❀❀❀❀❀❀❀❀❀❀❀❀❀❀❀❀❀❀❀❀❀❀❀❀❀❀❀❀❀❀❀❀❀❀❀❀❀
Branded Children's Clothes
VISIT our Website: www.glamkidz.net
Posts: 80Member
Joined: Sep 19, 2013
Architectural Draftsperson (ANZSCO 312111)
VISA 190
March 2, 2015 - ACT State Sponsorship application submitted
April 21, 2015 - CO assigned
May 6, 2015 - CO asked for further employment research
May 18, 2015 - State Sponsorship application approved
May 24, 2015 - Lodged Visa 190 Application
July 21, 2015 - CO contact
July 28, 2015 - submitted all required documents
September 18, 2015 - Visa Grant!!!
Posts: 682Member
Joined: May 19, 2014
Main Applicant: Medical Laboratory Scientist (Phil)
Dependent: Software Developer (Syria)
21 May 15 - Lodged Visa App (Visa 189)
16 July 15 - CO Allocated, Add'l Docs (3rd PCC, Form 1221, Form 80)
27 Aug 15 - Last Docs submitted
02 Sep 15 - Docs sent for Ext Security Check
07 Jul 16 - new PCC and Medical Exam requested
18 Aug 16 - Visa Grant
26 Aug 16 - Secured a job interview
03 Sep 16 - First entry to Oz
Waiting period - 1 year & 1.5 mos..
❀❀❀❀❀❀❀❀❀❀❀❀❀❀❀❀❀❀❀❀❀❀❀❀❀❀❀❀❀❀❀❀❀❀❀❀❀❀❀❀❀❀❀❀❀❀❀❀❀❀
Branded Children's Clothes
VISIT our Website: www.glamkidz.net
Posts: 80Member
Joined: Sep 19, 2013
Yes, meron ako access sa immiaccount- Assessment in progress sya and last updated July 28 pa.
Pag bubuksan ko, lahat kmi, Processing ang nakalagay..
Sa inyo, ano nakalagay sa immiaccount nyo?
Architectural Draftsperson (ANZSCO 312111)
VISA 190
March 2, 2015 - ACT State Sponsorship application submitted
April 21, 2015 - CO assigned
May 6, 2015 - CO asked for further employment research
May 18, 2015 - State Sponsorship application approved
May 24, 2015 - Lodged Visa 190 Application
July 21, 2015 - CO contact
July 28, 2015 - submitted all required documents
September 18, 2015 - Visa Grant!!!