most recent by eel_kram025
The Best Vegan Eats in San Diego: El Avocado
most recent by RosieHockm
VICTORIA STATES SPONSORSHIP 2024-2025
most recent by Ozdrims
QUEENSLAND STATES SPONSORSHIP FY 2024-2025
most recent by Ozdrims
Australian Computer Society Skills Application
most recent by Ozdrims
most recent by Cerberus13
NSW STATE SPONSORSHIP 2024~2025
most recent by Ozdrims
Highly suggested Migration Agency
most recent by Marionittes40
most recent by Marionittes40
The longest running Pinoy-Australian Forum site in the history. We are connecting Pinoys "in" and "to" Australia since 2010! If you want to join in, click one of these buttons!
Comments
Posts: 292Member
Joined: Oct 28, 2015
Dec 12 2015 - 1st IELTS LRWS failed
Feb 2016 - 2nd IELTS LRWS failed
June 14 2016 - PTE Acad LRWS 90/83/87/90 - 20 points!
June 23 2016 - Submitted req to ACS
July 7 2016 - ACS assessment received < 5 years. Sent email for
reassessment
July 8 2016 - ACS result update 5 years credited (75pts)
July 14 2016 - Sent EOI
July 28 2016 - Got my NBI Clearance
Aug 2 2016 - Received ITA
Aug 9 2016 - Lodged Visa
Aug 12 2016 - took Medical Exam
Aug 15 2016 - sent Medical results. No action needed.
- attached documents
Aug 30 2016 - uploaded form 80
Aug 31 2016 - CO contact (send PTE results online) sayang DG na
sana..
- Sent PTE results online. Clicked "Information
Provided" and emailed CO.
Oct 13 2016 - (12:43PM) Sent a follow up email. (ginaya si Bourne)
Oct 13 2016 - VISA received!
Feb 6 2016 - Bound to Melbourne
God is able to make all grace abound to you!
Never give up. Reach for your dreams!
Posts: 303Member
Joined: Feb 01, 2016
NOC - 261313 Software Engineer
Qualification - Bachelor Degree (BS Computer Science)
March 29, 2016 - Submitted to ACS
April 1, 2016 - IELTS (BC) Speaking Test
April 2, 2016 - IELTS (BC) Written (LWR) Test
April 12, 2016 - Received ACS Assessment result - Suitable (Degree), minus 2.2 years
April 15, 2016 - L/R/W/S - 7.5/6.5/6.5/7 -
April 18, 2016 - Secured NBI Clearance while in PH (me)
June 13, 2016 - PTE-A Exam
June 14, 2016 - PTE-A Result - L/R/S/W - 83/78/85/81
June 16, 2016 - Submitted EOI (subclass 189 / 70 pts)
July 1, 2016 - Partner applied for NBI Clearance (from SG)
July 06, 2016 - Received ITA
July 16, 2016 - Medical - SATA AMK, SG
July 19, 2016 - Medical cleared (me)
August 1, 2016 - Partner received her NBI clearance
August 2, 2016 - Medical cleared (partner)
August 9, 2016 - Logded Visa 189
August 9, 2016 - Applied for Singapore COC (me & partner)
August 10, 2016 - Uploaded docs (except SG COC)
August 18, 2016 - Collected and Uploaded SG COC
August 24, 2016 - CO (Brisbane) contacted, asking for form-80 of dependent - (Re-uploaded same day)
October 11, 2016 - Followed up via email
October 13, 2016 - Hugh Grant
Posts: 292Member
Joined: Oct 28, 2015
Dec 12 2015 - 1st IELTS LRWS failed
Feb 2016 - 2nd IELTS LRWS failed
June 14 2016 - PTE Acad LRWS 90/83/87/90 - 20 points!
June 23 2016 - Submitted req to ACS
July 7 2016 - ACS assessment received < 5 years. Sent email for
reassessment
July 8 2016 - ACS result update 5 years credited (75pts)
July 14 2016 - Sent EOI
July 28 2016 - Got my NBI Clearance
Aug 2 2016 - Received ITA
Aug 9 2016 - Lodged Visa
Aug 12 2016 - took Medical Exam
Aug 15 2016 - sent Medical results. No action needed.
- attached documents
Aug 30 2016 - uploaded form 80
Aug 31 2016 - CO contact (send PTE results online) sayang DG na
sana..
- Sent PTE results online. Clicked "Information
Provided" and emailed CO.
Oct 13 2016 - (12:43PM) Sent a follow up email. (ginaya si Bourne)
Oct 13 2016 - VISA received!
Feb 6 2016 - Bound to Melbourne
God is able to make all grace abound to you!
Never give up. Reach for your dreams!
Posts: 303Member
Joined: Feb 01, 2016
NOC - 261313 Software Engineer
Qualification - Bachelor Degree (BS Computer Science)
March 29, 2016 - Submitted to ACS
April 1, 2016 - IELTS (BC) Speaking Test
April 2, 2016 - IELTS (BC) Written (LWR) Test
April 12, 2016 - Received ACS Assessment result - Suitable (Degree), minus 2.2 years
April 15, 2016 - L/R/W/S - 7.5/6.5/6.5/7 -
April 18, 2016 - Secured NBI Clearance while in PH (me)
June 13, 2016 - PTE-A Exam
June 14, 2016 - PTE-A Result - L/R/S/W - 83/78/85/81
June 16, 2016 - Submitted EOI (subclass 189 / 70 pts)
July 1, 2016 - Partner applied for NBI Clearance (from SG)
July 06, 2016 - Received ITA
July 16, 2016 - Medical - SATA AMK, SG
July 19, 2016 - Medical cleared (me)
August 1, 2016 - Partner received her NBI clearance
August 2, 2016 - Medical cleared (partner)
August 9, 2016 - Logded Visa 189
August 9, 2016 - Applied for Singapore COC (me & partner)
August 10, 2016 - Uploaded docs (except SG COC)
August 18, 2016 - Collected and Uploaded SG COC
August 24, 2016 - CO (Brisbane) contacted, asking for form-80 of dependent - (Re-uploaded same day)
October 11, 2016 - Followed up via email
October 13, 2016 - Hugh Grant
Posts: 23Member
Joined: Feb 27, 2016
ako din nagfollow up last week, nagreply sila today sabi "We have received and recorded your husbands PTE scores and no further information is required in this respect. Processing of your application is ongoing and we will contact you should we require additional information or when we make a decision."
Masaya nako nagupdate sila hehehe. Ewan ko lang kelan si grant kasi yung friend ko nakareceive din daw ng ganyang email 2 weeks ago, and until now waley pa.
254499 - Nurse (NEC)
Aug 2015 -IELTS
Feb - April2016 - IRON Program (Melbourne)
May 6, 2016 - Registered Nurse Div1
May 21, 2016 - Submitted ANMAC
July 27, 2016 - Positive ANMAC result
Aug 2, 2016 - EOI
Aug 17, 2016 - Received ITA and Lodged Visa 189 (excited e)
Aug 23, 2016 - CO Contact (IELTS of husband expired, asking for english proof; CEMI uploaded same day)
Sept 9, 2016 - CO Contact (CEMI was not accepted, undergrad kasi si hubby but i read sa iba dito inaccept.)
Sept 16, 2016 - PTE Results of husband submitted
Oct 13, 2016 - received an email that "Processing of your application is ongoing and we will contact you should we require additional information or when we make a decision."
Posts: 303Member
Joined: Feb 01, 2016
NOC - 261313 Software Engineer
Qualification - Bachelor Degree (BS Computer Science)
March 29, 2016 - Submitted to ACS
April 1, 2016 - IELTS (BC) Speaking Test
April 2, 2016 - IELTS (BC) Written (LWR) Test
April 12, 2016 - Received ACS Assessment result - Suitable (Degree), minus 2.2 years
April 15, 2016 - L/R/W/S - 7.5/6.5/6.5/7 -
April 18, 2016 - Secured NBI Clearance while in PH (me)
June 13, 2016 - PTE-A Exam
June 14, 2016 - PTE-A Result - L/R/S/W - 83/78/85/81
June 16, 2016 - Submitted EOI (subclass 189 / 70 pts)
July 1, 2016 - Partner applied for NBI Clearance (from SG)
July 06, 2016 - Received ITA
July 16, 2016 - Medical - SATA AMK, SG
July 19, 2016 - Medical cleared (me)
August 1, 2016 - Partner received her NBI clearance
August 2, 2016 - Medical cleared (partner)
August 9, 2016 - Logded Visa 189
August 9, 2016 - Applied for Singapore COC (me & partner)
August 10, 2016 - Uploaded docs (except SG COC)
August 18, 2016 - Collected and Uploaded SG COC
August 24, 2016 - CO (Brisbane) contacted, asking for form-80 of dependent - (Re-uploaded same day)
October 11, 2016 - Followed up via email
October 13, 2016 - Hugh Grant
Posts: 913Member
Joined: Nov 15, 2014
312312 - (Electrical Engineering Technician) Primary
11/27/2015 - Lodge TRA assessment application
02/26/2016 - Received TRA outcome letter
04/19/2016 - lodge vetasses qualification assessment.
05/20/2016- Received Vetassess PTA, AQF Bachelors Degree
05/21/2016- Lodge SS for SA
06/06/2016- Received ITA SS SA
06/11/2016- Lodge SS for NSW
06/27/2016- Received ITA SS NSW ( God is great! thank you Lord)
07/14/2016- Medical Cleared
07/31/2016- lodge ITA NSW
08/05/2016- Uploaded NBI. Waiting.. In His time everything is right..,
23/11/2016- Grant ( Thanks Lord God )
Posts: 23Member
Joined: Feb 27, 2016
254499 - Nurse (NEC)
Aug 2015 -IELTS
Feb - April2016 - IRON Program (Melbourne)
May 6, 2016 - Registered Nurse Div1
May 21, 2016 - Submitted ANMAC
July 27, 2016 - Positive ANMAC result
Aug 2, 2016 - EOI
Aug 17, 2016 - Received ITA and Lodged Visa 189 (excited e)
Aug 23, 2016 - CO Contact (IELTS of husband expired, asking for english proof; CEMI uploaded same day)
Sept 9, 2016 - CO Contact (CEMI was not accepted, undergrad kasi si hubby but i read sa iba dito inaccept.)
Sept 16, 2016 - PTE Results of husband submitted
Oct 13, 2016 - received an email that "Processing of your application is ongoing and we will contact you should we require additional information or when we make a decision."
Posts: 44Member
Joined: Aug 15, 2016
complete na ba ang Aug batch?
Posts: 303Member
Joined: Feb 01, 2016
NOC - 261313 Software Engineer
Qualification - Bachelor Degree (BS Computer Science)
March 29, 2016 - Submitted to ACS
April 1, 2016 - IELTS (BC) Speaking Test
April 2, 2016 - IELTS (BC) Written (LWR) Test
April 12, 2016 - Received ACS Assessment result - Suitable (Degree), minus 2.2 years
April 15, 2016 - L/R/W/S - 7.5/6.5/6.5/7 -
April 18, 2016 - Secured NBI Clearance while in PH (me)
June 13, 2016 - PTE-A Exam
June 14, 2016 - PTE-A Result - L/R/S/W - 83/78/85/81
June 16, 2016 - Submitted EOI (subclass 189 / 70 pts)
July 1, 2016 - Partner applied for NBI Clearance (from SG)
July 06, 2016 - Received ITA
July 16, 2016 - Medical - SATA AMK, SG
July 19, 2016 - Medical cleared (me)
August 1, 2016 - Partner received her NBI clearance
August 2, 2016 - Medical cleared (partner)
August 9, 2016 - Logded Visa 189
August 9, 2016 - Applied for Singapore COC (me & partner)
August 10, 2016 - Uploaded docs (except SG COC)
August 18, 2016 - Collected and Uploaded SG COC
August 24, 2016 - CO (Brisbane) contacted, asking for form-80 of dependent - (Re-uploaded same day)
October 11, 2016 - Followed up via email
October 13, 2016 - Hugh Grant
Posts: 199Member
Joined: May 16, 2016
(263111 - Computer Network and Systems Engineer)
08-June-2016 - Submitted ACS
24-June-2016 - ACS Results (Suitable)
04-Aug-2016 - PTE-A Exam L84 | R84 | S90 | W82
04-Aug-2016 - EOI lodged for SC 189 (65 pts)
15-Aug-2016 - NBI fingerprint form sent to PH
16-Aug-2016 - ITA Received! Thank you LORD!
22-Aug-2016 - Medical at SATA AMK, SG (Me and wife)
23-Aug-2016 - NBI clearance released, scanned and e-mailed
24-Aug-2016 - Medical cleared – no action required (Me and wife)
26-Aug-2016 - SG COC collected (Me and wife)
28-Aug-2016 - Visa 189 Lodged!
01-Sep-2016 - CEMI (wife) uploaded
05-Sep-2016 - Direct Grant! I LOVE YOU LORD!
Mark 11:24
"Therefore I tell you, whatever you ask for in prayer, believe that you have received it, and it will be yours."
Posts: 78Member
Joined: Jul 08, 2016
01.26.15 - Engage with agent
03. 2815 - IELTS exam; not successful enough
05.15.16 - EA Skills Assessment Application
05.31.16 - Not qualified for Electronics Engr; EA suggest to apply for Engg Technologist
06.06.16 - EA positive response
07.02.16 - PTE Exam - got the 10 points
07.11.16 - EOI Application
07.20.16 - EOI Approved for 189
08.17.16 - Visa lodge
08.24.16 - Medical, Police Clearances Submission
09.12.16 - Agent / CO contacted requesting Form 80 and additional proof
09.30.16 - uploaded all documents requested
02.06.17 - 2nd Contact. Requested additional contact info of ex wife...
02.08.17 - Upload the requested information
02.14.17 - Contact Ex wife...
03.XX.17 - Waiting for the grant, in Jesus name I claim….
Posts: 222Member
Joined: Mar 19, 2016
Husband Points - 60pts; 65pts SS
261399 - Software and applications programmer nec
Jan-April 2016 - Gather reqts including revisions
May 2016 - IELTS exam L:8.0/S:7.0/W:6.0/R: 7.0
Aug 2016 - IELTS remarking Writing 6.0 to 7.0
Sept 2016 - Notarized and red ribbon COEs&statdec
Oct 6, 2016 - Submitted ACS
Oct 14, 2016 - Received ACS letter (positive result)
Oct 19, 2016 - Lodge 190 for NSW (hoping) and VIC
Oct 24, 2016 - Submitted VIC application
Oct 25, 2016 - Received the ref# (5am Phil time)
Oct 31, 2016 - Withdrew NSW application (kasi di naman open sa kanila) and emailed VIC of this change --> No reply
Nov 24, 2016 - Emailed again about the change
Nov 28, 2016 - Replied from VIC, that the change was made 10/31
** Jan 10 is the 12th week **
Posts: 222Member
Joined: Mar 19, 2016
Husband Points - 60pts; 65pts SS
261399 - Software and applications programmer nec
Jan-April 2016 - Gather reqts including revisions
May 2016 - IELTS exam L:8.0/S:7.0/W:6.0/R: 7.0
Aug 2016 - IELTS remarking Writing 6.0 to 7.0
Sept 2016 - Notarized and red ribbon COEs&statdec
Oct 6, 2016 - Submitted ACS
Oct 14, 2016 - Received ACS letter (positive result)
Oct 19, 2016 - Lodge 190 for NSW (hoping) and VIC
Oct 24, 2016 - Submitted VIC application
Oct 25, 2016 - Received the ref# (5am Phil time)
Oct 31, 2016 - Withdrew NSW application (kasi di naman open sa kanila) and emailed VIC of this change --> No reply
Nov 24, 2016 - Emailed again about the change
Nov 28, 2016 - Replied from VIC, that the change was made 10/31
** Jan 10 is the 12th week **
Posts: 78Member
Joined: Jul 08, 2016
01.26.15 - Engage with agent
03. 2815 - IELTS exam; not successful enough
05.15.16 - EA Skills Assessment Application
05.31.16 - Not qualified for Electronics Engr; EA suggest to apply for Engg Technologist
06.06.16 - EA positive response
07.02.16 - PTE Exam - got the 10 points
07.11.16 - EOI Application
07.20.16 - EOI Approved for 189
08.17.16 - Visa lodge
08.24.16 - Medical, Police Clearances Submission
09.12.16 - Agent / CO contacted requesting Form 80 and additional proof
09.30.16 - uploaded all documents requested
02.06.17 - 2nd Contact. Requested additional contact info of ex wife...
02.08.17 - Upload the requested information
02.14.17 - Contact Ex wife...
03.XX.17 - Waiting for the grant, in Jesus name I claim….
Posts: 292Member
Joined: Oct 28, 2015
tama sinabi ni @bourne. Nagfollow up ako kahapon ng 12:40PM tapos 3pm nagbigay ng Visa Grant. Maraming salamat sa lahat ng tumulong sa kin dito sa thread na to
Trabaho naman ang next!:)
Dec 12 2015 - 1st IELTS LRWS failed
Feb 2016 - 2nd IELTS LRWS failed
June 14 2016 - PTE Acad LRWS 90/83/87/90 - 20 points!
June 23 2016 - Submitted req to ACS
July 7 2016 - ACS assessment received < 5 years. Sent email for
reassessment
July 8 2016 - ACS result update 5 years credited (75pts)
July 14 2016 - Sent EOI
July 28 2016 - Got my NBI Clearance
Aug 2 2016 - Received ITA
Aug 9 2016 - Lodged Visa
Aug 12 2016 - took Medical Exam
Aug 15 2016 - sent Medical results. No action needed.
- attached documents
Aug 30 2016 - uploaded form 80
Aug 31 2016 - CO contact (send PTE results online) sayang DG na
sana..
- Sent PTE results online. Clicked "Information
Provided" and emailed CO.
Oct 13 2016 - (12:43PM) Sent a follow up email. (ginaya si Bourne)
Oct 13 2016 - VISA received!
Feb 6 2016 - Bound to Melbourne
God is able to make all grace abound to you!
Never give up. Reach for your dreams!
Posts: 37Member
Joined: May 07, 2016
Architectural Draftsperson 312111
06.07.15 - submit Assessment
12.09.15 - IDP sg IELTS (L7.5,R6,W6,S6.5 - OB 6.5)
14.10.15 - positive assessment (8.5 experience out of 9.5)
02.04.16 - IDP sg IELTS (L8.5,R7.5,W6.5,S6.5 - OB 7.5)
30.04.16 - retake IELTS hope to get 7 on speaking
13.05.16 - BC sg IELTS (L7.5,R7,W6.5,S7.5 - OB 7)
01.07.2016 - submit ACT nomination
07.07.2016 - case officer for ACT nomination
12.07.2016 - receive ITA for visa 190... Thank you Lord.
19.07.2016 - gave birth
08.08.2016 - NBI finger printing in PH embassy
12.08.2016 - Medical
15.08.2016 - SG COC
16.08.2016 - lodge visa 190 and document frontloaded (except NBI).
09.09.2016 - CO contact asking for form 80 (husband)
11.09.2016 - form 80 uploaded
25.10.2016 - visa grant. Praise the LORD
In God's will..
Posts: 627Member
Joined: Sep 11, 2014
Posts: 62Member
Joined: May 23, 2016
Posts: 292Member
Joined: Oct 28, 2015
@itang @StarJhan maraming salamat!
Dec 12 2015 - 1st IELTS LRWS failed
Feb 2016 - 2nd IELTS LRWS failed
June 14 2016 - PTE Acad LRWS 90/83/87/90 - 20 points!
June 23 2016 - Submitted req to ACS
July 7 2016 - ACS assessment received < 5 years. Sent email for
reassessment
July 8 2016 - ACS result update 5 years credited (75pts)
July 14 2016 - Sent EOI
July 28 2016 - Got my NBI Clearance
Aug 2 2016 - Received ITA
Aug 9 2016 - Lodged Visa
Aug 12 2016 - took Medical Exam
Aug 15 2016 - sent Medical results. No action needed.
- attached documents
Aug 30 2016 - uploaded form 80
Aug 31 2016 - CO contact (send PTE results online) sayang DG na
sana..
- Sent PTE results online. Clicked "Information
Provided" and emailed CO.
Oct 13 2016 - (12:43PM) Sent a follow up email. (ginaya si Bourne)
Oct 13 2016 - VISA received!
Feb 6 2016 - Bound to Melbourne
God is able to make all grace abound to you!
Never give up. Reach for your dreams!
Posts: 62Member
Joined: May 23, 2016
Joined: Aug 08, 2016
Posts: 78Member
Joined: Jul 08, 2016
01.26.15 - Engage with agent
03. 2815 - IELTS exam; not successful enough
05.15.16 - EA Skills Assessment Application
05.31.16 - Not qualified for Electronics Engr; EA suggest to apply for Engg Technologist
06.06.16 - EA positive response
07.02.16 - PTE Exam - got the 10 points
07.11.16 - EOI Application
07.20.16 - EOI Approved for 189
08.17.16 - Visa lodge
08.24.16 - Medical, Police Clearances Submission
09.12.16 - Agent / CO contacted requesting Form 80 and additional proof
09.30.16 - uploaded all documents requested
02.06.17 - 2nd Contact. Requested additional contact info of ex wife...
02.08.17 - Upload the requested information
02.14.17 - Contact Ex wife...
03.XX.17 - Waiting for the grant, in Jesus name I claim….
Posts: 303Member
Joined: Feb 01, 2016
NOC - 261313 Software Engineer
Qualification - Bachelor Degree (BS Computer Science)
March 29, 2016 - Submitted to ACS
April 1, 2016 - IELTS (BC) Speaking Test
April 2, 2016 - IELTS (BC) Written (LWR) Test
April 12, 2016 - Received ACS Assessment result - Suitable (Degree), minus 2.2 years
April 15, 2016 - L/R/W/S - 7.5/6.5/6.5/7 -
April 18, 2016 - Secured NBI Clearance while in PH (me)
June 13, 2016 - PTE-A Exam
June 14, 2016 - PTE-A Result - L/R/S/W - 83/78/85/81
June 16, 2016 - Submitted EOI (subclass 189 / 70 pts)
July 1, 2016 - Partner applied for NBI Clearance (from SG)
July 06, 2016 - Received ITA
July 16, 2016 - Medical - SATA AMK, SG
July 19, 2016 - Medical cleared (me)
August 1, 2016 - Partner received her NBI clearance
August 2, 2016 - Medical cleared (partner)
August 9, 2016 - Logded Visa 189
August 9, 2016 - Applied for Singapore COC (me & partner)
August 10, 2016 - Uploaded docs (except SG COC)
August 18, 2016 - Collected and Uploaded SG COC
August 24, 2016 - CO (Brisbane) contacted, asking for form-80 of dependent - (Re-uploaded same day)
October 11, 2016 - Followed up via email
October 13, 2016 - Hugh Grant
Posts: 303Member
Joined: Feb 01, 2016
NOC - 261313 Software Engineer
Qualification - Bachelor Degree (BS Computer Science)
March 29, 2016 - Submitted to ACS
April 1, 2016 - IELTS (BC) Speaking Test
April 2, 2016 - IELTS (BC) Written (LWR) Test
April 12, 2016 - Received ACS Assessment result - Suitable (Degree), minus 2.2 years
April 15, 2016 - L/R/W/S - 7.5/6.5/6.5/7 -
April 18, 2016 - Secured NBI Clearance while in PH (me)
June 13, 2016 - PTE-A Exam
June 14, 2016 - PTE-A Result - L/R/S/W - 83/78/85/81
June 16, 2016 - Submitted EOI (subclass 189 / 70 pts)
July 1, 2016 - Partner applied for NBI Clearance (from SG)
July 06, 2016 - Received ITA
July 16, 2016 - Medical - SATA AMK, SG
July 19, 2016 - Medical cleared (me)
August 1, 2016 - Partner received her NBI clearance
August 2, 2016 - Medical cleared (partner)
August 9, 2016 - Logded Visa 189
August 9, 2016 - Applied for Singapore COC (me & partner)
August 10, 2016 - Uploaded docs (except SG COC)
August 18, 2016 - Collected and Uploaded SG COC
August 24, 2016 - CO (Brisbane) contacted, asking for form-80 of dependent - (Re-uploaded same day)
October 11, 2016 - Followed up via email
October 13, 2016 - Hugh Grant
Joined: Aug 08, 2016
Posts: 96Member
Joined: Aug 27, 2016
261311 Analyst Programmer (Husband as the main applicant)
Total Points: 70 || Age: 25 | Qualification: 15 | Work Exp: 15 | English: 10 | Partner Skills: 5
261111 ICT Business Analyst (As Dependent)
Skilled Naughty Toddler! (As Dependent)
06-Jun-16 - Husband's ACS Results (8 relevant years of experience)
05-Jul-16 - My ACS Results (6 relevant years of experience)
30-Jul-16 - Our IELTS Examination
12-Aug-16 - Positive IELTS Results
16-Aug-16 - EOI Submission subclass 189
17-Aug-16 - ITA
19-Aug-16 - Lodged Visa Application 189
24-Aug-16 - Medical at Sata (Bedok)
25-Aug-16 - Medical Results (no action)
30-Aug-16 - CO Contacted. GSM Adelaide is asking for further documents
09-Sept-16 - Submitted all requested documents
28-Sept-16 - Visa Grant! All glory and praise to you Lord! Thank you!
14-Oct-2016 - Husband got employed! God is good! Thank you Lord!
04-Nov-2016 - Husband's IED
07-Nov-2016 - Husband's first day of work in Sydney
18-Nov-16 - Our IED
Posts: 2Member
Joined: Oct 10, 2016
Can you please tell me how long can i stay out of Australia after receiving the PR ?
Posts: 7Member
Joined: Jul 23, 2016
Is there any Forum or group to track the 263111 latest State nomination/Invitations for NSW state , To confirm what is the current trends of invite going on. As I am going through Immitracker but looks like no one is updating.
Thanks
Posts: 403Member
Joined: Nov 29, 2015