Major update has been completed. Please help to report any abnormality that you are facing (in case there is any) to [email protected] . Thank you for your continued support guys!
JustinPhilippines Posts: 444Member Joined: Jun 07, 2016
@agd Hahaha napaka trapik sa Turbina wag naman dun ang stop-over. Kahit sa may Tanauan nala-ang.
kaidenMVHSydney Posts: 916Member Joined: Feb 02, 2016
@Justin star tollway na laang pala, hindi na turbina hahaha. naalala ko nun wala pa star tollway kapag may fiestahan sa batangas, lahat ng bayan dadaanan bago makarating sa batangas pier. kada bayan ay may handaan haha, parusa e, bagay pa makibarik na laang lol kaysa maghabol ng barko.
312111 Architectural Draftsperson 80pts 190 NSW
04/Apr/2017 VETASSES
11/Jul/2017 VETASSES+
Waiting for States to open.......
26/Sep/2017 NSW open for 312111
29/Sep/2017 PTE exam
01/Oct/2017 PTE Result L85, R83, S79, W80
02/Oct/2017 EOI 190 NSW
20/Oct/2017 Pre Invite 190 NSW
30/Oct/2017 SS Application 190 NSW
21/Dec/2017 SS Approved/ITA 190 NSW
20/Jan/2018 health exam, me and eldest son
22/Jan/2018 eldest son mantoux TB test
(no stock at SATA AMK on 20/Jan!)
23/Jan/2018 health clearance (me)
25/Jan/2018 health clearance (5 yr old son)
29/Jan/2018 Singapore Police Force COC (me)
03/Feb/2018 health clearance (youngest son)
06/Feb/2018 Singapore Police Force COC (wife)
06/Feb/2018 health clearance (wife)
08/Feb/2018 Visa lodge! So help me God :-)
29/May/2018 CO contact (PH PCC)
05/Sep/2018 Golden Email! Thank you Lord!
Romans 12:12 Rejoice in hope, be patient in tribulation, be constant in prayer.
James 5:7-8 Be patient, therefore, brothers, until the coming of the Lord. See how the farmer waits for the precious fruit of the earth, being patient about it, until it receives the early and the late rains. You also, be patient. Establish your hearts, for the coming of the Lord is at hand.
Proverbs 3:5-6 Trust in the LORD with all your heart, and do not lean on your own understanding. In all your ways acknowledge him, and he will make straight your paths.
Onward to the next chapter!
JustinPhilippines Posts: 444Member Joined: Jun 07, 2016
@kaidenMVH tunay ka jan 4 na oras ang biyahe. Hahaha kala mo e nagpuntang bicol galing maynila.
30.12.2016 – Became an associate member of CPAA
26.01.2017 - PTE L85/ R70/ S72/ W84 (Proficient)
20.02.2017 – Received positive assessment from CPAA (5 yrs)
21.02.2017 - Submitted EOI 189-60 pts; 190(NSW)-65 pts
10.10.2017 - PTE Take 6 L90/ R79/ S90/ W82 (Superior at last!) 20 pts
11.10.2017 - Updated EOI 189-70 pts; 190(NSW)-75 pts
12.12.2017 - Updated EOI 189 - 75 pts; 190(NSW) - 80 pts
16.12.2017 - Skillselect update automatic reduction of points EOI 189 - 70 pts; 190(NSW) - 75 pts.
18.12.2017 - Received Pre-invite from NSW (subclass 190)
20.12.2017 - Submitted 190 NSW nomination application
16.01.2018 - ITA received/ NSW nomination approval
17.01.2018 - Medical at Nationwide Makati
17.01.2018 - Medical Result Cleared (18 months old)
23.01.2018 - Medical Results Cleared (me & hubby)
23.01.2018 - Lodged Visa 190
23.04.2018 - Direct Grant
preparing for BM
Jeremiah 29:11
"For I know the plans I have for you,” declares the LORD, “plans to prosper you and not to harm you, plans to give you hope and a future."
eynah_geeSingapore Posts: 220Member Joined: Jan 13, 2017
Omg congrats @SeiRian !! Jusko kinakabahan na ko lol :P
EA Assessment:
2017/08/08 - EA Assessment [Fast Track]
2017/08/25 - EA Assessment Outcome: Awarded IE 233511 Prof. Eng. Skill Level 1 and Relevant Skilled Emp for 14 yrs.
PTE-A Tests:
2017/10/24 - Applied for PTE-A Test on Nov 23
2017/11/19 - PTE-A Mock Test A: L82/R-77/S90/W86 / G67/OF83/P90/S90/V90/WD90
2017/11/22 - PTE-A Mock Test B: L81/R84/S90/W85 / G82/OF85/P90/S90/V90/WD90
2017/11/23 - PTE-A Exam day
2017/11/24 - PTE-A Results: L87/R88/S90/W84 = Superior / G90/OF90/P90/S66/V90/WD90
EOI2:
2017/11/24 - Filed new EOI for Visa 189 - 75 points
ITA:
2017/12/20 - ITA Received
2017/12/26 - Created Immi account, Health Dec for HAP ID
2018/01/02 - Medical Check with dependents
2018/01/10 - Medical reports submitted by Nationwide except daughter
2018/01/10 - Applied and paid for Visa lodging
2018/01/12 - Uploaded all evidences, except Health
2018/01/25 - All Health Clearance Finalised including daughter
01-19-2018 - Visa lodge, SG eAppeal
01-23-2018 - SG eAppeal Approved
01-25-2018 - Wife's SG eAppeal Approved
02-03-2018 - Medical - wife and me
02-05-2018 - Medical - kids
02-08-2018 - Medical - Daughter - IGRA
02-14-2018 - Form 815 Health Undertaking for daughter
04-27-2018 - 1st CO Contact: Parental Consent/Form 1229
05-22-2018 - 2nd CO Contact: Wife's Statutory Declaration
08-21-2018 - 3rd CO Contact: Repeat Medical - Daughter
09-21-2018 - VISA GRANT! Thank you Lord!
11-11-2018 - IE (Medicare, Centrelink, NSW DL)
April 2019 - Target BM with wife
January 2020 - Target BM - 3 kids
PebblesMelbourne Posts: 112Member Joined: Dec 12, 2017
@agd oo nga...my DG ng Jan 17.... omggg.......february na.... joke.
agdSingapore Posts: 773Member Joined: Jun 12, 2017
@Pebbles ang bilis magjump! Di malayo na baka next week ay February batch na ang abutan.
01-19-2018 - Visa lodge, SG eAppeal
01-23-2018 - SG eAppeal Approved
01-25-2018 - Wife's SG eAppeal Approved
02-03-2018 - Medical - wife and me
02-05-2018 - Medical - kids
02-08-2018 - Medical - Daughter - IGRA
02-14-2018 - Form 815 Health Undertaking for daughter
04-27-2018 - 1st CO Contact: Parental Consent/Form 1229
05-22-2018 - 2nd CO Contact: Wife's Statutory Declaration
08-21-2018 - 3rd CO Contact: Repeat Medical - Daughter
09-21-2018 - VISA GRANT! Thank you Lord!
11-11-2018 - IE (Medicare, Centrelink, NSW DL)
April 2019 - Target BM with wife
January 2020 - Target BM - 3 kids
kaidenMVHSydney Posts: 916Member Joined: Feb 02, 2016
oo nga nagulat ako dun hahaha. may kailangan pako pa stat dec kasi ayaw talaga ako bigyan dun sa isang work ko ng COE na may letterhead, although may mga payslip, contract at bank statement ako. nakakuha naman ako ng statement from my former colleague na parang COE na din, yun nga lang di din nya na print sa may letterhead kasi di rin sya authorized ng admin na mag print ng document with letterhead na walang approval. tanong ko, ako ba kailangan mag stat dec or yun officemate ko? or kahit ako pd na. Problema ko di ko daw na fulfill yun 30 days notice period nun nag resign ako (
312111 Architectural Draftsperson 80pts 190 NSW
04/Apr/2017 VETASSES
11/Jul/2017 VETASSES+
Waiting for States to open.......
26/Sep/2017 NSW open for 312111
29/Sep/2017 PTE exam
01/Oct/2017 PTE Result L85, R83, S79, W80
02/Oct/2017 EOI 190 NSW
20/Oct/2017 Pre Invite 190 NSW
30/Oct/2017 SS Application 190 NSW
21/Dec/2017 SS Approved/ITA 190 NSW
20/Jan/2018 health exam, me and eldest son
22/Jan/2018 eldest son mantoux TB test
(no stock at SATA AMK on 20/Jan!)
23/Jan/2018 health clearance (me)
25/Jan/2018 health clearance (5 yr old son)
29/Jan/2018 Singapore Police Force COC (me)
03/Feb/2018 health clearance (youngest son)
06/Feb/2018 Singapore Police Force COC (wife)
06/Feb/2018 health clearance (wife)
08/Feb/2018 Visa lodge! So help me God :-)
29/May/2018 CO contact (PH PCC)
05/Sep/2018 Golden Email! Thank you Lord!
Romans 12:12 Rejoice in hope, be patient in tribulation, be constant in prayer.
James 5:7-8 Be patient, therefore, brothers, until the coming of the Lord. See how the farmer waits for the precious fruit of the earth, being patient about it, until it receives the early and the late rains. You also, be patient. Establish your hearts, for the coming of the Lord is at hand.
Proverbs 3:5-6 Trust in the LORD with all your heart, and do not lean on your own understanding. In all your ways acknowledge him, and he will make straight your paths.
@SeiRian amazit chongrats po, sana may mainvite nah sa jan batch
agdSingapore Posts: 773Member Joined: Jun 12, 2017
@kaidenMVH Pagkakaalam ko sir, di na kailangan ng may letterhead pag may nagbigay ng stat dec sayo. papa-notary lang at pwede mag-attach din sya ng ID. Pwede din ata colleague na kahit di na nagwowork dun sa previous company nyo.
Tambay ka dun sa thread na vetassess questions, sir. Parang nasagot yan kelan lang. Kumpleto ka naman din ng supporting docs eh.
01-19-2018 - Visa lodge, SG eAppeal
01-23-2018 - SG eAppeal Approved
01-25-2018 - Wife's SG eAppeal Approved
02-03-2018 - Medical - wife and me
02-05-2018 - Medical - kids
02-08-2018 - Medical - Daughter - IGRA
02-14-2018 - Form 815 Health Undertaking for daughter
04-27-2018 - 1st CO Contact: Parental Consent/Form 1229
05-22-2018 - 2nd CO Contact: Wife's Statutory Declaration
08-21-2018 - 3rd CO Contact: Repeat Medical - Daughter
09-21-2018 - VISA GRANT! Thank you Lord!
11-11-2018 - IE (Medicare, Centrelink, NSW DL)
April 2019 - Target BM with wife
January 2020 - Target BM - 3 kids
PebblesMelbourne Posts: 112Member Joined: Dec 12, 2017
prang my DG din ng January 8... bkt prang puro ACT at NSW plng binubuksan... ^.^
kaidenMVHSydney Posts: 916Member Joined: Feb 02, 2016
@kaidenMVH Pagkakaalam ko sir, di na kailangan ng may letterhead pag may nagbigay ng stat dec sayo. papa-notary lang at pwede mag-attach din sya ng ID. Pwede din ata colleague na kahit di na nagwowork dun sa previous company nyo.
Tambay ka dun sa thread na vetassess questions, sir. Parang nasagot yan kelan lang. Kumpleto ka naman din ng supporting docs eh.
ginawa ko inattach ko yun email nya sakin showing yun designation nya at yun name ng company. dun pa din naman sya nag wowork hangang ngayon. attach ko na lng siguro yun IC scan copy nya.
312111 Architectural Draftsperson 80pts 190 NSW
04/Apr/2017 VETASSES
11/Jul/2017 VETASSES+
Waiting for States to open.......
26/Sep/2017 NSW open for 312111
29/Sep/2017 PTE exam
01/Oct/2017 PTE Result L85, R83, S79, W80
02/Oct/2017 EOI 190 NSW
20/Oct/2017 Pre Invite 190 NSW
30/Oct/2017 SS Application 190 NSW
21/Dec/2017 SS Approved/ITA 190 NSW
20/Jan/2018 health exam, me and eldest son
22/Jan/2018 eldest son mantoux TB test
(no stock at SATA AMK on 20/Jan!)
23/Jan/2018 health clearance (me)
25/Jan/2018 health clearance (5 yr old son)
29/Jan/2018 Singapore Police Force COC (me)
03/Feb/2018 health clearance (youngest son)
06/Feb/2018 Singapore Police Force COC (wife)
06/Feb/2018 health clearance (wife)
08/Feb/2018 Visa lodge! So help me God :-)
29/May/2018 CO contact (PH PCC)
05/Sep/2018 Golden Email! Thank you Lord!
Romans 12:12 Rejoice in hope, be patient in tribulation, be constant in prayer.
James 5:7-8 Be patient, therefore, brothers, until the coming of the Lord. See how the farmer waits for the precious fruit of the earth, being patient about it, until it receives the early and the late rains. You also, be patient. Establish your hearts, for the coming of the Lord is at hand.
Proverbs 3:5-6 Trust in the LORD with all your heart, and do not lean on your own understanding. In all your ways acknowledge him, and he will make straight your paths.
Onward to the next chapter!
agdSingapore Posts: 773Member Joined: Jun 12, 2017
01-19-2018 - Visa lodge, SG eAppeal
01-23-2018 - SG eAppeal Approved
01-25-2018 - Wife's SG eAppeal Approved
02-03-2018 - Medical - wife and me
02-05-2018 - Medical - kids
02-08-2018 - Medical - Daughter - IGRA
02-14-2018 - Form 815 Health Undertaking for daughter
04-27-2018 - 1st CO Contact: Parental Consent/Form 1229
05-22-2018 - 2nd CO Contact: Wife's Statutory Declaration
08-21-2018 - 3rd CO Contact: Repeat Medical - Daughter
09-21-2018 - VISA GRANT! Thank you Lord!
11-11-2018 - IE (Medicare, Centrelink, NSW DL)
April 2019 - Target BM with wife
January 2020 - Target BM - 3 kids
agdSingapore Posts: 773Member Joined: Jun 12, 2017
@kaidenMVH yes sir, pero mas ok yan kung na-notaryohan na din dito. Iwas CO contact.
01-19-2018 - Visa lodge, SG eAppeal
01-23-2018 - SG eAppeal Approved
01-25-2018 - Wife's SG eAppeal Approved
02-03-2018 - Medical - wife and me
02-05-2018 - Medical - kids
02-08-2018 - Medical - Daughter - IGRA
02-14-2018 - Form 815 Health Undertaking for daughter
04-27-2018 - 1st CO Contact: Parental Consent/Form 1229
05-22-2018 - 2nd CO Contact: Wife's Statutory Declaration
08-21-2018 - 3rd CO Contact: Repeat Medical - Daughter
09-21-2018 - VISA GRANT! Thank you Lord!
11-11-2018 - IE (Medicare, Centrelink, NSW DL)
April 2019 - Target BM with wife
January 2020 - Target BM - 3 kids
PebblesMelbourne Posts: 112Member Joined: Dec 12, 2017
@agd ay tlg? hahah sobra excited ko ...sa paningin ko basta highlighted DG na...hahaha
agdSingapore Posts: 773Member Joined: Jun 12, 2017
@Pebbles hahaha. ayoko muna isipin din, baka lalong tumagal. Kaya lang nakakapraning pala yung ganito.
01-19-2018 - Visa lodge, SG eAppeal
01-23-2018 - SG eAppeal Approved
01-25-2018 - Wife's SG eAppeal Approved
02-03-2018 - Medical - wife and me
02-05-2018 - Medical - kids
02-08-2018 - Medical - Daughter - IGRA
02-14-2018 - Form 815 Health Undertaking for daughter
04-27-2018 - 1st CO Contact: Parental Consent/Form 1229
05-22-2018 - 2nd CO Contact: Wife's Statutory Declaration
08-21-2018 - 3rd CO Contact: Repeat Medical - Daughter
09-21-2018 - VISA GRANT! Thank you Lord!
11-11-2018 - IE (Medicare, Centrelink, NSW DL)
April 2019 - Target BM with wife
January 2020 - Target BM - 3 kids
kaidenMVHSydney Posts: 916Member Joined: Feb 02, 2016
@kaidenMVH yes sir, pero mas ok yan kung na-notaryohan na din dito. Iwas CO contact.
yup, yun na nga lang gagawin ko. pareho lang ba bayad sa notarized at stat dec dito? any suggestion kung san mura hehehe?
312111 Architectural Draftsperson 80pts 190 NSW
04/Apr/2017 VETASSES
11/Jul/2017 VETASSES+
Waiting for States to open.......
26/Sep/2017 NSW open for 312111
29/Sep/2017 PTE exam
01/Oct/2017 PTE Result L85, R83, S79, W80
02/Oct/2017 EOI 190 NSW
20/Oct/2017 Pre Invite 190 NSW
30/Oct/2017 SS Application 190 NSW
21/Dec/2017 SS Approved/ITA 190 NSW
20/Jan/2018 health exam, me and eldest son
22/Jan/2018 eldest son mantoux TB test
(no stock at SATA AMK on 20/Jan!)
23/Jan/2018 health clearance (me)
25/Jan/2018 health clearance (5 yr old son)
29/Jan/2018 Singapore Police Force COC (me)
03/Feb/2018 health clearance (youngest son)
06/Feb/2018 Singapore Police Force COC (wife)
06/Feb/2018 health clearance (wife)
08/Feb/2018 Visa lodge! So help me God :-)
29/May/2018 CO contact (PH PCC)
05/Sep/2018 Golden Email! Thank you Lord!
Romans 12:12 Rejoice in hope, be patient in tribulation, be constant in prayer.
James 5:7-8 Be patient, therefore, brothers, until the coming of the Lord. See how the farmer waits for the precious fruit of the earth, being patient about it, until it receives the early and the late rains. You also, be patient. Establish your hearts, for the coming of the Lord is at hand.
Proverbs 3:5-6 Trust in the LORD with all your heart, and do not lean on your own understanding. In all your ways acknowledge him, and he will make straight your paths.
Onward to the next chapter!
agdSingapore Posts: 773Member Joined: Jun 12, 2017
@kaidenMVH lahat dito mahal sir. ) Di ko sure kung same lang sa stat dec, pero yung notaryo ko dati, 5 SGD per document, tapos may required na notarial certificate na 70SGD.
01-19-2018 - Visa lodge, SG eAppeal
01-23-2018 - SG eAppeal Approved
01-25-2018 - Wife's SG eAppeal Approved
02-03-2018 - Medical - wife and me
02-05-2018 - Medical - kids
02-08-2018 - Medical - Daughter - IGRA
02-14-2018 - Form 815 Health Undertaking for daughter
04-27-2018 - 1st CO Contact: Parental Consent/Form 1229
05-22-2018 - 2nd CO Contact: Wife's Statutory Declaration
08-21-2018 - 3rd CO Contact: Repeat Medical - Daughter
09-21-2018 - VISA GRANT! Thank you Lord!
11-11-2018 - IE (Medicare, Centrelink, NSW DL)
April 2019 - Target BM with wife
January 2020 - Target BM - 3 kids
kaidenMVHSydney Posts: 916Member Joined: Feb 02, 2016
@kaidenMVH lahat dito mahal sir. ) Di ko sure kung same lang sa stat dec, pero yung notaryo ko dati, 5 SGD per document, tapos may required na notarial certificate na 70SGD.
san yan sir? try ko na lang mag tanong sa kanila
312111 Architectural Draftsperson 80pts 190 NSW
04/Apr/2017 VETASSES
11/Jul/2017 VETASSES+
Waiting for States to open.......
26/Sep/2017 NSW open for 312111
29/Sep/2017 PTE exam
01/Oct/2017 PTE Result L85, R83, S79, W80
02/Oct/2017 EOI 190 NSW
20/Oct/2017 Pre Invite 190 NSW
30/Oct/2017 SS Application 190 NSW
21/Dec/2017 SS Approved/ITA 190 NSW
20/Jan/2018 health exam, me and eldest son
22/Jan/2018 eldest son mantoux TB test
(no stock at SATA AMK on 20/Jan!)
23/Jan/2018 health clearance (me)
25/Jan/2018 health clearance (5 yr old son)
29/Jan/2018 Singapore Police Force COC (me)
03/Feb/2018 health clearance (youngest son)
06/Feb/2018 Singapore Police Force COC (wife)
06/Feb/2018 health clearance (wife)
08/Feb/2018 Visa lodge! So help me God :-)
29/May/2018 CO contact (PH PCC)
05/Sep/2018 Golden Email! Thank you Lord!
Romans 12:12 Rejoice in hope, be patient in tribulation, be constant in prayer.
James 5:7-8 Be patient, therefore, brothers, until the coming of the Lord. See how the farmer waits for the precious fruit of the earth, being patient about it, until it receives the early and the late rains. You also, be patient. Establish your hearts, for the coming of the Lord is at hand.
Proverbs 3:5-6 Trust in the LORD with all your heart, and do not lean on your own understanding. In all your ways acknowledge him, and he will make straight your paths.
Onward to the next chapter!
agdSingapore Posts: 773Member Joined: Jun 12, 2017
01-19-2018 - Visa lodge, SG eAppeal
01-23-2018 - SG eAppeal Approved
01-25-2018 - Wife's SG eAppeal Approved
02-03-2018 - Medical - wife and me
02-05-2018 - Medical - kids
02-08-2018 - Medical - Daughter - IGRA
02-14-2018 - Form 815 Health Undertaking for daughter
04-27-2018 - 1st CO Contact: Parental Consent/Form 1229
05-22-2018 - 2nd CO Contact: Wife's Statutory Declaration
08-21-2018 - 3rd CO Contact: Repeat Medical - Daughter
09-21-2018 - VISA GRANT! Thank you Lord!
11-11-2018 - IE (Medicare, Centrelink, NSW DL)
April 2019 - Target BM with wife
January 2020 - Target BM - 3 kids
JustinPhilippines Posts: 444Member Joined: Jun 07, 2016
The longest running Pinoy-Australian Forum site in the history. We are connecting Pinoys "in" and "to" Australia since 2010! If you want to join in, click one of these buttons!
Comments
Posts: 444Member
Joined: Jun 07, 2016
Posts: 916Member
Joined: Feb 02, 2016
312111 Architectural Draftsperson 80pts 190 NSW
04/Apr/2017 VETASSES
11/Jul/2017 VETASSES+
Waiting for States to open.......
26/Sep/2017 NSW open for 312111
29/Sep/2017 PTE exam
01/Oct/2017 PTE Result L85, R83, S79, W80
02/Oct/2017 EOI 190 NSW
20/Oct/2017 Pre Invite 190 NSW
30/Oct/2017 SS Application 190 NSW
21/Dec/2017 SS Approved/ITA 190 NSW
20/Jan/2018 health exam, me and eldest son
22/Jan/2018 eldest son mantoux TB test
(no stock at SATA AMK on 20/Jan!)
23/Jan/2018 health clearance (me)
25/Jan/2018 health clearance (5 yr old son)
29/Jan/2018 Singapore Police Force COC (me)
03/Feb/2018 health clearance (youngest son)
06/Feb/2018 Singapore Police Force COC (wife)
06/Feb/2018 health clearance (wife)
08/Feb/2018 Visa lodge! So help me God :-)
29/May/2018 CO contact (PH PCC)
05/Sep/2018 Golden Email! Thank you Lord!
Romans 12:12 Rejoice in hope, be patient in tribulation, be constant in prayer.
James 5:7-8 Be patient, therefore, brothers, until the coming of the Lord. See how the farmer waits for the precious fruit of the earth, being patient about it, until it receives the early and the late rains. You also, be patient. Establish your hearts, for the coming of the Lord is at hand.
Proverbs 3:5-6 Trust in the LORD with all your heart, and do not lean on your own understanding. In all your ways acknowledge him, and he will make straight your paths.
Onward to the next chapter!
Posts: 444Member
Joined: Jun 07, 2016
Posts: 24Member
Joined: Sep 25, 2016
@chococrinkle lodgement date ko po 9 Jan 2018, total of 12 weeks from lodgement to visa grant.
Kapit lang po at sunod sunod na DG na po ang darating para sa batch natin at mga susunod na batch.
Sobra helpful po tong forum na ito. God bless po!
Joined: Aug 10, 2017
ANZSCO Code: 221214 – Internal Auditor
(Age:25 / Education:15 / Experience:15 / English Test:20 = 75pts)
02 Mar 2017 - Submitted documents for skill assessment
02 May 2017 - Received result of assessment : Positive
13 May 2017 - Took IELTS result withheld / results received Jul 10
10 Jul 2017 - IELTS General Exam Result: L8.5/R9.0/S7.5/W7.0
26 Jul 2017 - Lodged EOI : PR189 - 65pts
08 Aug 2017 - PTE A Exam : L90/R90/S86/W89
10 Aug 2017 - Updated EOI : PR189 - 75pts
06 Dec 2017 - ITA - PR189
21 Dec 2017 - Lodged Visa 189 - Frontloaded docs
28 Dec 2017 - Medical exam completed (myself / husband / daughter)
24 May 2018 - Direct Grant yey! - IED: 02 August 2018
23 Jun 2018 - IED (1 week)
13 Dec 2018 - BM!
Posts: 444Member
Joined: Jun 07, 2016
Posts: 543Member
Joined: Oct 20, 2017
Posts: 24Member
Joined: Sep 25, 2016
Posts: 212Member
Joined: Aug 29, 2015
ANZSCO 221111 - Accountant (General) 190(NSW)-75 pts
30.12.2016 – Became an associate member of CPAA
26.01.2017 - PTE L85/ R70/ S72/ W84 (Proficient)
20.02.2017 – Received positive assessment from CPAA (5 yrs)
21.02.2017 - Submitted EOI 189-60 pts; 190(NSW)-65 pts
10.10.2017 - PTE Take 6 L90/ R79/ S90/ W82 (Superior at last!) 20 pts
11.10.2017 - Updated EOI 189-70 pts; 190(NSW)-75 pts
12.12.2017 - Updated EOI 189 - 75 pts; 190(NSW) - 80 pts
16.12.2017 - Skillselect update automatic reduction of points EOI 189 - 70 pts; 190(NSW) - 75 pts.
18.12.2017 - Received Pre-invite from NSW (subclass 190)
20.12.2017 - Submitted 190 NSW nomination application
16.01.2018 - ITA received/ NSW nomination approval
17.01.2018 - Medical at Nationwide Makati
17.01.2018 - Medical Result Cleared (18 months old)
23.01.2018 - Medical Results Cleared (me & hubby)
23.01.2018 - Lodged Visa 190
23.04.2018 - Direct Grant
preparing for BM
Jeremiah 29:11
"For I know the plans I have for you,” declares the LORD, “plans to prosper you and not to harm you, plans to give you hope and a future."
Posts: 220Member
Joined: Jan 13, 2017
Posts: 212Member
Joined: Apr 03, 2017
Sana mag tuloy2x na sa inyo lahat
******** DG ********
@onin111 | 189 | 12 Jan 2018 | 26 Jun 2018 | Melbourne| 25 July 2018
-Current Status-
DG, Planning for BM
Application History:
IELTS Test:
2017/03/18 - IELTS Exam
2017/03/31 - IELTS Results: L-7.5, R-7, W-6.5, S-8
2017/04/11 - IELTS Enquiry on Results
2017/06/01 - Negative IELTS Enquiry on Results
EA Assessment:
2017/08/08 - EA Assessment [Fast Track]
2017/08/25 - EA Assessment Outcome: Awarded IE 233511 Prof. Eng. Skill Level 1 and Relevant Skilled Emp for 14 yrs.
EOI 1:
2017/08/29 - EOI 233511 - Industrial Engineer] 489 (Family Sponsored)-65, 189-55, 190-60
PTE-A Tests:
2017/10/24 - Applied for PTE-A Test on Nov 23
2017/11/19 - PTE-A Mock Test A: L82/R-77/S90/W86 / G67/OF83/P90/S90/V90/WD90
2017/11/22 - PTE-A Mock Test B: L81/R84/S90/W85 / G82/OF85/P90/S90/V90/WD90
2017/11/23 - PTE-A Exam day
2017/11/24 - PTE-A Results: L87/R88/S90/W84 = Superior / G90/OF90/P90/S66/V90/WD90
EOI2:
2017/11/24 - Filed new EOI for Visa 189 - 75 points
ITA:
2017/12/20 - ITA Received
2017/12/26 - Created Immi account, Health Dec for HAP ID
2018/01/02 - Medical Check with dependents
2018/01/10 - Medical reports submitted by Nationwide except daughter
2018/01/10 - Applied and paid for Visa lodging
2018/01/12 - Uploaded all evidences, except Health
2018/01/25 - All Health Clearance Finalised including daughter
Grant:
2018/06/26 - Grant by team Adelaide
Posts: 24Member
Joined: Sep 25, 2016
Posts: 24Member
Joined: Sep 25, 2016
10:26AM Posts: 175
Congrats! @SeiRian 190 NSW po ba kayo?
@katniss2015 190 ACT po
Posts: 773Member
Joined: Jun 12, 2017
261312 Developer Programmer - (English - 20pts | Age - 30pts. | Qualification - 10 | Experience - 0 ) = 60pts.
Subclass 189 - 60pts.
Subclass 190 - (60 + 5 spouse points + 5 SN) = 70pts.
08/04/2016 - Took IELTS - L/R/W/S - 6.5/7/6.5/7 - Competent
05/17/2017 - PTE Mock A - L/R/W/S - 74/62/66/76
05/19/2017 - PTE Mock B - L/R/W/S - 76/70/72/89
05/30/2017 - PTE Take 1 - L/R/W/S - 79/75/78/78 - Proficient
06/06/2017 - PTE Take 2 - L/R/W/S - 82/87/90/88- Superior - Thank you, Lord!
PTE Tips: http://pinoyau.info/discussion/4233/pte-academic/p465#Comment_245887
06/14/2017 - Collection of docs for ACS Assessment
06/21/2017 - Submitted ACS Assessment
08/14/2017 - ACS Result Positive. Equivalent to AQF Associate Degree. 5 years experience deducted.
08/15/2017 - Gathering docs for spouse points (VETASSESS)
08/22/2017 - Lodged spouse's VETASSESS
10/05/2017 - VETASSESS results positive - aquired 5pts. for 190
10/07/2017 - Submitted EOI - 189, 190-NSW, 190-VIC
10/20/2017 - ITA NSW Received!
10/22/2017 - Submitted NSW Application
11/28/2017 - NSW SS Approved! Received ITA for visa 190
---------------Gathering docs for visa lodge---------------
-------------------- Christmas Break --------------------
01-19-2018 - Visa lodge, SG eAppeal
01-23-2018 - SG eAppeal Approved
01-25-2018 - Wife's SG eAppeal Approved
02-03-2018 - Medical - wife and me
02-05-2018 - Medical - kids
02-08-2018 - Medical - Daughter - IGRA
02-14-2018 - Form 815 Health Undertaking for daughter
04-27-2018 - 1st CO Contact: Parental Consent/Form 1229
05-22-2018 - 2nd CO Contact: Wife's Statutory Declaration
08-21-2018 - 3rd CO Contact: Repeat Medical - Daughter
09-21-2018 - VISA GRANT! Thank you Lord!
11-11-2018 - IE (Medicare, Centrelink, NSW DL)
April 2019 - Target BM with wife
January 2020 - Target BM - 3 kids
Posts: 112Member
Joined: Dec 12, 2017
Posts: 773Member
Joined: Jun 12, 2017
261312 Developer Programmer - (English - 20pts | Age - 30pts. | Qualification - 10 | Experience - 0 ) = 60pts.
Subclass 189 - 60pts.
Subclass 190 - (60 + 5 spouse points + 5 SN) = 70pts.
08/04/2016 - Took IELTS - L/R/W/S - 6.5/7/6.5/7 - Competent
05/17/2017 - PTE Mock A - L/R/W/S - 74/62/66/76
05/19/2017 - PTE Mock B - L/R/W/S - 76/70/72/89
05/30/2017 - PTE Take 1 - L/R/W/S - 79/75/78/78 - Proficient
06/06/2017 - PTE Take 2 - L/R/W/S - 82/87/90/88- Superior - Thank you, Lord!
PTE Tips: http://pinoyau.info/discussion/4233/pte-academic/p465#Comment_245887
06/14/2017 - Collection of docs for ACS Assessment
06/21/2017 - Submitted ACS Assessment
08/14/2017 - ACS Result Positive. Equivalent to AQF Associate Degree. 5 years experience deducted.
08/15/2017 - Gathering docs for spouse points (VETASSESS)
08/22/2017 - Lodged spouse's VETASSESS
10/05/2017 - VETASSESS results positive - aquired 5pts. for 190
10/07/2017 - Submitted EOI - 189, 190-NSW, 190-VIC
10/20/2017 - ITA NSW Received!
10/22/2017 - Submitted NSW Application
11/28/2017 - NSW SS Approved! Received ITA for visa 190
---------------Gathering docs for visa lodge---------------
-------------------- Christmas Break --------------------
01-19-2018 - Visa lodge, SG eAppeal
01-23-2018 - SG eAppeal Approved
01-25-2018 - Wife's SG eAppeal Approved
02-03-2018 - Medical - wife and me
02-05-2018 - Medical - kids
02-08-2018 - Medical - Daughter - IGRA
02-14-2018 - Form 815 Health Undertaking for daughter
04-27-2018 - 1st CO Contact: Parental Consent/Form 1229
05-22-2018 - 2nd CO Contact: Wife's Statutory Declaration
08-21-2018 - 3rd CO Contact: Repeat Medical - Daughter
09-21-2018 - VISA GRANT! Thank you Lord!
11-11-2018 - IE (Medicare, Centrelink, NSW DL)
April 2019 - Target BM with wife
January 2020 - Target BM - 3 kids
Posts: 916Member
Joined: Feb 02, 2016
312111 Architectural Draftsperson 80pts 190 NSW
04/Apr/2017 VETASSES
11/Jul/2017 VETASSES+
Waiting for States to open.......
26/Sep/2017 NSW open for 312111
29/Sep/2017 PTE exam
01/Oct/2017 PTE Result L85, R83, S79, W80
02/Oct/2017 EOI 190 NSW
20/Oct/2017 Pre Invite 190 NSW
30/Oct/2017 SS Application 190 NSW
21/Dec/2017 SS Approved/ITA 190 NSW
20/Jan/2018 health exam, me and eldest son
22/Jan/2018 eldest son mantoux TB test
(no stock at SATA AMK on 20/Jan!)
23/Jan/2018 health clearance (me)
25/Jan/2018 health clearance (5 yr old son)
29/Jan/2018 Singapore Police Force COC (me)
03/Feb/2018 health clearance (youngest son)
06/Feb/2018 Singapore Police Force COC (wife)
06/Feb/2018 health clearance (wife)
08/Feb/2018 Visa lodge! So help me God :-)
29/May/2018 CO contact (PH PCC)
05/Sep/2018 Golden Email! Thank you Lord!
Romans 12:12 Rejoice in hope, be patient in tribulation, be constant in prayer.
James 5:7-8 Be patient, therefore, brothers, until the coming of the Lord. See how the farmer waits for the precious fruit of the earth, being patient about it, until it receives the early and the late rains. You also, be patient. Establish your hearts, for the coming of the Lord is at hand.
Proverbs 3:5-6 Trust in the LORD with all your heart, and do not lean on your own understanding. In all your ways acknowledge him, and he will make straight your paths.
Onward to the next chapter!
Posts: 13Member
Joined: Jul 17, 2017
Posts: 773Member
Joined: Jun 12, 2017
Tambay ka dun sa thread na vetassess questions, sir. Parang nasagot yan kelan lang. Kumpleto ka naman din ng supporting docs eh.
261312 Developer Programmer - (English - 20pts | Age - 30pts. | Qualification - 10 | Experience - 0 ) = 60pts.
Subclass 189 - 60pts.
Subclass 190 - (60 + 5 spouse points + 5 SN) = 70pts.
08/04/2016 - Took IELTS - L/R/W/S - 6.5/7/6.5/7 - Competent
05/17/2017 - PTE Mock A - L/R/W/S - 74/62/66/76
05/19/2017 - PTE Mock B - L/R/W/S - 76/70/72/89
05/30/2017 - PTE Take 1 - L/R/W/S - 79/75/78/78 - Proficient
06/06/2017 - PTE Take 2 - L/R/W/S - 82/87/90/88- Superior - Thank you, Lord!
PTE Tips: http://pinoyau.info/discussion/4233/pte-academic/p465#Comment_245887
06/14/2017 - Collection of docs for ACS Assessment
06/21/2017 - Submitted ACS Assessment
08/14/2017 - ACS Result Positive. Equivalent to AQF Associate Degree. 5 years experience deducted.
08/15/2017 - Gathering docs for spouse points (VETASSESS)
08/22/2017 - Lodged spouse's VETASSESS
10/05/2017 - VETASSESS results positive - aquired 5pts. for 190
10/07/2017 - Submitted EOI - 189, 190-NSW, 190-VIC
10/20/2017 - ITA NSW Received!
10/22/2017 - Submitted NSW Application
11/28/2017 - NSW SS Approved! Received ITA for visa 190
---------------Gathering docs for visa lodge---------------
-------------------- Christmas Break --------------------
01-19-2018 - Visa lodge, SG eAppeal
01-23-2018 - SG eAppeal Approved
01-25-2018 - Wife's SG eAppeal Approved
02-03-2018 - Medical - wife and me
02-05-2018 - Medical - kids
02-08-2018 - Medical - Daughter - IGRA
02-14-2018 - Form 815 Health Undertaking for daughter
04-27-2018 - 1st CO Contact: Parental Consent/Form 1229
05-22-2018 - 2nd CO Contact: Wife's Statutory Declaration
08-21-2018 - 3rd CO Contact: Repeat Medical - Daughter
09-21-2018 - VISA GRANT! Thank you Lord!
11-11-2018 - IE (Medicare, Centrelink, NSW DL)
April 2019 - Target BM with wife
January 2020 - Target BM - 3 kids
Posts: 112Member
Joined: Dec 12, 2017
Posts: 916Member
Joined: Feb 02, 2016
312111 Architectural Draftsperson 80pts 190 NSW
04/Apr/2017 VETASSES
11/Jul/2017 VETASSES+
Waiting for States to open.......
26/Sep/2017 NSW open for 312111
29/Sep/2017 PTE exam
01/Oct/2017 PTE Result L85, R83, S79, W80
02/Oct/2017 EOI 190 NSW
20/Oct/2017 Pre Invite 190 NSW
30/Oct/2017 SS Application 190 NSW
21/Dec/2017 SS Approved/ITA 190 NSW
20/Jan/2018 health exam, me and eldest son
22/Jan/2018 eldest son mantoux TB test
(no stock at SATA AMK on 20/Jan!)
23/Jan/2018 health clearance (me)
25/Jan/2018 health clearance (5 yr old son)
29/Jan/2018 Singapore Police Force COC (me)
03/Feb/2018 health clearance (youngest son)
06/Feb/2018 Singapore Police Force COC (wife)
06/Feb/2018 health clearance (wife)
08/Feb/2018 Visa lodge! So help me God :-)
29/May/2018 CO contact (PH PCC)
05/Sep/2018 Golden Email! Thank you Lord!
Romans 12:12 Rejoice in hope, be patient in tribulation, be constant in prayer.
James 5:7-8 Be patient, therefore, brothers, until the coming of the Lord. See how the farmer waits for the precious fruit of the earth, being patient about it, until it receives the early and the late rains. You also, be patient. Establish your hearts, for the coming of the Lord is at hand.
Proverbs 3:5-6 Trust in the LORD with all your heart, and do not lean on your own understanding. In all your ways acknowledge him, and he will make straight your paths.
Onward to the next chapter!
Posts: 773Member
Joined: Jun 12, 2017
261312 Developer Programmer - (English - 20pts | Age - 30pts. | Qualification - 10 | Experience - 0 ) = 60pts.
Subclass 189 - 60pts.
Subclass 190 - (60 + 5 spouse points + 5 SN) = 70pts.
08/04/2016 - Took IELTS - L/R/W/S - 6.5/7/6.5/7 - Competent
05/17/2017 - PTE Mock A - L/R/W/S - 74/62/66/76
05/19/2017 - PTE Mock B - L/R/W/S - 76/70/72/89
05/30/2017 - PTE Take 1 - L/R/W/S - 79/75/78/78 - Proficient
06/06/2017 - PTE Take 2 - L/R/W/S - 82/87/90/88- Superior - Thank you, Lord!
PTE Tips: http://pinoyau.info/discussion/4233/pte-academic/p465#Comment_245887
06/14/2017 - Collection of docs for ACS Assessment
06/21/2017 - Submitted ACS Assessment
08/14/2017 - ACS Result Positive. Equivalent to AQF Associate Degree. 5 years experience deducted.
08/15/2017 - Gathering docs for spouse points (VETASSESS)
08/22/2017 - Lodged spouse's VETASSESS
10/05/2017 - VETASSESS results positive - aquired 5pts. for 190
10/07/2017 - Submitted EOI - 189, 190-NSW, 190-VIC
10/20/2017 - ITA NSW Received!
10/22/2017 - Submitted NSW Application
11/28/2017 - NSW SS Approved! Received ITA for visa 190
---------------Gathering docs for visa lodge---------------
-------------------- Christmas Break --------------------
01-19-2018 - Visa lodge, SG eAppeal
01-23-2018 - SG eAppeal Approved
01-25-2018 - Wife's SG eAppeal Approved
02-03-2018 - Medical - wife and me
02-05-2018 - Medical - kids
02-08-2018 - Medical - Daughter - IGRA
02-14-2018 - Form 815 Health Undertaking for daughter
04-27-2018 - 1st CO Contact: Parental Consent/Form 1229
05-22-2018 - 2nd CO Contact: Wife's Statutory Declaration
08-21-2018 - 3rd CO Contact: Repeat Medical - Daughter
09-21-2018 - VISA GRANT! Thank you Lord!
11-11-2018 - IE (Medicare, Centrelink, NSW DL)
April 2019 - Target BM with wife
January 2020 - Target BM - 3 kids
Posts: 773Member
Joined: Jun 12, 2017
261312 Developer Programmer - (English - 20pts | Age - 30pts. | Qualification - 10 | Experience - 0 ) = 60pts.
Subclass 189 - 60pts.
Subclass 190 - (60 + 5 spouse points + 5 SN) = 70pts.
08/04/2016 - Took IELTS - L/R/W/S - 6.5/7/6.5/7 - Competent
05/17/2017 - PTE Mock A - L/R/W/S - 74/62/66/76
05/19/2017 - PTE Mock B - L/R/W/S - 76/70/72/89
05/30/2017 - PTE Take 1 - L/R/W/S - 79/75/78/78 - Proficient
06/06/2017 - PTE Take 2 - L/R/W/S - 82/87/90/88- Superior - Thank you, Lord!
PTE Tips: http://pinoyau.info/discussion/4233/pte-academic/p465#Comment_245887
06/14/2017 - Collection of docs for ACS Assessment
06/21/2017 - Submitted ACS Assessment
08/14/2017 - ACS Result Positive. Equivalent to AQF Associate Degree. 5 years experience deducted.
08/15/2017 - Gathering docs for spouse points (VETASSESS)
08/22/2017 - Lodged spouse's VETASSESS
10/05/2017 - VETASSESS results positive - aquired 5pts. for 190
10/07/2017 - Submitted EOI - 189, 190-NSW, 190-VIC
10/20/2017 - ITA NSW Received!
10/22/2017 - Submitted NSW Application
11/28/2017 - NSW SS Approved! Received ITA for visa 190
---------------Gathering docs for visa lodge---------------
-------------------- Christmas Break --------------------
01-19-2018 - Visa lodge, SG eAppeal
01-23-2018 - SG eAppeal Approved
01-25-2018 - Wife's SG eAppeal Approved
02-03-2018 - Medical - wife and me
02-05-2018 - Medical - kids
02-08-2018 - Medical - Daughter - IGRA
02-14-2018 - Form 815 Health Undertaking for daughter
04-27-2018 - 1st CO Contact: Parental Consent/Form 1229
05-22-2018 - 2nd CO Contact: Wife's Statutory Declaration
08-21-2018 - 3rd CO Contact: Repeat Medical - Daughter
09-21-2018 - VISA GRANT! Thank you Lord!
11-11-2018 - IE (Medicare, Centrelink, NSW DL)
April 2019 - Target BM with wife
January 2020 - Target BM - 3 kids
Posts: 112Member
Joined: Dec 12, 2017
Posts: 773Member
Joined: Jun 12, 2017
261312 Developer Programmer - (English - 20pts | Age - 30pts. | Qualification - 10 | Experience - 0 ) = 60pts.
Subclass 189 - 60pts.
Subclass 190 - (60 + 5 spouse points + 5 SN) = 70pts.
08/04/2016 - Took IELTS - L/R/W/S - 6.5/7/6.5/7 - Competent
05/17/2017 - PTE Mock A - L/R/W/S - 74/62/66/76
05/19/2017 - PTE Mock B - L/R/W/S - 76/70/72/89
05/30/2017 - PTE Take 1 - L/R/W/S - 79/75/78/78 - Proficient
06/06/2017 - PTE Take 2 - L/R/W/S - 82/87/90/88- Superior - Thank you, Lord!
PTE Tips: http://pinoyau.info/discussion/4233/pte-academic/p465#Comment_245887
06/14/2017 - Collection of docs for ACS Assessment
06/21/2017 - Submitted ACS Assessment
08/14/2017 - ACS Result Positive. Equivalent to AQF Associate Degree. 5 years experience deducted.
08/15/2017 - Gathering docs for spouse points (VETASSESS)
08/22/2017 - Lodged spouse's VETASSESS
10/05/2017 - VETASSESS results positive - aquired 5pts. for 190
10/07/2017 - Submitted EOI - 189, 190-NSW, 190-VIC
10/20/2017 - ITA NSW Received!
10/22/2017 - Submitted NSW Application
11/28/2017 - NSW SS Approved! Received ITA for visa 190
---------------Gathering docs for visa lodge---------------
-------------------- Christmas Break --------------------
01-19-2018 - Visa lodge, SG eAppeal
01-23-2018 - SG eAppeal Approved
01-25-2018 - Wife's SG eAppeal Approved
02-03-2018 - Medical - wife and me
02-05-2018 - Medical - kids
02-08-2018 - Medical - Daughter - IGRA
02-14-2018 - Form 815 Health Undertaking for daughter
04-27-2018 - 1st CO Contact: Parental Consent/Form 1229
05-22-2018 - 2nd CO Contact: Wife's Statutory Declaration
08-21-2018 - 3rd CO Contact: Repeat Medical - Daughter
09-21-2018 - VISA GRANT! Thank you Lord!
11-11-2018 - IE (Medicare, Centrelink, NSW DL)
April 2019 - Target BM with wife
January 2020 - Target BM - 3 kids
Posts: 916Member
Joined: Feb 02, 2016
312111 Architectural Draftsperson 80pts 190 NSW
04/Apr/2017 VETASSES
11/Jul/2017 VETASSES+
Waiting for States to open.......
26/Sep/2017 NSW open for 312111
29/Sep/2017 PTE exam
01/Oct/2017 PTE Result L85, R83, S79, W80
02/Oct/2017 EOI 190 NSW
20/Oct/2017 Pre Invite 190 NSW
30/Oct/2017 SS Application 190 NSW
21/Dec/2017 SS Approved/ITA 190 NSW
20/Jan/2018 health exam, me and eldest son
22/Jan/2018 eldest son mantoux TB test
(no stock at SATA AMK on 20/Jan!)
23/Jan/2018 health clearance (me)
25/Jan/2018 health clearance (5 yr old son)
29/Jan/2018 Singapore Police Force COC (me)
03/Feb/2018 health clearance (youngest son)
06/Feb/2018 Singapore Police Force COC (wife)
06/Feb/2018 health clearance (wife)
08/Feb/2018 Visa lodge! So help me God :-)
29/May/2018 CO contact (PH PCC)
05/Sep/2018 Golden Email! Thank you Lord!
Romans 12:12 Rejoice in hope, be patient in tribulation, be constant in prayer.
James 5:7-8 Be patient, therefore, brothers, until the coming of the Lord. See how the farmer waits for the precious fruit of the earth, being patient about it, until it receives the early and the late rains. You also, be patient. Establish your hearts, for the coming of the Lord is at hand.
Proverbs 3:5-6 Trust in the LORD with all your heart, and do not lean on your own understanding. In all your ways acknowledge him, and he will make straight your paths.
Onward to the next chapter!
Posts: 773Member
Joined: Jun 12, 2017
261312 Developer Programmer - (English - 20pts | Age - 30pts. | Qualification - 10 | Experience - 0 ) = 60pts.
Subclass 189 - 60pts.
Subclass 190 - (60 + 5 spouse points + 5 SN) = 70pts.
08/04/2016 - Took IELTS - L/R/W/S - 6.5/7/6.5/7 - Competent
05/17/2017 - PTE Mock A - L/R/W/S - 74/62/66/76
05/19/2017 - PTE Mock B - L/R/W/S - 76/70/72/89
05/30/2017 - PTE Take 1 - L/R/W/S - 79/75/78/78 - Proficient
06/06/2017 - PTE Take 2 - L/R/W/S - 82/87/90/88- Superior - Thank you, Lord!
PTE Tips: http://pinoyau.info/discussion/4233/pte-academic/p465#Comment_245887
06/14/2017 - Collection of docs for ACS Assessment
06/21/2017 - Submitted ACS Assessment
08/14/2017 - ACS Result Positive. Equivalent to AQF Associate Degree. 5 years experience deducted.
08/15/2017 - Gathering docs for spouse points (VETASSESS)
08/22/2017 - Lodged spouse's VETASSESS
10/05/2017 - VETASSESS results positive - aquired 5pts. for 190
10/07/2017 - Submitted EOI - 189, 190-NSW, 190-VIC
10/20/2017 - ITA NSW Received!
10/22/2017 - Submitted NSW Application
11/28/2017 - NSW SS Approved! Received ITA for visa 190
---------------Gathering docs for visa lodge---------------
-------------------- Christmas Break --------------------
01-19-2018 - Visa lodge, SG eAppeal
01-23-2018 - SG eAppeal Approved
01-25-2018 - Wife's SG eAppeal Approved
02-03-2018 - Medical - wife and me
02-05-2018 - Medical - kids
02-08-2018 - Medical - Daughter - IGRA
02-14-2018 - Form 815 Health Undertaking for daughter
04-27-2018 - 1st CO Contact: Parental Consent/Form 1229
05-22-2018 - 2nd CO Contact: Wife's Statutory Declaration
08-21-2018 - 3rd CO Contact: Repeat Medical - Daughter
09-21-2018 - VISA GRANT! Thank you Lord!
11-11-2018 - IE (Medicare, Centrelink, NSW DL)
April 2019 - Target BM with wife
January 2020 - Target BM - 3 kids
Posts: 916Member
Joined: Feb 02, 2016
312111 Architectural Draftsperson 80pts 190 NSW
04/Apr/2017 VETASSES
11/Jul/2017 VETASSES+
Waiting for States to open.......
26/Sep/2017 NSW open for 312111
29/Sep/2017 PTE exam
01/Oct/2017 PTE Result L85, R83, S79, W80
02/Oct/2017 EOI 190 NSW
20/Oct/2017 Pre Invite 190 NSW
30/Oct/2017 SS Application 190 NSW
21/Dec/2017 SS Approved/ITA 190 NSW
20/Jan/2018 health exam, me and eldest son
22/Jan/2018 eldest son mantoux TB test
(no stock at SATA AMK on 20/Jan!)
23/Jan/2018 health clearance (me)
25/Jan/2018 health clearance (5 yr old son)
29/Jan/2018 Singapore Police Force COC (me)
03/Feb/2018 health clearance (youngest son)
06/Feb/2018 Singapore Police Force COC (wife)
06/Feb/2018 health clearance (wife)
08/Feb/2018 Visa lodge! So help me God :-)
29/May/2018 CO contact (PH PCC)
05/Sep/2018 Golden Email! Thank you Lord!
Romans 12:12 Rejoice in hope, be patient in tribulation, be constant in prayer.
James 5:7-8 Be patient, therefore, brothers, until the coming of the Lord. See how the farmer waits for the precious fruit of the earth, being patient about it, until it receives the early and the late rains. You also, be patient. Establish your hearts, for the coming of the Lord is at hand.
Proverbs 3:5-6 Trust in the LORD with all your heart, and do not lean on your own understanding. In all your ways acknowledge him, and he will make straight your paths.
Onward to the next chapter!
Posts: 773Member
Joined: Jun 12, 2017
261312 Developer Programmer - (English - 20pts | Age - 30pts. | Qualification - 10 | Experience - 0 ) = 60pts.
Subclass 189 - 60pts.
Subclass 190 - (60 + 5 spouse points + 5 SN) = 70pts.
08/04/2016 - Took IELTS - L/R/W/S - 6.5/7/6.5/7 - Competent
05/17/2017 - PTE Mock A - L/R/W/S - 74/62/66/76
05/19/2017 - PTE Mock B - L/R/W/S - 76/70/72/89
05/30/2017 - PTE Take 1 - L/R/W/S - 79/75/78/78 - Proficient
06/06/2017 - PTE Take 2 - L/R/W/S - 82/87/90/88- Superior - Thank you, Lord!
PTE Tips: http://pinoyau.info/discussion/4233/pte-academic/p465#Comment_245887
06/14/2017 - Collection of docs for ACS Assessment
06/21/2017 - Submitted ACS Assessment
08/14/2017 - ACS Result Positive. Equivalent to AQF Associate Degree. 5 years experience deducted.
08/15/2017 - Gathering docs for spouse points (VETASSESS)
08/22/2017 - Lodged spouse's VETASSESS
10/05/2017 - VETASSESS results positive - aquired 5pts. for 190
10/07/2017 - Submitted EOI - 189, 190-NSW, 190-VIC
10/20/2017 - ITA NSW Received!
10/22/2017 - Submitted NSW Application
11/28/2017 - NSW SS Approved! Received ITA for visa 190
---------------Gathering docs for visa lodge---------------
-------------------- Christmas Break --------------------
01-19-2018 - Visa lodge, SG eAppeal
01-23-2018 - SG eAppeal Approved
01-25-2018 - Wife's SG eAppeal Approved
02-03-2018 - Medical - wife and me
02-05-2018 - Medical - kids
02-08-2018 - Medical - Daughter - IGRA
02-14-2018 - Form 815 Health Undertaking for daughter
04-27-2018 - 1st CO Contact: Parental Consent/Form 1229
05-22-2018 - 2nd CO Contact: Wife's Statutory Declaration
08-21-2018 - 3rd CO Contact: Repeat Medical - Daughter
09-21-2018 - VISA GRANT! Thank you Lord!
11-11-2018 - IE (Medicare, Centrelink, NSW DL)
April 2019 - Target BM with wife
January 2020 - Target BM - 3 kids