most recent by eel_kram025
The Best Vegan Eats in San Diego: El Avocado
most recent by RosieHockm
VICTORIA STATES SPONSORSHIP 2024-2025
most recent by Ozdrims
QUEENSLAND STATES SPONSORSHIP FY 2024-2025
most recent by Ozdrims
Australian Computer Society Skills Application
most recent by Ozdrims
most recent by Cerberus13
NSW STATE SPONSORSHIP 2024~2025
most recent by Ozdrims
Highly suggested Migration Agency
most recent by Marionittes40
The longest running Pinoy-Australian Forum site in the history. We are connecting Pinoys "in" and "to" Australia since 2010! If you want to join in, click one of these buttons!
Comments
Posts: 5,037Member, De-activated
Joined: Feb 23, 2012
Sep 24, 2011 - IELTS (L-8 R-8 W-8 S-7.5 : OBS-8)
Jan 04, 2012 - EA application submitted | Feb 23, 2012 - EA assessment result (IE ANZSCO 233511)
May 8, 2012 - Lodged GSM 175 online application | June 4, 2012 - CO Allocated
June 22, 2012 - Medicals Finalized | Aug 30, 2012 - PCCs Completed (PH, UAE, USA)
Sep 3, 2012 - Visa Granted (IED Jun 11, 2013) Thank You Lord!
Oct 16-28, 2012 - Initial Entry Completed - Sydney
July 28, 2013 - Final move to Perth
Sep 9, 2013 - Started work with the same company i worked for in UAE/USA
Oct 28, 2013 - Moved to another company..
Posts: 5,037Member, De-activated
Joined: Feb 23, 2012
para makita sa summary..
goodluck po.. very high score mabilis kayo maiinvite.. are you applying for visa 189?
Sep 24, 2011 - IELTS (L-8 R-8 W-8 S-7.5 : OBS-8)
Jan 04, 2012 - EA application submitted | Feb 23, 2012 - EA assessment result (IE ANZSCO 233511)
May 8, 2012 - Lodged GSM 175 online application | June 4, 2012 - CO Allocated
June 22, 2012 - Medicals Finalized | Aug 30, 2012 - PCCs Completed (PH, UAE, USA)
Sep 3, 2012 - Visa Granted (IED Jun 11, 2013) Thank You Lord!
Oct 16-28, 2012 - Initial Entry Completed - Sydney
July 28, 2013 - Final move to Perth
Sep 9, 2013 - Started work with the same company i worked for in UAE/USA
Oct 28, 2013 - Moved to another company..
Posts: 1,684Member
Joined: Jan 13, 2013
May ma aadvice pa po ba kayo?
Kinakabahan ako bat lumabas yung 0 point hehe
Sana nga po, okay lang yun at wala maging problem.
9 January 2013 Received Favorable Response from EA
18 January 2013 Lodged EOI Application via SkillSelect
21 January 2013 Received Invitation to Apply for Visa Subclass 189
26 January 2013 Lodged Visa Application
18 March 2013 CO Allocated, Team 34 Brisbane
14 May 2013 Submitted Form 815
23 May 2013 Submitted updated Form 815 with new passport details
03 June 2013 VISA Grant! Thank you Jesus
Posts: 5,037Member, De-activated
Joined: Feb 23, 2012
okay na po yan.. submit it..
always check your EOI or email para malaman nyo kung nainvite na kayo at pwde na mag visa application.. goodluck..
Sep 24, 2011 - IELTS (L-8 R-8 W-8 S-7.5 : OBS-8)
Jan 04, 2012 - EA application submitted | Feb 23, 2012 - EA assessment result (IE ANZSCO 233511)
May 8, 2012 - Lodged GSM 175 online application | June 4, 2012 - CO Allocated
June 22, 2012 - Medicals Finalized | Aug 30, 2012 - PCCs Completed (PH, UAE, USA)
Sep 3, 2012 - Visa Granted (IED Jun 11, 2013) Thank You Lord!
Oct 16-28, 2012 - Initial Entry Completed - Sydney
July 28, 2013 - Final move to Perth
Sep 9, 2013 - Started work with the same company i worked for in UAE/USA
Oct 28, 2013 - Moved to another company..
Posts: 8Member
Joined: Jan 19, 2013
Posts: 4,336Member
Joined: Feb 24, 2011
Take note that you have to get a score of not less than 7 in ALL part of your IELTS exam - take ACADEMIC!
Primary Applicant: Wife
Accountant (General): 221111
04 Aug 2012 - IELTS (Academic Module)
07 Aug 2012 - IELTS (Academic Module) Speaking Part
17 Aug 2012 - IELTS Results (L: 8.5 R: 8.5 W: 7.0 S: 7.5 OBS: 8.0)
24 Aug 2012 - CPAA Submitted (docs mailed same day via SG EMS)
25 Sep 2012 - Received +Skills Assessment from CPAA
25 Sep 2012 - Lodged EOI Application with 70pts
30 Sep 2012 - Invited by DIAC to apply for 189 Visa
01 Oct 2012 - Submitted 189 Visa Application
20 Oct 2012 - Medical Examinations
23 Oct 2012 - CO Assigned; Team 7 - SA
05 Nov 2012 - Submitted SG PCC and NBI Clearance
06 Nov 2012 - Visa Granted (IED: 23/10/2013)
03 Apr 2013 - Flight to MEL
03 Jun 2013 - started work
12 Jun 2013 - wife started work
15 Jun 2016 - applied for citizenship
29 Jul 2016 - citizenship examination
20 Oct 2016 - Aussie, Aussie, Aussie Oi Oi Oi!!
Posts: 5,037Member, De-activated
Joined: Feb 23, 2012
kung hindi po kayo sure kung anu ang assessing authority nyo, or kung hindi accountant ang occupation na inonominate nyo (ex, Internal Auditor), please check the SOL/CSOL... verify your assessing authority, check their requirements..
goodluck..
Sep 24, 2011 - IELTS (L-8 R-8 W-8 S-7.5 : OBS-8)
Jan 04, 2012 - EA application submitted | Feb 23, 2012 - EA assessment result (IE ANZSCO 233511)
May 8, 2012 - Lodged GSM 175 online application | June 4, 2012 - CO Allocated
June 22, 2012 - Medicals Finalized | Aug 30, 2012 - PCCs Completed (PH, UAE, USA)
Sep 3, 2012 - Visa Granted (IED Jun 11, 2013) Thank You Lord!
Oct 16-28, 2012 - Initial Entry Completed - Sydney
July 28, 2013 - Final move to Perth
Sep 9, 2013 - Started work with the same company i worked for in UAE/USA
Oct 28, 2013 - Moved to another company..
Posts: 8Member
Joined: Jan 19, 2013
Posts: 5,037Member, De-activated
Joined: Feb 23, 2012
http://www.pinoyau.info/discussion/29/share-some-tips-on-ielts#Item_2191
may reviewer din yata .. check mo link sa header...
also, may mga promo ang mga review center sa pinas, check mo ang mga group buying sites..
yung mga review centers can help you get familiarized with the test format at mga types of questions.. give tips on how to answer..
Sep 24, 2011 - IELTS (L-8 R-8 W-8 S-7.5 : OBS-8)
Jan 04, 2012 - EA application submitted | Feb 23, 2012 - EA assessment result (IE ANZSCO 233511)
May 8, 2012 - Lodged GSM 175 online application | June 4, 2012 - CO Allocated
June 22, 2012 - Medicals Finalized | Aug 30, 2012 - PCCs Completed (PH, UAE, USA)
Sep 3, 2012 - Visa Granted (IED Jun 11, 2013) Thank You Lord!
Oct 16-28, 2012 - Initial Entry Completed - Sydney
July 28, 2013 - Final move to Perth
Sep 9, 2013 - Started work with the same company i worked for in UAE/USA
Oct 28, 2013 - Moved to another company..
Posts: 1,684Member
Joined: Jan 13, 2013
Thank u thank u po ah
9 January 2013 Received Favorable Response from EA
18 January 2013 Lodged EOI Application via SkillSelect
21 January 2013 Received Invitation to Apply for Visa Subclass 189
26 January 2013 Lodged Visa Application
18 March 2013 CO Allocated, Team 34 Brisbane
14 May 2013 Submitted Form 815
23 May 2013 Submitted updated Form 815 with new passport details
03 June 2013 VISA Grant! Thank you Jesus
Posts: 1,684Member
Joined: Jan 13, 2013
Nainvite na agad kami to lodge an application.
pero dun sa letter po, walang step by step instructions on how to lodge a visa application.
pero sabi sa booklet 6 and booklet 11, pag nakareceive ng invitation, included na dun ang instruction on how to apply.
can you help us again please?
eto po ang intindi ko na dapat gawin to lodge a visa application:
1. payment
2. secure all documents, have them photocopied, pacertify true copy, then scan all documents
3. attach all documents upon visa lodgement
tama po ba?
may missing items pa po ba needed for the lodgement of visa?
by the way, yung Engineers Australia letter and IELTS result, need din po ipaphotocopy at ipa certify true copy?
would again appreciate your help...
thank you in advance.
9 January 2013 Received Favorable Response from EA
18 January 2013 Lodged EOI Application via SkillSelect
21 January 2013 Received Invitation to Apply for Visa Subclass 189
26 January 2013 Lodged Visa Application
18 March 2013 CO Allocated, Team 34 Brisbane
14 May 2013 Submitted Form 815
23 May 2013 Submitted updated Form 815 with new passport details
03 June 2013 VISA Grant! Thank you Jesus
Posts: 5,037Member, De-activated
Joined: Feb 23, 2012
hindi po ako dumaan sa EOI... pero as far as i know eto pakicheck mabuti..
1. dun po sa EOI nyo, i guess may "APPLY VISA" button.. pag-activated po yan meaning invited na po talga kayo to apply for the visa
2. pag click nyo ang "APPLY VISA", im assuming na mag-oopen sya ng bagong screen or form para ma-enter nyo na ang details ng visa application nyo.. then PAYMENT.
3. After payment.. saka nyo pa lang po i-aattach ang mga documents.. (ibang screen din po ito)
4. HINDI na po kailangan ipa-photocopy/CTC ang mga documents nyo... i scan nyo lang po ng colored ang mga ORIGINAL documents... at un na din po ang i-aattach nyo...
goodluck po..
Mga EOI peeps.. please confirm kung ganyan nga po ang process ng actual visa application..
thanks!!
Sep 24, 2011 - IELTS (L-8 R-8 W-8 S-7.5 : OBS-8)
Jan 04, 2012 - EA application submitted | Feb 23, 2012 - EA assessment result (IE ANZSCO 233511)
May 8, 2012 - Lodged GSM 175 online application | June 4, 2012 - CO Allocated
June 22, 2012 - Medicals Finalized | Aug 30, 2012 - PCCs Completed (PH, UAE, USA)
Sep 3, 2012 - Visa Granted (IED Jun 11, 2013) Thank You Lord!
Oct 16-28, 2012 - Initial Entry Completed - Sydney
July 28, 2013 - Final move to Perth
Sep 9, 2013 - Started work with the same company i worked for in UAE/USA
Oct 28, 2013 - Moved to another company..
Posts: 1,684Member
Joined: Jan 13, 2013
di ba po may nakalagay sa guidelines na dapat Certified True Copy ang mga documents?
Or di na po need?
Please help po
9 January 2013 Received Favorable Response from EA
18 January 2013 Lodged EOI Application via SkillSelect
21 January 2013 Received Invitation to Apply for Visa Subclass 189
26 January 2013 Lodged Visa Application
18 March 2013 CO Allocated, Team 34 Brisbane
14 May 2013 Submitted Form 815
23 May 2013 Submitted updated Form 815 with new passport details
03 June 2013 VISA Grant! Thank you Jesus
Posts: 5,037Member, De-activated
Joined: Feb 23, 2012
also, EA already did the initial verification ng mga documents nyo (educ and work exp)..
ganyan din po ginawa ko at ng iba dito.. scan your orignal documents (colored) then attach to your online visa application..
Sep 24, 2011 - IELTS (L-8 R-8 W-8 S-7.5 : OBS-8)
Jan 04, 2012 - EA application submitted | Feb 23, 2012 - EA assessment result (IE ANZSCO 233511)
May 8, 2012 - Lodged GSM 175 online application | June 4, 2012 - CO Allocated
June 22, 2012 - Medicals Finalized | Aug 30, 2012 - PCCs Completed (PH, UAE, USA)
Sep 3, 2012 - Visa Granted (IED Jun 11, 2013) Thank You Lord!
Oct 16-28, 2012 - Initial Entry Completed - Sydney
July 28, 2013 - Final move to Perth
Sep 9, 2013 - Started work with the same company i worked for in UAE/USA
Oct 28, 2013 - Moved to another company..
Posts: 1,684Member
Joined: Jan 13, 2013
yung sa payment po ba, gaano po katagal bago malaman na pumasok na yung payment via credit card?
9 January 2013 Received Favorable Response from EA
18 January 2013 Lodged EOI Application via SkillSelect
21 January 2013 Received Invitation to Apply for Visa Subclass 189
26 January 2013 Lodged Visa Application
18 March 2013 CO Allocated, Team 34 Brisbane
14 May 2013 Submitted Form 815
23 May 2013 Submitted updated Form 815 with new passport details
03 June 2013 VISA Grant! Thank you Jesus
Posts: 1,684Member
Joined: Jan 13, 2013
pakicheck nman po kung complete na to para makapag lodge na kami ng visa.
thank you po
Engineers Australia Letter
IELTS Result
Passport
Birth Certificate
COE
ITR
Payslip
Diploma
Transcript of Record
Marriage Contract
thanks po in advance sa walang sawang pagtulong
9 January 2013 Received Favorable Response from EA
18 January 2013 Lodged EOI Application via SkillSelect
21 January 2013 Received Invitation to Apply for Visa Subclass 189
26 January 2013 Lodged Visa Application
18 March 2013 CO Allocated, Team 34 Brisbane
14 May 2013 Submitted Form 815
23 May 2013 Submitted updated Form 815 with new passport details
03 June 2013 VISA Grant! Thank you Jesus
Posts: 5,037Member, De-activated
Joined: Feb 23, 2012
Sep 24, 2011 - IELTS (L-8 R-8 W-8 S-7.5 : OBS-8)
Jan 04, 2012 - EA application submitted | Feb 23, 2012 - EA assessment result (IE ANZSCO 233511)
May 8, 2012 - Lodged GSM 175 online application | June 4, 2012 - CO Allocated
June 22, 2012 - Medicals Finalized | Aug 30, 2012 - PCCs Completed (PH, UAE, USA)
Sep 3, 2012 - Visa Granted (IED Jun 11, 2013) Thank You Lord!
Oct 16-28, 2012 - Initial Entry Completed - Sydney
July 28, 2013 - Final move to Perth
Sep 9, 2013 - Started work with the same company i worked for in UAE/USA
Oct 28, 2013 - Moved to another company..
Posts: 5,037Member, De-activated
Joined: Feb 23, 2012
a) Diploma- of course pati ang secondary (wife) / at mga dependents na kasama nyo sa application (anak)
b) English Language requirement for secondary
Sep 24, 2011 - IELTS (L-8 R-8 W-8 S-7.5 : OBS-8)
Jan 04, 2012 - EA application submitted | Feb 23, 2012 - EA assessment result (IE ANZSCO 233511)
May 8, 2012 - Lodged GSM 175 online application | June 4, 2012 - CO Allocated
June 22, 2012 - Medicals Finalized | Aug 30, 2012 - PCCs Completed (PH, UAE, USA)
Sep 3, 2012 - Visa Granted (IED Jun 11, 2013) Thank You Lord!
Oct 16-28, 2012 - Initial Entry Completed - Sydney
July 28, 2013 - Final move to Perth
Sep 9, 2013 - Started work with the same company i worked for in UAE/USA
Oct 28, 2013 - Moved to another company..
Posts: 1,684Member
Joined: Jan 13, 2013
yes po ready na din po ang diploma ko pati english translation
yung sa Certificate of English as Medium of Instruction, nakakuha na din po ako knina
naliwagan na din po ako. pati si @psychoboy di na nagpa CTC as long as mascan daw in full color.
thank you so much @lock_code2004...
please pray for us...
9 January 2013 Received Favorable Response from EA
18 January 2013 Lodged EOI Application via SkillSelect
21 January 2013 Received Invitation to Apply for Visa Subclass 189
26 January 2013 Lodged Visa Application
18 March 2013 CO Allocated, Team 34 Brisbane
14 May 2013 Submitted Form 815
23 May 2013 Submitted updated Form 815 with new passport details
03 June 2013 VISA Grant! Thank you Jesus
Posts: 5,037Member, De-activated
Joined: Feb 23, 2012
libre mo kmi pag visa grant na kayo.. O:-)
Sep 24, 2011 - IELTS (L-8 R-8 W-8 S-7.5 : OBS-8)
Jan 04, 2012 - EA application submitted | Feb 23, 2012 - EA assessment result (IE ANZSCO 233511)
May 8, 2012 - Lodged GSM 175 online application | June 4, 2012 - CO Allocated
June 22, 2012 - Medicals Finalized | Aug 30, 2012 - PCCs Completed (PH, UAE, USA)
Sep 3, 2012 - Visa Granted (IED Jun 11, 2013) Thank You Lord!
Oct 16-28, 2012 - Initial Entry Completed - Sydney
July 28, 2013 - Final move to Perth
Sep 9, 2013 - Started work with the same company i worked for in UAE/USA
Oct 28, 2013 - Moved to another company..
Posts: 1,684Member
Joined: Jan 13, 2013
pagpray nyo po kami ah..
meet up po tayo after sama nyo po ang wife nyo
thank you @lock_code2004.
pinapagpray ko din na pumasa kami sa medicals... please Jesus
9 January 2013 Received Favorable Response from EA
18 January 2013 Lodged EOI Application via SkillSelect
21 January 2013 Received Invitation to Apply for Visa Subclass 189
26 January 2013 Lodged Visa Application
18 March 2013 CO Allocated, Team 34 Brisbane
14 May 2013 Submitted Form 815
23 May 2013 Submitted updated Form 815 with new passport details
03 June 2013 VISA Grant! Thank you Jesus
Posts: 4,336Member
Joined: Feb 24, 2011
Primary Applicant: Wife
Accountant (General): 221111
04 Aug 2012 - IELTS (Academic Module)
07 Aug 2012 - IELTS (Academic Module) Speaking Part
17 Aug 2012 - IELTS Results (L: 8.5 R: 8.5 W: 7.0 S: 7.5 OBS: 8.0)
24 Aug 2012 - CPAA Submitted (docs mailed same day via SG EMS)
25 Sep 2012 - Received +Skills Assessment from CPAA
25 Sep 2012 - Lodged EOI Application with 70pts
30 Sep 2012 - Invited by DIAC to apply for 189 Visa
01 Oct 2012 - Submitted 189 Visa Application
20 Oct 2012 - Medical Examinations
23 Oct 2012 - CO Assigned; Team 7 - SA
05 Nov 2012 - Submitted SG PCC and NBI Clearance
06 Nov 2012 - Visa Granted (IED: 23/10/2013)
03 Apr 2013 - Flight to MEL
03 Jun 2013 - started work
12 Jun 2013 - wife started work
15 Jun 2016 - applied for citizenship
29 Jul 2016 - citizenship examination
20 Oct 2016 - Aussie, Aussie, Aussie Oi Oi Oi!!
Posts: 1,684Member
Joined: Jan 13, 2013
please include us in your prayers din po ah
9 January 2013 Received Favorable Response from EA
18 January 2013 Lodged EOI Application via SkillSelect
21 January 2013 Received Invitation to Apply for Visa Subclass 189
26 January 2013 Lodged Visa Application
18 March 2013 CO Allocated, Team 34 Brisbane
14 May 2013 Submitted Form 815
23 May 2013 Submitted updated Form 815 with new passport details
03 June 2013 VISA Grant! Thank you Jesus
Posts: 1,684Member
Joined: Jan 13, 2013
yung sa passport po, yung first page and last page lang po ang need i-scan? tama po ba?
9 January 2013 Received Favorable Response from EA
18 January 2013 Lodged EOI Application via SkillSelect
21 January 2013 Received Invitation to Apply for Visa Subclass 189
26 January 2013 Lodged Visa Application
18 March 2013 CO Allocated, Team 34 Brisbane
14 May 2013 Submitted Form 815
23 May 2013 Submitted updated Form 815 with new passport details
03 June 2013 VISA Grant! Thank you Jesus
Posts: 4,336Member
Joined: Feb 24, 2011
http://www.immi.gov.au/skills/skillselect/index/checklists/189-applicant-checklist.pdf
All you need to know for visa 189 is in the below link and the Booklet 6:
http://www.immi.gov.au/skills/skillselect/index/visas/subclass-189/
Err, if you can refresh me, where are you now in the visa application process... wala kasi naka-indicate na timeline sa signature mo.
I wish you nothing but the best, cheers!
Primary Applicant: Wife
Accountant (General): 221111
04 Aug 2012 - IELTS (Academic Module)
07 Aug 2012 - IELTS (Academic Module) Speaking Part
17 Aug 2012 - IELTS Results (L: 8.5 R: 8.5 W: 7.0 S: 7.5 OBS: 8.0)
24 Aug 2012 - CPAA Submitted (docs mailed same day via SG EMS)
25 Sep 2012 - Received +Skills Assessment from CPAA
25 Sep 2012 - Lodged EOI Application with 70pts
30 Sep 2012 - Invited by DIAC to apply for 189 Visa
01 Oct 2012 - Submitted 189 Visa Application
20 Oct 2012 - Medical Examinations
23 Oct 2012 - CO Assigned; Team 7 - SA
05 Nov 2012 - Submitted SG PCC and NBI Clearance
06 Nov 2012 - Visa Granted (IED: 23/10/2013)
03 Apr 2013 - Flight to MEL
03 Jun 2013 - started work
12 Jun 2013 - wife started work
15 Jun 2016 - applied for citizenship
29 Jul 2016 - citizenship examination
20 Oct 2016 - Aussie, Aussie, Aussie Oi Oi Oi!!
Posts: 5,037Member, De-activated
Joined: Feb 23, 2012
wala naman information sa last page eh..
Sep 24, 2011 - IELTS (L-8 R-8 W-8 S-7.5 : OBS-8)
Jan 04, 2012 - EA application submitted | Feb 23, 2012 - EA assessment result (IE ANZSCO 233511)
May 8, 2012 - Lodged GSM 175 online application | June 4, 2012 - CO Allocated
June 22, 2012 - Medicals Finalized | Aug 30, 2012 - PCCs Completed (PH, UAE, USA)
Sep 3, 2012 - Visa Granted (IED Jun 11, 2013) Thank You Lord!
Oct 16-28, 2012 - Initial Entry Completed - Sydney
July 28, 2013 - Final move to Perth
Sep 9, 2013 - Started work with the same company i worked for in UAE/USA
Oct 28, 2013 - Moved to another company..
Posts: 5,037Member, De-activated
Joined: Feb 23, 2012
wala po ako sa pinas.. heheh
also, please update your timeline, para makita ng iba ang status nyo..
click your "username".. and then "signature settings"..
Sep 24, 2011 - IELTS (L-8 R-8 W-8 S-7.5 : OBS-8)
Jan 04, 2012 - EA application submitted | Feb 23, 2012 - EA assessment result (IE ANZSCO 233511)
May 8, 2012 - Lodged GSM 175 online application | June 4, 2012 - CO Allocated
June 22, 2012 - Medicals Finalized | Aug 30, 2012 - PCCs Completed (PH, UAE, USA)
Sep 3, 2012 - Visa Granted (IED Jun 11, 2013) Thank You Lord!
Oct 16-28, 2012 - Initial Entry Completed - Sydney
July 28, 2013 - Final move to Perth
Sep 9, 2013 - Started work with the same company i worked for in UAE/USA
Oct 28, 2013 - Moved to another company..
Posts: 9Member
Joined: Dec 07, 2012
i am currently holding 489 visa sponsored by wa, but i find it hard to get a job in regional wa, so i decided to stay temporarily with my relatives in sydney so that my accommodation is free. my question is can i apply for a job in regional nsw since the only visa condition in the grant letter is to live and work in regional area without specifically stating wa? how do i inform wa? many thanks!
Posts: 1,684Member
Joined: Jan 13, 2013
Thank you. Cge first page na din po ang iscan namin
9 January 2013 Received Favorable Response from EA
18 January 2013 Lodged EOI Application via SkillSelect
21 January 2013 Received Invitation to Apply for Visa Subclass 189
26 January 2013 Lodged Visa Application
18 March 2013 CO Allocated, Team 34 Brisbane
14 May 2013 Submitted Form 815
23 May 2013 Submitted updated Form 815 with new passport details
03 June 2013 VISA Grant! Thank you Jesus
Posts: 1,684Member
Joined: Jan 13, 2013
kung may promo cge bah hehe magrant lang kami ng visa...lol
ahh akala ko po nasa pinas na kayo. kasi kala ko nakauwi na kayo from dubai.
cge icheck ko po ang settings ko hehe
9 January 2013 Received Favorable Response from EA
18 January 2013 Lodged EOI Application via SkillSelect
21 January 2013 Received Invitation to Apply for Visa Subclass 189
26 January 2013 Lodged Visa Application
18 March 2013 CO Allocated, Team 34 Brisbane
14 May 2013 Submitted Form 815
23 May 2013 Submitted updated Form 815 with new passport details
03 June 2013 VISA Grant! Thank you Jesus