most recent by fmp_921
most recent by uoieaeam
General Skilled Immigration Visa - Step By Step Process
most recent by whimpee
Australian Computer Society Skills Application
most recent by mathilde9
Western Australia Immigration Matters FY 2024-2025
most recent by fmp_921
AUSTRALIAN CITIZENSHIP TIMELINE
most recent by chewy
VICTORIA STATES SPONSORSHIP 2024-2025
most recent by rainmaker
Ph Vacation with One Month Visa Validity
most recent by Ozdrims
The longest running Pinoy-Australian Forum site in the history. We are connecting Pinoys "in" and "to" Australia since 2010! If you want to join in, click one of these buttons!
Comments
Posts: 4Member
Joined: Jun 13, 2014
thank you for being so accommodating sa pagsagot ng tanong. One more thing, yung coe ko, most of my previous employers hindi nila nilalagay yung job description. I have COE without JD. pano kaya yun???
@danz1213 telecommunications network engineer ba?? i used to work sa accenture as network engineer. pwede ko ba masilip yung career episodes mo?
Posts: 135Member
Joined: May 24, 2014
May 2014 -- Ielts 1st Take (Philippines)
-- L-8, R-7.5, W=6, S=7.5
July 2014 -- IELTS Remarking result W>6.5 (short paren aw)
Sept 2014 -- Submitted CDR to EA
Jan 2014 -- Rcv Positive Skill Assessment )Telecom Network Engineer
Apr 2016 -- Pursue OZ Dream! IELTS 2nd Take (Bangkok)
-- L=8.5, R=7.5, W=6.5, S=8
Jun 2016 -- IELTS Remarking W>7.0 (Thank God!)
Aug 17, 2016 -- Resubmitted CDR (65pts)
Aug 22, 2016 -- Rcv ITA
Oct 03, 2016 -- Lodged Visa 189 (frontloaded all except Medical Results)
Oct 06, 2016 -- Medical at BNH Bangkok ]
Oct 10, 2016 -- Wife Medical at St Lukes
Oct 26, 2016 -- Direct Grant!!!! Umaapaw na luha mula sa buong pamilya!
-- IED Sept 17, 2017
Apr 2017 -- BIG MOVE MELBOURNE
"NEVER GIVE UP… TRUST YOURSELF AND THE LORD, AND HIS PROPER TIMING!"
Posts: 4Member
Joined: Jun 13, 2014
guys, one more thing, im currently unemployed. actually, nag nenegosyo kasi ako ngayon. kailngan ba employed ka pag nag submit ng CDR? or okay lang naman so long as you have previous jobs na related, which in my case more than 5yrs na work experience ko. okay lang kaya yun?
Posts: 3Member
Joined: May 24, 2014
Posts: 686Member
Joined: Oct 14, 2013
Nominated Occupation : Production or Plant Engineer 233513
12/15/13 - IELTS IDP [ L : 9.0 I R :8.0 I S : 7.5 I W : 6.5 ]
01/17/14 - Submit CDR to Engineers Australia.
02/15/14 - IELTS IDP [ L : 9.0 I R :9.0 I S : 7.5 I W : 7.0 ]
05/29/14 - EA positive assessment as Production or Plant Engineer 233513
06/02/14 - EA Letter Received. Lodge EOI 65points.
06/09/14 - Received invitation to lodge Visa 189.
06/12/14 - Lodge Visa 189. Upload Docs/Form 80.
07/14/14 - Medicals @ SLEC Global.
07/15/14 - Upload NBI. (NBI Valid until July 4, 2015).
07/17/14 - CO Allocated. Team 7 GSM Adelaide ( CO : LM )
07/21/14 - VISA GRANT! Thank You Lord! IED : 07/04/15
02/06/15 - Hubby in Melbourne (Jobhunting)
03/27/15 - Me and my son in Melbourne
04/07/15 - Hubby 1st day of job
08/24/15 - My 1st day in BP, Thank you Lord God Jesus!
Enjoying the wonderful life in Oz, abundant blessings indeed :-)
Posts: 81Member
Joined: Jun 19, 2014
2014/06/22-CDR & IELTS Prep | 2014/08/02-IELTS Exam 08/15-0 pts | 2014/12/13-IELTS Exam 12/29-10pts | 2015/01/07-CDR Submit | 04/30-EA Result (233513-Positive) | 2015/04/30-Submit EOI | 05/08-Invite | 2015/05/09-Visa ELodge | 2015/05/15-Singapore COC (05/21 release) | 2015/06/04-Medical | 2015/06/24-NBI Clearance | 2015/06/29-CO Allocated | 2015/07/08-Visa Granted!!!
2016/03/15-Arrived in Melbourne
2016/04/01-Started Working... (Thank God!)
Posts: 686Member
Joined: Oct 14, 2013
Nominated Occupation : Production or Plant Engineer 233513
12/15/13 - IELTS IDP [ L : 9.0 I R :8.0 I S : 7.5 I W : 6.5 ]
01/17/14 - Submit CDR to Engineers Australia.
02/15/14 - IELTS IDP [ L : 9.0 I R :9.0 I S : 7.5 I W : 7.0 ]
05/29/14 - EA positive assessment as Production or Plant Engineer 233513
06/02/14 - EA Letter Received. Lodge EOI 65points.
06/09/14 - Received invitation to lodge Visa 189.
06/12/14 - Lodge Visa 189. Upload Docs/Form 80.
07/14/14 - Medicals @ SLEC Global.
07/15/14 - Upload NBI. (NBI Valid until July 4, 2015).
07/17/14 - CO Allocated. Team 7 GSM Adelaide ( CO : LM )
07/21/14 - VISA GRANT! Thank You Lord! IED : 07/04/15
02/06/15 - Hubby in Melbourne (Jobhunting)
03/27/15 - Me and my son in Melbourne
04/07/15 - Hubby 1st day of job
08/24/15 - My 1st day in BP, Thank you Lord God Jesus!
Enjoying the wonderful life in Oz, abundant blessings indeed :-)
Posts: 263Member
Joined: Oct 09, 2013
Electronics Engineer 233411
2013
Oct - Made long overdue decision!
21-Nov - IELTS Results (L-8.5/R-8.0/W-7.0/S-7.0)
Dec - CDR preparations / Holiday Mode
2014
16-Jan - EA skills assessment receipt date
24-Jun - Received EA assessment result from our mailbox
25-Jun - Submitted EOI
28-Jul - Received invitation to apply visa 189
30-Jul - NBI Fingerprinting @ Cantonment Police/Authentication @ PH Embassy SG
1-Aug - Lodged Visa 189 application (w/ wife and 2 kids)
14-Aug - All Medicals Cleared
22-Sep - Uploaded last doc (SG COC)
9-Oct - Assigned CO - Adelaide T4 (Sent requested SG PCC which I already uploaded last Sep22)
10- Oct - Visa Grant! Thank you Lord!
Posts: 1,342Member
Joined: Feb 19, 2013
16 weeks turn-around time na lang din ang assessment ngayon
Nominated Occupation: Plant or Production Engineer (ANZSCO 233513)
03/23/13: IELTS GT Exam (British Council)
04/05/13: IELTS Results L:7.0/R:7.5/W:7.5/S:8.5 OBS: 7.5
makalipas ang isang taon....
04/20/14: CDR Application sent to EA
07/09/14: EA started reviewing my CDR
08/08/14: EA Assessment Positive Results (Thank you LORD!!!)
09/16/14: Requested EA for a Duplicate Letter (Original Outcome Letter lost during mail delivery to PH)
09/21/14: Duplicate Assessment Letter received (Finally!!)
09/21/14: EOI Lodged (70 pts)
09/22/14: Invited to lodge Skilled - Independent (Subclass 189) visa
09/23/14: Obtained Overseas PCC
09/29/14: Obtained NBI Clearance
10/12/14: Lodged application - Visa Subclass 189
10/12/14: Uploaded docs
10/20/14: Medicals Done
12/06/14: Direct Grant! To GOD Be the Glory!
12/13/14: Completed Initial Entry - Sydney
Joined: Mar 19, 2014
Nominated Occupation: Plant or Production Engineer (ANZSCO 233513)
04/11/14~04/19/14: Holiday in Sydney And Melbourne
04/19/14: Decided to pursue Australian Dream
05/17/14: IELTS GT Exam (IDP Singapore)
05/23/14: Started to write my CDR
05/30/14: IELTS passed but with no points
06/19/14: Finished My CDR
06/21/14: CTCéd my Docs
06/22/14: Completed my CDR Requirements
06/23/14: Sent My CDR docs via Fedex/DHL Singapore
06/25/14: CDR Received By EA (1st Batch)
06/26/14: Skilled Employment Record (For Additional Assessment Received by EA)
06/26/14: AUD 870 was charged to my card at THE INSTITUTION OF ENG BA
09/17/14: Applied NBI in the Philippines
09/19/14: EA Assessment Positive Results
09/23/14: Obtained NBI
09/25/14: EA Letter Received
09/26/14: EOI Lodged (Subclass 189)
10/12/14: SG Time - Invited to lodge Skilled - Independent (Subclass 189)
10/13/14: Lodged application - Visa Subclass 189
10/13/14: AUD 3558.02 was charged to my card at Department of Immigrat SO
10/14/14: Applied SG PCC (Release date: Nov 04)
10/15/14: Started uploading docs
11/01/14: Medicals Done (Point Medical Paragon SG)
11/04/14: Obtained SG PCC (Uploaded Immediately). Completed and uploaded all required documents
11/05/14: Medical has been submitted to DIBP
11/07/14: Frontloaded Form 80
12/08/14: CO Allocation - Team Brisbane- Requested additional docs and VISA GRANT on the same day
05/02/15: EID Done!
Thank you LORD!
Posts: 306Member
Joined: Aug 24, 2013
2013 - 1st IELTS L 7.5 R 7.5 W 5.5 S 7.5
April 2014 - 2nd IELTS L 7.5 R 7.0 W 6.0 S 7.0
14 May 2014 - CDR sent via DHL Singapore
16 May 2014 - Delivered at EA
19 May 2014 - 870 AUD charged to my credit card. Waiting game starts now
7 August 2014 - EOR for my IELTS L 7.5 R 7 W 7 S 6
26 August 2014 - EA Positive results Civil Engineer
11 October 2014 EOR Speaking 6 to 6.5
28 Feb IELTS success! 10 pts! L 7.5 R 8 W 7 S 7.5
13 March 2015 EOI submitted visa 189 65 pts.
27 March Invited
27 March Lodged! At long last. In His perfect timing. Scan documents and obtain clearances and medical
11 May VISA GRANT! Direct grant. Did not upload form 80
Joined: Mar 19, 2014
Nominated Occupation: Plant or Production Engineer (ANZSCO 233513)
04/11/14~04/19/14: Holiday in Sydney And Melbourne
04/19/14: Decided to pursue Australian Dream
05/17/14: IELTS GT Exam (IDP Singapore)
05/23/14: Started to write my CDR
05/30/14: IELTS passed but with no points
06/19/14: Finished My CDR
06/21/14: CTCéd my Docs
06/22/14: Completed my CDR Requirements
06/23/14: Sent My CDR docs via Fedex/DHL Singapore
06/25/14: CDR Received By EA (1st Batch)
06/26/14: Skilled Employment Record (For Additional Assessment Received by EA)
06/26/14: AUD 870 was charged to my card at THE INSTITUTION OF ENG BA
09/17/14: Applied NBI in the Philippines
09/19/14: EA Assessment Positive Results
09/23/14: Obtained NBI
09/25/14: EA Letter Received
09/26/14: EOI Lodged (Subclass 189)
10/12/14: SG Time - Invited to lodge Skilled - Independent (Subclass 189)
10/13/14: Lodged application - Visa Subclass 189
10/13/14: AUD 3558.02 was charged to my card at Department of Immigrat SO
10/14/14: Applied SG PCC (Release date: Nov 04)
10/15/14: Started uploading docs
11/01/14: Medicals Done (Point Medical Paragon SG)
11/04/14: Obtained SG PCC (Uploaded Immediately). Completed and uploaded all required documents
11/05/14: Medical has been submitted to DIBP
11/07/14: Frontloaded Form 80
12/08/14: CO Allocation - Team Brisbane- Requested additional docs and VISA GRANT on the same day
05/02/15: EID Done!
Thank you LORD!
Posts: 17Member
Joined: Dec 03, 2013
Sir, pano po kayo nag-request magpachange ng correspondence address? thru email lang din po ba? di ko po kase narcv ung snail mail from EA. TIA..
15Feb14 - IELTS GT Exam
28Feb14 - IELTS Results (Pass but no points)
20May14 - CDR send to EA for assessment
26May14 - 870AUD charged to my CC
19Aug14 - Positive EA Assessment (6+ exp)
30Aug14 - Official EA Letter received in PH address
--- Thinking which path to take ---
--- To God All the Glory ---
Posts: 1,342Member
Joined: Feb 19, 2013
@karl_amogawin Uu nabasa ko lang kanina sa MSA website ng EA, 16 weeks daw?--> http://www.engineersaustralia.org.au/about-us/migration-skills-assessment
buti nabanggit mo, nag-check din ako ng Status, March16 apps na nga sila.. konting hintay na lang!
@supertoblerone Yung sakin 20Apr ko pinadala 23Apr na-acknowledged na ng EA yung application ko... LBC yung courier ko. Tingin ko aabot yan, within this week siguro acknowledged na application mo.. very reliable din naman ang delivery ng Fedex based on my experience.
Nominated Occupation: Plant or Production Engineer (ANZSCO 233513)
03/23/13: IELTS GT Exam (British Council)
04/05/13: IELTS Results L:7.0/R:7.5/W:7.5/S:8.5 OBS: 7.5
makalipas ang isang taon....
04/20/14: CDR Application sent to EA
07/09/14: EA started reviewing my CDR
08/08/14: EA Assessment Positive Results (Thank you LORD!!!)
09/16/14: Requested EA for a Duplicate Letter (Original Outcome Letter lost during mail delivery to PH)
09/21/14: Duplicate Assessment Letter received (Finally!!)
09/21/14: EOI Lodged (70 pts)
09/22/14: Invited to lodge Skilled - Independent (Subclass 189) visa
09/23/14: Obtained Overseas PCC
09/29/14: Obtained NBI Clearance
10/12/14: Lodged application - Visa Subclass 189
10/12/14: Uploaded docs
10/20/14: Medicals Done
12/06/14: Direct Grant! To GOD Be the Glory!
12/13/14: Completed Initial Entry - Sydney
Posts: 306Member
Joined: Aug 24, 2013
2013 - 1st IELTS L 7.5 R 7.5 W 5.5 S 7.5
April 2014 - 2nd IELTS L 7.5 R 7.0 W 6.0 S 7.0
14 May 2014 - CDR sent via DHL Singapore
16 May 2014 - Delivered at EA
19 May 2014 - 870 AUD charged to my credit card. Waiting game starts now
7 August 2014 - EOR for my IELTS L 7.5 R 7 W 7 S 6
26 August 2014 - EA Positive results Civil Engineer
11 October 2014 EOR Speaking 6 to 6.5
28 Feb IELTS success! 10 pts! L 7.5 R 8 W 7 S 7.5
13 March 2015 EOI submitted visa 189 65 pts.
27 March Invited
27 March Lodged! At long last. In His perfect timing. Scan documents and obtain clearances and medical
11 May VISA GRANT! Direct grant. Did not upload form 80
Joined: Mar 19, 2014
pero ok na...nacontact ko na ang IDP dito sa SG. i have to shoulder the freight charge.
Nominated Occupation: Plant or Production Engineer (ANZSCO 233513)
04/11/14~04/19/14: Holiday in Sydney And Melbourne
04/19/14: Decided to pursue Australian Dream
05/17/14: IELTS GT Exam (IDP Singapore)
05/23/14: Started to write my CDR
05/30/14: IELTS passed but with no points
06/19/14: Finished My CDR
06/21/14: CTCéd my Docs
06/22/14: Completed my CDR Requirements
06/23/14: Sent My CDR docs via Fedex/DHL Singapore
06/25/14: CDR Received By EA (1st Batch)
06/26/14: Skilled Employment Record (For Additional Assessment Received by EA)
06/26/14: AUD 870 was charged to my card at THE INSTITUTION OF ENG BA
09/17/14: Applied NBI in the Philippines
09/19/14: EA Assessment Positive Results
09/23/14: Obtained NBI
09/25/14: EA Letter Received
09/26/14: EOI Lodged (Subclass 189)
10/12/14: SG Time - Invited to lodge Skilled - Independent (Subclass 189)
10/13/14: Lodged application - Visa Subclass 189
10/13/14: AUD 3558.02 was charged to my card at Department of Immigrat SO
10/14/14: Applied SG PCC (Release date: Nov 04)
10/15/14: Started uploading docs
11/01/14: Medicals Done (Point Medical Paragon SG)
11/04/14: Obtained SG PCC (Uploaded Immediately). Completed and uploaded all required documents
11/05/14: Medical has been submitted to DIBP
11/07/14: Frontloaded Form 80
12/08/14: CO Allocation - Team Brisbane- Requested additional docs and VISA GRANT on the same day
05/02/15: EID Done!
Thank you LORD!
Joined: Mar 19, 2014
Nominated Occupation: Plant or Production Engineer (ANZSCO 233513)
04/11/14~04/19/14: Holiday in Sydney And Melbourne
04/19/14: Decided to pursue Australian Dream
05/17/14: IELTS GT Exam (IDP Singapore)
05/23/14: Started to write my CDR
05/30/14: IELTS passed but with no points
06/19/14: Finished My CDR
06/21/14: CTCéd my Docs
06/22/14: Completed my CDR Requirements
06/23/14: Sent My CDR docs via Fedex/DHL Singapore
06/25/14: CDR Received By EA (1st Batch)
06/26/14: Skilled Employment Record (For Additional Assessment Received by EA)
06/26/14: AUD 870 was charged to my card at THE INSTITUTION OF ENG BA
09/17/14: Applied NBI in the Philippines
09/19/14: EA Assessment Positive Results
09/23/14: Obtained NBI
09/25/14: EA Letter Received
09/26/14: EOI Lodged (Subclass 189)
10/12/14: SG Time - Invited to lodge Skilled - Independent (Subclass 189)
10/13/14: Lodged application - Visa Subclass 189
10/13/14: AUD 3558.02 was charged to my card at Department of Immigrat SO
10/14/14: Applied SG PCC (Release date: Nov 04)
10/15/14: Started uploading docs
11/01/14: Medicals Done (Point Medical Paragon SG)
11/04/14: Obtained SG PCC (Uploaded Immediately). Completed and uploaded all required documents
11/05/14: Medical has been submitted to DIBP
11/07/14: Frontloaded Form 80
12/08/14: CO Allocation - Team Brisbane- Requested additional docs and VISA GRANT on the same day
05/02/15: EID Done!
Thank you LORD!
Posts: 306Member
Joined: Aug 24, 2013
2013 - 1st IELTS L 7.5 R 7.5 W 5.5 S 7.5
April 2014 - 2nd IELTS L 7.5 R 7.0 W 6.0 S 7.0
14 May 2014 - CDR sent via DHL Singapore
16 May 2014 - Delivered at EA
19 May 2014 - 870 AUD charged to my credit card. Waiting game starts now
7 August 2014 - EOR for my IELTS L 7.5 R 7 W 7 S 6
26 August 2014 - EA Positive results Civil Engineer
11 October 2014 EOR Speaking 6 to 6.5
28 Feb IELTS success! 10 pts! L 7.5 R 8 W 7 S 7.5
13 March 2015 EOI submitted visa 189 65 pts.
27 March Invited
27 March Lodged! At long last. In His perfect timing. Scan documents and obtain clearances and medical
11 May VISA GRANT! Direct grant. Did not upload form 80
Joined: Mar 19, 2014
Di kasi ako nagfill up non...then sa johnvangie nagfillup..Baka mag take ako next month na..magrereview pa ako.. hehe..Ikaw?
Nominated Occupation: Plant or Production Engineer (ANZSCO 233513)
04/11/14~04/19/14: Holiday in Sydney And Melbourne
04/19/14: Decided to pursue Australian Dream
05/17/14: IELTS GT Exam (IDP Singapore)
05/23/14: Started to write my CDR
05/30/14: IELTS passed but with no points
06/19/14: Finished My CDR
06/21/14: CTCéd my Docs
06/22/14: Completed my CDR Requirements
06/23/14: Sent My CDR docs via Fedex/DHL Singapore
06/25/14: CDR Received By EA (1st Batch)
06/26/14: Skilled Employment Record (For Additional Assessment Received by EA)
06/26/14: AUD 870 was charged to my card at THE INSTITUTION OF ENG BA
09/17/14: Applied NBI in the Philippines
09/19/14: EA Assessment Positive Results
09/23/14: Obtained NBI
09/25/14: EA Letter Received
09/26/14: EOI Lodged (Subclass 189)
10/12/14: SG Time - Invited to lodge Skilled - Independent (Subclass 189)
10/13/14: Lodged application - Visa Subclass 189
10/13/14: AUD 3558.02 was charged to my card at Department of Immigrat SO
10/14/14: Applied SG PCC (Release date: Nov 04)
10/15/14: Started uploading docs
11/01/14: Medicals Done (Point Medical Paragon SG)
11/04/14: Obtained SG PCC (Uploaded Immediately). Completed and uploaded all required documents
11/05/14: Medical has been submitted to DIBP
11/07/14: Frontloaded Form 80
12/08/14: CO Allocation - Team Brisbane- Requested additional docs and VISA GRANT on the same day
05/02/15: EID Done!
Thank you LORD!
Posts: 306Member
Joined: Aug 24, 2013
2013 - 1st IELTS L 7.5 R 7.5 W 5.5 S 7.5
April 2014 - 2nd IELTS L 7.5 R 7.0 W 6.0 S 7.0
14 May 2014 - CDR sent via DHL Singapore
16 May 2014 - Delivered at EA
19 May 2014 - 870 AUD charged to my credit card. Waiting game starts now
7 August 2014 - EOR for my IELTS L 7.5 R 7 W 7 S 6
26 August 2014 - EA Positive results Civil Engineer
11 October 2014 EOR Speaking 6 to 6.5
28 Feb IELTS success! 10 pts! L 7.5 R 8 W 7 S 7.5
13 March 2015 EOI submitted visa 189 65 pts.
27 March Invited
27 March Lodged! At long last. In His perfect timing. Scan documents and obtain clearances and medical
11 May VISA GRANT! Direct grant. Did not upload form 80
Joined: Mar 19, 2014
Nominated Occupation: Plant or Production Engineer (ANZSCO 233513)
04/11/14~04/19/14: Holiday in Sydney And Melbourne
04/19/14: Decided to pursue Australian Dream
05/17/14: IELTS GT Exam (IDP Singapore)
05/23/14: Started to write my CDR
05/30/14: IELTS passed but with no points
06/19/14: Finished My CDR
06/21/14: CTCéd my Docs
06/22/14: Completed my CDR Requirements
06/23/14: Sent My CDR docs via Fedex/DHL Singapore
06/25/14: CDR Received By EA (1st Batch)
06/26/14: Skilled Employment Record (For Additional Assessment Received by EA)
06/26/14: AUD 870 was charged to my card at THE INSTITUTION OF ENG BA
09/17/14: Applied NBI in the Philippines
09/19/14: EA Assessment Positive Results
09/23/14: Obtained NBI
09/25/14: EA Letter Received
09/26/14: EOI Lodged (Subclass 189)
10/12/14: SG Time - Invited to lodge Skilled - Independent (Subclass 189)
10/13/14: Lodged application - Visa Subclass 189
10/13/14: AUD 3558.02 was charged to my card at Department of Immigrat SO
10/14/14: Applied SG PCC (Release date: Nov 04)
10/15/14: Started uploading docs
11/01/14: Medicals Done (Point Medical Paragon SG)
11/04/14: Obtained SG PCC (Uploaded Immediately). Completed and uploaded all required documents
11/05/14: Medical has been submitted to DIBP
11/07/14: Frontloaded Form 80
12/08/14: CO Allocation - Team Brisbane- Requested additional docs and VISA GRANT on the same day
05/02/15: EID Done!
Thank you LORD!
Posts: 1,877Member
Joined: Mar 08, 2014
Posts: 686Member
Joined: Oct 14, 2013
Nominated Occupation : Production or Plant Engineer 233513
12/15/13 - IELTS IDP [ L : 9.0 I R :8.0 I S : 7.5 I W : 6.5 ]
01/17/14 - Submit CDR to Engineers Australia.
02/15/14 - IELTS IDP [ L : 9.0 I R :9.0 I S : 7.5 I W : 7.0 ]
05/29/14 - EA positive assessment as Production or Plant Engineer 233513
06/02/14 - EA Letter Received. Lodge EOI 65points.
06/09/14 - Received invitation to lodge Visa 189.
06/12/14 - Lodge Visa 189. Upload Docs/Form 80.
07/14/14 - Medicals @ SLEC Global.
07/15/14 - Upload NBI. (NBI Valid until July 4, 2015).
07/17/14 - CO Allocated. Team 7 GSM Adelaide ( CO : LM )
07/21/14 - VISA GRANT! Thank You Lord! IED : 07/04/15
02/06/15 - Hubby in Melbourne (Jobhunting)
03/27/15 - Me and my son in Melbourne
04/07/15 - Hubby 1st day of job
08/24/15 - My 1st day in BP, Thank you Lord God Jesus!
Enjoying the wonderful life in Oz, abundant blessings indeed :-)
Posts: 686Member
Joined: Oct 14, 2013
http://www.engineersaustralia.org.au/about-us/migration-skills-assessment
Nominated Occupation : Production or Plant Engineer 233513
12/15/13 - IELTS IDP [ L : 9.0 I R :8.0 I S : 7.5 I W : 6.5 ]
01/17/14 - Submit CDR to Engineers Australia.
02/15/14 - IELTS IDP [ L : 9.0 I R :9.0 I S : 7.5 I W : 7.0 ]
05/29/14 - EA positive assessment as Production or Plant Engineer 233513
06/02/14 - EA Letter Received. Lodge EOI 65points.
06/09/14 - Received invitation to lodge Visa 189.
06/12/14 - Lodge Visa 189. Upload Docs/Form 80.
07/14/14 - Medicals @ SLEC Global.
07/15/14 - Upload NBI. (NBI Valid until July 4, 2015).
07/17/14 - CO Allocated. Team 7 GSM Adelaide ( CO : LM )
07/21/14 - VISA GRANT! Thank You Lord! IED : 07/04/15
02/06/15 - Hubby in Melbourne (Jobhunting)
03/27/15 - Me and my son in Melbourne
04/07/15 - Hubby 1st day of job
08/24/15 - My 1st day in BP, Thank you Lord God Jesus!
Enjoying the wonderful life in Oz, abundant blessings indeed :-)
Posts: 550Member
Joined: Apr 16, 2013
Pero go pa rin... Go lang tayo ng go...
ANZSCO CODE: 233511 || Industrial Engineer
06.20.2014 - IDP Singapore IELTS (R- 8; W-7; L- 6.5; S - 6.0)
09.30.2014 - sent CDR to EA through Singpost
10.03.2014 - EA received the documents
12.29.2014 - IDP Singapore IELTS (R- 6.5; W-6.5; L- 8.5; S - 6.5)
2.12.2015 - received mail from EA dated 2.5.2015 (positive outcome)
2.13.2015 - submitted EOI (Visa 190 NSW)
6.3.2015 - PTE Academic exam (failed)
7.6.2015 - revised EOI (Visa 190 SA)
7.14.2015 - PTE Academic (passed - thank u LORD!)
7.17.2015 - PTE (L 83, R 71, S 65, W 79) - submitted new EOI for Visa 189 (65 points)
8.3.2015 - Received invite to lodge Skilled - Independent (Subclass 189) (Permanent) visa application
8.13.2015 - Lodged Visa Application
8.17.2015 - SPC Application
9.3.2015 - NBI
9.8.2015 - Uploaded SPC and NBI and pictures
10.6.2015 - Uploaded Form 80
10.7.2015 - Medical results finalized. All cleared. Thank you Lord!
10.9.2015 - CO requested for Form 80 for dependent
10.22.2015 - Golden Email received. Thank you Lord for the VISA grant
4.11.2016 - Big MOVE to Melbourne
4.18.2016 - Hubby got a job (Thank you Lord!)
8.25.2016 - Started looking for a job (If God's will He will provide in the right time)
Posts: 81Member
Joined: Jun 19, 2014
2014/06/22-CDR & IELTS Prep | 2014/08/02-IELTS Exam 08/15-0 pts | 2014/12/13-IELTS Exam 12/29-10pts | 2015/01/07-CDR Submit | 04/30-EA Result (233513-Positive) | 2015/04/30-Submit EOI | 05/08-Invite | 2015/05/09-Visa ELodge | 2015/05/15-Singapore COC (05/21 release) | 2015/06/04-Medical | 2015/06/24-NBI Clearance | 2015/06/29-CO Allocated | 2015/07/08-Visa Granted!!!
2016/03/15-Arrived in Melbourne
2016/04/01-Started Working... (Thank God!)
Posts: 81Member
Joined: Jun 19, 2014
2014/06/22-CDR & IELTS Prep | 2014/08/02-IELTS Exam 08/15-0 pts | 2014/12/13-IELTS Exam 12/29-10pts | 2015/01/07-CDR Submit | 04/30-EA Result (233513-Positive) | 2015/04/30-Submit EOI | 05/08-Invite | 2015/05/09-Visa ELodge | 2015/05/15-Singapore COC (05/21 release) | 2015/06/04-Medical | 2015/06/24-NBI Clearance | 2015/06/29-CO Allocated | 2015/07/08-Visa Granted!!!
2016/03/15-Arrived in Melbourne
2016/04/01-Started Working... (Thank God!)
Posts: 263Member
Joined: Oct 09, 2013
Electronics Engineer 233411
2013
Oct - Made long overdue decision!
21-Nov - IELTS Results (L-8.5/R-8.0/W-7.0/S-7.0)
Dec - CDR preparations / Holiday Mode
2014
16-Jan - EA skills assessment receipt date
24-Jun - Received EA assessment result from our mailbox
25-Jun - Submitted EOI
28-Jul - Received invitation to apply visa 189
30-Jul - NBI Fingerprinting @ Cantonment Police/Authentication @ PH Embassy SG
1-Aug - Lodged Visa 189 application (w/ wife and 2 kids)
14-Aug - All Medicals Cleared
22-Sep - Uploaded last doc (SG COC)
9-Oct - Assigned CO - Adelaide T4 (Sent requested SG PCC which I already uploaded last Sep22)
10- Oct - Visa Grant! Thank you Lord!
Joined: Mar 19, 2014
Nominated Occupation: Plant or Production Engineer (ANZSCO 233513)
04/11/14~04/19/14: Holiday in Sydney And Melbourne
04/19/14: Decided to pursue Australian Dream
05/17/14: IELTS GT Exam (IDP Singapore)
05/23/14: Started to write my CDR
05/30/14: IELTS passed but with no points
06/19/14: Finished My CDR
06/21/14: CTCéd my Docs
06/22/14: Completed my CDR Requirements
06/23/14: Sent My CDR docs via Fedex/DHL Singapore
06/25/14: CDR Received By EA (1st Batch)
06/26/14: Skilled Employment Record (For Additional Assessment Received by EA)
06/26/14: AUD 870 was charged to my card at THE INSTITUTION OF ENG BA
09/17/14: Applied NBI in the Philippines
09/19/14: EA Assessment Positive Results
09/23/14: Obtained NBI
09/25/14: EA Letter Received
09/26/14: EOI Lodged (Subclass 189)
10/12/14: SG Time - Invited to lodge Skilled - Independent (Subclass 189)
10/13/14: Lodged application - Visa Subclass 189
10/13/14: AUD 3558.02 was charged to my card at Department of Immigrat SO
10/14/14: Applied SG PCC (Release date: Nov 04)
10/15/14: Started uploading docs
11/01/14: Medicals Done (Point Medical Paragon SG)
11/04/14: Obtained SG PCC (Uploaded Immediately). Completed and uploaded all required documents
11/05/14: Medical has been submitted to DIBP
11/07/14: Frontloaded Form 80
12/08/14: CO Allocation - Team Brisbane- Requested additional docs and VISA GRANT on the same day
05/02/15: EID Done!
Thank you LORD!
Posts: 1,342Member
Joined: Feb 19, 2013
ang importante is kumpleto sya sa details especially yung top 5 main responsibilities
Nominated Occupation: Plant or Production Engineer (ANZSCO 233513)
03/23/13: IELTS GT Exam (British Council)
04/05/13: IELTS Results L:7.0/R:7.5/W:7.5/S:8.5 OBS: 7.5
makalipas ang isang taon....
04/20/14: CDR Application sent to EA
07/09/14: EA started reviewing my CDR
08/08/14: EA Assessment Positive Results (Thank you LORD!!!)
09/16/14: Requested EA for a Duplicate Letter (Original Outcome Letter lost during mail delivery to PH)
09/21/14: Duplicate Assessment Letter received (Finally!!)
09/21/14: EOI Lodged (70 pts)
09/22/14: Invited to lodge Skilled - Independent (Subclass 189) visa
09/23/14: Obtained Overseas PCC
09/29/14: Obtained NBI Clearance
10/12/14: Lodged application - Visa Subclass 189
10/12/14: Uploaded docs
10/20/14: Medicals Done
12/06/14: Direct Grant! To GOD Be the Glory!
12/13/14: Completed Initial Entry - Sydney