Apr 29, 2012 - Lodged 175 Online Application
June 4, 2012 - CO Allocation. CO requested Medical and Police Clearance
June 30, 2012 - Medical finalized
July 05, 2012 - VISA GRANT!!!!
IED: June 13, 2013
Thank you so much Lord!!!!
VICTORIA STATES SPONSORSHIP 2024-2025
most recent by rainmaker
most recent by CBD
AUSTRALIAN CITIZENSHIP TIMELINE
most recent by crashbandicoot
Ph Vacation with One Month Visa Validity
most recent by Ozdrims
NSW STATE SPONSORSHIP 2024~2025
most recent by Roberto21
most recent by fruitsalad
most recent by RheaMARN1171933
most recent by kimgilbie
Western Australia Immigration Matters FY 2024-2025
most recent by Roberto21
The longest running Pinoy-Australian Forum site in the history. We are connecting Pinoys "in" and "to" Australia since 2010! If you want to join in, click one of these buttons!
Comments
Posts: 993Member
Joined: Feb 15, 2012
261313 (Software Engineer)
Feb.15.2012 - started working on ACS requirements
Mar.02.2012 - submitted online ACS application and sent documents to ACS via Fedex
Mar.05.2012 - ACS acknowledged actual documents
Mar.21.2012 - ACS finalised assessment: Suitable
Mar.31.2012 - IELTS exam with BC
Apr.13.2012 - IELTS Results (L:8.5 R:7 W: 7 S: 8 OB: 7.5) Thank you LORD!
Apr.14.2012 - Lodged 175 Online Application
Apr.20.2012 - Completed Online Attachments
May.24.2012 - "Application being processed further"
May.29.2012 - CO Assigned :-)
Jun.07.2012 - Uploaded NBI Clearance
Jun.13.2012 - Medical/Health Requirements Finalised
Jun.14.2012 - VISA GRANT! Thank you, LORD! :-)
Jun.07.2013 - Initial Entry Date Deadline
Apr.28.2013 - Initial Entry (Sydney)
Jun.28.2013 - Verbal Job Offer (Melbourne)
Jul.08.2013 - First day of Work and first day of child care for my son (Melbourne)
Aug.21.2013 - First day of Work in Sydney
"Great is the LORD and most worthy of praise; his greatness no one can fathom." Psalm 145:3
Posts: 243Member
Joined: Jan 10, 2012
“We can make our own plans, but the Lord gives the right answer. – Proverbs 16:1”
Occupation: 261111 (ICT Business Analyst)
Apr 29, 2012 - Lodged 175 Online Application
June 4, 2012 - CO Allocation. CO requested Medical and Police Clearance
June 30, 2012 - Medical finalized
July 05, 2012 - VISA GRANT!!!!
IED: June 13, 2013
Thank you so much Lord!!!!
Posts: 854Member
Joined: May 27, 2011
Occupation: ICT Software Engineer (ANZSCO 261313)
Dec 13 2011 - ACS: Suitable (AQF Diploma)
Feb 03 2012 - IELTS #1 Failed (W-6.5)
Mar 02 2012 - IELTS #2 Passed
Apr 21 2012 - 175 Visa Lodged Online
May 29 2012 - CO Assigned
Jun 25 2012 - Visa Grant (IED: Dec 14 2012)
Aug 19 2012 - Arrived in Sydney
Sept 10 2012 - Start @ 1st Job (Web Developer)
Posts: 993Member
Joined: Feb 15, 2012
261313 (Software Engineer)
Feb.15.2012 - started working on ACS requirements
Mar.02.2012 - submitted online ACS application and sent documents to ACS via Fedex
Mar.05.2012 - ACS acknowledged actual documents
Mar.21.2012 - ACS finalised assessment: Suitable
Mar.31.2012 - IELTS exam with BC
Apr.13.2012 - IELTS Results (L:8.5 R:7 W: 7 S: 8 OB: 7.5) Thank you LORD!
Apr.14.2012 - Lodged 175 Online Application
Apr.20.2012 - Completed Online Attachments
May.24.2012 - "Application being processed further"
May.29.2012 - CO Assigned :-)
Jun.07.2012 - Uploaded NBI Clearance
Jun.13.2012 - Medical/Health Requirements Finalised
Jun.14.2012 - VISA GRANT! Thank you, LORD! :-)
Jun.07.2013 - Initial Entry Date Deadline
Apr.28.2013 - Initial Entry (Sydney)
Jun.28.2013 - Verbal Job Offer (Melbourne)
Jul.08.2013 - First day of Work and first day of child care for my son (Melbourne)
Aug.21.2013 - First day of Work in Sydney
"Great is the LORD and most worthy of praise; his greatness no one can fathom." Psalm 145:3
Posts: 213Member
Joined: Jun 24, 2011
27.08.2011 - Submitted ACS Assessment via Fedex. Nominated Occupation : Systems Analyst (261112)
10.10.2011 - ACS assessment received (PIM3 / Group A)
17.11.2011 - IELTS General Training Exam (BC) Take 1
30.11.2011 - IELTS General Training Exam (BC) Take 1 Result Received L- 9, R-9, W-7.5, S-8, OB-8.5
04.12.2011 - Lodged 175(Online)
17.04.2012 - Submitted request for FBI clearance (Me)
02.05.2012 - Application being processed further
29.05.2012 - Followed up CO Allocation
01.06.2012 - CO Allocated, requesting for PCC and Meds
02.06.2012 - Received FBI clearance. My middle name is misspelled (toink!)
13.06.2012 - Submitted form 1022 and supporting documents to add spouse as dependent.
15.06.2012 - Submit request for FBI clearance (Me and Spouse). 8-week wait time begins
22.06.2012 - Uploaded NBI clearance
22.06.2012 - Medicals @ SLEC (Wifey and Me)
28.06.2012 - 28th DAY MILESTONE
16.07.2012 - All Medicals Finalized
26.07.2012 - Uploaded FBI clearance
02.08.2012 - APRUB!!
Freedom aint cheap mate! (lol)
Posts: 993Member
Joined: Feb 15, 2012
261313 (Software Engineer)
Feb.15.2012 - started working on ACS requirements
Mar.02.2012 - submitted online ACS application and sent documents to ACS via Fedex
Mar.05.2012 - ACS acknowledged actual documents
Mar.21.2012 - ACS finalised assessment: Suitable
Mar.31.2012 - IELTS exam with BC
Apr.13.2012 - IELTS Results (L:8.5 R:7 W: 7 S: 8 OB: 7.5) Thank you LORD!
Apr.14.2012 - Lodged 175 Online Application
Apr.20.2012 - Completed Online Attachments
May.24.2012 - "Application being processed further"
May.29.2012 - CO Assigned :-)
Jun.07.2012 - Uploaded NBI Clearance
Jun.13.2012 - Medical/Health Requirements Finalised
Jun.14.2012 - VISA GRANT! Thank you, LORD! :-)
Jun.07.2013 - Initial Entry Date Deadline
Apr.28.2013 - Initial Entry (Sydney)
Jun.28.2013 - Verbal Job Offer (Melbourne)
Jul.08.2013 - First day of Work and first day of child care for my son (Melbourne)
Aug.21.2013 - First day of Work in Sydney
"Great is the LORD and most worthy of praise; his greatness no one can fathom." Psalm 145:3
Posts: 213Member
Joined: Jun 24, 2011
Didnt mention if PCCs are required though haahah!
27.08.2011 - Submitted ACS Assessment via Fedex. Nominated Occupation : Systems Analyst (261112)
10.10.2011 - ACS assessment received (PIM3 / Group A)
17.11.2011 - IELTS General Training Exam (BC) Take 1
30.11.2011 - IELTS General Training Exam (BC) Take 1 Result Received L- 9, R-9, W-7.5, S-8, OB-8.5
04.12.2011 - Lodged 175(Online)
17.04.2012 - Submitted request for FBI clearance (Me)
02.05.2012 - Application being processed further
29.05.2012 - Followed up CO Allocation
01.06.2012 - CO Allocated, requesting for PCC and Meds
02.06.2012 - Received FBI clearance. My middle name is misspelled (toink!)
13.06.2012 - Submitted form 1022 and supporting documents to add spouse as dependent.
15.06.2012 - Submit request for FBI clearance (Me and Spouse). 8-week wait time begins
22.06.2012 - Uploaded NBI clearance
22.06.2012 - Medicals @ SLEC (Wifey and Me)
28.06.2012 - 28th DAY MILESTONE
16.07.2012 - All Medicals Finalized
26.07.2012 - Uploaded FBI clearance
02.08.2012 - APRUB!!
Freedom aint cheap mate! (lol)
Posts: 993Member
Joined: Feb 15, 2012
And yung DIAC naman kase, tinitingnan daw nila ung possibility na bka gusto mo raw kase dalhin in the future ung dependants mo kahit non-migrating sila ngayon... So the question is, gusto ba natin sila isama don, or hindi? hehehe :-) Advise ng iba, wag na raw muna isama as dependant kase it may lead to some complexities pa with your visa application if wala namang need to do it. Anyway daw, you can still bring them there in future via Parent visa ata pero un nga lang, mas magastos raw. Or yung iba holiday visa na lang.
261313 (Software Engineer)
Feb.15.2012 - started working on ACS requirements
Mar.02.2012 - submitted online ACS application and sent documents to ACS via Fedex
Mar.05.2012 - ACS acknowledged actual documents
Mar.21.2012 - ACS finalised assessment: Suitable
Mar.31.2012 - IELTS exam with BC
Apr.13.2012 - IELTS Results (L:8.5 R:7 W: 7 S: 8 OB: 7.5) Thank you LORD!
Apr.14.2012 - Lodged 175 Online Application
Apr.20.2012 - Completed Online Attachments
May.24.2012 - "Application being processed further"
May.29.2012 - CO Assigned :-)
Jun.07.2012 - Uploaded NBI Clearance
Jun.13.2012 - Medical/Health Requirements Finalised
Jun.14.2012 - VISA GRANT! Thank you, LORD! :-)
Jun.07.2013 - Initial Entry Date Deadline
Apr.28.2013 - Initial Entry (Sydney)
Jun.28.2013 - Verbal Job Offer (Melbourne)
Jul.08.2013 - First day of Work and first day of child care for my son (Melbourne)
Aug.21.2013 - First day of Work in Sydney
"Great is the LORD and most worthy of praise; his greatness no one can fathom." Psalm 145:3
Posts: 854Member
Joined: May 27, 2011
Occupation: ICT Software Engineer (ANZSCO 261313)
Dec 13 2011 - ACS: Suitable (AQF Diploma)
Feb 03 2012 - IELTS #1 Failed (W-6.5)
Mar 02 2012 - IELTS #2 Passed
Apr 21 2012 - 175 Visa Lodged Online
May 29 2012 - CO Assigned
Jun 25 2012 - Visa Grant (IED: Dec 14 2012)
Aug 19 2012 - Arrived in Sydney
Sept 10 2012 - Start @ 1st Job (Web Developer)
Posts: 5,037Member, De-activated
Joined: Feb 23, 2012
Sep 24, 2011 - IELTS (L-8 R-8 W-8 S-7.5 : OBS-8)
Jan 04, 2012 - EA application submitted | Feb 23, 2012 - EA assessment result (IE ANZSCO 233511)
May 8, 2012 - Lodged GSM 175 online application | June 4, 2012 - CO Allocated
June 22, 2012 - Medicals Finalized | Aug 30, 2012 - PCCs Completed (PH, UAE, USA)
Sep 3, 2012 - Visa Granted (IED Jun 11, 2013) Thank You Lord!
Oct 16-28, 2012 - Initial Entry Completed - Sydney
July 28, 2013 - Final move to Perth
Sep 9, 2013 - Started work with the same company i worked for in UAE/USA
Oct 28, 2013 - Moved to another company..
Posts: 854Member
Joined: May 27, 2011
Thanks for the reply. Nabasa ko nga din sa ibang forums, dapat sa other family members sila.. since hindi mo naman talaga sila dependents. Kasi hihingan nga sila medicals.
Occupation: ICT Software Engineer (ANZSCO 261313)
Dec 13 2011 - ACS: Suitable (AQF Diploma)
Feb 03 2012 - IELTS #1 Failed (W-6.5)
Mar 02 2012 - IELTS #2 Passed
Apr 21 2012 - 175 Visa Lodged Online
May 29 2012 - CO Assigned
Jun 25 2012 - Visa Grant (IED: Dec 14 2012)
Aug 19 2012 - Arrived in Sydney
Sept 10 2012 - Start @ 1st Job (Web Developer)
Posts: 993Member
Joined: Feb 15, 2012
261313 (Software Engineer)
Feb.15.2012 - started working on ACS requirements
Mar.02.2012 - submitted online ACS application and sent documents to ACS via Fedex
Mar.05.2012 - ACS acknowledged actual documents
Mar.21.2012 - ACS finalised assessment: Suitable
Mar.31.2012 - IELTS exam with BC
Apr.13.2012 - IELTS Results (L:8.5 R:7 W: 7 S: 8 OB: 7.5) Thank you LORD!
Apr.14.2012 - Lodged 175 Online Application
Apr.20.2012 - Completed Online Attachments
May.24.2012 - "Application being processed further"
May.29.2012 - CO Assigned :-)
Jun.07.2012 - Uploaded NBI Clearance
Jun.13.2012 - Medical/Health Requirements Finalised
Jun.14.2012 - VISA GRANT! Thank you, LORD! :-)
Jun.07.2013 - Initial Entry Date Deadline
Apr.28.2013 - Initial Entry (Sydney)
Jun.28.2013 - Verbal Job Offer (Melbourne)
Jul.08.2013 - First day of Work and first day of child care for my son (Melbourne)
Aug.21.2013 - First day of Work in Sydney
"Great is the LORD and most worthy of praise; his greatness no one can fathom." Psalm 145:3
Posts: 243Member
Joined: Jan 10, 2012
Re: parents - Mukhang ganung route na den dadaanan ko pagdating sa parents ko, same kri bryann... mukhang tourist tourist na lang muna hayzz
“We can make our own plans, but the Lord gives the right answer. – Proverbs 16:1”
Occupation: 261111 (ICT Business Analyst)
Apr 29, 2012 - Lodged 175 Online Application
June 4, 2012 - CO Allocation. CO requested Medical and Police Clearance
June 30, 2012 - Medical finalized
July 05, 2012 - VISA GRANT!!!!
IED: June 13, 2013
Thank you so much Lord!!!!
Posts: 221Member
Joined: Oct 07, 2011
"If you have a dream, protect it. Love it. Chase it. And one day you will live it"
Posts: 993Member
Joined: Feb 15, 2012
261313 (Software Engineer)
Feb.15.2012 - started working on ACS requirements
Mar.02.2012 - submitted online ACS application and sent documents to ACS via Fedex
Mar.05.2012 - ACS acknowledged actual documents
Mar.21.2012 - ACS finalised assessment: Suitable
Mar.31.2012 - IELTS exam with BC
Apr.13.2012 - IELTS Results (L:8.5 R:7 W: 7 S: 8 OB: 7.5) Thank you LORD!
Apr.14.2012 - Lodged 175 Online Application
Apr.20.2012 - Completed Online Attachments
May.24.2012 - "Application being processed further"
May.29.2012 - CO Assigned :-)
Jun.07.2012 - Uploaded NBI Clearance
Jun.13.2012 - Medical/Health Requirements Finalised
Jun.14.2012 - VISA GRANT! Thank you, LORD! :-)
Jun.07.2013 - Initial Entry Date Deadline
Apr.28.2013 - Initial Entry (Sydney)
Jun.28.2013 - Verbal Job Offer (Melbourne)
Jul.08.2013 - First day of Work and first day of child care for my son (Melbourne)
Aug.21.2013 - First day of Work in Sydney
"Great is the LORD and most worthy of praise; his greatness no one can fathom." Psalm 145:3
Posts: 854Member
Joined: May 27, 2011
Occupation: ICT Software Engineer (ANZSCO 261313)
Dec 13 2011 - ACS: Suitable (AQF Diploma)
Feb 03 2012 - IELTS #1 Failed (W-6.5)
Mar 02 2012 - IELTS #2 Passed
Apr 21 2012 - 175 Visa Lodged Online
May 29 2012 - CO Assigned
Jun 25 2012 - Visa Grant (IED: Dec 14 2012)
Aug 19 2012 - Arrived in Sydney
Sept 10 2012 - Start @ 1st Job (Web Developer)
Posts: 221Member
Joined: Oct 07, 2011
"If you have a dream, protect it. Love it. Chase it. And one day you will live it"
Posts: 993Member
Joined: Feb 15, 2012
261313 (Software Engineer)
Feb.15.2012 - started working on ACS requirements
Mar.02.2012 - submitted online ACS application and sent documents to ACS via Fedex
Mar.05.2012 - ACS acknowledged actual documents
Mar.21.2012 - ACS finalised assessment: Suitable
Mar.31.2012 - IELTS exam with BC
Apr.13.2012 - IELTS Results (L:8.5 R:7 W: 7 S: 8 OB: 7.5) Thank you LORD!
Apr.14.2012 - Lodged 175 Online Application
Apr.20.2012 - Completed Online Attachments
May.24.2012 - "Application being processed further"
May.29.2012 - CO Assigned :-)
Jun.07.2012 - Uploaded NBI Clearance
Jun.13.2012 - Medical/Health Requirements Finalised
Jun.14.2012 - VISA GRANT! Thank you, LORD! :-)
Jun.07.2013 - Initial Entry Date Deadline
Apr.28.2013 - Initial Entry (Sydney)
Jun.28.2013 - Verbal Job Offer (Melbourne)
Jul.08.2013 - First day of Work and first day of child care for my son (Melbourne)
Aug.21.2013 - First day of Work in Sydney
"Great is the LORD and most worthy of praise; his greatness no one can fathom." Psalm 145:3
Posts: 221Member
Joined: Oct 07, 2011
"If you have a dream, protect it. Love it. Chase it. And one day you will live it"
Posts: 74Member
Joined: Oct 17, 2011
if only child, will this make any difference?
gusto ko sana dalhin mother ko sa AU (my father is already deceased) .
NOMINATED OCCUPATION: Analyst Programmer (261311)
10/12/2011 - IELTS Exam #1 - Failed (L-8.5; R-8.0; S-7.5; W-6.5) | 20/12/2011 - ACS received documents | 23/12/2011 - Applied for IELTS Remarking | 27/01/2012 - ACS assessment: Suitable (AQF Bachelor Degree with a major in computing) | 20/02/2012 - Remarking Failed | 31/03/2012 - IELTS Exam #2 - Passed (L-8.0; R-7.0; S-8.0; W-7.0) | 27/04/2012 - NSW SS received documents | 15/05/2012 - NSW SS approval received | 21/05/2012 - Lodged Online Application | 30/05/2012 - Application being processed further | 30/05/2012 - CO Assigned | 02/06/2012 - Medical Exam at Nationwide Makati | 11/06/2012 - Submitted NBI clearance | 14/06/2012 - Health requirements finalised (Wifey's) | 26/06/2012 - Health requirements finalised | 27/06/2012 - VISA Granted (Initial Entry Date Deadline - 11/06/2013)
08/09/2012 - Arrived in Sydney
Posts: 5,037Member, De-activated
Joined: Feb 23, 2012
Sep 24, 2011 - IELTS (L-8 R-8 W-8 S-7.5 : OBS-8)
Jan 04, 2012 - EA application submitted | Feb 23, 2012 - EA assessment result (IE ANZSCO 233511)
May 8, 2012 - Lodged GSM 175 online application | June 4, 2012 - CO Allocated
June 22, 2012 - Medicals Finalized | Aug 30, 2012 - PCCs Completed (PH, UAE, USA)
Sep 3, 2012 - Visa Granted (IED Jun 11, 2013) Thank You Lord!
Oct 16-28, 2012 - Initial Entry Completed - Sydney
July 28, 2013 - Final move to Perth
Sep 9, 2013 - Started work with the same company i worked for in UAE/USA
Oct 28, 2013 - Moved to another company..
Posts: 5,037Member, De-activated
Joined: Feb 23, 2012
Other Dependent Relatives
Other relatives of you or your partner may be considered in the application if they meet all of the following:
- they have no other relative able to care for them in their own country and they either:
- are not currently married, engaged or in a de facto relationship
- are usually resident in your household
- rely on you for financial support for their basic needs and you have supported them for a substantial period
- rely on you more than any other person or source.
Example: An aged, unmarried relative.
Sep 24, 2011 - IELTS (L-8 R-8 W-8 S-7.5 : OBS-8)
Jan 04, 2012 - EA application submitted | Feb 23, 2012 - EA assessment result (IE ANZSCO 233511)
May 8, 2012 - Lodged GSM 175 online application | June 4, 2012 - CO Allocated
June 22, 2012 - Medicals Finalized | Aug 30, 2012 - PCCs Completed (PH, UAE, USA)
Sep 3, 2012 - Visa Granted (IED Jun 11, 2013) Thank You Lord!
Oct 16-28, 2012 - Initial Entry Completed - Sydney
July 28, 2013 - Final move to Perth
Sep 9, 2013 - Started work with the same company i worked for in UAE/USA
Oct 28, 2013 - Moved to another company..
Posts: 993Member
Joined: Feb 15, 2012
261313 (Software Engineer)
Feb.15.2012 - started working on ACS requirements
Mar.02.2012 - submitted online ACS application and sent documents to ACS via Fedex
Mar.05.2012 - ACS acknowledged actual documents
Mar.21.2012 - ACS finalised assessment: Suitable
Mar.31.2012 - IELTS exam with BC
Apr.13.2012 - IELTS Results (L:8.5 R:7 W: 7 S: 8 OB: 7.5) Thank you LORD!
Apr.14.2012 - Lodged 175 Online Application
Apr.20.2012 - Completed Online Attachments
May.24.2012 - "Application being processed further"
May.29.2012 - CO Assigned :-)
Jun.07.2012 - Uploaded NBI Clearance
Jun.13.2012 - Medical/Health Requirements Finalised
Jun.14.2012 - VISA GRANT! Thank you, LORD! :-)
Jun.07.2013 - Initial Entry Date Deadline
Apr.28.2013 - Initial Entry (Sydney)
Jun.28.2013 - Verbal Job Offer (Melbourne)
Jul.08.2013 - First day of Work and first day of child care for my son (Melbourne)
Aug.21.2013 - First day of Work in Sydney
"Great is the LORD and most worthy of praise; his greatness no one can fathom." Psalm 145:3
Posts: 74Member
Joined: Oct 17, 2011
NOMINATED OCCUPATION: Analyst Programmer (261311)
10/12/2011 - IELTS Exam #1 - Failed (L-8.5; R-8.0; S-7.5; W-6.5) | 20/12/2011 - ACS received documents | 23/12/2011 - Applied for IELTS Remarking | 27/01/2012 - ACS assessment: Suitable (AQF Bachelor Degree with a major in computing) | 20/02/2012 - Remarking Failed | 31/03/2012 - IELTS Exam #2 - Passed (L-8.0; R-7.0; S-8.0; W-7.0) | 27/04/2012 - NSW SS received documents | 15/05/2012 - NSW SS approval received | 21/05/2012 - Lodged Online Application | 30/05/2012 - Application being processed further | 30/05/2012 - CO Assigned | 02/06/2012 - Medical Exam at Nationwide Makati | 11/06/2012 - Submitted NBI clearance | 14/06/2012 - Health requirements finalised (Wifey's) | 26/06/2012 - Health requirements finalised | 27/06/2012 - VISA Granted (Initial Entry Date Deadline - 11/06/2013)
08/09/2012 - Arrived in Sydney
Posts: 993Member
Joined: Feb 15, 2012
261313 (Software Engineer)
Feb.15.2012 - started working on ACS requirements
Mar.02.2012 - submitted online ACS application and sent documents to ACS via Fedex
Mar.05.2012 - ACS acknowledged actual documents
Mar.21.2012 - ACS finalised assessment: Suitable
Mar.31.2012 - IELTS exam with BC
Apr.13.2012 - IELTS Results (L:8.5 R:7 W: 7 S: 8 OB: 7.5) Thank you LORD!
Apr.14.2012 - Lodged 175 Online Application
Apr.20.2012 - Completed Online Attachments
May.24.2012 - "Application being processed further"
May.29.2012 - CO Assigned :-)
Jun.07.2012 - Uploaded NBI Clearance
Jun.13.2012 - Medical/Health Requirements Finalised
Jun.14.2012 - VISA GRANT! Thank you, LORD! :-)
Jun.07.2013 - Initial Entry Date Deadline
Apr.28.2013 - Initial Entry (Sydney)
Jun.28.2013 - Verbal Job Offer (Melbourne)
Jul.08.2013 - First day of Work and first day of child care for my son (Melbourne)
Aug.21.2013 - First day of Work in Sydney
"Great is the LORD and most worthy of praise; his greatness no one can fathom." Psalm 145:3
Posts: 74Member
Joined: Oct 17, 2011
salamat @stolich18! baka kasi sa dami ng aasikasuhin pa sa mother ko e di naman umabot sa july 1 deadline. might go with the approach you mentioned.
NOMINATED OCCUPATION: Analyst Programmer (261311)
10/12/2011 - IELTS Exam #1 - Failed (L-8.5; R-8.0; S-7.5; W-6.5) | 20/12/2011 - ACS received documents | 23/12/2011 - Applied for IELTS Remarking | 27/01/2012 - ACS assessment: Suitable (AQF Bachelor Degree with a major in computing) | 20/02/2012 - Remarking Failed | 31/03/2012 - IELTS Exam #2 - Passed (L-8.0; R-7.0; S-8.0; W-7.0) | 27/04/2012 - NSW SS received documents | 15/05/2012 - NSW SS approval received | 21/05/2012 - Lodged Online Application | 30/05/2012 - Application being processed further | 30/05/2012 - CO Assigned | 02/06/2012 - Medical Exam at Nationwide Makati | 11/06/2012 - Submitted NBI clearance | 14/06/2012 - Health requirements finalised (Wifey's) | 26/06/2012 - Health requirements finalised | 27/06/2012 - VISA Granted (Initial Entry Date Deadline - 11/06/2013)
08/09/2012 - Arrived in Sydney
Posts: 993Member
Joined: Feb 15, 2012
261313 (Software Engineer)
Feb.15.2012 - started working on ACS requirements
Mar.02.2012 - submitted online ACS application and sent documents to ACS via Fedex
Mar.05.2012 - ACS acknowledged actual documents
Mar.21.2012 - ACS finalised assessment: Suitable
Mar.31.2012 - IELTS exam with BC
Apr.13.2012 - IELTS Results (L:8.5 R:7 W: 7 S: 8 OB: 7.5) Thank you LORD!
Apr.14.2012 - Lodged 175 Online Application
Apr.20.2012 - Completed Online Attachments
May.24.2012 - "Application being processed further"
May.29.2012 - CO Assigned :-)
Jun.07.2012 - Uploaded NBI Clearance
Jun.13.2012 - Medical/Health Requirements Finalised
Jun.14.2012 - VISA GRANT! Thank you, LORD! :-)
Jun.07.2013 - Initial Entry Date Deadline
Apr.28.2013 - Initial Entry (Sydney)
Jun.28.2013 - Verbal Job Offer (Melbourne)
Jul.08.2013 - First day of Work and first day of child care for my son (Melbourne)
Aug.21.2013 - First day of Work in Sydney
"Great is the LORD and most worthy of praise; his greatness no one can fathom." Psalm 145:3