Jan 2015 - My wife studied for IELTS (Academic)
Feb 2015 - IELTS Passed (minimum of 7.0 for Nursing)
March 2015 - Gathered requirements for student visa application
April 2015 - Lodged visa for 573 (Higher Education) for my wife (Nursing)
May 2015 - Student Visa approved!
July 2015 - Flight to Sunshine Coast
@Xiaomau82 Ok thanks.. Yun nga din naisip ko eh, since nasa SOL ang BA/SA. And yung PM nasa CSOL (needs sponsorship).
Jan 2015 - My wife studied for IELTS (Academic)
Feb 2015 - IELTS Passed (minimum of 7.0 for Nursing)
March 2015 - Gathered requirements for student visa application
April 2015 - Lodged visa for 573 (Higher Education) for my wife (Nursing)
May 2015 - Student Visa approved!
July 2015 - Flight to Sunshine Coast
As of Aug28 - No work yet
J_OzSydney Posts: 1,002Member Joined: Jun 05, 2014
@mmm_85 sabi sa ACS dapat daw relevant work experience.
The term “Relevant work experience” means work experience which is closely related to the nominated occupation (ANZSCO) and performed at a professional ICT level.
You may want to check yong requirements for Business Analyst.
eto kinuha ko dun sa ACS Guideline
4 – Recognition of Prior Learning – (RPL) The RPL application is for applicants with Non ICT or insufficient ICT qualifications, or do not hold any tertiary ICT qualifications.
6 years of full time professional ICT work experience in a field closely related to the nominated ANZSCO Code is required if you hold a Non ICT or insufficient ICT qualification and 8 years if you do not have any qualifications.
You are required to submit 2 Project Reports for an RPL application - ACS Project Report Form (RPL).
Each report must provide a detailed description of a career episode in your employment history with sufficient detail of evidence in applying the claimed knowledge in a working situation.
Ensure you sign the “Declaration of Authorship” when completing the project report. The Recognition of Prior Learning Project Report must be entirely your own work and not submitted by another person, a paid writing business or editing agency.
All quoted or paraphrased material must be clearly referenced and all sources noted in the Project Report.
Failure to disclose information include in the Project Report that is NOT your own, will result in an unsuitable assessment and notification of fraudulent activity to DIBP.
Please refer to the Key areas of Knowledge documentation to help you with applying for an RPL.
Sufficient detail must be provided to demonstrate the depth and breadth of your ICT knowledge gained during your ICT employment.
Developer Programmer (261312)
08.25.2014: Completed gathering of documents
08.29.2014: ACS Skills Assessment
09.09.2014: ACS Result - OK - Thank you Lord!
10.18.2014: IELTS IDP Makati
10.31.2014: IELTS- R:8.5 L:7.5 S:7 W:7 - OBS:7.5) - Thank you Lord!
02.03.2015: Submitted EOI
02.26.2015: Received ITA 189
04.24.2015: Lodged Visa - Day 1
04.25.2015: Uploaded docs - Day 2
05.08.2015: Wife NBI Clearance - Day 15 || 05.25.2015: Uploaded NBI Clearance - Day 32
05.28.2015: Medicals @ SLEC BGC Day 35
05.30.2015: Medicals Finalised - Day 37
06.11.2015: CO Allocated - Day 48
07.02.2015 - Visa Granted! Thank you LORD! Glory to God!
10.15.2015 - Arrived in SYD - Jer 29:11
@J_Oz sana nga 2 yrs lang ibawas.. may kutob ako na baka mas mataas dun and i deduct... ece course ko.. at NO ko 263111...
J_OzSydney Posts: 1,002Member Joined: Jun 05, 2014
@baknir maraming ECE dito na nag IT and I think related naman siya sa NO mo. Tsaka, if you will stay with your current company eh ok lang na magsubmit ka kahit ngayon pa lang .
All the best, sana yong pinaka maganda ang result kapag nagpa-assess ka.
Developer Programmer (261312)
08.25.2014: Completed gathering of documents
08.29.2014: ACS Skills Assessment
09.09.2014: ACS Result - OK - Thank you Lord!
10.18.2014: IELTS IDP Makati
10.31.2014: IELTS- R:8.5 L:7.5 S:7 W:7 - OBS:7.5) - Thank you Lord!
02.03.2015: Submitted EOI
02.26.2015: Received ITA 189
04.24.2015: Lodged Visa - Day 1
04.25.2015: Uploaded docs - Day 2
05.08.2015: Wife NBI Clearance - Day 15 || 05.25.2015: Uploaded NBI Clearance - Day 32
05.28.2015: Medicals @ SLEC BGC Day 35
05.30.2015: Medicals Finalised - Day 37
06.11.2015: CO Allocated - Day 48
07.02.2015 - Visa Granted! Thank you LORD! Glory to God!
10.15.2015 - Arrived in SYD - Jer 29:11
gerarddsNorth Ryde Posts: 221Member Joined: Jun 25, 2012
@mmm_85 In my opinion ok lang yun, as long as similar yung duties and responsibilities mo for BA role. like for my case, my assessment was Analyst/Programmer although my positions held were programmer, software engineer and my current which is research and development Manager. because they are basing on your duties and responsibilities
Regarding yung RPL , required yang route na yan kasi if yung course mo is Non-IT you can refer to @J_Oz post above.
3 dependents: wife and two kids
ANZSCO 261311-Analyst Programmer
2013-11-08 ACS + total 10 Years credited
2014-03-11 IELTS OBS 7
2014-07-12 EOI Lodged
2014-07-14 NSW State Submitted
2014-08-11 PCC Malaysia Applied
2014-08-18 PCC Malaysia Rcvd
2014-08-26 NSW Invited
2014-09-05 Visa Lodged
2014-09-13 Medical
2014-09-15 NBI Applied
2014-09-22 Medical Completed
2014-09-26 NBI Rcvd
2014-09-30 Frontloaded All docs
2014-10-29 Direct Grant!!! IED - 2015-08-18
2014-11-23 Wife Initial Entry to prepare and look for apartment
2014-12-02 Wife Fulltime job
2014-12-24 Kids,Myself Entry
2014-12-24 - 2014-01-05 Vacation Mode
2015-01-08 - Work From Home (Online from prev company)
and Casual Work (part time)
2015-01-28 Kids First day of School
2015-02-09 - job offer 1
2015-02-10 - job offer 2
2015-02-16 - First Day of Job
2015-03-07 - Passed Driving Knowledge Test
2015-03-20 - Passed Driving Test (Full License)
b1g_d0m3North Ryde Posts: 43Member Joined: Oct 17, 2014
Good Day po! Newbie here pero I have been reading some posts here for some time. I have a question hope someone can help me.
I got my ACS results and gusto ko po sana malaman if tama ung pagkakaintindi ko sa result letter ko in terms of applying for points.
Your qualification has been assessed as follows: Your Bachelor of Science in Computer Engineering from University A completed March 2006 has been assessed as comparable to an AQF Bachelor Degree with a major in computing. The following employment after August 2008 is considered to equate to work at an appropriately skilled level and relevant to 261313 (Software Engineer) of the ANZSCO Code.
Dates: 08/06 - 07/13 (6yrs 11mths) Position: Software Engineer A Employer: Company A Country: PHILIPPINES Dates: 07/13 - 02/14 (0yrs 7mths) Position: Software Engineer B Employer: Company B Country: PHILIPPINES
The following employment has been assessed as not suitable.
Dates: 02/14 - 10/14 (0yrs 0mths) Position: Application Support Analyst 1 - Not Closely Related to the Nominated ANZSCO Employer: Company C Country: PHILIPPINES
Points to Apply: Education Qualification is Bachelor Degree = 10 pts ? Employment After August 2008 is 5 years (August 2008 to February 2014) = 10 pts ?
Thanks po and God Bless!
261313 - Software Engineer (https://www.acs.org.au/__data/assets/pdf_file/0018/7641/ANZSCO-Descriptions.pdf)
14-Jun to 14-July - Review IELTS in IRIS, Gather documentations
14-Jul-31 - IELTS IDP Speaking
14-Aug-03 - IELTS IDP Listening, Reading and Writing
14-Aug-15 - Received IELTS Results, need retake! (L-5.5, R-6.5, W-6.5, S-6.0)
14-Sep-18 - IELTS IDP Retake Speaking
14-Sep-20 - IELTS IDP Retake Listening, Reading and Writing
14-Oct-3 - Received Retake IELTS Results, FInally! (L-7.5, R-8.0, W-7.5, S-7.0)
14-Oct-7 - Finalized the documentations; Copy, Notarize, Scan, Upload
14-Oct-16 ACS Skill Assessment
14-Oct-17 ACS Stage 3 - Needed Additional Documents
14-Oct-22 Uploaded requested Documents
14-Oct-23 ACS Status: Stage 4 - With Assessor
14-Oct-30 Thurs - ACS Suitable- AQF Bachelor Degree with a major in computing - BS CoE - 2 years deduction
14-Oct-31 Visa 189 EO1 Submission
14-Nov-14 - EOI invitation to lodge 189 visa
14-Dec-10 - Paid Visa
14-Dec-11- Frontload Docs in ImmiAccount
14-Dec-22 - Medicals done in St. Luke's BGC
15-Feb-11 - DIRECT GRANT! Bang! Thank you Lord! GSM Adelaide Team 4 (IED: 15-Nov-18)
@gerardds@J_Oz Thanks for the help! Since non-IT ang course ko, mukhang need ko nga magsubmit ng RPL (Recognition of Prior Learning) for BA/SA nominated occupation.
Meron na po ba dito or may kakilala na nagsubmit ng RPL and naging suitable ang result ng Skills Assessment for Business/Systems Analyst? Or any nominated occupation? Any tips/advice you can share?
Jan 2015 - My wife studied for IELTS (Academic)
Feb 2015 - IELTS Passed (minimum of 7.0 for Nursing)
March 2015 - Gathered requirements for student visa application
April 2015 - Lodged visa for 573 (Higher Education) for my wife (Nursing)
May 2015 - Student Visa approved!
July 2015 - Flight to Sunshine Coast
1. You will have 15 points for the bachelor's degree. 2. The following periods can only be eligible for points therefore you will get 10 points.
Dates: 09/08 - 07/13 (5yrs 10mths) Position: Software Engineer A Employer: Company A Country: PHILIPPINES Dates: 07/13 - 02/14 (0yrs 7mths) Position: Software Engineer B Employer: Company B Country: PHILIPPINES
3. You have a total of 25 points already for this assessment. Not Bad!
261313 - Software Engineer (https://www.acs.org.au/__data/assets/pdf_file/0018/7641/ANZSCO-Descriptions.pdf)
14-Oct-04 Sat - ACS Submission > 14-Oct-07 Tue - Stage 2 - Allocated > 14-Oct-08 Wed - ACS Status: Stage 4 - With Assessor
14-Oct-14 Fri - ACS Suitable- AQF Bachelor Degree with a major in computing - BS ECE - 4 years deduction
14-Oct-31 Fri - IELTS #1 Result (FAIL - W6.5)
14-Dec-05 Fri - IELTS #2 Result (FAIL - W6.5 again) > 14-Dec-12 Remark Request > 15-Feb-13 Remark Result W6.5 S7to7.5 Failed but Refunded
15-Jan-23 Fri - IELTS #3 Result Success W7
15-Jan-26 Mon - 189 EOI 261313 Submitted
15-Feb-12 Thu - Received Invite (15-Feb-13 00:30 AEDT)
15-Feb-13 Fri - Visa Application Paid and Lodged (Day 0)
15-Feb-26 Thu - Health Examination at Saint Luke BGC (Day 13)
15-Feb-26 Thu - Requested Australia Police Clearance (Day 13)
15-Apr-02 Thu - All documents uploaded (Day 48)
15-Apr-09 Thu - CO requested for NBI clearance as submitted copy got corrupted. Uploaded same day (Day 55)
15-Apr-16 Thu - Called immi to confirm if they can open uploaded pdf, moments after.. visa granted (Day 62)
Thank you for the opportunity dear Lord
Jeremiah 29:11 - "For I know the plans I have for you,” declares the Lord, “plans to prosper you and not to harm you, plans to give you hope and a future."
b1g_d0m3North Ryde Posts: 43Member Joined: Oct 17, 2014
@b1g_d0m3 sure no worries. Well done! go for the next invitation round!
Btw, can you also put some timeline in your signature? That would be great for us to follow your progress as well. It's kind a fun to see as well
261313 - Software Engineer (https://www.acs.org.au/__data/assets/pdf_file/0018/7641/ANZSCO-Descriptions.pdf)
14-Oct-04 Sat - ACS Submission > 14-Oct-07 Tue - Stage 2 - Allocated > 14-Oct-08 Wed - ACS Status: Stage 4 - With Assessor
14-Oct-14 Fri - ACS Suitable- AQF Bachelor Degree with a major in computing - BS ECE - 4 years deduction
14-Oct-31 Fri - IELTS #1 Result (FAIL - W6.5)
14-Dec-05 Fri - IELTS #2 Result (FAIL - W6.5 again) > 14-Dec-12 Remark Request > 15-Feb-13 Remark Result W6.5 S7to7.5 Failed but Refunded
15-Jan-23 Fri - IELTS #3 Result Success W7
15-Jan-26 Mon - 189 EOI 261313 Submitted
15-Feb-12 Thu - Received Invite (15-Feb-13 00:30 AEDT)
15-Feb-13 Fri - Visa Application Paid and Lodged (Day 0)
15-Feb-26 Thu - Health Examination at Saint Luke BGC (Day 13)
15-Feb-26 Thu - Requested Australia Police Clearance (Day 13)
15-Apr-02 Thu - All documents uploaded (Day 48)
15-Apr-09 Thu - CO requested for NBI clearance as submitted copy got corrupted. Uploaded same day (Day 55)
15-Apr-16 Thu - Called immi to confirm if they can open uploaded pdf, moments after.. visa granted (Day 62)
Thank you for the opportunity dear Lord
Jeremiah 29:11 - "For I know the plans I have for you,” declares the Lord, “plans to prosper you and not to harm you, plans to give you hope and a future."
raiden14Sydney Posts: 704Member Joined: Feb 27, 2013
Hello.. pwede magtanong ano magiging outcome ng ACS assesment if the following is submmitted. The suggested plan is to nominate Software engineer, pero macoconsider kaya ng ACS yung most recent job? ALso magkakaproblem kaya sa DIBP? Thanks in advanced, sana may makashare ng same experience.
2003-2010 application systems support ( various company) 2010-2014 - software engineer ( 1 and current company)
Visa Grant - Dec 22, 2015
b1g_d0m3North Ryde Posts: 43Member Joined: Oct 17, 2014
In my years sa IT, I mostly do application support roles though in between, i have some development work which requires me to do coding, design, test and deploy fixes to the apps that I am supporting. There were cases also that I do enhancement work for those apps which required me to do the stuffs na nakalagay dun sa description ng Software Engineer. If mappresent nyo po yan sa documents nyo, i think maassess naman po yan just like in my case. Ung current job ko nga doesn't require me to do coding kaya nassess sya as not suitable though I am just 7 mos to my work and will get my points on my first previous jobs. Pero take note that ACS will still have the final say with regards to your assessment.
261313 - Software Engineer (https://www.acs.org.au/__data/assets/pdf_file/0018/7641/ANZSCO-Descriptions.pdf)
14-Jun to 14-July - Review IELTS in IRIS, Gather documentations
14-Jul-31 - IELTS IDP Speaking
14-Aug-03 - IELTS IDP Listening, Reading and Writing
14-Aug-15 - Received IELTS Results, need retake! (L-5.5, R-6.5, W-6.5, S-6.0)
14-Sep-18 - IELTS IDP Retake Speaking
14-Sep-20 - IELTS IDP Retake Listening, Reading and Writing
14-Oct-3 - Received Retake IELTS Results, FInally! (L-7.5, R-8.0, W-7.5, S-7.0)
14-Oct-7 - Finalized the documentations; Copy, Notarize, Scan, Upload
14-Oct-16 ACS Skill Assessment
14-Oct-17 ACS Stage 3 - Needed Additional Documents
14-Oct-22 Uploaded requested Documents
14-Oct-23 ACS Status: Stage 4 - With Assessor
14-Oct-30 Thurs - ACS Suitable- AQF Bachelor Degree with a major in computing - BS CoE - 2 years deduction
14-Oct-31 Visa 189 EO1 Submission
14-Nov-14 - EOI invitation to lodge 189 visa
14-Dec-10 - Paid Visa
14-Dec-11- Frontload Docs in ImmiAccount
14-Dec-22 - Medicals done in St. Luke's BGC
15-Feb-11 - DIRECT GRANT! Bang! Thank you Lord! GSM Adelaide Team 4 (IED: 15-Nov-18)
gerarddsNorth Ryde Posts: 221Member Joined: Jun 25, 2012
edited October 2014
@raiden14 i think it will all depends on your roles and responsibilities for my case, i have various job titles such as software engineer, developer, programmer, team leader and manager in different companies. But since roles are more into analyst/Programmer, i used it as my nomination and i have no problem with my assessment till i received my grant
3 dependents: wife and two kids
ANZSCO 261311-Analyst Programmer
2013-11-08 ACS + total 10 Years credited
2014-03-11 IELTS OBS 7
2014-07-12 EOI Lodged
2014-07-14 NSW State Submitted
2014-08-11 PCC Malaysia Applied
2014-08-18 PCC Malaysia Rcvd
2014-08-26 NSW Invited
2014-09-05 Visa Lodged
2014-09-13 Medical
2014-09-15 NBI Applied
2014-09-22 Medical Completed
2014-09-26 NBI Rcvd
2014-09-30 Frontloaded All docs
2014-10-29 Direct Grant!!! IED - 2015-08-18
2014-11-23 Wife Initial Entry to prepare and look for apartment
2014-12-02 Wife Fulltime job
2014-12-24 Kids,Myself Entry
2014-12-24 - 2014-01-05 Vacation Mode
2015-01-08 - Work From Home (Online from prev company)
and Casual Work (part time)
2015-01-28 Kids First day of School
2015-02-09 - job offer 1
2015-02-10 - job offer 2
2015-02-16 - First Day of Job
2015-03-07 - Passed Driving Knowledge Test
2015-03-20 - Passed Driving Test (Full License)
@b1g_d0m3 That is perfect. So ACS still processing time is still under a month which used to be 3 months before.
@raiden14 I think if you will highlight "software engineer" specific tasks (found in https://www.acs.org.au/__data/assets/pdf_file/0018/7641/ANZSCO-Descriptions.pdf) written in your job reference document (or detailed COE with job description) and just do not state irrelevant tasks, then you can get ACS to focus on what is needed to be a software engineer. Did you write your own job reference doc and got it signed with your manager? If yes, then you can do it again if possible.
261313 - Software Engineer (https://www.acs.org.au/__data/assets/pdf_file/0018/7641/ANZSCO-Descriptions.pdf)
14-Oct-04 Sat - ACS Submission > 14-Oct-07 Tue - Stage 2 - Allocated > 14-Oct-08 Wed - ACS Status: Stage 4 - With Assessor
14-Oct-14 Fri - ACS Suitable- AQF Bachelor Degree with a major in computing - BS ECE - 4 years deduction
14-Oct-31 Fri - IELTS #1 Result (FAIL - W6.5)
14-Dec-05 Fri - IELTS #2 Result (FAIL - W6.5 again) > 14-Dec-12 Remark Request > 15-Feb-13 Remark Result W6.5 S7to7.5 Failed but Refunded
15-Jan-23 Fri - IELTS #3 Result Success W7
15-Jan-26 Mon - 189 EOI 261313 Submitted
15-Feb-12 Thu - Received Invite (15-Feb-13 00:30 AEDT)
15-Feb-13 Fri - Visa Application Paid and Lodged (Day 0)
15-Feb-26 Thu - Health Examination at Saint Luke BGC (Day 13)
15-Feb-26 Thu - Requested Australia Police Clearance (Day 13)
15-Apr-02 Thu - All documents uploaded (Day 48)
15-Apr-09 Thu - CO requested for NBI clearance as submitted copy got corrupted. Uploaded same day (Day 55)
15-Apr-16 Thu - Called immi to confirm if they can open uploaded pdf, moments after.. visa granted (Day 62)
Thank you for the opportunity dear Lord
Jeremiah 29:11 - "For I know the plans I have for you,” declares the Lord, “plans to prosper you and not to harm you, plans to give you hope and a future."
raiden14Sydney Posts: 704Member Joined: Feb 27, 2013
di ba nila titingnan yung past ko as in. kasi support roles ginawa ko from 2003 to 2010 eh. Then nagswitch lang ng 2010- until currently. Baka kasi mas makita nila yung mas maraming function ko. And yes whizler , I provide my own roles and responsibilities sa COE they dont have a defined role for my position in black and white eh.
Visa Grant - Dec 22, 2015
heyits7me_magsImus City Posts: 599Member Joined: Jan 13, 2011
Hello.. pwede magtanong ano magiging outcome ng ACS assesment if the following is submmitted. The suggested plan is to nominate Software engineer, pero macoconsider kaya ng ACS yung most recent job? ALso magkakaproblem kaya sa DIBP? Thanks in advanced, sana may makashare ng same experience.
2003-2010 application systems support ( various company) 2010-2014 - software engineer ( 1 and current company)
@raiden14 what will be ACS assessment if u won't submit your earliest job description like yung duration of work fr. 2003-2010 I mean your support work to get ACS focus on your role as software Engr. Bka lng maiba result favorable to you.
05/17/11 - ACS favorable result released for my husband's skills assessment nominated job-261311 Analyst Programmer.
12/10/11 - Hubby IELTS first take at BC result L & R-5.5, W & S-6.0 OBS=6.0 retake!!!
12/30/11- Hubby registered at 9.0 Niners.
03/15/14 - Hubby's comeback at 9.0 Niners preparing for IELTS test. Second attempt for Australian visa.
05/12/14 - Complete uploading of ACS skills assessment required documents and payment made thru direct deposit.
05/12/14 - ACS assessment application received.
07/02/14 - ACS skills assessment result suitable ANZCO code 262113 Systems Administrator as recommended by CO for hubby's job description rather than ANZCO 261311 Analyst Programmer the first ACS ANZCO result suitable released in 2011. I conclude ACS reclassifies ICT Occupations.
- Work exp. 12yrs. less 6yrs deduction by ACS.
- Educ. Qualification assessed as AQF Associate Degree major in computing for a 4yr. course BS. Computer Science in a section 2 school.
heyits7me_magsImus City Posts: 599Member Joined: Jan 13, 2011
Come to think of it lng nman.
05/17/11 - ACS favorable result released for my husband's skills assessment nominated job-261311 Analyst Programmer.
12/10/11 - Hubby IELTS first take at BC result L & R-5.5, W & S-6.0 OBS=6.0 retake!!!
12/30/11- Hubby registered at 9.0 Niners.
03/15/14 - Hubby's comeback at 9.0 Niners preparing for IELTS test. Second attempt for Australian visa.
05/12/14 - Complete uploading of ACS skills assessment required documents and payment made thru direct deposit.
05/12/14 - ACS assessment application received.
07/02/14 - ACS skills assessment result suitable ANZCO code 262113 Systems Administrator as recommended by CO for hubby's job description rather than ANZCO 261311 Analyst Programmer the first ACS ANZCO result suitable released in 2011. I conclude ACS reclassifies ICT Occupations.
- Work exp. 12yrs. less 6yrs deduction by ACS.
- Educ. Qualification assessed as AQF Associate Degree major in computing for a 4yr. course BS. Computer Science in a section 2 school.
@raiden14 However if you have the following tasks (taken from the ANZSCO-Descriptions.pdf) in your previous work (2003-2010 application systems support ( various company)) then you should highlight and include them.
261313 - Software Engineer Designs, develops, modifies, documents, tests, implements, installs and supports software applications and systems.
261313 - Software Engineer (https://www.acs.org.au/__data/assets/pdf_file/0018/7641/ANZSCO-Descriptions.pdf)
14-Oct-04 Sat - ACS Submission > 14-Oct-07 Tue - Stage 2 - Allocated > 14-Oct-08 Wed - ACS Status: Stage 4 - With Assessor
14-Oct-14 Fri - ACS Suitable- AQF Bachelor Degree with a major in computing - BS ECE - 4 years deduction
14-Oct-31 Fri - IELTS #1 Result (FAIL - W6.5)
14-Dec-05 Fri - IELTS #2 Result (FAIL - W6.5 again) > 14-Dec-12 Remark Request > 15-Feb-13 Remark Result W6.5 S7to7.5 Failed but Refunded
15-Jan-23 Fri - IELTS #3 Result Success W7
15-Jan-26 Mon - 189 EOI 261313 Submitted
15-Feb-12 Thu - Received Invite (15-Feb-13 00:30 AEDT)
15-Feb-13 Fri - Visa Application Paid and Lodged (Day 0)
15-Feb-26 Thu - Health Examination at Saint Luke BGC (Day 13)
15-Feb-26 Thu - Requested Australia Police Clearance (Day 13)
15-Apr-02 Thu - All documents uploaded (Day 48)
15-Apr-09 Thu - CO requested for NBI clearance as submitted copy got corrupted. Uploaded same day (Day 55)
15-Apr-16 Thu - Called immi to confirm if they can open uploaded pdf, moments after.. visa granted (Day 62)
Thank you for the opportunity dear Lord
Jeremiah 29:11 - "For I know the plans I have for you,” declares the Lord, “plans to prosper you and not to harm you, plans to give you hope and a future."
raiden14Sydney Posts: 704Member Joined: Feb 27, 2013
If i wont include them, then kukulangin ako ng points for 189. Short with 5 pts. Magiging 5 pts lang ako from work experience since 4 yrs lang ang meron ako as software engineer.
Hello! regarding the certification of ACS requirements, acceptable po ba kung University registrar ang mag stamp and certify ng Diploma and Transcript of Records?
Ok lang din po ba na yung wording ng certification stamp is "Certified Copy", and not "Certified True Copy of the Original", as required by ACS?
Thank you!
altuser41Taguig Posts: 202Member Joined: Aug 28, 2013
08/2013 | Got interested in Australia Migration
09/2013 - 01/2019 | Our plan somehow stagnated
01/2019 | ACS Assessment: Submitted
02/2019 | ACS Assessment: Positive Result
09/2020 | PTE: Superior Score
09/2020 | EOI Submitted (75)
10/2020 | Partner PTE: Proficient (+5)
10/2020 | EOI Updated (80)
11/2020 | NAATI CCL Exam
12/2020 | NAATI CCL Exam: Positive Result! (+5)
12/2020 | EOI Updated (85)
12/2020 | Partner's ACS Assessment: Submitted
02/2021 | Partner's ACS Assessment: Positive Result (+5)
?? / ???? | ITA
?? / ???? | Visa Grant
coachella9Quezon City Posts: 317Member Joined: Jul 28, 2012
Hello @altuser41 Thank po. By the way yung Project Manager ko po is hinde na connected dun sa company namin before (company A), lumipat na cya sa ibang company (company . Dun po sa statutory declaration form na na pakita niyo sa link naka state kasi du sa taas yung company name and address, ano po ba yung dapat ilagay ng project manager na mag gagawa ng statutory declaration. yung company A or company B? (for example). Thanks!
“Pray, hope, and don't worry. Worry is useless. God is merciful and will hear your prayer.” ― Padre Pio
just_g29North Ryde Posts: 51Member Joined: Aug 11, 2014
edited November 2014
mga sirs, paano po ba ang dapat gawin kasi yung birth certificate ko from NSO e sobrang labo. halos di na mabasa mga nakasulat. naka 3 request na ako ng birth certificate iba ibang branch ng NSO pare parehong malabo. ano po kaya ang maadvise ninyo? TIA
Not sure if may sumagot npo nito.. but if i may answer.. get a certified copy of your civil registrar birth certificate po.. bka mas clear yun and yun lng din nmn ang iniscan ng nso eh..
MAY 9, 2014 - EOI
MAY 26, 2014 -Received invitation
JULY 9, 2014 - Lodged visa
JULY 28, 2014 - Medical
AUG 1, 2014 -Medical submitted
Documents were uploaded..
fatcharlieSingapore Posts: 2Member Joined: Jan 21, 2014
@fatcharlie in my case, ang labo ng dryseal saken.. halos di kita. Pero hindi naman nagkaproblem. yung dryseal kasi sa UST, literal na embossed seal na may small pirma lang ng registrar.
embossed dry seal din yung sa akin, though walang signature and totally hindi makita sa scanned version. Anyway try ko nalang to submit it and wait and see kung papaulit ba ng ACS salamat sa reply!
buchockSingapore Posts: 134Member Joined: Jan 26, 2013
This June 2015 mag-expired na ang ACS result ko. Kung magpapaassess ba ulit ako, kailangan ko pa bang magpaCTC ulit? Npansin ko kasi sa stamp ng Notary Public may date. Ano ba yun validity pagkakaCTC ng docs mo?
01-Apr-13 : Completed all requirements in Philippines
27-May-13 : Got the documents from Philippines via DHL
13-Jun-13 : Completed all requirements in Singapore
14-Jun-13 : ACS Skills Assessment - Submitted
14-Jun-13 : ACS Skills Assessment - Allocated
21-Jun-13 : ACS Skills Assessment - With Assessor
19-Jul-13 : IELTS (BC) -
16-Sep-13 : ACS Result - "Thank you lord after 12 weeks "Suitable" sya"
19-Jul-14 - Second attempt! this time IDP naman
grant512North Ryde Posts: 262Member Joined: Nov 12, 2013
Hi po , ask ko lang po my wife is Accounting Graduate and she work as Business Analyst for 7 years till present. Nag agency po kami para sa assesment sa ACS with RPL na din.. Meron po ba same experience? kaka lodge lang namin kahapon at medyo excited ako last try kasi namin year 2007 at Accountant pa work nya nun.
2009 - Assssment req, submit req, ielts failed, wife got pregnant
Pursue our dream! ( finish what you started )
Nov 13, 2013 --Enquiry for agent fees and reading materials for RPL
Nov 7, 2014 -- ACS lodge for skill assessment
Nov 17, 2014-- + assessment from ACS
Nov 26, 2014 -- IELTS payment and review starts now.
result of IELTS FAILED!
Apr 10, 2015-- IELTS EXAM + result 7,7,7.5, 7.5 Passed!
May 6, 2015-- EOI Submitted (60pts visa189 )
Oct 3, 2015 -- + 5 points work experience EOI Updated (65pts visa 189)
Jan 22, 2016 -- invited to lodge
Feb 5, 2016 -- Lodge 189 visa and pay visa fee
Feb 24, 2016 -- CO allocation and ask for medical, nbi clearance, medium of instruction for me
March 00, 2016 - wife & me went to NBI for clearance ( may hit! ) settle the next day sa UN branch. I got mine my wife needs to wait 2 weeks pa!
March 00, 2016 -- Went to Medical city (sat) it was closed!
March 00, 2016 -- I went back to SG for my medical and my family medical sched below
March 17 , 2016 -- Medical at St Lukes
April 19, 2016 -- Visa Grant! Thank you for the additional blessing Lord!
Feb 8, 2017 -- Hello Sydney!
Feb 21-- Got our own place to stay and we can call home
March 5, 2017 -- Got the job I wanted
July 30, 2017 - Got another Job offer! better pay and permanent position
Oh yeah! Dreams do come true! Act now!
gerarddsNorth Ryde Posts: 221Member Joined: Jun 25, 2012
hi @grant512 for RPL, just fyi may deduction na at least 6 years experience so I dont think you will be able to claim points for experience if 7 years na wife mo as BA.
if pasok pa rin naman kayo sa total points, ipa-vetassess nyo naman yung qualification nya para may points sa education since hindi maaassess ng ACS yung accounting. pero check nyo rin yung school nya sa Country education profile kung section 1 kasi alam ko pag section 1 di na kailangan ng vetassess
3 dependents: wife and two kids
ANZSCO 261311-Analyst Programmer
2013-11-08 ACS + total 10 Years credited
2014-03-11 IELTS OBS 7
2014-07-12 EOI Lodged
2014-07-14 NSW State Submitted
2014-08-11 PCC Malaysia Applied
2014-08-18 PCC Malaysia Rcvd
2014-08-26 NSW Invited
2014-09-05 Visa Lodged
2014-09-13 Medical
2014-09-15 NBI Applied
2014-09-22 Medical Completed
2014-09-26 NBI Rcvd
2014-09-30 Frontloaded All docs
2014-10-29 Direct Grant!!! IED - 2015-08-18
2014-11-23 Wife Initial Entry to prepare and look for apartment
2014-12-02 Wife Fulltime job
2014-12-24 Kids,Myself Entry
2014-12-24 - 2014-01-05 Vacation Mode
2015-01-08 - Work From Home (Online from prev company)
and Casual Work (part time)
2015-01-28 Kids First day of School
2015-02-09 - job offer 1
2015-02-10 - job offer 2
2015-02-16 - First Day of Job
2015-03-07 - Passed Driving Knowledge Test
2015-03-20 - Passed Driving Test (Full License)
grant512North Ryde Posts: 262Member Joined: Nov 12, 2013
hi @gerardds Thanks po sa reply, medyo nalilito ako, Di po ba kailagan muna sa ACS since hindi sya IT grad.. PInagawa pa kami ng rpl to justify na enough na ang IT experience nya.
Tama po ba ang process? thanks
Regarding sa school paano po ma check if section1? Thanks
2009 - Assssment req, submit req, ielts failed, wife got pregnant
Pursue our dream! ( finish what you started )
Nov 13, 2013 --Enquiry for agent fees and reading materials for RPL
Nov 7, 2014 -- ACS lodge for skill assessment
Nov 17, 2014-- + assessment from ACS
Nov 26, 2014 -- IELTS payment and review starts now.
result of IELTS FAILED!
Apr 10, 2015-- IELTS EXAM + result 7,7,7.5, 7.5 Passed!
May 6, 2015-- EOI Submitted (60pts visa189 )
Oct 3, 2015 -- + 5 points work experience EOI Updated (65pts visa 189)
Jan 22, 2016 -- invited to lodge
Feb 5, 2016 -- Lodge 189 visa and pay visa fee
Feb 24, 2016 -- CO allocation and ask for medical, nbi clearance, medium of instruction for me
March 00, 2016 - wife & me went to NBI for clearance ( may hit! ) settle the next day sa UN branch. I got mine my wife needs to wait 2 weeks pa!
March 00, 2016 -- Went to Medical city (sat) it was closed!
March 00, 2016 -- I went back to SG for my medical and my family medical sched below
March 17 , 2016 -- Medical at St Lukes
April 19, 2016 -- Visa Grant! Thank you for the additional blessing Lord!
Feb 8, 2017 -- Hello Sydney!
Feb 21-- Got our own place to stay and we can call home
March 5, 2017 -- Got the job I wanted
July 30, 2017 - Got another Job offer! better pay and permanent position
The longest running Pinoy-Australian Forum site in the history. We are connecting Pinoys "in" and "to" Australia since 2010! If you want to join in, click one of these buttons!
Comments
Posts: 19Member
Joined: Oct 29, 2014
Jan 2015 - My wife studied for IELTS (Academic)
Feb 2015 - IELTS Passed (minimum of 7.0 for Nursing)
March 2015 - Gathered requirements for student visa application
April 2015 - Lodged visa for 573 (Higher Education) for my wife (Nursing)
May 2015 - Student Visa approved!
July 2015 - Flight to Sunshine Coast
As of Aug28 - No work yet
Posts: 19Member
Joined: Oct 29, 2014
Jan 2015 - My wife studied for IELTS (Academic)
Feb 2015 - IELTS Passed (minimum of 7.0 for Nursing)
March 2015 - Gathered requirements for student visa application
April 2015 - Lodged visa for 573 (Higher Education) for my wife (Nursing)
May 2015 - Student Visa approved!
July 2015 - Flight to Sunshine Coast
As of Aug28 - No work yet
Posts: 1,002Member
Joined: Jun 05, 2014
The term “Relevant work experience” means work experience which is closely related to the nominated
occupation (ANZSCO) and performed at a professional ICT level.
You may want to check yong requirements for Business Analyst.
eto kinuha ko dun sa ACS Guideline
Developer Programmer (261312)
08.25.2014: Completed gathering of documents
08.29.2014: ACS Skills Assessment
09.09.2014: ACS Result - OK - Thank you Lord!
10.18.2014: IELTS IDP Makati
10.31.2014: IELTS- R:8.5 L:7.5 S:7 W:7 - OBS:7.5) - Thank you Lord!
02.03.2015: Submitted EOI
02.26.2015: Received ITA 189
04.24.2015: Lodged Visa - Day 1
04.25.2015: Uploaded docs - Day 2
05.08.2015: Wife NBI Clearance - Day 15 || 05.25.2015: Uploaded NBI Clearance - Day 32
05.28.2015: Medicals @ SLEC BGC Day 35
05.30.2015: Medicals Finalised - Day 37
06.11.2015: CO Allocated - Day 48
07.02.2015 - Visa Granted! Thank you LORD! Glory to God!
10.15.2015 - Arrived in SYD - Jer 29:11
Posts: 129Member
Joined: Sep 14, 2014
Posts: 1,002Member
Joined: Jun 05, 2014
All the best, sana yong pinaka maganda ang result kapag nagpa-assess ka.
Developer Programmer (261312)
08.25.2014: Completed gathering of documents
08.29.2014: ACS Skills Assessment
09.09.2014: ACS Result - OK - Thank you Lord!
10.18.2014: IELTS IDP Makati
10.31.2014: IELTS- R:8.5 L:7.5 S:7 W:7 - OBS:7.5) - Thank you Lord!
02.03.2015: Submitted EOI
02.26.2015: Received ITA 189
04.24.2015: Lodged Visa - Day 1
04.25.2015: Uploaded docs - Day 2
05.08.2015: Wife NBI Clearance - Day 15 || 05.25.2015: Uploaded NBI Clearance - Day 32
05.28.2015: Medicals @ SLEC BGC Day 35
05.30.2015: Medicals Finalised - Day 37
06.11.2015: CO Allocated - Day 48
07.02.2015 - Visa Granted! Thank you LORD! Glory to God!
10.15.2015 - Arrived in SYD - Jer 29:11
Posts: 221Member
Joined: Jun 25, 2012
like for my case, my assessment was Analyst/Programmer although my positions held were programmer, software engineer and my current which is research and development Manager. because they are basing on your duties and responsibilities
Regarding yung RPL , required yang route na yan kasi if yung course mo is Non-IT
you can refer to @J_Oz post above.
3 dependents: wife and two kids
ANZSCO 261311-Analyst Programmer
2013-11-08 ACS + total 10 Years credited
2014-03-11 IELTS OBS 7
2014-07-12 EOI Lodged
2014-07-14 NSW State Submitted
2014-08-11 PCC Malaysia Applied
2014-08-18 PCC Malaysia Rcvd
2014-08-26 NSW Invited
2014-09-05 Visa Lodged
2014-09-13 Medical
2014-09-15 NBI Applied
2014-09-22 Medical Completed
2014-09-26 NBI Rcvd
2014-09-30 Frontloaded All docs
2014-10-29 Direct Grant!!! IED - 2015-08-18
2014-11-23 Wife Initial Entry to prepare and look for apartment
2014-12-02 Wife Fulltime job
2014-12-24 Kids,Myself Entry
2014-12-24 - 2014-01-05 Vacation Mode
2015-01-08 - Work From Home (Online from prev company)
and Casual Work (part time)
2015-01-28 Kids First day of School
2015-02-09 - job offer 1
2015-02-10 - job offer 2
2015-02-16 - First Day of Job
2015-03-07 - Passed Driving Knowledge Test
2015-03-20 - Passed Driving Test (Full License)
Posts: 43Member
Joined: Oct 17, 2014
I got my ACS results and gusto ko po sana malaman if tama ung pagkakaintindi ko sa result letter ko in terms of applying for points.
Your qualification has been assessed as follows:
Your Bachelor of Science in Computer Engineering from University A completed March
2006 has been assessed as comparable to an AQF Bachelor Degree with a major in computing.
The following employment after August 2008 is considered to equate to work at an appropriately
skilled level and relevant to 261313 (Software Engineer) of the ANZSCO Code.
Dates: 08/06 - 07/13 (6yrs 11mths)
Position: Software Engineer A
Employer: Company A
Country: PHILIPPINES
Dates: 07/13 - 02/14 (0yrs 7mths)
Position: Software Engineer B
Employer: Company B
Country: PHILIPPINES
The following employment has been assessed as not suitable.
Dates: 02/14 - 10/14 (0yrs 0mths)
Position: Application Support Analyst 1 - Not Closely Related to the Nominated ANZSCO
Employer: Company C
Country: PHILIPPINES
Points to Apply:
Education Qualification is Bachelor Degree = 10 pts ?
Employment After August 2008 is 5 years (August 2008 to February 2014) = 10 pts ?
Thanks po and God Bless!
261313 - Software Engineer (https://www.acs.org.au/__data/assets/pdf_file/0018/7641/ANZSCO-Descriptions.pdf)
14-Jun to 14-July - Review IELTS in IRIS, Gather documentations
14-Jul-31 - IELTS IDP Speaking
14-Aug-03 - IELTS IDP Listening, Reading and Writing
14-Aug-15 - Received IELTS Results, need retake! (L-5.5, R-6.5, W-6.5, S-6.0)
14-Sep-18 - IELTS IDP Retake Speaking
14-Sep-20 - IELTS IDP Retake Listening, Reading and Writing
14-Oct-3 - Received Retake IELTS Results, FInally! (L-7.5, R-8.0, W-7.5, S-7.0)
14-Oct-7 - Finalized the documentations; Copy, Notarize, Scan, Upload
14-Oct-16 ACS Skill Assessment
14-Oct-17 ACS Stage 3 - Needed Additional Documents
14-Oct-22 Uploaded requested Documents
14-Oct-23 ACS Status: Stage 4 - With Assessor
14-Oct-30 Thurs - ACS Suitable- AQF Bachelor Degree with a major in computing - BS CoE - 2 years deduction
14-Oct-31 Visa 189 EO1 Submission
14-Nov-14 - EOI invitation to lodge 189 visa
14-Dec-10 - Paid Visa
14-Dec-11- Frontload Docs in ImmiAccount
14-Dec-22 - Medicals done in St. Luke's BGC
15-Feb-11 - DIRECT GRANT! Bang! Thank you Lord! GSM Adelaide Team 4 (IED: 15-Nov-18)
Posts: 19Member
Joined: Oct 29, 2014
Thanks for the help! Since non-IT ang course ko, mukhang need ko nga magsubmit ng RPL (Recognition of Prior Learning) for BA/SA nominated occupation.
Meron na po ba dito or may kakilala na nagsubmit ng RPL and naging suitable ang result ng Skills Assessment for Business/Systems Analyst? Or any nominated occupation? Any tips/advice you can share?
Jan 2015 - My wife studied for IELTS (Academic)
Feb 2015 - IELTS Passed (minimum of 7.0 for Nursing)
March 2015 - Gathered requirements for student visa application
April 2015 - Lodged visa for 573 (Higher Education) for my wife (Nursing)
May 2015 - Student Visa approved!
July 2015 - Flight to Sunshine Coast
As of Aug28 - No work yet
Posts: 75Member
Joined: Sep 10, 2014
1. You will have 15 points for the bachelor's degree.
2. The following periods can only be eligible for points therefore you will get 10 points.
Dates: 09/08 - 07/13 (5yrs 10mths)
Position: Software Engineer A
Employer: Company A
Country: PHILIPPINES
Dates: 07/13 - 02/14 (0yrs 7mths)
Position: Software Engineer B
Employer: Company B
Country: PHILIPPINES
3. You have a total of 25 points already for this assessment. Not Bad!
Reference: http://www.immi.gov.au/Visas/Pages/189.aspx
261313 - Software Engineer (https://www.acs.org.au/__data/assets/pdf_file/0018/7641/ANZSCO-Descriptions.pdf)
14-Oct-04 Sat - ACS Submission > 14-Oct-07 Tue - Stage 2 - Allocated > 14-Oct-08 Wed - ACS Status: Stage 4 - With Assessor
14-Oct-14 Fri - ACS Suitable- AQF Bachelor Degree with a major in computing - BS ECE - 4 years deduction
14-Oct-31 Fri - IELTS #1 Result (FAIL - W6.5)
14-Dec-05 Fri - IELTS #2 Result (FAIL - W6.5 again) > 14-Dec-12 Remark Request > 15-Feb-13 Remark Result W6.5 S7to7.5 Failed but Refunded
15-Jan-23 Fri - IELTS #3 Result Success W7
15-Jan-26 Mon - 189 EOI 261313 Submitted
15-Feb-12 Thu - Received Invite (15-Feb-13 00:30 AEDT)
15-Feb-13 Fri - Visa Application Paid and Lodged (Day 0)
15-Feb-26 Thu - Health Examination at Saint Luke BGC (Day 13)
15-Feb-26 Thu - Requested Australia Police Clearance (Day 13)
15-Apr-02 Thu - All documents uploaded (Day 48)
15-Apr-09 Thu - CO requested for NBI clearance as submitted copy got corrupted. Uploaded same day (Day 55)
15-Apr-16 Thu - Called immi to confirm if they can open uploaded pdf, moments after.. visa granted (Day 62)
Thank you for the opportunity dear Lord
Jeremiah 29:11 - "For I know the plans I have for you,” declares the Lord, “plans to prosper you and not to harm you, plans to give you hope and a future."
Posts: 43Member
Joined: Oct 17, 2014
I think nameet ko na ung points needed.
25 points
+ 30 points for Age (25–32 years)
+ 10 points for IELTS (scored at least 7 on Listening, Reading, Writing and Speaking)
Total = 65 points
Next: File my Visa 189 EOI.
261313 - Software Engineer (https://www.acs.org.au/__data/assets/pdf_file/0018/7641/ANZSCO-Descriptions.pdf)
14-Jun to 14-July - Review IELTS in IRIS, Gather documentations
14-Jul-31 - IELTS IDP Speaking
14-Aug-03 - IELTS IDP Listening, Reading and Writing
14-Aug-15 - Received IELTS Results, need retake! (L-5.5, R-6.5, W-6.5, S-6.0)
14-Sep-18 - IELTS IDP Retake Speaking
14-Sep-20 - IELTS IDP Retake Listening, Reading and Writing
14-Oct-3 - Received Retake IELTS Results, FInally! (L-7.5, R-8.0, W-7.5, S-7.0)
14-Oct-7 - Finalized the documentations; Copy, Notarize, Scan, Upload
14-Oct-16 ACS Skill Assessment
14-Oct-17 ACS Stage 3 - Needed Additional Documents
14-Oct-22 Uploaded requested Documents
14-Oct-23 ACS Status: Stage 4 - With Assessor
14-Oct-30 Thurs - ACS Suitable- AQF Bachelor Degree with a major in computing - BS CoE - 2 years deduction
14-Oct-31 Visa 189 EO1 Submission
14-Nov-14 - EOI invitation to lodge 189 visa
14-Dec-10 - Paid Visa
14-Dec-11- Frontload Docs in ImmiAccount
14-Dec-22 - Medicals done in St. Luke's BGC
15-Feb-11 - DIRECT GRANT! Bang! Thank you Lord! GSM Adelaide Team 4 (IED: 15-Nov-18)
Posts: 75Member
Joined: Sep 10, 2014
Btw, can you also put some timeline in your signature? That would be great for us to follow your progress as well. It's kind a fun to see as well
261313 - Software Engineer (https://www.acs.org.au/__data/assets/pdf_file/0018/7641/ANZSCO-Descriptions.pdf)
14-Oct-04 Sat - ACS Submission > 14-Oct-07 Tue - Stage 2 - Allocated > 14-Oct-08 Wed - ACS Status: Stage 4 - With Assessor
14-Oct-14 Fri - ACS Suitable- AQF Bachelor Degree with a major in computing - BS ECE - 4 years deduction
14-Oct-31 Fri - IELTS #1 Result (FAIL - W6.5)
14-Dec-05 Fri - IELTS #2 Result (FAIL - W6.5 again) > 14-Dec-12 Remark Request > 15-Feb-13 Remark Result W6.5 S7to7.5 Failed but Refunded
15-Jan-23 Fri - IELTS #3 Result Success W7
15-Jan-26 Mon - 189 EOI 261313 Submitted
15-Feb-12 Thu - Received Invite (15-Feb-13 00:30 AEDT)
15-Feb-13 Fri - Visa Application Paid and Lodged (Day 0)
15-Feb-26 Thu - Health Examination at Saint Luke BGC (Day 13)
15-Feb-26 Thu - Requested Australia Police Clearance (Day 13)
15-Apr-02 Thu - All documents uploaded (Day 48)
15-Apr-09 Thu - CO requested for NBI clearance as submitted copy got corrupted. Uploaded same day (Day 55)
15-Apr-16 Thu - Called immi to confirm if they can open uploaded pdf, moments after.. visa granted (Day 62)
Thank you for the opportunity dear Lord
Jeremiah 29:11 - "For I know the plans I have for you,” declares the Lord, “plans to prosper you and not to harm you, plans to give you hope and a future."
Posts: 704Member
Joined: Feb 27, 2013
kaya ng ACS yung most recent job? ALso magkakaproblem kaya sa DIBP?
Thanks in advanced, sana may makashare ng same experience.
2003-2010 application systems support ( various company)
2010-2014 - software engineer ( 1 and current company)
Visa Grant - Dec 22, 2015
Posts: 43Member
Joined: Oct 17, 2014
261313 - Software Engineer (https://www.acs.org.au/__data/assets/pdf_file/0018/7641/ANZSCO-Descriptions.pdf)
14-Jun to 14-July - Review IELTS in IRIS, Gather documentations
14-Jul-31 - IELTS IDP Speaking
14-Aug-03 - IELTS IDP Listening, Reading and Writing
14-Aug-15 - Received IELTS Results, need retake! (L-5.5, R-6.5, W-6.5, S-6.0)
14-Sep-18 - IELTS IDP Retake Speaking
14-Sep-20 - IELTS IDP Retake Listening, Reading and Writing
14-Oct-3 - Received Retake IELTS Results, FInally! (L-7.5, R-8.0, W-7.5, S-7.0)
14-Oct-7 - Finalized the documentations; Copy, Notarize, Scan, Upload
14-Oct-16 ACS Skill Assessment
14-Oct-17 ACS Stage 3 - Needed Additional Documents
14-Oct-22 Uploaded requested Documents
14-Oct-23 ACS Status: Stage 4 - With Assessor
14-Oct-30 Thurs - ACS Suitable- AQF Bachelor Degree with a major in computing - BS CoE - 2 years deduction
14-Oct-31 Visa 189 EO1 Submission
14-Nov-14 - EOI invitation to lodge 189 visa
14-Dec-10 - Paid Visa
14-Dec-11- Frontload Docs in ImmiAccount
14-Dec-22 - Medicals done in St. Luke's BGC
15-Feb-11 - DIRECT GRANT! Bang! Thank you Lord! GSM Adelaide Team 4 (IED: 15-Nov-18)
Posts: 43Member
Joined: Oct 17, 2014
In my years sa IT, I mostly do application support roles though in between, i have some development work which requires me to do coding, design, test and deploy fixes to the apps that I am supporting. There were cases also that I do enhancement work for those apps which required me to do the stuffs na nakalagay dun sa description ng Software Engineer. If mappresent nyo po yan sa documents nyo, i think maassess naman po yan just like in my case. Ung current job ko nga doesn't require me to do coding kaya nassess sya as not suitable though I am just 7 mos to my work and will get my points on my first previous jobs. Pero take note that ACS will still have the final say with regards to your assessment.
261313 - Software Engineer (https://www.acs.org.au/__data/assets/pdf_file/0018/7641/ANZSCO-Descriptions.pdf)
14-Jun to 14-July - Review IELTS in IRIS, Gather documentations
14-Jul-31 - IELTS IDP Speaking
14-Aug-03 - IELTS IDP Listening, Reading and Writing
14-Aug-15 - Received IELTS Results, need retake! (L-5.5, R-6.5, W-6.5, S-6.0)
14-Sep-18 - IELTS IDP Retake Speaking
14-Sep-20 - IELTS IDP Retake Listening, Reading and Writing
14-Oct-3 - Received Retake IELTS Results, FInally! (L-7.5, R-8.0, W-7.5, S-7.0)
14-Oct-7 - Finalized the documentations; Copy, Notarize, Scan, Upload
14-Oct-16 ACS Skill Assessment
14-Oct-17 ACS Stage 3 - Needed Additional Documents
14-Oct-22 Uploaded requested Documents
14-Oct-23 ACS Status: Stage 4 - With Assessor
14-Oct-30 Thurs - ACS Suitable- AQF Bachelor Degree with a major in computing - BS CoE - 2 years deduction
14-Oct-31 Visa 189 EO1 Submission
14-Nov-14 - EOI invitation to lodge 189 visa
14-Dec-10 - Paid Visa
14-Dec-11- Frontload Docs in ImmiAccount
14-Dec-22 - Medicals done in St. Luke's BGC
15-Feb-11 - DIRECT GRANT! Bang! Thank you Lord! GSM Adelaide Team 4 (IED: 15-Nov-18)
Posts: 221Member
Joined: Jun 25, 2012
for my case, i have various job titles such as software engineer, developer, programmer, team leader and manager in different companies. But since roles are more into analyst/Programmer, i used it as my nomination and i have no problem with my assessment till i received my grant
3 dependents: wife and two kids
ANZSCO 261311-Analyst Programmer
2013-11-08 ACS + total 10 Years credited
2014-03-11 IELTS OBS 7
2014-07-12 EOI Lodged
2014-07-14 NSW State Submitted
2014-08-11 PCC Malaysia Applied
2014-08-18 PCC Malaysia Rcvd
2014-08-26 NSW Invited
2014-09-05 Visa Lodged
2014-09-13 Medical
2014-09-15 NBI Applied
2014-09-22 Medical Completed
2014-09-26 NBI Rcvd
2014-09-30 Frontloaded All docs
2014-10-29 Direct Grant!!! IED - 2015-08-18
2014-11-23 Wife Initial Entry to prepare and look for apartment
2014-12-02 Wife Fulltime job
2014-12-24 Kids,Myself Entry
2014-12-24 - 2014-01-05 Vacation Mode
2015-01-08 - Work From Home (Online from prev company)
and Casual Work (part time)
2015-01-28 Kids First day of School
2015-02-09 - job offer 1
2015-02-10 - job offer 2
2015-02-16 - First Day of Job
2015-03-07 - Passed Driving Knowledge Test
2015-03-20 - Passed Driving Test (Full License)
Posts: 75Member
Joined: Sep 10, 2014
@raiden14 I think if you will highlight "software engineer" specific tasks (found in https://www.acs.org.au/__data/assets/pdf_file/0018/7641/ANZSCO-Descriptions.pdf) written in your job reference document (or detailed COE with job description) and just do not state irrelevant tasks, then you can get ACS to focus on what is needed to be a software engineer. Did you write your own job reference doc and got it signed with your manager? If yes, then you can do it again if possible.
261313 - Software Engineer (https://www.acs.org.au/__data/assets/pdf_file/0018/7641/ANZSCO-Descriptions.pdf)
14-Oct-04 Sat - ACS Submission > 14-Oct-07 Tue - Stage 2 - Allocated > 14-Oct-08 Wed - ACS Status: Stage 4 - With Assessor
14-Oct-14 Fri - ACS Suitable- AQF Bachelor Degree with a major in computing - BS ECE - 4 years deduction
14-Oct-31 Fri - IELTS #1 Result (FAIL - W6.5)
14-Dec-05 Fri - IELTS #2 Result (FAIL - W6.5 again) > 14-Dec-12 Remark Request > 15-Feb-13 Remark Result W6.5 S7to7.5 Failed but Refunded
15-Jan-23 Fri - IELTS #3 Result Success W7
15-Jan-26 Mon - 189 EOI 261313 Submitted
15-Feb-12 Thu - Received Invite (15-Feb-13 00:30 AEDT)
15-Feb-13 Fri - Visa Application Paid and Lodged (Day 0)
15-Feb-26 Thu - Health Examination at Saint Luke BGC (Day 13)
15-Feb-26 Thu - Requested Australia Police Clearance (Day 13)
15-Apr-02 Thu - All documents uploaded (Day 48)
15-Apr-09 Thu - CO requested for NBI clearance as submitted copy got corrupted. Uploaded same day (Day 55)
15-Apr-16 Thu - Called immi to confirm if they can open uploaded pdf, moments after.. visa granted (Day 62)
Thank you for the opportunity dear Lord
Jeremiah 29:11 - "For I know the plans I have for you,” declares the Lord, “plans to prosper you and not to harm you, plans to give you hope and a future."
Posts: 704Member
Joined: Feb 27, 2013
Visa Grant - Dec 22, 2015
Posts: 599Member
Joined: Jan 13, 2011
05/17/11 - ACS favorable result released for my husband's skills assessment nominated job-261311 Analyst Programmer.
12/10/11 - Hubby IELTS first take at BC result L & R-5.5, W & S-6.0 OBS=6.0 retake!!!
12/30/11- Hubby registered at 9.0 Niners.
03/15/14 - Hubby's comeback at 9.0 Niners preparing for IELTS test. Second attempt for Australian visa.
05/12/14 - Complete uploading of ACS skills assessment required documents and payment made thru direct deposit.
05/12/14 - ACS assessment application received.
07/02/14 - ACS skills assessment result suitable ANZCO code 262113 Systems Administrator as recommended by CO for hubby's job description rather than ANZCO 261311 Analyst Programmer the first ACS ANZCO result suitable released in 2011. I conclude ACS reclassifies ICT Occupations.
- Work exp. 12yrs. less 6yrs deduction by ACS.
- Educ. Qualification assessed as AQF Associate Degree major in computing for a 4yr. course BS. Computer Science in a section 2 school.
Posts: 599Member
Joined: Jan 13, 2011
05/17/11 - ACS favorable result released for my husband's skills assessment nominated job-261311 Analyst Programmer.
12/10/11 - Hubby IELTS first take at BC result L & R-5.5, W & S-6.0 OBS=6.0 retake!!!
12/30/11- Hubby registered at 9.0 Niners.
03/15/14 - Hubby's comeback at 9.0 Niners preparing for IELTS test. Second attempt for Australian visa.
05/12/14 - Complete uploading of ACS skills assessment required documents and payment made thru direct deposit.
05/12/14 - ACS assessment application received.
07/02/14 - ACS skills assessment result suitable ANZCO code 262113 Systems Administrator as recommended by CO for hubby's job description rather than ANZCO 261311 Analyst Programmer the first ACS ANZCO result suitable released in 2011. I conclude ACS reclassifies ICT Occupations.
- Work exp. 12yrs. less 6yrs deduction by ACS.
- Educ. Qualification assessed as AQF Associate Degree major in computing for a 4yr. course BS. Computer Science in a section 2 school.
Posts: 75Member
Joined: Sep 10, 2014
@raiden14 However if you have the following tasks (taken from the ANZSCO-Descriptions.pdf) in your previous work (2003-2010 application systems support ( various company)) then you should highlight and include them.
261313 - Software Engineer
Designs, develops, modifies, documents, tests, implements, installs and supports software applications and systems.
261313 - Software Engineer (https://www.acs.org.au/__data/assets/pdf_file/0018/7641/ANZSCO-Descriptions.pdf)
14-Oct-04 Sat - ACS Submission > 14-Oct-07 Tue - Stage 2 - Allocated > 14-Oct-08 Wed - ACS Status: Stage 4 - With Assessor
14-Oct-14 Fri - ACS Suitable- AQF Bachelor Degree with a major in computing - BS ECE - 4 years deduction
14-Oct-31 Fri - IELTS #1 Result (FAIL - W6.5)
14-Dec-05 Fri - IELTS #2 Result (FAIL - W6.5 again) > 14-Dec-12 Remark Request > 15-Feb-13 Remark Result W6.5 S7to7.5 Failed but Refunded
15-Jan-23 Fri - IELTS #3 Result Success W7
15-Jan-26 Mon - 189 EOI 261313 Submitted
15-Feb-12 Thu - Received Invite (15-Feb-13 00:30 AEDT)
15-Feb-13 Fri - Visa Application Paid and Lodged (Day 0)
15-Feb-26 Thu - Health Examination at Saint Luke BGC (Day 13)
15-Feb-26 Thu - Requested Australia Police Clearance (Day 13)
15-Apr-02 Thu - All documents uploaded (Day 48)
15-Apr-09 Thu - CO requested for NBI clearance as submitted copy got corrupted. Uploaded same day (Day 55)
15-Apr-16 Thu - Called immi to confirm if they can open uploaded pdf, moments after.. visa granted (Day 62)
Thank you for the opportunity dear Lord
Jeremiah 29:11 - "For I know the plans I have for you,” declares the Lord, “plans to prosper you and not to harm you, plans to give you hope and a future."
Posts: 704Member
Joined: Feb 27, 2013
Magiging 5 pts lang ako from work experience since 4 yrs lang ang meron ako as software engineer.
Visa Grant - Dec 22, 2015
Posts: 13Member
Joined: Jan 27, 2014
Ok lang din po ba na yung wording ng certification stamp is "Certified Copy", and not "Certified True Copy of the Original", as required by ACS?
Thank you!
Posts: 202Member
Joined: Aug 28, 2013
261112 - Systems Analyst ( Age: 25 | Educ: 15 | Work: 15 | PTE - 20| Partner: 10 | NAATI: 5) Total: 90 pts.
08/2013 | Got interested in Australia Migration
09/2013 - 01/2019 | Our plan somehow stagnated
01/2019 | ACS Assessment: Submitted
02/2019 | ACS Assessment: Positive Result
09/2020 | PTE: Superior Score
09/2020 | EOI Submitted (75)
10/2020 | Partner PTE: Proficient (+5)
10/2020 | EOI Updated (80)
11/2020 | NAATI CCL Exam
12/2020 | NAATI CCL Exam: Positive Result! (+5)
12/2020 | EOI Updated (85)
12/2020 | Partner's ACS Assessment: Submitted
02/2021 | Partner's ACS Assessment: Positive Result (+5)
?? / ???? | ITA
?? / ???? | Visa Grant
Posts: 317Member
Joined: Jul 28, 2012
“Pray, hope, and don't worry. Worry is useless. God is merciful and will hear your prayer.” ― Padre Pio
Posts: 51Member
Joined: Aug 11, 2014
MAY 9, 2014 - EOI
MAY 26, 2014 -Received invitation
JULY 9, 2014 - Lodged visa
JULY 28, 2014 - Medical
AUG 1, 2014 -Medical submitted
Documents were uploaded..
Posts: 2Member
Joined: Jan 21, 2014
Posts: 134Member
Joined: Jan 26, 2013
01-Apr-13 : Completed all requirements in Philippines
27-May-13 : Got the documents from Philippines via DHL
13-Jun-13 : Completed all requirements in Singapore
14-Jun-13 : ACS Skills Assessment - Submitted
14-Jun-13 : ACS Skills Assessment - Allocated
21-Jun-13 : ACS Skills Assessment - With Assessor
19-Jul-13 : IELTS (BC) -
16-Sep-13 : ACS Result - "Thank you lord after 12 weeks "Suitable" sya"
19-Jul-14 - Second attempt! this time IDP naman
Posts: 262Member
Joined: Nov 12, 2013
2009 - Assssment req, submit req, ielts failed, wife got pregnant
Pursue our dream! ( finish what you started )
Nov 13, 2013 --Enquiry for agent fees and reading materials for RPL
Nov 7, 2014 -- ACS lodge for skill assessment
Nov 17, 2014-- + assessment from ACS
Nov 26, 2014 -- IELTS payment and review starts now.
Apr 10, 2015-- IELTS EXAM + result 7,7,7.5, 7.5 Passed!
May 6, 2015-- EOI Submitted (60pts visa189 )
Oct 3, 2015 -- + 5 points work experience EOI Updated (65pts visa 189)
Jan 22, 2016 -- invited to lodge
Feb 5, 2016 -- Lodge 189 visa and pay visa fee
Feb 24, 2016 -- CO allocation and ask for medical, nbi clearance, medium of instruction for me
March 00, 2016 - wife & me went to NBI for clearance ( may hit! ) settle the next day sa UN branch. I got mine my wife needs to wait 2 weeks pa!
March 00, 2016 -- Went to Medical city (sat) it was closed!
March 00, 2016 -- I went back to SG for my medical and my family medical sched below
March 17 , 2016 -- Medical at St Lukes
April 19, 2016 -- Visa Grant! Thank you for the additional blessing Lord!
Feb 8, 2017 -- Hello Sydney!
Feb 21-- Got our own place to stay and we can call home
March 5, 2017 -- Got the job I wanted
July 30, 2017 - Got another Job offer! better pay and permanent position
Oh yeah! Dreams do come true! Act now!
Posts: 221Member
Joined: Jun 25, 2012
so I dont think you will be able to claim points for experience if 7 years na wife mo as BA.
if pasok pa rin naman kayo sa total points, ipa-vetassess nyo naman yung qualification
nya para may points sa education since hindi maaassess ng ACS yung accounting.
pero check nyo rin yung school nya sa Country education profile kung section 1
kasi alam ko pag section 1 di na kailangan ng vetassess
3 dependents: wife and two kids
ANZSCO 261311-Analyst Programmer
2013-11-08 ACS + total 10 Years credited
2014-03-11 IELTS OBS 7
2014-07-12 EOI Lodged
2014-07-14 NSW State Submitted
2014-08-11 PCC Malaysia Applied
2014-08-18 PCC Malaysia Rcvd
2014-08-26 NSW Invited
2014-09-05 Visa Lodged
2014-09-13 Medical
2014-09-15 NBI Applied
2014-09-22 Medical Completed
2014-09-26 NBI Rcvd
2014-09-30 Frontloaded All docs
2014-10-29 Direct Grant!!! IED - 2015-08-18
2014-11-23 Wife Initial Entry to prepare and look for apartment
2014-12-02 Wife Fulltime job
2014-12-24 Kids,Myself Entry
2014-12-24 - 2014-01-05 Vacation Mode
2015-01-08 - Work From Home (Online from prev company)
and Casual Work (part time)
2015-01-28 Kids First day of School
2015-02-09 - job offer 1
2015-02-10 - job offer 2
2015-02-16 - First Day of Job
2015-03-07 - Passed Driving Knowledge Test
2015-03-20 - Passed Driving Test (Full License)
Posts: 262Member
Joined: Nov 12, 2013
Tama po ba ang process? thanks
Regarding sa school paano po ma check if section1? Thanks
2009 - Assssment req, submit req, ielts failed, wife got pregnant
Pursue our dream! ( finish what you started )
Nov 13, 2013 --Enquiry for agent fees and reading materials for RPL
Nov 7, 2014 -- ACS lodge for skill assessment
Nov 17, 2014-- + assessment from ACS
Nov 26, 2014 -- IELTS payment and review starts now.
Apr 10, 2015-- IELTS EXAM + result 7,7,7.5, 7.5 Passed!
May 6, 2015-- EOI Submitted (60pts visa189 )
Oct 3, 2015 -- + 5 points work experience EOI Updated (65pts visa 189)
Jan 22, 2016 -- invited to lodge
Feb 5, 2016 -- Lodge 189 visa and pay visa fee
Feb 24, 2016 -- CO allocation and ask for medical, nbi clearance, medium of instruction for me
March 00, 2016 - wife & me went to NBI for clearance ( may hit! ) settle the next day sa UN branch. I got mine my wife needs to wait 2 weeks pa!
March 00, 2016 -- Went to Medical city (sat) it was closed!
March 00, 2016 -- I went back to SG for my medical and my family medical sched below
March 17 , 2016 -- Medical at St Lukes
April 19, 2016 -- Visa Grant! Thank you for the additional blessing Lord!
Feb 8, 2017 -- Hello Sydney!
Feb 21-- Got our own place to stay and we can call home
March 5, 2017 -- Got the job I wanted
July 30, 2017 - Got another Job offer! better pay and permanent position
Oh yeah! Dreams do come true! Act now!