Occupation: Civil Engineer (ANZSCO 233211)
Main Applicant: Moi
February 02, 2013 - IELTS - passed
August 27, 2013 - Sent CDR to EA for Assessment
January 15, 2014 - Received Positive Assessment
February 24, 2014 - Submitted EOI
March 10, 2014 - Received Invitation to Apply for Visa
March 31, 2014 - Lodged Visa 189 (but system reflected application lodged on April 1, 2014 due to time diff)
April 19, 2014 - Medicals done and all documents uploaded
May 2014 - CO Allocated
June 2014 - SSS and Pagibig documents for 2009-2010 requested
July 2014 - Visa Grant! God is Great!
September 2014 - IED
August 2015 - Big move
----countdown mode ----
most recent by eel_kram025
The Best Vegan Eats in San Diego: El Avocado
most recent by RosieHockm
VICTORIA STATES SPONSORSHIP 2024-2025
most recent by Ozdrims
QUEENSLAND STATES SPONSORSHIP FY 2024-2025
most recent by Ozdrims
Australian Computer Society Skills Application
most recent by Ozdrims
most recent by Cerberus13
NSW STATE SPONSORSHIP 2024~2025
most recent by Ozdrims
Highly suggested Migration Agency
most recent by Marionittes40
most recent by Marionittes40
The longest running Pinoy-Australian Forum site in the history. We are connecting Pinoys "in" and "to" Australia since 2010! If you want to join in, click one of these buttons!
Comments
Posts: 692Member
Joined: Jul 18, 2012
apply apply ka na sa seek.com.au ng civil engineering jobs or draftsman or estimator...or probably revit..in demand siya dito sa oz... then revise ur cv to about 3 pages lang, oz style ika nga...
goodluck :-)
October 6, 2012 - Passed IELTS - Academic (W 6 S 6 L 8 R 7 OBS 7.0) pwde na yan!
October 16, 2012 - Submitted CDR to EA
February 27, 2013 - Received Favorable letter from EA (Mechanical Engineer - ANZSCO 233512) Thank you Lord!
March 8, 2013 - Applied WA SS
March 25, 2013 - Received Letter for WA SS (delaying/maximising 28 days; waiting for civil wedding)
May 31, 2013 - Submitted Visa Application (with everything; PCC Saudi, NBI, Marriage certificate, etc)
July 11, 2013 - CO Assigned / Team 7 Adelaide
August 17, 2013 - Done with the Medicals
September 4, 2013 - Visa Grant (Subclass 190 / ANZCO233515 - Mechanical Engineer) Thank you Lord! / IED August 23, 2014
August 8, 2014 - Flight to Oz, No turning Back, This is it!
May 2015 - End of relationship
June 2015 - Wife found new partner (aussie)
October 2015 - Wife filed for divorce (That cunt)
January 2016 - Divorced
August 2018 - Lodged Citizenship
March 2019 - Sit in Citizenship Exam/Interview
May 2019 - Citizenship Ceremony
June 2019 - Au Passport received
Posts: 334Member
Joined: Sep 09, 2012
Occupation: Civil Engineer (ANZSCO 233211)
Main Applicant: Moi
February 02, 2013 - IELTS - passed
August 27, 2013 - Sent CDR to EA for Assessment
January 15, 2014 - Received Positive Assessment
February 24, 2014 - Submitted EOI
March 10, 2014 - Received Invitation to Apply for Visa
March 31, 2014 - Lodged Visa 189 (but system reflected application lodged on April 1, 2014 due to time diff)
April 19, 2014 - Medicals done and all documents uploaded
May 2014 - CO Allocated
June 2014 - SSS and Pagibig documents for 2009-2010 requested
July 2014 - Visa Grant! God is Great!
September 2014 - IED
August 2015 - Big move
----countdown mode ----
Posts: 692Member
Joined: Jul 18, 2012
uhm, yep, meron mga swerte na nahihire kahit offshore pa kaya try sending resume na rin kahit offshore ka pa...malay mo isa ka sa swerte :-)
October 6, 2012 - Passed IELTS - Academic (W 6 S 6 L 8 R 7 OBS 7.0) pwde na yan!
October 16, 2012 - Submitted CDR to EA
February 27, 2013 - Received Favorable letter from EA (Mechanical Engineer - ANZSCO 233512) Thank you Lord!
March 8, 2013 - Applied WA SS
March 25, 2013 - Received Letter for WA SS (delaying/maximising 28 days; waiting for civil wedding)
May 31, 2013 - Submitted Visa Application (with everything; PCC Saudi, NBI, Marriage certificate, etc)
July 11, 2013 - CO Assigned / Team 7 Adelaide
August 17, 2013 - Done with the Medicals
September 4, 2013 - Visa Grant (Subclass 190 / ANZCO233515 - Mechanical Engineer) Thank you Lord! / IED August 23, 2014
August 8, 2014 - Flight to Oz, No turning Back, This is it!
May 2015 - End of relationship
June 2015 - Wife found new partner (aussie)
October 2015 - Wife filed for divorce (That cunt)
January 2016 - Divorced
August 2018 - Lodged Citizenship
March 2019 - Sit in Citizenship Exam/Interview
May 2019 - Citizenship Ceremony
June 2019 - Au Passport received
Posts: 334Member
Joined: Sep 09, 2012
Occupation: Civil Engineer (ANZSCO 233211)
Main Applicant: Moi
February 02, 2013 - IELTS - passed
August 27, 2013 - Sent CDR to EA for Assessment
January 15, 2014 - Received Positive Assessment
February 24, 2014 - Submitted EOI
March 10, 2014 - Received Invitation to Apply for Visa
March 31, 2014 - Lodged Visa 189 (but system reflected application lodged on April 1, 2014 due to time diff)
April 19, 2014 - Medicals done and all documents uploaded
May 2014 - CO Allocated
June 2014 - SSS and Pagibig documents for 2009-2010 requested
July 2014 - Visa Grant! God is Great!
September 2014 - IED
August 2015 - Big move
----countdown mode ----
Posts: 692Member
Joined: Jul 18, 2012
October 6, 2012 - Passed IELTS - Academic (W 6 S 6 L 8 R 7 OBS 7.0) pwde na yan!
October 16, 2012 - Submitted CDR to EA
February 27, 2013 - Received Favorable letter from EA (Mechanical Engineer - ANZSCO 233512) Thank you Lord!
March 8, 2013 - Applied WA SS
March 25, 2013 - Received Letter for WA SS (delaying/maximising 28 days; waiting for civil wedding)
May 31, 2013 - Submitted Visa Application (with everything; PCC Saudi, NBI, Marriage certificate, etc)
July 11, 2013 - CO Assigned / Team 7 Adelaide
August 17, 2013 - Done with the Medicals
September 4, 2013 - Visa Grant (Subclass 190 / ANZCO233515 - Mechanical Engineer) Thank you Lord! / IED August 23, 2014
August 8, 2014 - Flight to Oz, No turning Back, This is it!
May 2015 - End of relationship
June 2015 - Wife found new partner (aussie)
October 2015 - Wife filed for divorce (That cunt)
January 2016 - Divorced
August 2018 - Lodged Citizenship
March 2019 - Sit in Citizenship Exam/Interview
May 2019 - Citizenship Ceremony
June 2019 - Au Passport received
Posts: 21Member
Joined: Apr 08, 2015
Posts: 334Member
Joined: Sep 09, 2012
Occupation: Civil Engineer (ANZSCO 233211)
Main Applicant: Moi
February 02, 2013 - IELTS - passed
August 27, 2013 - Sent CDR to EA for Assessment
January 15, 2014 - Received Positive Assessment
February 24, 2014 - Submitted EOI
March 10, 2014 - Received Invitation to Apply for Visa
March 31, 2014 - Lodged Visa 189 (but system reflected application lodged on April 1, 2014 due to time diff)
April 19, 2014 - Medicals done and all documents uploaded
May 2014 - CO Allocated
June 2014 - SSS and Pagibig documents for 2009-2010 requested
July 2014 - Visa Grant! God is Great!
September 2014 - IED
August 2015 - Big move
----countdown mode ----
Posts: 15Member
Joined: Apr 13, 2015
Posts: 692Member
Joined: Jul 18, 2012
company 1 from 2012 to 2014
company 2 from 2010 to 2012
company 3 from 2008 to 2010
company 4 from 2006 to 2008
company 5 from 2004 to 2006
company 1 - from 2012 to 2014
--job description--
--key achievements--
company 2 - from 2010 to 2012
--job description--
--key achievements--
company 3 - from 2008 to 2010
--job description--
--key achievements--
-----Career history available upon request----
**gets mo?! :-)
October 6, 2012 - Passed IELTS - Academic (W 6 S 6 L 8 R 7 OBS 7.0) pwde na yan!
October 16, 2012 - Submitted CDR to EA
February 27, 2013 - Received Favorable letter from EA (Mechanical Engineer - ANZSCO 233512) Thank you Lord!
March 8, 2013 - Applied WA SS
March 25, 2013 - Received Letter for WA SS (delaying/maximising 28 days; waiting for civil wedding)
May 31, 2013 - Submitted Visa Application (with everything; PCC Saudi, NBI, Marriage certificate, etc)
July 11, 2013 - CO Assigned / Team 7 Adelaide
August 17, 2013 - Done with the Medicals
September 4, 2013 - Visa Grant (Subclass 190 / ANZCO233515 - Mechanical Engineer) Thank you Lord! / IED August 23, 2014
August 8, 2014 - Flight to Oz, No turning Back, This is it!
May 2015 - End of relationship
June 2015 - Wife found new partner (aussie)
October 2015 - Wife filed for divorce (That cunt)
January 2016 - Divorced
August 2018 - Lodged Citizenship
March 2019 - Sit in Citizenship Exam/Interview
May 2019 - Citizenship Ceremony
June 2019 - Au Passport received
Posts: 692Member
Joined: Jul 18, 2012
try brushing up ur CV to about 3 pages...without picture...check online ng oz cv format...
maaga pa yan..usually ang mga companies e hinde agad nagtatawag for interview...talagang hinihintay nila ung job closing date bago sila magsort out ng candidates...and minsan pag tinawagan ka na for an interview, usually 50% e pasok ka na sa job...minsan naman, pag urgent hiring e nagcacall agad sila...
if gusto mo na magwork, try doing casual job muna that is not inline with ur profession...para malibang ka lang at kumita kahit paano...take note na if ever magaapply ka ng odd jobs, put in a resume na mababa kesa sa profession mo...
good luck mate.. :-)
October 6, 2012 - Passed IELTS - Academic (W 6 S 6 L 8 R 7 OBS 7.0) pwde na yan!
October 16, 2012 - Submitted CDR to EA
February 27, 2013 - Received Favorable letter from EA (Mechanical Engineer - ANZSCO 233512) Thank you Lord!
March 8, 2013 - Applied WA SS
March 25, 2013 - Received Letter for WA SS (delaying/maximising 28 days; waiting for civil wedding)
May 31, 2013 - Submitted Visa Application (with everything; PCC Saudi, NBI, Marriage certificate, etc)
July 11, 2013 - CO Assigned / Team 7 Adelaide
August 17, 2013 - Done with the Medicals
September 4, 2013 - Visa Grant (Subclass 190 / ANZCO233515 - Mechanical Engineer) Thank you Lord! / IED August 23, 2014
August 8, 2014 - Flight to Oz, No turning Back, This is it!
May 2015 - End of relationship
June 2015 - Wife found new partner (aussie)
October 2015 - Wife filed for divorce (That cunt)
January 2016 - Divorced
August 2018 - Lodged Citizenship
March 2019 - Sit in Citizenship Exam/Interview
May 2019 - Citizenship Ceremony
June 2019 - Au Passport received
Posts: 212Member
Joined: Feb 24, 2015
ANZSCO code: 263311 (Telecommunication Engineer)
02.14.2013 - IELTS
Feb 2013 - Dec 2014 - Prioritizing others, realizing I need to pursue it again.
Jan 25, 2015 - Completed all documents
Jan 26, 2015 - Submitted to EA for Assessment (13 weeks to wait)
Apr 27, 2015 - Received EA Assessment (Praise GOD)
Apr 28, 2015 - Submission of EOI (60 points)
May 22, 2015 - Received Invitation (thanks GOD, another milestone)
May 26, 2015 - Lodged Visa
July 8, 2015 - Medicals at SLMC BGC (praying that it will be alright)
..... since my secondary sponsor has an on-going medication (PTB), we need to wait to complete all the series of Sputum and X-Ray.
Oct 27, 2015 - My secondary sponsor all cleared from PTB (all results are negative).
Nov 12, 2015 - CO requested form 815 (Health Undertaking)
Waiting for the visa grant.
Dec 23, 2015 - And our journey begins here, VISA granted. GOD gave us a very special gift!
Feb 28, 2016 - Flight to Sydney alone
Mar 1 - May 1, 2016 - Apply for Engineering job and attended Skillmax to gain more knowledge in finding job, creating CV and CL and correct way of answering interviews. The most difficult and frustrating months. Many rejections..
Apr 10, 2016 - My wife and my son arrived!
May 2 - 6, 2016 - Phone interview, face to face interview and job offer! Got Engineering job. Worth the wait.
May 9, 2016 - Start my first day of Work in Australia as an RF Engineer.
Philippians 4:13 - "I can do all things through Christ who strengthens me"
Posts: 334Member
Joined: Sep 09, 2012
Occupation: Civil Engineer (ANZSCO 233211)
Main Applicant: Moi
February 02, 2013 - IELTS - passed
August 27, 2013 - Sent CDR to EA for Assessment
January 15, 2014 - Received Positive Assessment
February 24, 2014 - Submitted EOI
March 10, 2014 - Received Invitation to Apply for Visa
March 31, 2014 - Lodged Visa 189 (but system reflected application lodged on April 1, 2014 due to time diff)
April 19, 2014 - Medicals done and all documents uploaded
May 2014 - CO Allocated
June 2014 - SSS and Pagibig documents for 2009-2010 requested
July 2014 - Visa Grant! God is Great!
September 2014 - IED
August 2015 - Big move
----countdown mode ----
Posts: 49Member
Joined: Jan 22, 2015
Dapat straight to the point din yung answers. I recalled IELTS speaking.. Hahah!! The category when you need to answer in 2 min. came in reality in a 4 walled interview room that will get you to your dream job!
Posts: 331Member
Joined: Oct 14, 2014
Nominated Occupation: ANZSCO 233513 (Plant or Production Engineer)
Feb 02 2013: IELTS
Feb 2013 to Aug 2014: Wife having second thought....
Zzzzzzzzzzzzzzzzzzzzzz...............
Sept 2014: Finally decided to pursue Au dream!
Sept 2014: Completed CDR
Sept 25 2014: Completed documentations
Sept 30 2014: Paper application submitted to EA thru DHL
Oct 07 2014: AUD890 deducted from CC
Nov 22 2014: IELTS (L8.5 R8.0 W7.5 S8.0 OBS8.0) (God is good!)
Jan 06 2015: EA assessment ETC (13 weeks)
Feb 05 2015: Positive EA result (Thank you Lord!!!)
Feb 13 2015: Air Mail received
Feb 16 2015: Lodged EOI (65 pts)
Feb 27 2015: Received invitation to lodge visa 189
Mar 05 2015: Lodged visa 189
Mar 05 2015: Visa payment charged in Credit Card
Mar 06 2015: Submitted NBI, Mal & Id Police Clearance to agent
Mar 11 2015: Submitted Form-80 to agent
Mar 20 2015: Medical with family done in SG (Point Medical Paragon)
Mar 25 2015: Medical result uploaded
Mar 26 2015: SSS and PAG-IBIG uploaded
May 07 2015: Visa Granted!!! (IED 24Mar2016)
Jan 2016: BIG Move!!!
Posts: 49Member
Joined: Jan 22, 2015
Try ninyo mag pass ng application sa Peoplebank Adelaide or sa Robert Walters recruitment.. They are more inclined to ICT, ENGR clients.
Hope this helps.
Posts: 49Member
Joined: Jan 22, 2015
Posts: 1,342Member
Joined: Feb 19, 2013
Like sa case ko kasi, I’m an ECE pero from a manufacturing engineering background, gusto ko sana makapag-shift to probably ICT-related field sa Oz.. Thanks!
Nominated Occupation: Plant or Production Engineer (ANZSCO 233513)
03/23/13: IELTS GT Exam (British Council)
04/05/13: IELTS Results L:7.0/R:7.5/W:7.5/S:8.5 OBS: 7.5
makalipas ang isang taon....
04/20/14: CDR Application sent to EA
07/09/14: EA started reviewing my CDR
08/08/14: EA Assessment Positive Results (Thank you LORD!!!)
09/16/14: Requested EA for a Duplicate Letter (Original Outcome Letter lost during mail delivery to PH)
09/21/14: Duplicate Assessment Letter received (Finally!!)
09/21/14: EOI Lodged (70 pts)
09/22/14: Invited to lodge Skilled - Independent (Subclass 189) visa
09/23/14: Obtained Overseas PCC
09/29/14: Obtained NBI Clearance
10/12/14: Lodged application - Visa Subclass 189
10/12/14: Uploaded docs
10/20/14: Medicals Done
12/06/14: Direct Grant! To GOD Be the Glory!
12/13/14: Completed Initial Entry - Sydney
Posts: 49Member
Joined: Jan 22, 2015
Good luck.
Posts: 49Member
Joined: Jan 22, 2015
Google mo kasi marami kang options. Be proactive lng talaga.
Good luck.
Posts: 735Member
Joined: Jun 19, 2015
CONSTRUCTION PROJECT MANAGER
Age - 25pts
Experience - 5pts
Education - 15pts
PTE - 10pts
SS - 5pts
TOTAL = 60 POINTS (VISA 190)
November 2014 = Decided to pursue family migration to Australia
January 2015 = Took the IELTS @ British Council (S:7.5,W:6.5,L:7.5,R:7.5)
February - July 2015 = Gather Necessary Documents For Assessment
August 3, 2015 = Submitted documents to Vetassess
October 15, 2015 = Vetassess called our landline to verify my submitted documents
October 21, 2015 = Positive and Negative Result from Vetassess.....out of 10 years of employment 2.7 years lang ang credited sa akin....
October 23, 2015 = Scheduled for PTE-A on November 6...aiming to get 20 points..wish me luck
November 7, 2015 = I took the PTE-A Exam
November 8, 2015 = Results of PTE-A (Listening:80;Reading:63;Speaking:84;Writing:75) 2 Points na lang hindi pa ako pinagbigyan....huhuhu
November 13, 2015 = Baba ng 5 points at the same time schedule din ng PTE-A exam ko
November 13, 2015 = Result of PTE Take 2 (Listening:69; Reading:63; Speaking:79;Writing:78) Sablay na naman
December 2, 2015 = PTE 3rd Retake (sana pumasa na)
December 4, 2015 = PTE Result (Listening:65; Reading: 67; Speaking:68; Writing: 67) Sa wakas
December 4, 2015 = Submitted EOI Visa 190
December 11, 2015 = Received ITA
December 12, 2015 = Lodged NSW Nomination
January 11, 2015 = NSW Approved
January 25, 2016 = Medical @ Nationwide Makati
February 15, 2016 = Lodged Visa (Waiting Game)
March 15, 2016 = CO reuqested for PTE results
*****Sana maging okay ang lahat****
Posts: 735Member
Joined: Jun 19, 2015
CONSTRUCTION PROJECT MANAGER
Age - 25pts
Experience - 5pts
Education - 15pts
PTE - 10pts
SS - 5pts
TOTAL = 60 POINTS (VISA 190)
November 2014 = Decided to pursue family migration to Australia
January 2015 = Took the IELTS @ British Council (S:7.5,W:6.5,L:7.5,R:7.5)
February - July 2015 = Gather Necessary Documents For Assessment
August 3, 2015 = Submitted documents to Vetassess
October 15, 2015 = Vetassess called our landline to verify my submitted documents
October 21, 2015 = Positive and Negative Result from Vetassess.....out of 10 years of employment 2.7 years lang ang credited sa akin....
October 23, 2015 = Scheduled for PTE-A on November 6...aiming to get 20 points..wish me luck
November 7, 2015 = I took the PTE-A Exam
November 8, 2015 = Results of PTE-A (Listening:80;Reading:63;Speaking:84;Writing:75) 2 Points na lang hindi pa ako pinagbigyan....huhuhu
November 13, 2015 = Baba ng 5 points at the same time schedule din ng PTE-A exam ko
November 13, 2015 = Result of PTE Take 2 (Listening:69; Reading:63; Speaking:79;Writing:78) Sablay na naman
December 2, 2015 = PTE 3rd Retake (sana pumasa na)
December 4, 2015 = PTE Result (Listening:65; Reading: 67; Speaking:68; Writing: 67) Sa wakas
December 4, 2015 = Submitted EOI Visa 190
December 11, 2015 = Received ITA
December 12, 2015 = Lodged NSW Nomination
January 11, 2015 = NSW Approved
January 25, 2016 = Medical @ Nationwide Makati
February 15, 2016 = Lodged Visa (Waiting Game)
March 15, 2016 = CO reuqested for PTE results
*****Sana maging okay ang lahat****
Posts: 140Member
Joined: Apr 11, 2015
Pansin ko lang sa Vetassess ka... why not AE?
06Dec14 : IELTS (R7 L7 W7 S6.5)
12Feb15 : Queued for EA Assessment (BSEE)
18Apr15 : IELTS Retake (R8.5 L7 W7.5 S7 +10!)
05May15 : EA positive
05May15 : Lodge EOI 65 points
08May15 : Invited for 189
23June15 : Submitted and paid by BPI Mastercard CC
17Aug15 : CO assigned (Day 55)
16Nov15 : Wife's early but successful delivery
21Nov15 : Applied for baby's passport (RD: December 7)
08Dec15 : Sent passport to CO
05Jan16 : Received acknowledgement of additional dependent
07Jan16 : Received HAP ID for baby's medicals
09Jan16 : Medicals completed
25Jan16 : All medical clearance provided
23Feb16 : Thanks God!
Preparing for April Big Move!
Posts: 735Member
Joined: Jun 19, 2015
CONSTRUCTION PROJECT MANAGER
Age - 25pts
Experience - 5pts
Education - 15pts
PTE - 10pts
SS - 5pts
TOTAL = 60 POINTS (VISA 190)
November 2014 = Decided to pursue family migration to Australia
January 2015 = Took the IELTS @ British Council (S:7.5,W:6.5,L:7.5,R:7.5)
February - July 2015 = Gather Necessary Documents For Assessment
August 3, 2015 = Submitted documents to Vetassess
October 15, 2015 = Vetassess called our landline to verify my submitted documents
October 21, 2015 = Positive and Negative Result from Vetassess.....out of 10 years of employment 2.7 years lang ang credited sa akin....
October 23, 2015 = Scheduled for PTE-A on November 6...aiming to get 20 points..wish me luck
November 7, 2015 = I took the PTE-A Exam
November 8, 2015 = Results of PTE-A (Listening:80;Reading:63;Speaking:84;Writing:75) 2 Points na lang hindi pa ako pinagbigyan....huhuhu
November 13, 2015 = Baba ng 5 points at the same time schedule din ng PTE-A exam ko
November 13, 2015 = Result of PTE Take 2 (Listening:69; Reading:63; Speaking:79;Writing:78) Sablay na naman
December 2, 2015 = PTE 3rd Retake (sana pumasa na)
December 4, 2015 = PTE Result (Listening:65; Reading: 67; Speaking:68; Writing: 67) Sa wakas
December 4, 2015 = Submitted EOI Visa 190
December 11, 2015 = Received ITA
December 12, 2015 = Lodged NSW Nomination
January 11, 2015 = NSW Approved
January 25, 2016 = Medical @ Nationwide Makati
February 15, 2016 = Lodged Visa (Waiting Game)
March 15, 2016 = CO reuqested for PTE results
*****Sana maging okay ang lahat****
Posts: 15Member
Joined: Apr 13, 2015
Posts: 735Member
Joined: Jun 19, 2015
CONSTRUCTION PROJECT MANAGER
Age - 25pts
Experience - 5pts
Education - 15pts
PTE - 10pts
SS - 5pts
TOTAL = 60 POINTS (VISA 190)
November 2014 = Decided to pursue family migration to Australia
January 2015 = Took the IELTS @ British Council (S:7.5,W:6.5,L:7.5,R:7.5)
February - July 2015 = Gather Necessary Documents For Assessment
August 3, 2015 = Submitted documents to Vetassess
October 15, 2015 = Vetassess called our landline to verify my submitted documents
October 21, 2015 = Positive and Negative Result from Vetassess.....out of 10 years of employment 2.7 years lang ang credited sa akin....
October 23, 2015 = Scheduled for PTE-A on November 6...aiming to get 20 points..wish me luck
November 7, 2015 = I took the PTE-A Exam
November 8, 2015 = Results of PTE-A (Listening:80;Reading:63;Speaking:84;Writing:75) 2 Points na lang hindi pa ako pinagbigyan....huhuhu
November 13, 2015 = Baba ng 5 points at the same time schedule din ng PTE-A exam ko
November 13, 2015 = Result of PTE Take 2 (Listening:69; Reading:63; Speaking:79;Writing:78) Sablay na naman
December 2, 2015 = PTE 3rd Retake (sana pumasa na)
December 4, 2015 = PTE Result (Listening:65; Reading: 67; Speaking:68; Writing: 67) Sa wakas
December 4, 2015 = Submitted EOI Visa 190
December 11, 2015 = Received ITA
December 12, 2015 = Lodged NSW Nomination
January 11, 2015 = NSW Approved
January 25, 2016 = Medical @ Nationwide Makati
February 15, 2016 = Lodged Visa (Waiting Game)
March 15, 2016 = CO reuqested for PTE results
*****Sana maging okay ang lahat****
Posts: 15Member
Joined: Apr 13, 2015
Posts: 735Member
Joined: Jun 19, 2015
CONSTRUCTION PROJECT MANAGER
Age - 25pts
Experience - 5pts
Education - 15pts
PTE - 10pts
SS - 5pts
TOTAL = 60 POINTS (VISA 190)
November 2014 = Decided to pursue family migration to Australia
January 2015 = Took the IELTS @ British Council (S:7.5,W:6.5,L:7.5,R:7.5)
February - July 2015 = Gather Necessary Documents For Assessment
August 3, 2015 = Submitted documents to Vetassess
October 15, 2015 = Vetassess called our landline to verify my submitted documents
October 21, 2015 = Positive and Negative Result from Vetassess.....out of 10 years of employment 2.7 years lang ang credited sa akin....
October 23, 2015 = Scheduled for PTE-A on November 6...aiming to get 20 points..wish me luck
November 7, 2015 = I took the PTE-A Exam
November 8, 2015 = Results of PTE-A (Listening:80;Reading:63;Speaking:84;Writing:75) 2 Points na lang hindi pa ako pinagbigyan....huhuhu
November 13, 2015 = Baba ng 5 points at the same time schedule din ng PTE-A exam ko
November 13, 2015 = Result of PTE Take 2 (Listening:69; Reading:63; Speaking:79;Writing:78) Sablay na naman
December 2, 2015 = PTE 3rd Retake (sana pumasa na)
December 4, 2015 = PTE Result (Listening:65; Reading: 67; Speaking:68; Writing: 67) Sa wakas
December 4, 2015 = Submitted EOI Visa 190
December 11, 2015 = Received ITA
December 12, 2015 = Lodged NSW Nomination
January 11, 2015 = NSW Approved
January 25, 2016 = Medical @ Nationwide Makati
February 15, 2016 = Lodged Visa (Waiting Game)
March 15, 2016 = CO reuqested for PTE results
*****Sana maging okay ang lahat****
Posts: 735Member
Joined: Jun 19, 2015
CONSTRUCTION PROJECT MANAGER
Age - 25pts
Experience - 5pts
Education - 15pts
PTE - 10pts
SS - 5pts
TOTAL = 60 POINTS (VISA 190)
November 2014 = Decided to pursue family migration to Australia
January 2015 = Took the IELTS @ British Council (S:7.5,W:6.5,L:7.5,R:7.5)
February - July 2015 = Gather Necessary Documents For Assessment
August 3, 2015 = Submitted documents to Vetassess
October 15, 2015 = Vetassess called our landline to verify my submitted documents
October 21, 2015 = Positive and Negative Result from Vetassess.....out of 10 years of employment 2.7 years lang ang credited sa akin....
October 23, 2015 = Scheduled for PTE-A on November 6...aiming to get 20 points..wish me luck
November 7, 2015 = I took the PTE-A Exam
November 8, 2015 = Results of PTE-A (Listening:80;Reading:63;Speaking:84;Writing:75) 2 Points na lang hindi pa ako pinagbigyan....huhuhu
November 13, 2015 = Baba ng 5 points at the same time schedule din ng PTE-A exam ko
November 13, 2015 = Result of PTE Take 2 (Listening:69; Reading:63; Speaking:79;Writing:78) Sablay na naman
December 2, 2015 = PTE 3rd Retake (sana pumasa na)
December 4, 2015 = PTE Result (Listening:65; Reading: 67; Speaking:68; Writing: 67) Sa wakas
December 4, 2015 = Submitted EOI Visa 190
December 11, 2015 = Received ITA
December 12, 2015 = Lodged NSW Nomination
January 11, 2015 = NSW Approved
January 25, 2016 = Medical @ Nationwide Makati
February 15, 2016 = Lodged Visa (Waiting Game)
March 15, 2016 = CO reuqested for PTE results
*****Sana maging okay ang lahat****
Posts: 15Member
Joined: Apr 13, 2015
Posts: 735Member
Joined: Jun 19, 2015
CONSTRUCTION PROJECT MANAGER
Age - 25pts
Experience - 5pts
Education - 15pts
PTE - 10pts
SS - 5pts
TOTAL = 60 POINTS (VISA 190)
November 2014 = Decided to pursue family migration to Australia
January 2015 = Took the IELTS @ British Council (S:7.5,W:6.5,L:7.5,R:7.5)
February - July 2015 = Gather Necessary Documents For Assessment
August 3, 2015 = Submitted documents to Vetassess
October 15, 2015 = Vetassess called our landline to verify my submitted documents
October 21, 2015 = Positive and Negative Result from Vetassess.....out of 10 years of employment 2.7 years lang ang credited sa akin....
October 23, 2015 = Scheduled for PTE-A on November 6...aiming to get 20 points..wish me luck
November 7, 2015 = I took the PTE-A Exam
November 8, 2015 = Results of PTE-A (Listening:80;Reading:63;Speaking:84;Writing:75) 2 Points na lang hindi pa ako pinagbigyan....huhuhu
November 13, 2015 = Baba ng 5 points at the same time schedule din ng PTE-A exam ko
November 13, 2015 = Result of PTE Take 2 (Listening:69; Reading:63; Speaking:79;Writing:78) Sablay na naman
December 2, 2015 = PTE 3rd Retake (sana pumasa na)
December 4, 2015 = PTE Result (Listening:65; Reading: 67; Speaking:68; Writing: 67) Sa wakas
December 4, 2015 = Submitted EOI Visa 190
December 11, 2015 = Received ITA
December 12, 2015 = Lodged NSW Nomination
January 11, 2015 = NSW Approved
January 25, 2016 = Medical @ Nationwide Makati
February 15, 2016 = Lodged Visa (Waiting Game)
March 15, 2016 = CO reuqested for PTE results
*****Sana maging okay ang lahat****