NSW STATE SPONSORSHIP 2024~2025
most recent by rlsaints
most recent by missyeur
most recent by schrodingers_cat
Australian Computer Society Skills Application
most recent by cebreros
SA Nomination Application Concerns
most recent by manifestingvisagrant
Engineers Australia Skills Assessment
most recent by rosyengr
most recent by jameslee
most recent by jameslee
The longest running Pinoy-Australian Forum site in the history. We are connecting Pinoys "in" and "to" Australia since 2010! If you want to join in, click one of these buttons!
Comments
Posts: 528Member
Joined: Jan 08, 2011
Nominated Occupation: Software Engineer (261313) - Husband is the primary applicant.
10.21.2012 - Arrived in Melbourne. This is the day that the Lord has made.
03.26.2012 - Visa granted. God is good, all the time! All the time, God is good!
03.23.2012 - PCC submitted and medicals finalized
03.02.2012 - Application being processed further / CO assigned
06.26.2011 - Lodged Visa 175 application
Posts: 247Member
Joined: Jul 05, 2012
Skilled – Family Sponsored (Subclass 176)
Software Programmer (261313)
05/03/2012 - Lodged visa application (Online)
06/07/2012 - CO allocated/Medicals requested
06/11/2012 - Medical exam at NHSI
06/28/2012 - PCCs submitted
07/03/2012 - Health requirements finalised
07/13/2012 - Visa granted (IED: 06/19/2013)
Thanks be to God!!!
Posts: 247Member
Joined: Jul 05, 2012
Skilled – Family Sponsored (Subclass 176)
Software Programmer (261313)
05/03/2012 - Lodged visa application (Online)
06/07/2012 - CO allocated/Medicals requested
06/11/2012 - Medical exam at NHSI
06/28/2012 - PCCs submitted
07/03/2012 - Health requirements finalised
07/13/2012 - Visa granted (IED: 06/19/2013)
Thanks be to God!!!
Posts: 204Member
Joined: Aug 06, 2012
21.jan.12 - Vetasses Positive
16.may.12 - 4th Ielts - IDP - L8.5 R7.5 W7.0 S7.5 = 7.5 - Pass
15.june.12 - State sponsorship Approved
19.june.12 - 176 Visa applied at DIAC
20.july.2012 - Singapore & Phi. Police checks finalised
17.aug.2012 - VISA GRANT
29.sept.2012 - Landed Sydney Alone! @_@ #$%&*#$^$
Posts: 5,037Member, De-activated
Joined: Feb 23, 2012
Wahooo.. thank you Lord!!
Sep 24, 2011 - IELTS (L-8 R-8 W-8 S-7.5 : OBS-8)
Jan 04, 2012 - EA application submitted | Feb 23, 2012 - EA assessment result (IE ANZSCO 233511)
May 8, 2012 - Lodged GSM 175 online application | June 4, 2012 - CO Allocated
June 22, 2012 - Medicals Finalized | Aug 30, 2012 - PCCs Completed (PH, UAE, USA)
Sep 3, 2012 - Visa Granted (IED Jun 11, 2013) Thank You Lord!
Oct 16-28, 2012 - Initial Entry Completed - Sydney
July 28, 2013 - Final move to Perth
Sep 9, 2013 - Started work with the same company i worked for in UAE/USA
Oct 28, 2013 - Moved to another company..
Posts: 1,643Member
Joined: Nov 10, 2011
Occupation: Analyst Programmer (ANZSCO Code 261311)
May 21 2012 - lodged visa 176 (NSW) online application
May 30 2012 - CO allocation
Jul 16 2012 - Visa Granted! (IED Deadline: May 16, 2013)
Jan 19 2013 - Arrived in Sydney
Jan 20 2013 - Started our job hunt
Mar 11 2013 - Officially became a "HOUSE-BAND"
Apr 22 2013 - End of my "HOUSE-BAND" career
Posts: 64Member
Joined: Jul 24, 2012
June 30, 2012 : Took IELTS. Passed OB = 8.0
August 24, 2012 : Applied at ECU
September 18, 2012 : Received Letter of Offer from ECU
September 20, 2012 : Applied at Murdoch Uni.
October 18, 2012: Received Letter of Offer from Murdoch Uni.
March 19, 2013: VETASSESS received my documents
June 7, 2013: Skills assessment yielded positive result!
June 7, 2013: EOI submitted
June 17, 2013: Applied for WA SS
June 27, 2013: Application for WA SS was successful!
June 30, 2013: Signed the agreement
July 1, 2013: Received invitation to apply for Visa SC 190
July 21, 2013: Lodged Visa Application
August 15, 2013: CO emailed me regarding additional documents. Currently in the Philippines. Applied for NBI clearance.
August 27, 2013: Medical at St. Luke's. Pinabalik ako.haha!
September 2, 2013: Received NBI Clearance.
September 8, 2013: Back in UAE. Immediately applied for police clearance.
September 10, 2013: Received UAE Police Clearance. Uploaded final documents.
September 11, 2013: Visa Grant Notice received via email. Nostalgic. I miss you,mama. This is for you. I love you.
February 10, 2014: Flight to Perth
Posts: 178Member
Joined: Apr 22, 2012
25 Jul 2011 - Applied For Skills Assessment, Engineers Australia
23 Sep 2011 - Skills Assessment Received, ANZCO Code: 233211 (Civil Engineer)
10 Mar 2012 - IELTS Exam
24 Mar 2012 - IELTS Result L-8.5; R,W,S -7
26 Apr 2012 - 175 Application lodged....
24 May 2012 - "Application Being Processed Further"
10 Jun 2012 - Applied for NBI / Dubai Police Clearance
12 Jun 2012 - Dubai Police Clearance Received
15 Jun 2012 - CO Allocated
25 Jun 2012 - Medicals
27 Jun 2012 - Medicals Finalised
30 Jun 2012 - PCCs Uploaded
02 July 2012 - Visa Grant
14-26 Mar 2013 - Initial Entry - Melbourne
30 August 2014 - Big Move
08 Sep 2014 - First day of work
Posts: 5,037Member, De-activated
Joined: Feb 23, 2012
hopefully bago mag expire ang IEDate.. heheh
Sep 24, 2011 - IELTS (L-8 R-8 W-8 S-7.5 : OBS-8)
Jan 04, 2012 - EA application submitted | Feb 23, 2012 - EA assessment result (IE ANZSCO 233511)
May 8, 2012 - Lodged GSM 175 online application | June 4, 2012 - CO Allocated
June 22, 2012 - Medicals Finalized | Aug 30, 2012 - PCCs Completed (PH, UAE, USA)
Sep 3, 2012 - Visa Granted (IED Jun 11, 2013) Thank You Lord!
Oct 16-28, 2012 - Initial Entry Completed - Sydney
July 28, 2013 - Final move to Perth
Sep 9, 2013 - Started work with the same company i worked for in UAE/USA
Oct 28, 2013 - Moved to another company..
Posts: 5,037Member, De-activated
Joined: Feb 23, 2012
Sep 24, 2011 - IELTS (L-8 R-8 W-8 S-7.5 : OBS-8)
Jan 04, 2012 - EA application submitted | Feb 23, 2012 - EA assessment result (IE ANZSCO 233511)
May 8, 2012 - Lodged GSM 175 online application | June 4, 2012 - CO Allocated
June 22, 2012 - Medicals Finalized | Aug 30, 2012 - PCCs Completed (PH, UAE, USA)
Sep 3, 2012 - Visa Granted (IED Jun 11, 2013) Thank You Lord!
Oct 16-28, 2012 - Initial Entry Completed - Sydney
July 28, 2013 - Final move to Perth
Sep 9, 2013 - Started work with the same company i worked for in UAE/USA
Oct 28, 2013 - Moved to another company..
Posts: 5,037Member, De-activated
Joined: Feb 23, 2012
Sep 24, 2011 - IELTS (L-8 R-8 W-8 S-7.5 : OBS-8)
Jan 04, 2012 - EA application submitted | Feb 23, 2012 - EA assessment result (IE ANZSCO 233511)
May 8, 2012 - Lodged GSM 175 online application | June 4, 2012 - CO Allocated
June 22, 2012 - Medicals Finalized | Aug 30, 2012 - PCCs Completed (PH, UAE, USA)
Sep 3, 2012 - Visa Granted (IED Jun 11, 2013) Thank You Lord!
Oct 16-28, 2012 - Initial Entry Completed - Sydney
July 28, 2013 - Final move to Perth
Sep 9, 2013 - Started work with the same company i worked for in UAE/USA
Oct 28, 2013 - Moved to another company..
Posts: 712Member
Joined: May 30, 2011
“We can make our own plans, but the LORD gives the right answer.”
Posts: 265Member
Joined: Jan 21, 2011
29 May 2012 - lodged 176 online application
(Civil Engineer 233211;WA State Sponsored)
2 June 2012 - CO allocation
6 June 2012 - PCC uploaded
8 June 2012 - Medicals
21 June 2012 - further medical results received
25 June 2012 - Health requirements finalised
27 June 2012 - Visa Granted!! To God be the glory!
19 Aug 2012 - Landed in AU
Believe in the power of prayers!
When challenges are so big that we feel our strength is not enough to carry them , keep on going. The extra mile is where the GRACE OF GOD begins.
Posts: 5,037Member, De-activated
Joined: Feb 23, 2012
@mikaela01 - thanks.. hope your enjoying your new life in AU..
Sep 24, 2011 - IELTS (L-8 R-8 W-8 S-7.5 : OBS-8)
Jan 04, 2012 - EA application submitted | Feb 23, 2012 - EA assessment result (IE ANZSCO 233511)
May 8, 2012 - Lodged GSM 175 online application | June 4, 2012 - CO Allocated
June 22, 2012 - Medicals Finalized | Aug 30, 2012 - PCCs Completed (PH, UAE, USA)
Sep 3, 2012 - Visa Granted (IED Jun 11, 2013) Thank You Lord!
Oct 16-28, 2012 - Initial Entry Completed - Sydney
July 28, 2013 - Final move to Perth
Sep 9, 2013 - Started work with the same company i worked for in UAE/USA
Oct 28, 2013 - Moved to another company..
Posts: 993Member
Joined: Feb 15, 2012
261313 (Software Engineer)
Feb.15.2012 - started working on ACS requirements
Mar.02.2012 - submitted online ACS application and sent documents to ACS via Fedex
Mar.05.2012 - ACS acknowledged actual documents
Mar.21.2012 - ACS finalised assessment: Suitable
Mar.31.2012 - IELTS exam with BC
Apr.13.2012 - IELTS Results (L:8.5 R:7 W: 7 S: 8 OB: 7.5) Thank you LORD!
Apr.14.2012 - Lodged 175 Online Application
Apr.20.2012 - Completed Online Attachments
May.24.2012 - "Application being processed further"
May.29.2012 - CO Assigned :-)
Jun.07.2012 - Uploaded NBI Clearance
Jun.13.2012 - Medical/Health Requirements Finalised
Jun.14.2012 - VISA GRANT! Thank you, LORD! :-)
Jun.07.2013 - Initial Entry Date Deadline
Apr.28.2013 - Initial Entry (Sydney)
Jun.28.2013 - Verbal Job Offer (Melbourne)
Jul.08.2013 - First day of Work and first day of child care for my son (Melbourne)
Aug.21.2013 - First day of Work in Sydney
"Great is the LORD and most worthy of praise; his greatness no one can fathom." Psalm 145:3
Posts: 770Member
Joined: Apr 04, 2012
Skilled – Family Sponsored (Migrant) Visa (Subclass 176)
Nominated Occupation: CHEMIST 2111-11
11/MAY/2011 - IELTS Exam
20/JUNE/2011 - Lodged Online Visa Application
15/FEB/2012 - CO Allocation
26/JUNE/2012 - VISA GRANTED! Thank you Lord!
11/APR/2013 - Initial Entry Date Deadline
10/MAR/2013 - Arrived in Sydney
Posts: 204Member
Joined: Aug 06, 2012
21.jan.12 - Vetasses Positive
16.may.12 - 4th Ielts - IDP - L8.5 R7.5 W7.0 S7.5 = 7.5 - Pass
15.june.12 - State sponsorship Approved
19.june.12 - 176 Visa applied at DIAC
20.july.2012 - Singapore & Phi. Police checks finalised
17.aug.2012 - VISA GRANT
29.sept.2012 - Landed Sydney Alone! @_@ #$%&*#$^$
Posts: 993Member
Joined: Feb 15, 2012
261313 (Software Engineer)
Feb.15.2012 - started working on ACS requirements
Mar.02.2012 - submitted online ACS application and sent documents to ACS via Fedex
Mar.05.2012 - ACS acknowledged actual documents
Mar.21.2012 - ACS finalised assessment: Suitable
Mar.31.2012 - IELTS exam with BC
Apr.13.2012 - IELTS Results (L:8.5 R:7 W: 7 S: 8 OB: 7.5) Thank you LORD!
Apr.14.2012 - Lodged 175 Online Application
Apr.20.2012 - Completed Online Attachments
May.24.2012 - "Application being processed further"
May.29.2012 - CO Assigned :-)
Jun.07.2012 - Uploaded NBI Clearance
Jun.13.2012 - Medical/Health Requirements Finalised
Jun.14.2012 - VISA GRANT! Thank you, LORD! :-)
Jun.07.2013 - Initial Entry Date Deadline
Apr.28.2013 - Initial Entry (Sydney)
Jun.28.2013 - Verbal Job Offer (Melbourne)
Jul.08.2013 - First day of Work and first day of child care for my son (Melbourne)
Aug.21.2013 - First day of Work in Sydney
"Great is the LORD and most worthy of praise; his greatness no one can fathom." Psalm 145:3
Posts: 111Member
Joined: Jul 02, 2012
SUB CLASS 175 (Mechanical Engineer)
11, July 2012 – VISA Grant – God is Good!!! Thank you Lord.
10, June 2013 - IED deadline
15, Nov 2012 - Landed, Rocky QLD
Posts: 76Member
Joined: Jun 28, 2012
Posts: 55Member
Joined: Jan 06, 2012
Posts: 5,037Member, De-activated
Joined: Feb 23, 2012
Sep 24, 2011 - IELTS (L-8 R-8 W-8 S-7.5 : OBS-8)
Jan 04, 2012 - EA application submitted | Feb 23, 2012 - EA assessment result (IE ANZSCO 233511)
May 8, 2012 - Lodged GSM 175 online application | June 4, 2012 - CO Allocated
June 22, 2012 - Medicals Finalized | Aug 30, 2012 - PCCs Completed (PH, UAE, USA)
Sep 3, 2012 - Visa Granted (IED Jun 11, 2013) Thank You Lord!
Oct 16-28, 2012 - Initial Entry Completed - Sydney
July 28, 2013 - Final move to Perth
Sep 9, 2013 - Started work with the same company i worked for in UAE/USA
Oct 28, 2013 - Moved to another company..
Posts: 5,037Member, De-activated
Joined: Feb 23, 2012
kaya tumagal ng from june to aug...
anyway. tapos na rin... wahoo.. goodluck sa atin..
Sep 24, 2011 - IELTS (L-8 R-8 W-8 S-7.5 : OBS-8)
Jan 04, 2012 - EA application submitted | Feb 23, 2012 - EA assessment result (IE ANZSCO 233511)
May 8, 2012 - Lodged GSM 175 online application | June 4, 2012 - CO Allocated
June 22, 2012 - Medicals Finalized | Aug 30, 2012 - PCCs Completed (PH, UAE, USA)
Sep 3, 2012 - Visa Granted (IED Jun 11, 2013) Thank You Lord!
Oct 16-28, 2012 - Initial Entry Completed - Sydney
July 28, 2013 - Final move to Perth
Sep 9, 2013 - Started work with the same company i worked for in UAE/USA
Oct 28, 2013 - Moved to another company..
Posts: 5,037Member, De-activated
Joined: Feb 23, 2012
Sep 24, 2011 - IELTS (L-8 R-8 W-8 S-7.5 : OBS-8)
Jan 04, 2012 - EA application submitted | Feb 23, 2012 - EA assessment result (IE ANZSCO 233511)
May 8, 2012 - Lodged GSM 175 online application | June 4, 2012 - CO Allocated
June 22, 2012 - Medicals Finalized | Aug 30, 2012 - PCCs Completed (PH, UAE, USA)
Sep 3, 2012 - Visa Granted (IED Jun 11, 2013) Thank You Lord!
Oct 16-28, 2012 - Initial Entry Completed - Sydney
July 28, 2013 - Final move to Perth
Sep 9, 2013 - Started work with the same company i worked for in UAE/USA
Oct 28, 2013 - Moved to another company..
Posts: 5,037Member, De-activated
Joined: Feb 23, 2012
Sep 24, 2011 - IELTS (L-8 R-8 W-8 S-7.5 : OBS-8)
Jan 04, 2012 - EA application submitted | Feb 23, 2012 - EA assessment result (IE ANZSCO 233511)
May 8, 2012 - Lodged GSM 175 online application | June 4, 2012 - CO Allocated
June 22, 2012 - Medicals Finalized | Aug 30, 2012 - PCCs Completed (PH, UAE, USA)
Sep 3, 2012 - Visa Granted (IED Jun 11, 2013) Thank You Lord!
Oct 16-28, 2012 - Initial Entry Completed - Sydney
July 28, 2013 - Final move to Perth
Sep 9, 2013 - Started work with the same company i worked for in UAE/USA
Oct 28, 2013 - Moved to another company..
Posts: 5,037Member, De-activated
Joined: Feb 23, 2012
Sep 24, 2011 - IELTS (L-8 R-8 W-8 S-7.5 : OBS-8)
Jan 04, 2012 - EA application submitted | Feb 23, 2012 - EA assessment result (IE ANZSCO 233511)
May 8, 2012 - Lodged GSM 175 online application | June 4, 2012 - CO Allocated
June 22, 2012 - Medicals Finalized | Aug 30, 2012 - PCCs Completed (PH, UAE, USA)
Sep 3, 2012 - Visa Granted (IED Jun 11, 2013) Thank You Lord!
Oct 16-28, 2012 - Initial Entry Completed - Sydney
July 28, 2013 - Final move to Perth
Sep 9, 2013 - Started work with the same company i worked for in UAE/USA
Oct 28, 2013 - Moved to another company..
Posts: 314Member
Joined: Mar 22, 2012
Occupation: Industrial Engineer
11/05/2011 - IELTS exam at BC (L-6.5,R-6,W-6.5,S-6.5)
02/06/2012 - EA received my CDR
04/17/2012 - Received Favorable Letter from EA
04/21/2012 - IELTS exam retake at IDP (L-8, R-6, W-6.5, S-6)
07/03/2012 - Applied online for SA Statesponsorship
08/13/2012 - SA SS approved
08/16/2012 - Received an invitation in skill select
09/11/2012 - Lodge a visa subclass 190
09/13/2012 - Acknowledgement Receipt & Medicals Requested
09/19/2012 - Medicals Done
12/11/2012 - Medicals Finalised
12/14/2012 - Visa Grant
03/18/2013 - Flight to Adelaide
04/22/2013 - Got my first Job
Posts: 204Member
Joined: Aug 06, 2012
21.jan.12 - Vetasses Positive
16.may.12 - 4th Ielts - IDP - L8.5 R7.5 W7.0 S7.5 = 7.5 - Pass
15.june.12 - State sponsorship Approved
19.june.12 - 176 Visa applied at DIAC
20.july.2012 - Singapore & Phi. Police checks finalised
17.aug.2012 - VISA GRANT
29.sept.2012 - Landed Sydney Alone! @_@ #$%&*#$^$
Posts: 204Member
Joined: Aug 06, 2012
21.jan.12 - Vetasses Positive
16.may.12 - 4th Ielts - IDP - L8.5 R7.5 W7.0 S7.5 = 7.5 - Pass
15.june.12 - State sponsorship Approved
19.june.12 - 176 Visa applied at DIAC
20.july.2012 - Singapore & Phi. Police checks finalised
17.aug.2012 - VISA GRANT
29.sept.2012 - Landed Sydney Alone! @_@ #$%&*#$^$
Posts: 5,037Member, De-activated
Joined: Feb 23, 2012
goodluck sa atin!!
Sep 24, 2011 - IELTS (L-8 R-8 W-8 S-7.5 : OBS-8)
Jan 04, 2012 - EA application submitted | Feb 23, 2012 - EA assessment result (IE ANZSCO 233511)
May 8, 2012 - Lodged GSM 175 online application | June 4, 2012 - CO Allocated
June 22, 2012 - Medicals Finalized | Aug 30, 2012 - PCCs Completed (PH, UAE, USA)
Sep 3, 2012 - Visa Granted (IED Jun 11, 2013) Thank You Lord!
Oct 16-28, 2012 - Initial Entry Completed - Sydney
July 28, 2013 - Final move to Perth
Sep 9, 2013 - Started work with the same company i worked for in UAE/USA
Oct 28, 2013 - Moved to another company..