General Skilled Immigration Visa - Step By Step Process
most recent by whimpee
Australian Computer Society Skills Application
most recent by mathilde9
most recent by mathilde9
Western Australia Immigration Matters FY 2024-2025
most recent by fmp_921
most recent by future_is_bright
AUSTRALIAN CITIZENSHIP TIMELINE
most recent by chewy
VICTORIA STATES SPONSORSHIP 2024-2025
most recent by rainmaker
Ph Vacation with One Month Visa Validity
most recent by Ozdrims
The longest running Pinoy-Australian Forum site in the history. We are connecting Pinoys "in" and "to" Australia since 2010! If you want to join in, click one of these buttons!
Comments
Posts: 66Member
Joined: Apr 06, 2012
Posts: 31Member
Joined: Feb 08, 2013
Visa Type - Subclass 190 (Recruitment Consultant)
December 2012 - Positive assessment from VETASSESS
March 2013 - Passed IELTS
June 24, 2013 - Granted State Sponsorship
June 26, 2013 - Lodge visa application
August 2013 - CO allocation
Nov 4, 2013 - done with medical
Nov 26, 2014 - VISA Granted
April 6, 2014 - IED in SA
Posts: 103Member
Joined: Nov 30, 2012
june 20, 2013 - Received DIAC invitation to apply for visa 190/Lodged visa 190($3060)...
still waiting for CO
God bless sa ating lahat
Civil engineering draftsperson (ANZSCO 312211)
feb. 7, 2013 - send documents to Vetassess
feb. 13, 2013 - Vetassess acknowledges receipt of documents (630 aud)
june 5, 2013 - received POSITIVE result from vetasess
June 7, 2013 - ielts result/eoi lodgement/WA application (200aud)
june 18, 2013 - WA State Sponsorship Approval/signed & sent the agreement
june 20, 2013 - Received DIAC invitation to apply for visa 190/Lodged visa 190($3060)
june 28, 2013 - medicals done (Drs. Horne & Chin) Frontload(Adult-192.60S$ /Kids below 15 y/o-160.50S$)(Xray 69.55S$)
july 1, 2013 - health case submitted to DIAC
july 15, 2013 - CO allocated Adelaide GSM Team 6 (CO Cynthia)
july 27, 2013 - NBI / Form 80 uploaded
august 2, 2013 - SG PCC uploaded
october 3, 2013 - VISA GRANTED ....IED 29 June 2014
march 18, 2014 - arrived in Melbourne
may 2014 - 1st day @ work
Posts: 333Member
Joined: Jan 07, 2013
Analyst Programmer (ANZSCO Code 261311)
YEAR 2012 - Collated all required documents and RPL
Jan. 06, 2013 - ACS (RPL) Submitted
Feb. 02, 2013 - IELTS Exam (BC)
Feb. 15, 2013 - L-8.0 R-7.0 S-6.5 W-6.0 (Charge to experience)
Mar. 14, 2013 - ACS Stage 4 - In Progress
Mar. 15, 2013 - ACS Suitable 9+ Years Work Experience
Apr. 06, 2013 - IELTS Exam 2 (IDP)
Apr. 19, 2013 - L-8.5 R-7.0 S-7.5 W-7.5
Apr. 19, 2013 - EOI 190 & VIC SS Submitted
Apr. 24, 2013 - VIC SS Acknowledgement Received
May 03, 2013 - Updated EOI, Submitted 189 with 65 points
May 06, 2013 - Received DIAC invite
June 06, 2013 - Lodged VISA 189
Aug. 03 2013 - Medicals Done @NHSI
Aug. 06 2013 - CO Allocated, Adelaide Team 6
Aug. 06 2013 - Uploaded NBI Clearance
Aug. 08 2013 - Uploaded ITRs, payslips & Form 80
Aug, 14 2013 - Daughter's Medical referred to MOC
Sep. 18 2013 - VISA GRANT!!!! IED Aug. 2014
Nov. 12 2013 - MNL - MEL via PAL
Jan. 14 2014 - Job Offer
Jan. 20 2014 - First day of work!
Posts: 1,684Member
Joined: Jan 13, 2013
sis @staycool, gawa ka din ng thread for us hehe June Visa Grantees hihihi
9 January 2013 Received Favorable Response from EA
18 January 2013 Lodged EOI Application via SkillSelect
21 January 2013 Received Invitation to Apply for Visa Subclass 189
26 January 2013 Lodged Visa Application
18 March 2013 CO Allocated, Team 34 Brisbane
14 May 2013 Submitted Form 815
23 May 2013 Submitted updated Form 815 with new passport details
03 June 2013 VISA Grant! Thank you Jesus
Posts: 253Member
Joined: Jul 11, 2013
June 05 - Application lodged Partners Visa Subclass 309 VIA Centre
June 11 - received acknowledgement email from DIAC
July 08 - Medicals done, additional documents submitted VIA
July 11 - Additional documents submitted, NSO BC and MC
Aug 19 - CO allocated
Waiting.....
Posts: 253Member
Joined: Jul 11, 2013
June 05 - Application lodged Partners Visa Subclass 309 VIA Centre
June 11 - received acknowledgement email from DIAC
July 08 - Medicals done, additional documents submitted VIA
July 11 - Additional documents submitted, NSO BC and MC
Aug 19 - CO allocated
Waiting.....
Posts: 37Member
Joined: Jul 04, 2013
7th June 2013 subclass 309 application lodged.
A few months later CO appointed, medical done and extra documents tendered.
Waiting.....waiting.
Posts: 176Member
Joined: Feb 05, 2013
Dec 8, 2012: IELTS
Feb 4, 2013: EA CDR assessment submitted
April 2013: Visited Sydney on Tourist Visa.. confirmed that I love it there
May 20, 2013: EA work experience assessment submitted
Jun 5, 2013: EA positive assessment
Jun 7, 2013: EOI submitted
Jun 17, 2013: Invited to apply for 189 visa
Jun 17, 2013: Visa application submitted
Jul 5, 2013: Medical submitted to DIAC
Jul 17, 2013: NBI Clearance Uploaded
Aug 2, 2013: CO Allocated-GSM Adelaide Team 6
Aug 6, 2013: Visa Granted
Thank you Lord
Posts: 176Member
Joined: Feb 05, 2013
subclass 189 |CPA: May/2013 |IELTS: March/2013 |EOI May/2013 |Invite: May/2013 | Lodged: 25 May 2013 |CO:11 July 2013 |PCC : |Medical: 13 July 2013|Grant: ?
Dec 8, 2012: IELTS
Feb 4, 2013: EA CDR assessment submitted
April 2013: Visited Sydney on Tourist Visa.. confirmed that I love it there
May 20, 2013: EA work experience assessment submitted
Jun 5, 2013: EA positive assessment
Jun 7, 2013: EOI submitted
Jun 17, 2013: Invited to apply for 189 visa
Jun 17, 2013: Visa application submitted
Jul 5, 2013: Medical submitted to DIAC
Jul 17, 2013: NBI Clearance Uploaded
Aug 2, 2013: CO Allocated-GSM Adelaide Team 6
Aug 6, 2013: Visa Granted
Thank you Lord
Posts: 103Member
Joined: Nov 30, 2012
Civil engineering draftsperson (ANZSCO 312211)
feb. 7, 2013 - send documents to Vetassess
feb. 13, 2013 - Vetassess acknowledges receipt of documents (630 aud)
june 5, 2013 - received POSITIVE result from vetasess
June 7, 2013 - ielts result/eoi lodgement/WA application (200aud)
june 18, 2013 - WA State Sponsorship Approval/signed & sent the agreement
june 20, 2013 - Received DIAC invitation to apply for visa 190/Lodged visa 190($3060)
june 28, 2013 - medicals done (Drs. Horne & Chin) Frontload(Adult-192.60S$ /Kids below 15 y/o-160.50S$)(Xray 69.55S$)
july 1, 2013 - health case submitted to DIAC
july 15, 2013 - CO allocated Adelaide GSM Team 6 (CO Cynthia)
july 27, 2013 - NBI / Form 80 uploaded
august 2, 2013 - SG PCC uploaded
october 3, 2013 - VISA GRANTED ....IED 29 June 2014
march 18, 2014 - arrived in Melbourne
may 2014 - 1st day @ work
Posts: 22Member
Joined: Mar 12, 2012
thank you.
Posts: 103Member
Joined: Nov 30, 2012
- Evidence of Character (Overseas Police Clearance-National)
- Evidence of Overseas Work Experience
- Form 80
Civil engineering draftsperson (ANZSCO 312211)
feb. 7, 2013 - send documents to Vetassess
feb. 13, 2013 - Vetassess acknowledges receipt of documents (630 aud)
june 5, 2013 - received POSITIVE result from vetasess
June 7, 2013 - ielts result/eoi lodgement/WA application (200aud)
june 18, 2013 - WA State Sponsorship Approval/signed & sent the agreement
june 20, 2013 - Received DIAC invitation to apply for visa 190/Lodged visa 190($3060)
june 28, 2013 - medicals done (Drs. Horne & Chin) Frontload(Adult-192.60S$ /Kids below 15 y/o-160.50S$)(Xray 69.55S$)
july 1, 2013 - health case submitted to DIAC
july 15, 2013 - CO allocated Adelaide GSM Team 6 (CO Cynthia)
july 27, 2013 - NBI / Form 80 uploaded
august 2, 2013 - SG PCC uploaded
october 3, 2013 - VISA GRANTED ....IED 29 June 2014
march 18, 2014 - arrived in Melbourne
may 2014 - 1st day @ work
Posts: 260Member
Joined: Nov 16, 2012
261111 - ICT Business Analyst
January 4, 2013 - ACS Assessment Submitted
January 5, 2013 - IELTS Exam (BC Singapore)
January 18, 2013 - IELTS Result: L:8.5, R:8.5, W:7.5, S:7.0 = OB: 8.0
March 13, 2013 - Received Positive Assessment from ACS
March 21, 2013 - EOI Submitted
July 15, 2013 - Invitation to lodge 189 visa received
July 25, 2013 - Lodged Visa. Acknowledgement received.
July 29, 2013 - Medicals done (+ Husband and Baby)
September 18, 2013 - CO Allocated Team 23 GSM Brisbane (Additional docs requested: SG PCC, Form 80, Evidence of Overseas Experience (payslips, taxation docs, etc), Evidence of English Ability for Husband)
October 10, 2013 - CO informed us that the evidence of english ability of my Husband is not sufficient. Asked us to pay for EEC, I said.. Hey, no way let him take the IELTS instead.
October 16, 2013 - Uploaded SG COC
October 19, 2013 - Husband's IELTS Academic Exam (earliest available schedule)
November 4, 2013 - Uploaded Husband's IELTS test result form
November 5, 2013 - VISA GRANT! Thank you LORD!!!
IED - July 30, 2014
March 23, 2014 - Initial Entry/Holiday
June 30, 2014 - Flight to Sydney.
July 28, 2014 - Husband started work.
September 15, 2014 - First day at my new job.
"If your dreams don't scare you, they aren't big enough"
Posts: 103Member
Joined: Nov 30, 2012
Civil engineering draftsperson (ANZSCO 312211)
feb. 7, 2013 - send documents to Vetassess
feb. 13, 2013 - Vetassess acknowledges receipt of documents (630 aud)
june 5, 2013 - received POSITIVE result from vetasess
June 7, 2013 - ielts result/eoi lodgement/WA application (200aud)
june 18, 2013 - WA State Sponsorship Approval/signed & sent the agreement
june 20, 2013 - Received DIAC invitation to apply for visa 190/Lodged visa 190($3060)
june 28, 2013 - medicals done (Drs. Horne & Chin) Frontload(Adult-192.60S$ /Kids below 15 y/o-160.50S$)(Xray 69.55S$)
july 1, 2013 - health case submitted to DIAC
july 15, 2013 - CO allocated Adelaide GSM Team 6 (CO Cynthia)
july 27, 2013 - NBI / Form 80 uploaded
august 2, 2013 - SG PCC uploaded
october 3, 2013 - VISA GRANTED ....IED 29 June 2014
march 18, 2014 - arrived in Melbourne
may 2014 - 1st day @ work
Posts: 176Member
Joined: Feb 05, 2013
Dec 8, 2012: IELTS
Feb 4, 2013: EA CDR assessment submitted
April 2013: Visited Sydney on Tourist Visa.. confirmed that I love it there
May 20, 2013: EA work experience assessment submitted
Jun 5, 2013: EA positive assessment
Jun 7, 2013: EOI submitted
Jun 17, 2013: Invited to apply for 189 visa
Jun 17, 2013: Visa application submitted
Jul 5, 2013: Medical submitted to DIAC
Jul 17, 2013: NBI Clearance Uploaded
Aug 2, 2013: CO Allocated-GSM Adelaide Team 6
Aug 6, 2013: Visa Granted
Thank you Lord
Posts: 103Member
Joined: Nov 30, 2012
Civil engineering draftsperson (ANZSCO 312211)
feb. 7, 2013 - send documents to Vetassess
feb. 13, 2013 - Vetassess acknowledges receipt of documents (630 aud)
june 5, 2013 - received POSITIVE result from vetasess
June 7, 2013 - ielts result/eoi lodgement/WA application (200aud)
june 18, 2013 - WA State Sponsorship Approval/signed & sent the agreement
june 20, 2013 - Received DIAC invitation to apply for visa 190/Lodged visa 190($3060)
june 28, 2013 - medicals done (Drs. Horne & Chin) Frontload(Adult-192.60S$ /Kids below 15 y/o-160.50S$)(Xray 69.55S$)
july 1, 2013 - health case submitted to DIAC
july 15, 2013 - CO allocated Adelaide GSM Team 6 (CO Cynthia)
july 27, 2013 - NBI / Form 80 uploaded
august 2, 2013 - SG PCC uploaded
october 3, 2013 - VISA GRANTED ....IED 29 June 2014
march 18, 2014 - arrived in Melbourne
may 2014 - 1st day @ work
Posts: 501Member
Joined: Jan 22, 2013
Occupation: Architectural Drafstperson (ANZSCO Code 312111)
Feb 2013 - Started collecting Vetassess requirements; March 29, 2013 - Lodged for Vetassess skills assessment; June 8, 2013 - took IELTS (BC, UAE); June 14, 2013 - received VETASSESS positive skills assessment; June 21, 2013 - got ielts results OBS 7.0 (l-7.5, r-7, w-7, s-7); June 24, 2013 - submitted EOI; June 27, 2013 - submitted WA state sponsorship application; July 03, 2013 - WA state sponsorship application approved; July 05, 2013 - received from DIAC invitation to lodge; July 14, 2013 - lodge visa application; August 13, 2013 - CO allocated, Team 7 GSM Adelaide; August 20, 2013 - submitted Form 80, NBI, PCC, bank statements for me, hubby and daughter and additional docs for hubby in lieu of Saudi PCC (statutory declaration, exit visa and end of service contract); August 22, 2013 - Medical check done; August 26, 2013 - uploaded hubby's Saudi PCC.... finally!; Sept 27, 2013 - visa grant daw but unofficial, hindi namin alam granted na pala.... long story…; Oct 10, 2013 - when we learned that our case was granted but no official confirmation.; Oct 11, 2013 - Official VISA Grant! Finally!!!! Thank God. End of the 1st journey, start of the new beginning; July 10, 2014 - IED
You may not always understand why God allows certain things to happen, but you can be certain that God is not making any mistakes.
Proverbs 3:5-6
"Trust in the Lord with all your heart and lean not on your own understanding; in all your ways submit to him, and he will make your paths straight
Posts: 103Member
Joined: Nov 30, 2012
-To whom
-when he started and to put the word "permanent"
-not so detailed job description
parang COE na rin..pro ndi kasing kumpleto...
Civil engineering draftsperson (ANZSCO 312211)
feb. 7, 2013 - send documents to Vetassess
feb. 13, 2013 - Vetassess acknowledges receipt of documents (630 aud)
june 5, 2013 - received POSITIVE result from vetasess
June 7, 2013 - ielts result/eoi lodgement/WA application (200aud)
june 18, 2013 - WA State Sponsorship Approval/signed & sent the agreement
june 20, 2013 - Received DIAC invitation to apply for visa 190/Lodged visa 190($3060)
june 28, 2013 - medicals done (Drs. Horne & Chin) Frontload(Adult-192.60S$ /Kids below 15 y/o-160.50S$)(Xray 69.55S$)
july 1, 2013 - health case submitted to DIAC
july 15, 2013 - CO allocated Adelaide GSM Team 6 (CO Cynthia)
july 27, 2013 - NBI / Form 80 uploaded
august 2, 2013 - SG PCC uploaded
october 3, 2013 - VISA GRANTED ....IED 29 June 2014
march 18, 2014 - arrived in Melbourne
may 2014 - 1st day @ work
Posts: 188Member
Joined: Nov 08, 2012
Dec 11, 2012 - Submitted Skills Assessment Engineers Australia (Telecommunications Engineer)
Mar 23, 2013 - Took IELTS Exam (GT)
Apr 2, 2013 - IELTS Result (Listeneing=8.5, Reading=7.0, Writing=7.0, Speaking=7.0)
Apr 22, 2013 - Received positive Skills Assessment EA (Telecommunication Engineer)
Apr 27, 2013 - Lodged EOI (Telecommunication Engineer) Ceiling Reached
June 3, 2013 - Received Positive Assessment EA (Telecommunications Technical Officer/Technologist)
June 4, 2013 - Lodged EOI (Telecommunications Technical Officer/Technologist)
June 17, 2013 - Invited to apply Visa 189
June 26, 2013 - Submitted Visa 189 Application
Aug 10, 2013 - Form 80 uploaded
Aug 13, 2013 - NBI and Pay slips uploaded
Aug 16, 2013 - Medicals
Aug 27, 2013 - Medicals uploaded by St. Lukes
Sep 17, 2013 - Visa Grant! \m/
IED: 25 July 2014
Nov 23, 2013 - Flight to Melbourne
Thank you God and thank you PinoyAu
Posts: 176Member
Joined: Feb 05, 2013
Dec 8, 2012: IELTS
Feb 4, 2013: EA CDR assessment submitted
April 2013: Visited Sydney on Tourist Visa.. confirmed that I love it there
May 20, 2013: EA work experience assessment submitted
Jun 5, 2013: EA positive assessment
Jun 7, 2013: EOI submitted
Jun 17, 2013: Invited to apply for 189 visa
Jun 17, 2013: Visa application submitted
Jul 5, 2013: Medical submitted to DIAC
Jul 17, 2013: NBI Clearance Uploaded
Aug 2, 2013: CO Allocated-GSM Adelaide Team 6
Aug 6, 2013: Visa Granted
Thank you Lord
Posts: 103Member
Joined: Nov 30, 2012
ibig po bng sabihin nito OK na yng medicals namin?...any input about this? thanx
Civil engineering draftsperson (ANZSCO 312211)
feb. 7, 2013 - send documents to Vetassess
feb. 13, 2013 - Vetassess acknowledges receipt of documents (630 aud)
june 5, 2013 - received POSITIVE result from vetasess
June 7, 2013 - ielts result/eoi lodgement/WA application (200aud)
june 18, 2013 - WA State Sponsorship Approval/signed & sent the agreement
june 20, 2013 - Received DIAC invitation to apply for visa 190/Lodged visa 190($3060)
june 28, 2013 - medicals done (Drs. Horne & Chin) Frontload(Adult-192.60S$ /Kids below 15 y/o-160.50S$)(Xray 69.55S$)
july 1, 2013 - health case submitted to DIAC
july 15, 2013 - CO allocated Adelaide GSM Team 6 (CO Cynthia)
july 27, 2013 - NBI / Form 80 uploaded
august 2, 2013 - SG PCC uploaded
october 3, 2013 - VISA GRANTED ....IED 29 June 2014
march 18, 2014 - arrived in Melbourne
may 2014 - 1st day @ work
Posts: 176Member
Joined: Feb 05, 2013
Dec 8, 2012: IELTS
Feb 4, 2013: EA CDR assessment submitted
April 2013: Visited Sydney on Tourist Visa.. confirmed that I love it there
May 20, 2013: EA work experience assessment submitted
Jun 5, 2013: EA positive assessment
Jun 7, 2013: EOI submitted
Jun 17, 2013: Invited to apply for 189 visa
Jun 17, 2013: Visa application submitted
Jul 5, 2013: Medical submitted to DIAC
Jul 17, 2013: NBI Clearance Uploaded
Aug 2, 2013: CO Allocated-GSM Adelaide Team 6
Aug 6, 2013: Visa Granted
Thank you Lord
Posts: 176Member
Joined: Feb 05, 2013
Dec 8, 2012: IELTS
Feb 4, 2013: EA CDR assessment submitted
April 2013: Visited Sydney on Tourist Visa.. confirmed that I love it there
May 20, 2013: EA work experience assessment submitted
Jun 5, 2013: EA positive assessment
Jun 7, 2013: EOI submitted
Jun 17, 2013: Invited to apply for 189 visa
Jun 17, 2013: Visa application submitted
Jul 5, 2013: Medical submitted to DIAC
Jul 17, 2013: NBI Clearance Uploaded
Aug 2, 2013: CO Allocated-GSM Adelaide Team 6
Aug 6, 2013: Visa Granted
Thank you Lord
Posts: 176Member
Joined: Feb 05, 2013
yes. it means all your medicals have been cleared. Confirmed through my CO.
Dec 8, 2012: IELTS
Feb 4, 2013: EA CDR assessment submitted
April 2013: Visited Sydney on Tourist Visa.. confirmed that I love it there
May 20, 2013: EA work experience assessment submitted
Jun 5, 2013: EA positive assessment
Jun 7, 2013: EOI submitted
Jun 17, 2013: Invited to apply for 189 visa
Jun 17, 2013: Visa application submitted
Jul 5, 2013: Medical submitted to DIAC
Jul 17, 2013: NBI Clearance Uploaded
Aug 2, 2013: CO Allocated-GSM Adelaide Team 6
Aug 6, 2013: Visa Granted
Thank you Lord
Posts: 103Member
Joined: Nov 30, 2012
Civil engineering draftsperson (ANZSCO 312211)
feb. 7, 2013 - send documents to Vetassess
feb. 13, 2013 - Vetassess acknowledges receipt of documents (630 aud)
june 5, 2013 - received POSITIVE result from vetasess
June 7, 2013 - ielts result/eoi lodgement/WA application (200aud)
june 18, 2013 - WA State Sponsorship Approval/signed & sent the agreement
june 20, 2013 - Received DIAC invitation to apply for visa 190/Lodged visa 190($3060)
june 28, 2013 - medicals done (Drs. Horne & Chin) Frontload(Adult-192.60S$ /Kids below 15 y/o-160.50S$)(Xray 69.55S$)
july 1, 2013 - health case submitted to DIAC
july 15, 2013 - CO allocated Adelaide GSM Team 6 (CO Cynthia)
july 27, 2013 - NBI / Form 80 uploaded
august 2, 2013 - SG PCC uploaded
october 3, 2013 - VISA GRANTED ....IED 29 June 2014
march 18, 2014 - arrived in Melbourne
may 2014 - 1st day @ work
Posts: 161Member
Joined: Aug 26, 2012
Nov 30, 2012 - IELTS OBS 7.0
Dec 21,2012-EA received documents :
May 21, 2013- Received Positive assessment (released 15 May)
May 21,2013 - Lodged EOI -Visa 189
June 3, 2013- Invited Visa 189
June 4 , 2013 - Lodged Visa
June 5,2013- Uploaded documents and certificate
June 15, 2013 - Uploaded NBI Clearance
June 29, 2013- DIAC received medical through SATA Bedok
July 30,2013- CO Assigned GSM Team 33 Brisbane
Aug 22,2013- Uploaded SG Clearance (3 weeks processing)
Aug 23,2013- VISA GRANT (IED June 19 2014)
March 22,2014 - Arrived in Brisbane
May 21,2014 - Hubby started work
July 22,2014 -started work
Posts: 176Member
Joined: Feb 05, 2013
Dec 8, 2012: IELTS
Feb 4, 2013: EA CDR assessment submitted
April 2013: Visited Sydney on Tourist Visa.. confirmed that I love it there
May 20, 2013: EA work experience assessment submitted
Jun 5, 2013: EA positive assessment
Jun 7, 2013: EOI submitted
Jun 17, 2013: Invited to apply for 189 visa
Jun 17, 2013: Visa application submitted
Jul 5, 2013: Medical submitted to DIAC
Jul 17, 2013: NBI Clearance Uploaded
Aug 2, 2013: CO Allocated-GSM Adelaide Team 6
Aug 6, 2013: Visa Granted
Thank you Lord
Posts: 161Member
Joined: Aug 26, 2012
Requiring SG PCC and work evidence payslips/bank statements for the last 8 years..
Nov 30, 2012 - IELTS OBS 7.0
Dec 21,2012-EA received documents :
May 21, 2013- Received Positive assessment (released 15 May)
May 21,2013 - Lodged EOI -Visa 189
June 3, 2013- Invited Visa 189
June 4 , 2013 - Lodged Visa
June 5,2013- Uploaded documents and certificate
June 15, 2013 - Uploaded NBI Clearance
June 29, 2013- DIAC received medical through SATA Bedok
July 30,2013- CO Assigned GSM Team 33 Brisbane
Aug 22,2013- Uploaded SG Clearance (3 weeks processing)
Aug 23,2013- VISA GRANT (IED June 19 2014)
March 22,2014 - Arrived in Brisbane
May 21,2014 - Hubby started work
July 22,2014 -started work
Posts: 176Member
Joined: Feb 05, 2013
Dec 8, 2012: IELTS
Feb 4, 2013: EA CDR assessment submitted
April 2013: Visited Sydney on Tourist Visa.. confirmed that I love it there
May 20, 2013: EA work experience assessment submitted
Jun 5, 2013: EA positive assessment
Jun 7, 2013: EOI submitted
Jun 17, 2013: Invited to apply for 189 visa
Jun 17, 2013: Visa application submitted
Jul 5, 2013: Medical submitted to DIAC
Jul 17, 2013: NBI Clearance Uploaded
Aug 2, 2013: CO Allocated-GSM Adelaide Team 6
Aug 6, 2013: Visa Granted
Thank you Lord