most recent by rmbalingit
Engineers Australia Skills Assessment
most recent by minshii
SG-based Members; drop by here! (",)
most recent by datch29
most recent by leonorjohny
most recent by ana_xxx5
The longest running Pinoy-Australian Forum site in the history. We are connecting Pinoys "in" and "to" Australia since 2010! If you want to join in, click one of these buttons!
Comments
Posts: 290Member
Joined: Sep 14, 2013
ANZSCO 233311
02 Oct 2013 - EA Positive Assessment
05 Oct 2013 - Submit EOI
11 Oct 2013 - WA SS invitation
21 Oct 2013 - Visa 189 invitation
23 Oct 2013 - Lodge Visa Subclass 189
28 Oct 2013 - SG PCC applied / Medicals done
31 Oct 2013 - Medical Result -No health examinations required
18 Nov 2013 - SG PCC uploaded
25 Nov 2013 - Form 80 uploaded
26 Nov 2013 - VISA GRANT (GSM Brisbane Team 33) To God be all the Glory!!!! (24 Oct 2014 - IED)
01 May 2014 - Arrival to Perth
"...and the Lord your God will bless you in the land you are entering to possess." -Deuteronomy 30:16
Posts: 459Member
Joined: Jan 25, 2013
Occupation: Software Engineer (ANZSCO Code 261313)
Feb 02, 2012 - Skill Assessment submission to ACS
Mar 23, 2013 - IELTS Result - Competent
Apr 03, 2013 - ACS Assessment Positive
Apr 06, 2013 - Submitted EOI (190)
Apr 11, 2013 - Submitted NSW SS (190)
Apr 16, 2013 - NSW SS Acknowledgment email received
July 01, 2013 - NSW SS approval letter received
July 03, 2013 - Skillselect Invite received
Aug 14, 2013 - Lodged Visa 190
Aug 16, 2013 - Upload Docs (including NBI Clearance)
Aug 25, 2013 - Gave Birth
Sep 20, 2013 - CO Allocated (GSM Adelaide Team 06)
Sep 22, 2013 - Informed CO of additional dependent (Baby)
Oct 04, 2013 - Hubby's Medical Uploaded
Oct 12, 2013 - Medical Uploaded
Oct 16, 2013 - SG PCC Collected and Uploaded
Oct 17, 2013 - Form 1022, Baby's Birth Certificate and Passport sent to CO
Oct 23, 2013 - Baby is included in eVisa
Oct 30, 2013 - Baby's Medical Uploaded
Nov 21, 2013 - VISA GRANT (IED: Aug 2014)
Feb 08, 2014 - Hubby's initial entry
Feb 13, 2014 - Hubby's Job Offer
Feb 18, 2014 - Hubby's First Day High
Apr 23, 2014 - Initial Entry (Baby and Me)
Feb 04, 2015 - My First day high (Home-based perm position)
Thank you, thank you so much Lord. Life is indeed beautiful
Posts: 459Member
Joined: Jan 25, 2013
Occupation: Software Engineer (ANZSCO Code 261313)
Feb 02, 2012 - Skill Assessment submission to ACS
Mar 23, 2013 - IELTS Result - Competent
Apr 03, 2013 - ACS Assessment Positive
Apr 06, 2013 - Submitted EOI (190)
Apr 11, 2013 - Submitted NSW SS (190)
Apr 16, 2013 - NSW SS Acknowledgment email received
July 01, 2013 - NSW SS approval letter received
July 03, 2013 - Skillselect Invite received
Aug 14, 2013 - Lodged Visa 190
Aug 16, 2013 - Upload Docs (including NBI Clearance)
Aug 25, 2013 - Gave Birth
Sep 20, 2013 - CO Allocated (GSM Adelaide Team 06)
Sep 22, 2013 - Informed CO of additional dependent (Baby)
Oct 04, 2013 - Hubby's Medical Uploaded
Oct 12, 2013 - Medical Uploaded
Oct 16, 2013 - SG PCC Collected and Uploaded
Oct 17, 2013 - Form 1022, Baby's Birth Certificate and Passport sent to CO
Oct 23, 2013 - Baby is included in eVisa
Oct 30, 2013 - Baby's Medical Uploaded
Nov 21, 2013 - VISA GRANT (IED: Aug 2014)
Feb 08, 2014 - Hubby's initial entry
Feb 13, 2014 - Hubby's Job Offer
Feb 18, 2014 - Hubby's First Day High
Apr 23, 2014 - Initial Entry (Baby and Me)
Feb 04, 2015 - My First day high (Home-based perm position)
Thank you, thank you so much Lord. Life is indeed beautiful
Posts: 119Member
Joined: Oct 19, 2012
@wizz oo nga noh? Anu kaya pinagdadaanan ng CO mo? Pray natin hindi masyado mabigat para magrant ka na. Smile! Tama sis @peterpan07 bawal magkawrinkles sa oz!
@moonwitchbleu sasama ko na nga din sa evidence visa stamps ko na together kami sa Korea every christmas and new year.. baka makatulong din yun. Hehe.. thanks!
ANZSCO 233311
2013 Aug 28 - EA Positive Assessment
2013 Sep 14 - EOI
2013 Sep 16 - Invitation
2013 Oct 01 - Lodge visa 189
2013 Nov 06 - Medicals at SLEC
2013 Nov 20 - CO Allocated (GSM Brisbane Team 33)
2013 Nov 25 - Hubby Medicals at Severance Hospital (Kr)
2013 Dec 09 - PCC
2013 Dec 10 - Form 929 then Visa Grant
2014 Nov 08 - IED
Thank you Lord for the blessings!
Posts: 290Member
Joined: Sep 14, 2013
ANZSCO 233311
02 Oct 2013 - EA Positive Assessment
05 Oct 2013 - Submit EOI
11 Oct 2013 - WA SS invitation
21 Oct 2013 - Visa 189 invitation
23 Oct 2013 - Lodge Visa Subclass 189
28 Oct 2013 - SG PCC applied / Medicals done
31 Oct 2013 - Medical Result -No health examinations required
18 Nov 2013 - SG PCC uploaded
25 Nov 2013 - Form 80 uploaded
26 Nov 2013 - VISA GRANT (GSM Brisbane Team 33) To God be all the Glory!!!! (24 Oct 2014 - IED)
01 May 2014 - Arrival to Perth
"...and the Lord your God will bless you in the land you are entering to possess." -Deuteronomy 30:16
Posts: 119Member
Joined: Oct 19, 2012
ANZSCO 233311
2013 Aug 28 - EA Positive Assessment
2013 Sep 14 - EOI
2013 Sep 16 - Invitation
2013 Oct 01 - Lodge visa 189
2013 Nov 06 - Medicals at SLEC
2013 Nov 20 - CO Allocated (GSM Brisbane Team 33)
2013 Nov 25 - Hubby Medicals at Severance Hospital (Kr)
2013 Dec 09 - PCC
2013 Dec 10 - Form 929 then Visa Grant
2014 Nov 08 - IED
Thank you Lord for the blessings!
Posts: 698Member
Joined: Apr 17, 2013
ANZSCO 149311
31 May 13 - Vetassess Requirements Acknowledge
22 June 13 - IELTS Exam at IDP Singapore
5 July 13 - IELTS Passed
30 Aug 13 - Vetassess Results - Positive + EOI Submitted
4 Sept 13 - Initial Contact WA SS
5 Sept 13 - Invited to apply for WA SS
9 Sept 13 - WA SS approved!
12 Sept 13 - Lodged Visa 190
23 Sept 13 - Medical Examination - SATA Bedok SG
27 Sept 13 - Medicals Uploaded
21 Oct 13 - CO allocated (Adelaide GSM Team 6, MN)
1 Nov 13 - SG PCC submitted
5 Dec 13 - Visa Granted! To God be the Glory!
IED: 26 Sep 14
1 May 14 - Touchdown Perth!

12 June 14 - First day of work. God will always provide.
Psalm 37:4 Delight yourself in the Lord;
And He will give you the desires of your heart.
Posts: 56Member
Joined: Sep 16, 2013
@rooroo Congrats din sa'yo... ang bilis mo ah... ok na kagad clearance mo...
@peterpan07 Salamat sa contacts ha... kaw na sunod...
Mechanical Engineer 233512
4/23/13 - CDR sent to EA
9/03/13 - Received favorable letter from EA
9/16/13 - EOI
9/17/13 - Dubai Police Clearance and NBI Clearance
10/07/13 - Receive invitation Visa Subclass 189
10/09/13 - Lodge Visa Subclass 189
10/22/13 - Medical Test done
11/20/13 - CO Allocated (Team 23 Adelaide)
12/03/13 - NBI Clearance uploaded
12/09/13 - Visa Grant... Praise the Lord
05/12/14 - IED... (excited!)
HE is truly gracious...
Posts: 698Member
Joined: Apr 17, 2013
Agree ako na isama mo yung mga visa stamps. consular docs yan kaya magandang proof
God bless sa atin lahat.
ANZSCO 149311
31 May 13 - Vetassess Requirements Acknowledge
22 June 13 - IELTS Exam at IDP Singapore
5 July 13 - IELTS Passed
30 Aug 13 - Vetassess Results - Positive + EOI Submitted
4 Sept 13 - Initial Contact WA SS
5 Sept 13 - Invited to apply for WA SS
9 Sept 13 - WA SS approved!
12 Sept 13 - Lodged Visa 190
23 Sept 13 - Medical Examination - SATA Bedok SG
27 Sept 13 - Medicals Uploaded
21 Oct 13 - CO allocated (Adelaide GSM Team 6, MN)
1 Nov 13 - SG PCC submitted
5 Dec 13 - Visa Granted! To God be the Glory!
IED: 26 Sep 14
1 May 14 - Touchdown Perth!

12 June 14 - First day of work. God will always provide.
Psalm 37:4 Delight yourself in the Lord;
And He will give you the desires of your heart.
Posts: 462Member
Joined: Jul 29, 2013
@kadie, hopefully ma upload ko na yung lahat ng docs by monday. and the waiting game begins again!
Nominated Occupation: ANZSCO 261112 - Systems Analyst

Timeline:
Jul 01, 2013 - ACS Skill Assessment
Jul 19, 2013 - IELTS Results (L:8, R:8.5, W:7, S:8)
Oct 02, 2013 - ACS result received (suitable)
Oct 02, 2013 - submitted EOI for Visa 189 (65 pts).
Oct 05, 2013 - submitted Victoria SS for Visa 190 (70 pts, for backup)
Oct 18, 2013 - Victoria SS approved/Received invitation to apply for Visa 190 from Skillselect.
Oct 20, 2013 - lodged VISA 190 application.
Nov 20, 2013 - CO allocated | GSM Adelaide Team 6
Nov 27, 2013 - VISA GRANT! Thank you Lord! IED: NOV 12, 2014
Jul 03, 2014 - arrival in Melbourne
Aug 07, 2014 - started work
Jul 24, 2015 - left 1st job
Jul 27, 2015 - joined 2nd job
Posts: 459Member
Joined: Jan 25, 2013
Occupation: Software Engineer (ANZSCO Code 261313)
Feb 02, 2012 - Skill Assessment submission to ACS
Mar 23, 2013 - IELTS Result - Competent
Apr 03, 2013 - ACS Assessment Positive
Apr 06, 2013 - Submitted EOI (190)
Apr 11, 2013 - Submitted NSW SS (190)
Apr 16, 2013 - NSW SS Acknowledgment email received
July 01, 2013 - NSW SS approval letter received
July 03, 2013 - Skillselect Invite received
Aug 14, 2013 - Lodged Visa 190
Aug 16, 2013 - Upload Docs (including NBI Clearance)
Aug 25, 2013 - Gave Birth
Sep 20, 2013 - CO Allocated (GSM Adelaide Team 06)
Sep 22, 2013 - Informed CO of additional dependent (Baby)
Oct 04, 2013 - Hubby's Medical Uploaded
Oct 12, 2013 - Medical Uploaded
Oct 16, 2013 - SG PCC Collected and Uploaded
Oct 17, 2013 - Form 1022, Baby's Birth Certificate and Passport sent to CO
Oct 23, 2013 - Baby is included in eVisa
Oct 30, 2013 - Baby's Medical Uploaded
Nov 21, 2013 - VISA GRANT (IED: Aug 2014)
Feb 08, 2014 - Hubby's initial entry
Feb 13, 2014 - Hubby's Job Offer
Feb 18, 2014 - Hubby's First Day High
Apr 23, 2014 - Initial Entry (Baby and Me)
Feb 04, 2015 - My First day high (Home-based perm position)
Thank you, thank you so much Lord. Life is indeed beautiful
Posts: 459Member
Joined: Jan 25, 2013
Occupation: Software Engineer (ANZSCO Code 261313)
Feb 02, 2012 - Skill Assessment submission to ACS
Mar 23, 2013 - IELTS Result - Competent
Apr 03, 2013 - ACS Assessment Positive
Apr 06, 2013 - Submitted EOI (190)
Apr 11, 2013 - Submitted NSW SS (190)
Apr 16, 2013 - NSW SS Acknowledgment email received
July 01, 2013 - NSW SS approval letter received
July 03, 2013 - Skillselect Invite received
Aug 14, 2013 - Lodged Visa 190
Aug 16, 2013 - Upload Docs (including NBI Clearance)
Aug 25, 2013 - Gave Birth
Sep 20, 2013 - CO Allocated (GSM Adelaide Team 06)
Sep 22, 2013 - Informed CO of additional dependent (Baby)
Oct 04, 2013 - Hubby's Medical Uploaded
Oct 12, 2013 - Medical Uploaded
Oct 16, 2013 - SG PCC Collected and Uploaded
Oct 17, 2013 - Form 1022, Baby's Birth Certificate and Passport sent to CO
Oct 23, 2013 - Baby is included in eVisa
Oct 30, 2013 - Baby's Medical Uploaded
Nov 21, 2013 - VISA GRANT (IED: Aug 2014)
Feb 08, 2014 - Hubby's initial entry
Feb 13, 2014 - Hubby's Job Offer
Feb 18, 2014 - Hubby's First Day High
Apr 23, 2014 - Initial Entry (Baby and Me)
Feb 04, 2015 - My First day high (Home-based perm position)
Thank you, thank you so much Lord. Life is indeed beautiful
Posts: 232Member
Joined: Jan 30, 2013
Analyst Programmer (ANZSCO Code 261311)
03/18/2013 - ACS submitted
04/06/2013 - IELTS (BC) - L-7.5 R-7.0 W-7.0 S-6.5
06/20/2013 - Received ACS positive result (AQF Diploma)
07/27/2013 - IELTS (BC) - L-7.5 R-9.0 W-6.0 S-7.5
09/21/2013 - IELTS (IDP) - L-8.5 R-8.5 W-8.0 S-7.0 (Thank God!)
10/08/2013 - VIC SS application
10/24/2013 - VIC SS approved/Skillselect Invitation
10/30/2013 - Lodge Online Visa 190
10/31/2013 - NBI
11/15/2013 - Medicals Done (w/ wife and 2 kids)
12/05/2013 - CO Team 7 Adelaide (LM)
01/16/2014 - CO asked additional documents (contract, ITR, payslip, wife's form 80)
01/24/2014 - Uploaded additional documents
02/10/2014 - Visa Granted! Glory to God (IED - Jun. 11 2014)
03/16/2014 - Arrived in Melbourne
04/30/2014 - Started Job as Web Developer
For nothing is impossible with God. - Luke 1:37
Posts: 738Member
Joined: Aug 07, 2012
Skilled Migration (261112 Systems Analyst)
November 20, 2013 - Visa Grant (IED: July 22, 2014)
April 19, 2014 - Arrived in Melbourne
May 2, 2014 - Job offer
May 7, 2014 - First day of work
It is only through GOD that we can achieve success..
Posts: 92Member
Joined: Oct 15, 2013
Dun sa nagtatanong ng normal fedex price. ilang bese na rin ako nagpadala documents SG-bulacan around S$36.00 sya.
Nominated Skill 263111 Computer Network and Systems
Engineer
Main Applicant: Husband
Dec. 19, 2013- Visa Grant (IED-Dec. 2, 2014)
Dec. 17, 2013-Additonal Requirements Submitted (Form 80, Form 1221, Police Clearance, Proof of Functional English)
Nov. 28, 2013- Medical done
Nov. 26, 2013- CO allocated (GSM Adelaide Team 7)
Nov. 22, 2013-Applied NBI Clearance
Oct. 22, 2013- Lodge 189 Visa Application
Oct. 7, 2013 - Received Invitation for 189 Visa
Sept. 19, 2013 - EOI Submitted
Sept. 10, 2013 - ICT Skills Assesment Result
June 11, 2013 - ICT Skills Assesment Application
April 19, 2013 - IELTS result (L-8,R-9,W-7,S-7) Bond Score-8.0
April 6, 2013 - IELTS exam
Posts: 459Member
Joined: Jan 25, 2013
Occupation: Software Engineer (ANZSCO Code 261313)
Feb 02, 2012 - Skill Assessment submission to ACS
Mar 23, 2013 - IELTS Result - Competent
Apr 03, 2013 - ACS Assessment Positive
Apr 06, 2013 - Submitted EOI (190)
Apr 11, 2013 - Submitted NSW SS (190)
Apr 16, 2013 - NSW SS Acknowledgment email received
July 01, 2013 - NSW SS approval letter received
July 03, 2013 - Skillselect Invite received
Aug 14, 2013 - Lodged Visa 190
Aug 16, 2013 - Upload Docs (including NBI Clearance)
Aug 25, 2013 - Gave Birth
Sep 20, 2013 - CO Allocated (GSM Adelaide Team 06)
Sep 22, 2013 - Informed CO of additional dependent (Baby)
Oct 04, 2013 - Hubby's Medical Uploaded
Oct 12, 2013 - Medical Uploaded
Oct 16, 2013 - SG PCC Collected and Uploaded
Oct 17, 2013 - Form 1022, Baby's Birth Certificate and Passport sent to CO
Oct 23, 2013 - Baby is included in eVisa
Oct 30, 2013 - Baby's Medical Uploaded
Nov 21, 2013 - VISA GRANT (IED: Aug 2014)
Feb 08, 2014 - Hubby's initial entry
Feb 13, 2014 - Hubby's Job Offer
Feb 18, 2014 - Hubby's First Day High
Apr 23, 2014 - Initial Entry (Baby and Me)
Feb 04, 2015 - My First day high (Home-based perm position)
Thank you, thank you so much Lord. Life is indeed beautiful
Posts: 290Member
Joined: Sep 14, 2013
ANZSCO 233311
02 Oct 2013 - EA Positive Assessment
05 Oct 2013 - Submit EOI
11 Oct 2013 - WA SS invitation
21 Oct 2013 - Visa 189 invitation
23 Oct 2013 - Lodge Visa Subclass 189
28 Oct 2013 - SG PCC applied / Medicals done
31 Oct 2013 - Medical Result -No health examinations required
18 Nov 2013 - SG PCC uploaded
25 Nov 2013 - Form 80 uploaded
26 Nov 2013 - VISA GRANT (GSM Brisbane Team 33) To God be all the Glory!!!! (24 Oct 2014 - IED)
01 May 2014 - Arrival to Perth
"...and the Lord your God will bless you in the land you are entering to possess." -Deuteronomy 30:16
Posts: 459Member
Joined: Jan 25, 2013
Occupation: Software Engineer (ANZSCO Code 261313)
Feb 02, 2012 - Skill Assessment submission to ACS
Mar 23, 2013 - IELTS Result - Competent
Apr 03, 2013 - ACS Assessment Positive
Apr 06, 2013 - Submitted EOI (190)
Apr 11, 2013 - Submitted NSW SS (190)
Apr 16, 2013 - NSW SS Acknowledgment email received
July 01, 2013 - NSW SS approval letter received
July 03, 2013 - Skillselect Invite received
Aug 14, 2013 - Lodged Visa 190
Aug 16, 2013 - Upload Docs (including NBI Clearance)
Aug 25, 2013 - Gave Birth
Sep 20, 2013 - CO Allocated (GSM Adelaide Team 06)
Sep 22, 2013 - Informed CO of additional dependent (Baby)
Oct 04, 2013 - Hubby's Medical Uploaded
Oct 12, 2013 - Medical Uploaded
Oct 16, 2013 - SG PCC Collected and Uploaded
Oct 17, 2013 - Form 1022, Baby's Birth Certificate and Passport sent to CO
Oct 23, 2013 - Baby is included in eVisa
Oct 30, 2013 - Baby's Medical Uploaded
Nov 21, 2013 - VISA GRANT (IED: Aug 2014)
Feb 08, 2014 - Hubby's initial entry
Feb 13, 2014 - Hubby's Job Offer
Feb 18, 2014 - Hubby's First Day High
Apr 23, 2014 - Initial Entry (Baby and Me)
Feb 04, 2015 - My First day high (Home-based perm position)
Thank you, thank you so much Lord. Life is indeed beautiful
Posts: 290Member
Joined: Sep 14, 2013
ANZSCO 233311
02 Oct 2013 - EA Positive Assessment
05 Oct 2013 - Submit EOI
11 Oct 2013 - WA SS invitation
21 Oct 2013 - Visa 189 invitation
23 Oct 2013 - Lodge Visa Subclass 189
28 Oct 2013 - SG PCC applied / Medicals done
31 Oct 2013 - Medical Result -No health examinations required
18 Nov 2013 - SG PCC uploaded
25 Nov 2013 - Form 80 uploaded
26 Nov 2013 - VISA GRANT (GSM Brisbane Team 33) To God be all the Glory!!!! (24 Oct 2014 - IED)
01 May 2014 - Arrival to Perth
"...and the Lord your God will bless you in the land you are entering to possess." -Deuteronomy 30:16
Posts: 290Member
Joined: Sep 14, 2013
ANZSCO 233311
02 Oct 2013 - EA Positive Assessment
05 Oct 2013 - Submit EOI
11 Oct 2013 - WA SS invitation
21 Oct 2013 - Visa 189 invitation
23 Oct 2013 - Lodge Visa Subclass 189
28 Oct 2013 - SG PCC applied / Medicals done
31 Oct 2013 - Medical Result -No health examinations required
18 Nov 2013 - SG PCC uploaded
25 Nov 2013 - Form 80 uploaded
26 Nov 2013 - VISA GRANT (GSM Brisbane Team 33) To God be all the Glory!!!! (24 Oct 2014 - IED)
01 May 2014 - Arrival to Perth
"...and the Lord your God will bless you in the land you are entering to possess." -Deuteronomy 30:16
Posts: 290Member
Joined: Sep 14, 2013
ANZSCO 233311
02 Oct 2013 - EA Positive Assessment
05 Oct 2013 - Submit EOI
11 Oct 2013 - WA SS invitation
21 Oct 2013 - Visa 189 invitation
23 Oct 2013 - Lodge Visa Subclass 189
28 Oct 2013 - SG PCC applied / Medicals done
31 Oct 2013 - Medical Result -No health examinations required
18 Nov 2013 - SG PCC uploaded
25 Nov 2013 - Form 80 uploaded
26 Nov 2013 - VISA GRANT (GSM Brisbane Team 33) To God be all the Glory!!!! (24 Oct 2014 - IED)
01 May 2014 - Arrival to Perth
"...and the Lord your God will bless you in the land you are entering to possess." -Deuteronomy 30:16
Posts: 92Member
Joined: Oct 15, 2013
Nominated Skill 263111 Computer Network and Systems
Engineer
Main Applicant: Husband
Dec. 19, 2013- Visa Grant (IED-Dec. 2, 2014)
Dec. 17, 2013-Additonal Requirements Submitted (Form 80, Form 1221, Police Clearance, Proof of Functional English)
Nov. 28, 2013- Medical done
Nov. 26, 2013- CO allocated (GSM Adelaide Team 7)
Nov. 22, 2013-Applied NBI Clearance
Oct. 22, 2013- Lodge 189 Visa Application
Oct. 7, 2013 - Received Invitation for 189 Visa
Sept. 19, 2013 - EOI Submitted
Sept. 10, 2013 - ICT Skills Assesment Result
June 11, 2013 - ICT Skills Assesment Application
April 19, 2013 - IELTS result (L-8,R-9,W-7,S-7) Bond Score-8.0
April 6, 2013 - IELTS exam
Posts: 462Member
Joined: Jul 29, 2013
Nominated Occupation: ANZSCO 261112 - Systems Analyst

Timeline:
Jul 01, 2013 - ACS Skill Assessment
Jul 19, 2013 - IELTS Results (L:8, R:8.5, W:7, S:8)
Oct 02, 2013 - ACS result received (suitable)
Oct 02, 2013 - submitted EOI for Visa 189 (65 pts).
Oct 05, 2013 - submitted Victoria SS for Visa 190 (70 pts, for backup)
Oct 18, 2013 - Victoria SS approved/Received invitation to apply for Visa 190 from Skillselect.
Oct 20, 2013 - lodged VISA 190 application.
Nov 20, 2013 - CO allocated | GSM Adelaide Team 6
Nov 27, 2013 - VISA GRANT! Thank you Lord! IED: NOV 12, 2014
Jul 03, 2014 - arrival in Melbourne
Aug 07, 2014 - started work
Jul 24, 2015 - left 1st job
Jul 27, 2015 - joined 2nd job
Posts: 290Member
Joined: Sep 14, 2013
ANZSCO 233311
02 Oct 2013 - EA Positive Assessment
05 Oct 2013 - Submit EOI
11 Oct 2013 - WA SS invitation
21 Oct 2013 - Visa 189 invitation
23 Oct 2013 - Lodge Visa Subclass 189
28 Oct 2013 - SG PCC applied / Medicals done
31 Oct 2013 - Medical Result -No health examinations required
18 Nov 2013 - SG PCC uploaded
25 Nov 2013 - Form 80 uploaded
26 Nov 2013 - VISA GRANT (GSM Brisbane Team 33) To God be all the Glory!!!! (24 Oct 2014 - IED)
01 May 2014 - Arrival to Perth
"...and the Lord your God will bless you in the land you are entering to possess." -Deuteronomy 30:16
Posts: 537Member
Joined: Jul 15, 2013
IELTS - 5/ 06/13-- L-8.5; S-8.5;W-8.5;R-8.5
ANZSCO CODE:241411
Assessment (AITSL) - 18/07/13
Assessment Positive Result-11/09/13
EOI lodged-11/09/13
Invitation SI(Subclass 189)-16/09/13
Visa lodgement-05/10/13
PCC and All docs upload- 10/10/13
Form 80 upload- 24/10/13
Medicals Done/ Uploaded ( SLEC )- 31/10/13
Uploaded Docs Received (DIBP screen )- 31/10/13
CO allocated- 20/11/13- GSM Brisbane Team 34
Visa Granted: 25/11/13
Date first hired: Jan 2014
Registered and accredited BOSTES- April 2014
Second Job- April 2014 Language College Sydney- Part time
Third Job- July 2015 to present ESL Full time high school teacher in a Grammar School in Sydney
--In Him alone is our strength--- in God's grace!!
Posts: 537Member
Joined: Jul 15, 2013
IELTS - 5/ 06/13-- L-8.5; S-8.5;W-8.5;R-8.5
ANZSCO CODE:241411
Assessment (AITSL) - 18/07/13
Assessment Positive Result-11/09/13
EOI lodged-11/09/13
Invitation SI(Subclass 189)-16/09/13
Visa lodgement-05/10/13
PCC and All docs upload- 10/10/13
Form 80 upload- 24/10/13
Medicals Done/ Uploaded ( SLEC )- 31/10/13
Uploaded Docs Received (DIBP screen )- 31/10/13
CO allocated- 20/11/13- GSM Brisbane Team 34
Visa Granted: 25/11/13
Date first hired: Jan 2014
Registered and accredited BOSTES- April 2014
Second Job- April 2014 Language College Sydney- Part time
Third Job- July 2015 to present ESL Full time high school teacher in a Grammar School in Sydney
--In Him alone is our strength--- in God's grace!!
Posts: 537Member
Joined: Jul 15, 2013
IELTS - 5/ 06/13-- L-8.5; S-8.5;W-8.5;R-8.5
ANZSCO CODE:241411
Assessment (AITSL) - 18/07/13
Assessment Positive Result-11/09/13
EOI lodged-11/09/13
Invitation SI(Subclass 189)-16/09/13
Visa lodgement-05/10/13
PCC and All docs upload- 10/10/13
Form 80 upload- 24/10/13
Medicals Done/ Uploaded ( SLEC )- 31/10/13
Uploaded Docs Received (DIBP screen )- 31/10/13
CO allocated- 20/11/13- GSM Brisbane Team 34
Visa Granted: 25/11/13
Date first hired: Jan 2014
Registered and accredited BOSTES- April 2014
Second Job- April 2014 Language College Sydney- Part time
Third Job- July 2015 to present ESL Full time high school teacher in a Grammar School in Sydney
--In Him alone is our strength--- in God's grace!!
Posts: 537Member
Joined: Jul 15, 2013
IELTS - 5/ 06/13-- L-8.5; S-8.5;W-8.5;R-8.5
ANZSCO CODE:241411
Assessment (AITSL) - 18/07/13
Assessment Positive Result-11/09/13
EOI lodged-11/09/13
Invitation SI(Subclass 189)-16/09/13
Visa lodgement-05/10/13
PCC and All docs upload- 10/10/13
Form 80 upload- 24/10/13
Medicals Done/ Uploaded ( SLEC )- 31/10/13
Uploaded Docs Received (DIBP screen )- 31/10/13
CO allocated- 20/11/13- GSM Brisbane Team 34
Visa Granted: 25/11/13
Date first hired: Jan 2014
Registered and accredited BOSTES- April 2014
Second Job- April 2014 Language College Sydney- Part time
Third Job- July 2015 to present ESL Full time high school teacher in a Grammar School in Sydney
--In Him alone is our strength--- in God's grace!!
Posts: 232Member
Joined: Jan 30, 2013
Analyst Programmer (ANZSCO Code 261311)
03/18/2013 - ACS submitted
04/06/2013 - IELTS (BC) - L-7.5 R-7.0 W-7.0 S-6.5
06/20/2013 - Received ACS positive result (AQF Diploma)
07/27/2013 - IELTS (BC) - L-7.5 R-9.0 W-6.0 S-7.5
09/21/2013 - IELTS (IDP) - L-8.5 R-8.5 W-8.0 S-7.0 (Thank God!)
10/08/2013 - VIC SS application
10/24/2013 - VIC SS approved/Skillselect Invitation
10/30/2013 - Lodge Online Visa 190
10/31/2013 - NBI
11/15/2013 - Medicals Done (w/ wife and 2 kids)
12/05/2013 - CO Team 7 Adelaide (LM)
01/16/2014 - CO asked additional documents (contract, ITR, payslip, wife's form 80)
01/24/2014 - Uploaded additional documents
02/10/2014 - Visa Granted! Glory to God (IED - Jun. 11 2014)
03/16/2014 - Arrived in Melbourne
04/30/2014 - Started Job as Web Developer
For nothing is impossible with God. - Luke 1:37
Posts: 462Member
Joined: Jul 29, 2013
@Kindred, hahaha ma-tyaga lang ako mag sulat
Ikaw malamang grant na yan maya maya!!
Nominated Occupation: ANZSCO 261112 - Systems Analyst

Timeline:
Jul 01, 2013 - ACS Skill Assessment
Jul 19, 2013 - IELTS Results (L:8, R:8.5, W:7, S:8)
Oct 02, 2013 - ACS result received (suitable)
Oct 02, 2013 - submitted EOI for Visa 189 (65 pts).
Oct 05, 2013 - submitted Victoria SS for Visa 190 (70 pts, for backup)
Oct 18, 2013 - Victoria SS approved/Received invitation to apply for Visa 190 from Skillselect.
Oct 20, 2013 - lodged VISA 190 application.
Nov 20, 2013 - CO allocated | GSM Adelaide Team 6
Nov 27, 2013 - VISA GRANT! Thank you Lord! IED: NOV 12, 2014
Jul 03, 2014 - arrival in Melbourne
Aug 07, 2014 - started work
Jul 24, 2015 - left 1st job
Jul 27, 2015 - joined 2nd job