Ad space available
reach us at [email protected].
Major update has been completed. Please help to report any abnormality that you are facing (in case there is any) to [email protected] . Thank you for your continued support guys!

Processing updates?

1235789

Comments

  • onesilvertwoonesilvertwo Kuala Lumpur
    Posts: 131Member
    Joined: Aug 17, 2011
    @JClem, meron ng bagong update, April 28 na ang 175. :) lapit na kayo!

    Visa Subclass 175 - Skilled Independent
    Nominated Occupation : Analyst Programmer (261311)
    20/06/2011 - ACS Received the Application (via Courier)
    03/08/2011 - ACS Finalised the Case (PIM3, Group A)
    03/09/2011 - IELTS General Examination (BC)
    14/09/2011 - IELTS Result Received L- 7.5, R-7.5, W-7.0, S-8.0
    27/10/2011 - Lodged the Visa Application (Online)
    13/04/2012 - CO Allocated (Team 7)
    14/04/2012 to 20/06/2012 - processing on hold, waiting for wife to deliver
    13/07/2012 - PCCs submitted
    21/07/2012 - Medicals Conducted
    23/07/2012 - Medicals Finalised
    25/07/2012 - Visa Granted!

  • JClemJClem Melbourne
    Posts: 528Member
    Joined: Jan 08, 2011
    175 Visa Application Updates:

    As of Dec. 02 - Apr. 28, 2011 (latest allocation date)
    As of Nov. 21 - Mar. 22, 2011
    As of Nov. 04 - Feb. 28, 2011
    As of Oct. 21 - Feb. 01, 2011
    As of Oct. 07 - Jan. 01, 2011
    As of Sep. 23 - Dec. 10, 2010
    As of Sep. 09 - Dec. 01, 2010
    As of Aug. 26 - Sep. 09, 2010
    As of Aug. 12 - Aug. 26, 2010

    For other GSM visa processing timelines, you can refer to this site: http://www.immi.gov.au/skilled/general-skilled-migration/estimated-allocation-times.htm#b

    Nominated Occupation: Software Engineer (261313) - Husband is the primary applicant.

    10.21.2012 - Arrived in Melbourne. This is the day that the Lord has made. :)
    03.26.2012 - Visa granted. God is good, all the time! All the time, God is good! :)
    03.23.2012 - PCC submitted and medicals finalized
    03.02.2012 - Application being processed further / CO assigned
    06.26.2011 - Lodged Visa 175 application

  • JClemJClem Melbourne
    Posts: 528Member
    Joined: Jan 08, 2011
    Sana nga. I've also read in this forum that there are June applicants with CO already. (sent to me by one of the forumers here, @jelms), http://www.expatforum.com/expats/australia-expat-forum-expats-living-australia/55385-priority-3-now-priority-4-applicants-club-1042.html

    Another good news na nabasa ko sa forum na yan is that DIAC aims to finish 2010-2011 applicants by 2011. It was announced daw months ago kaya lang di ko makita sa DIAC site to confirm. Sana nga totoo para malapit na din yung sa inyo, @onesilvertwo. :) Just in case makita mo or anyone here yung official announcement, kindly share please. :)
    @JClem, meron ng bagong update, April 28 na ang 175. :) lapit na kayo!

    Nominated Occupation: Software Engineer (261313) - Husband is the primary applicant.

    10.21.2012 - Arrived in Melbourne. This is the day that the Lord has made. :)
    03.26.2012 - Visa granted. God is good, all the time! All the time, God is good! :)
    03.23.2012 - PCC submitted and medicals finalized
    03.02.2012 - Application being processed further / CO assigned
    06.26.2011 - Lodged Visa 175 application

  • LokiJrLokiJr Quezon City
    Posts: 2,616Member, Moderator
    Joined: Jan 13, 2011
    So mukhang wala nang atrasan ang malaking pagbabago sa immigration rules sa July 2012 nito :(
  • JClemJClem Melbourne
    Posts: 528Member
    Joined: Jan 08, 2011
    175 Visa Application Updates:

    As of Dec. 09 - Apr. 30, 2011 (latest allocation date, supposed to be this Friday pa lang sila mag-uupdate pero meron na nun Dec. 9. Two days lang ang jump ng 175 applicants, Apr. 28 to Apr. 30. Pero ok lang, at least may progress. Sa mga Priority 5 applicants naman, pinaprocess na as of Aug. 2007.)

    As of Dec. 02 - Apr. 28, 2011
    As of Nov. 21 - Mar. 22, 2011
    As of Nov. 04 - Feb. 28, 2011
    As of Oct. 21 - Feb. 01, 2011
    As of Oct. 07 - Jan. 01, 2011
    As of Sep. 23 - Dec. 10, 2010
    As of Sep. 09 - Dec. 01, 2010
    As of Aug. 26 - Sep. 09, 2010
    As of Aug. 12 - Aug. 26, 2010

    For other GSM visa processing timelines, you can refer to this site: http://www.immi.gov.au/skilled/general-skilled-migration/estimated-allocation-times.htm#b

    Nominated Occupation: Software Engineer (261313) - Husband is the primary applicant.

    10.21.2012 - Arrived in Melbourne. This is the day that the Lord has made. :)
    03.26.2012 - Visa granted. God is good, all the time! All the time, God is good! :)
    03.23.2012 - PCC submitted and medicals finalized
    03.02.2012 - Application being processed further / CO assigned
    06.26.2011 - Lodged Visa 175 application

  • mikaimikai Lexington
    Posts: 73Member
    Joined: Mar 28, 2011
    :( baka bumagal gawa nung P5. hahay...

    Aug 15, 2011 - Visa 175 Lodged (Mechanical Engr)
    Feb 21, 2012 - Application Being Processed Further
    Mar 30, 2012 - Contacted by C.O.
    Apr 14, 2012 - Med and PCC sent
    May 10, 2012 - Visa Granted! Thank you Lord!

  • JClemJClem Melbourne
    Posts: 528Member
    Joined: Jan 08, 2011
    Naku, wag naman sana. Pero nababasa ko sa British Expat Forum, madami-dami ng May and June applicants ang may CO na. :)
    :( baka bumagal gawa nung P5. hahay...

    Nominated Occupation: Software Engineer (261313) - Husband is the primary applicant.

    10.21.2012 - Arrived in Melbourne. This is the day that the Lord has made. :)
    03.26.2012 - Visa granted. God is good, all the time! All the time, God is good! :)
    03.23.2012 - PCC submitted and medicals finalized
    03.02.2012 - Application being processed further / CO assigned
    06.26.2011 - Lodged Visa 175 application

  • mikaimikai Lexington
    Posts: 73Member
    Joined: Mar 28, 2011
    sana yun nga. pero inisip ko din na baka ginawa nila to para may malaking gap ang timeline ng 176 (State Sponsored) at yun 175 or else wala nang magpa sponsor ng state.
    Naku, wag naman sana. Pero nababasa ko sa British Expat Forum, madami-dami ng May and June applicants ang may CO na. :)
    :( baka bumagal gawa nung P5. hahay...

    Aug 15, 2011 - Visa 175 Lodged (Mechanical Engr)
    Feb 21, 2012 - Application Being Processed Further
    Mar 30, 2012 - Contacted by C.O.
    Apr 14, 2012 - Med and PCC sent
    May 10, 2012 - Visa Granted! Thank you Lord!

  • JClemJClem Melbourne
    Posts: 528Member
    Joined: Jan 08, 2011
    Hmm mukhang hindi naman kasi mas mabilis pa din ang 176 SS, weeks lang may CO na agad. Ang 175 months pa din ang binibilang. :(
    sana yun nga. pero inisip ko din na baka ginawa nila to para may malaking gap ang timeline ng 176 (State Sponsored) at yun 175 or else wala nang magpa sponsor ng state.

    Nominated Occupation: Software Engineer (261313) - Husband is the primary applicant.

    10.21.2012 - Arrived in Melbourne. This is the day that the Lord has made. :)
    03.26.2012 - Visa granted. God is good, all the time! All the time, God is good! :)
    03.23.2012 - PCC submitted and medicals finalized
    03.02.2012 - Application being processed further / CO assigned
    06.26.2011 - Lodged Visa 175 application

  • LokiJrLokiJr Quezon City
    Posts: 2,616Member, Moderator
    Joined: Jan 13, 2011
    edited December 2011
    May movement bigla o!
    Nasa April 30 na ang 175, 176 etc...at may mga visas types na "all applications allocated" na :D
  • p0rn5taRp0rn5taR Melbourne
    Posts: 147Member
    Joined: Aug 02, 2011
    question po.. may idea po ba kayo kung ano ang possible causes ng delay if sept. 2010 ka pa naka paglodge tapos til now wala pa ring CO? pag tinatanung ko naman ang agent ko, wala namang specific details :-(( may ipapa verify pa daw na details.. nauubos na yata ang buhok ko sa kakaisip at kakahintay.. i envy those who just lodged this year tapos approved na ang visa.. :-((

    AUSTRALIA MIGRATION TIMELINE:

    Visa Subclass 190 † Computer Network & Systems Engineer (ANZSCO 263111) † Age: 30pts (25-32) † Educ: 15pts (Bachelors) † English: 10pts (Proficient) † State Sponsorship: 5pts (Victoria) † Work Exp: 0pts || TOTAL: 60pts

    August 17, 2013: IELTS exam
    August 29, 2013: IELTS results (L:7.5; R8.5; W:8.5; S:7.5; O:8)

    ----- Decided to gain more experience -----

    October 20, 2015: Submitted for ACS skills for Computer Network & Systems Engineer

    • ACS Stage 1
      October 21, 2015: ACS Stage 2&4
      October 27, 2015: ACS Results: AQF Bachelors degree with a major in computing (4 yrs deducted; only 2 yrs credited);

    • Submitted EOI (190 for all states)
      October 28, 2015: Submitted Victoria State Nomination
      November 3, 2015: Booked PTE-Academic Exam on Dec 4 with the hopes of obtaining 20pts
      November 18, 2015: Victoria State Nomination approved

    • Received invitation to lodge visa 190
      November 20, 2015: NBI fingerprinting appointment at Philippine Embassy in SG & Sent to Philippines for processing
      November 24, 2015: Lodged Visa 190

    • Cancelled PTE-Academic Exam as application for visa 190 has already been submitted
      November 27, 2015: Processed SG CoC
      December 2, 2015: Medical at SATA Chai Chee
      December 3, 2015: Medical requirements finalized
      December 4, 2015: CO Allocated and requested for Form 80 & PCC

    • Claimed and uploaded SG CoC

    • Uploaded Form 80
      December 12, 2015: NBI results received and uploaded
      December 24, 2015: Best Christmas gift ever! :D
      February 6, 2016: Initial entry (Melbourne)
      March 31, 2016: Big Move

    "When you want something, all the universe conspires in helping you to achieve it." ~Paulo Coelho

  • JClemJClem Melbourne
    Posts: 528Member
    Joined: Jan 08, 2011
    Hi po! I saw in your signature na Visa 175 applicant ka and ABPF na status mo. But if you check dun sa trending na sinesend ko above, supposed to be between Aug and Sep of 2011, may result na application mo. Why not email DIAC directly for the status of your application? Or if may details na iveverify, somehow dapat informed ka kung ano yun kasi baka may kelangan pa silang additional documents from you. Kulitin mo din si agent mo. I believe they are paid a high amount of money para matulungan ka nila on these cases.

    Ayoko mangyari sa'yo yung nangyari dun sa isang applicant sa kabilang forum. Hindi sya iniinform ng agent nya na denied pala visa application nya. Several months have passed bago pa nya nalaman. :(
    question po.. may idea po ba kayo kung ano ang possible causes ng delay if sept. 2010 ka pa naka paglodge tapos til now wala pa ring CO? pag tinatanung ko naman ang agent ko, wala namang specific details :-(( may ipapa verify pa daw na details.. nauubos na yata ang buhok ko sa kakaisip at kakahintay.. i envy those who just lodged this year tapos approved na ang visa.. :-((

    Nominated Occupation: Software Engineer (261313) - Husband is the primary applicant.

    10.21.2012 - Arrived in Melbourne. This is the day that the Lord has made. :)
    03.26.2012 - Visa granted. God is good, all the time! All the time, God is good! :)
    03.23.2012 - PCC submitted and medicals finalized
    03.02.2012 - Application being processed further / CO assigned
    06.26.2011 - Lodged Visa 175 application

  • LokiJrLokiJr Quezon City
    Posts: 2,616Member, Moderator
    Joined: Jan 13, 2011
    Posibleng oversight or negligent ang agent...may mga kasong ganyan katagal wala pa ring CO pero dapat may details for delay naman dapat nakukuha ang agent...
  • p0rn5taRp0rn5taR Melbourne
    Posts: 147Member
    Joined: Aug 02, 2011
    @JClem thanks po sa input.. o nga eh.. sept. pa ako nag.eexpect ng feedback tsaka hindi nmn ako nagkulang ng pag.iinquire sa agent ko.. pag tinatanong ko xa vague yung answers nya.. hindi talaga nagbibigay ng specifics o details mn lng at least.. sinasabi lng nya na may hinihingi na additional details at naghihintay pa xa ng instruction.. i tried emailing diac pero hindi sila makapagbigay ng direct information sa akin kasi hindi ako authorized to receive information directly from their department.. i authorized the agent to communicate with diac on my behalf kaya dapat daw sa agent ako magtanong.. kng madedenied ang application ko makikita ko nmn yun sa online status ng visa application ko dba? so far hindi pa nmn denied.. abpf pa din nmn.. alam ko nmn dati pa na complicated ang case ko compared sa iba.. for prio 4 applications diac is estimating 18 months yata for completion (http://www.immi.gov.au/about/charters/client-services-charter/visas/8.0.htm#b) , sa akin 15 months pa but i'm really hoping it would be sooner na.. i'll try getting back to my agent at sana nmn hindi xa makulitan at magbigay pa xa ng additional info.. =((

    AUSTRALIA MIGRATION TIMELINE:

    Visa Subclass 190 † Computer Network & Systems Engineer (ANZSCO 263111) † Age: 30pts (25-32) † Educ: 15pts (Bachelors) † English: 10pts (Proficient) † State Sponsorship: 5pts (Victoria) † Work Exp: 0pts || TOTAL: 60pts

    August 17, 2013: IELTS exam
    August 29, 2013: IELTS results (L:7.5; R8.5; W:8.5; S:7.5; O:8)

    ----- Decided to gain more experience -----

    October 20, 2015: Submitted for ACS skills for Computer Network & Systems Engineer

    • ACS Stage 1
      October 21, 2015: ACS Stage 2&4
      October 27, 2015: ACS Results: AQF Bachelors degree with a major in computing (4 yrs deducted; only 2 yrs credited);

    • Submitted EOI (190 for all states)
      October 28, 2015: Submitted Victoria State Nomination
      November 3, 2015: Booked PTE-Academic Exam on Dec 4 with the hopes of obtaining 20pts
      November 18, 2015: Victoria State Nomination approved

    • Received invitation to lodge visa 190
      November 20, 2015: NBI fingerprinting appointment at Philippine Embassy in SG & Sent to Philippines for processing
      November 24, 2015: Lodged Visa 190

    • Cancelled PTE-Academic Exam as application for visa 190 has already been submitted
      November 27, 2015: Processed SG CoC
      December 2, 2015: Medical at SATA Chai Chee
      December 3, 2015: Medical requirements finalized
      December 4, 2015: CO Allocated and requested for Form 80 & PCC

    • Claimed and uploaded SG CoC

    • Uploaded Form 80
      December 12, 2015: NBI results received and uploaded
      December 24, 2015: Best Christmas gift ever! :D
      February 6, 2016: Initial entry (Melbourne)
      March 31, 2016: Big Move

    "When you want something, all the universe conspires in helping you to achieve it." ~Paulo Coelho

  • p0rn5taRp0rn5taR Melbourne
    Posts: 147Member
    Joined: Aug 02, 2011
    @LokiJr ayoko sanang mag.isip na negligent ang agent ko kasi sayang nmn yung binayad ng erpats ko sa kanya pero hindi ko talaga maiwasan eh.. i know waiting can cause anxieties at lahat ng dumaan sa ganitong process alam ko makakarelate.. pero cguro nmn my agent can lessen my worries by being more honest or detailed regarding diac's inquiries about my application.. i tried to be optimistic nga thinking na my agent probably doesn't want me to worry pero i think with the current status it's actually making me worry more.. thanx po sa input.. i'll try contacting my agent again..

    AUSTRALIA MIGRATION TIMELINE:

    Visa Subclass 190 † Computer Network & Systems Engineer (ANZSCO 263111) † Age: 30pts (25-32) † Educ: 15pts (Bachelors) † English: 10pts (Proficient) † State Sponsorship: 5pts (Victoria) † Work Exp: 0pts || TOTAL: 60pts

    August 17, 2013: IELTS exam
    August 29, 2013: IELTS results (L:7.5; R8.5; W:8.5; S:7.5; O:8)

    ----- Decided to gain more experience -----

    October 20, 2015: Submitted for ACS skills for Computer Network & Systems Engineer

    • ACS Stage 1
      October 21, 2015: ACS Stage 2&4
      October 27, 2015: ACS Results: AQF Bachelors degree with a major in computing (4 yrs deducted; only 2 yrs credited);

    • Submitted EOI (190 for all states)
      October 28, 2015: Submitted Victoria State Nomination
      November 3, 2015: Booked PTE-Academic Exam on Dec 4 with the hopes of obtaining 20pts
      November 18, 2015: Victoria State Nomination approved

    • Received invitation to lodge visa 190
      November 20, 2015: NBI fingerprinting appointment at Philippine Embassy in SG & Sent to Philippines for processing
      November 24, 2015: Lodged Visa 190

    • Cancelled PTE-Academic Exam as application for visa 190 has already been submitted
      November 27, 2015: Processed SG CoC
      December 2, 2015: Medical at SATA Chai Chee
      December 3, 2015: Medical requirements finalized
      December 4, 2015: CO Allocated and requested for Form 80 & PCC

    • Claimed and uploaded SG CoC

    • Uploaded Form 80
      December 12, 2015: NBI results received and uploaded
      December 24, 2015: Best Christmas gift ever! :D
      February 6, 2016: Initial entry (Melbourne)
      March 31, 2016: Big Move

    "When you want something, all the universe conspires in helping you to achieve it." ~Paulo Coelho

  • JClemJClem Melbourne
    Posts: 528Member
    Joined: Jan 08, 2011
    Hi @p0rn5taR! Yes, I believe makikita mo naman sa online if denied. Good thing na ABPF pa din. Anyway, like @LokiJr said, at least dapat may details bakit delay. It's understood na sabi ng DIAC na dapat decision ready na ang application kapag ni-lodge. Pero in case may kelangan pa sila or kahit complicated ang case mo, iniinform nila si applicant or si agent para maasikaso na to and avoid further delays. Honestly, sa case mo lang ako nakarinig na walang specific details. Go back to your agent. Wag ka mahiya and hindi sila dapat makulitan sayo, ikaw ang customer nila so they better serve you. Hindi biro yung amount na binayad mo sa kanila. Ask mo na din how they communicate kay DIAC. If through emails/PLE, baka pwede nila forward yun sayo. 18 months talaga ang estimated processing ng 175 sa DIAC website pero mabilis na ang processing ngayon.

    Anyway, sabi nga sa signature mo "patience is a virtue". :) Pero ang hirap mag-antay di ba? Kahit ako, halos araw-araw ako nagchecheck ng status namin online. Minsan nga ayoko na antayin e baka bigla na lang sya dumating. Hehe! :) Iniisip ko na lang na way to ni God in teaching us to be patient. I'll include you in my prayers. Be more patient, baka bukas visa grantee ka na. Balitaan mo kami ha. See you in AU! :)
    @JClem thanks po sa input.. o nga eh.. sept. pa ako nag.eexpect ng feedback tsaka hindi nmn ako nagkulang ng pag.iinquire sa agent ko.. pag tinatanong ko xa vague yung answers nya.. hindi talaga nagbibigay ng specifics o details mn lng at least.. sinasabi lng nya na may hinihingi na additional details at naghihintay pa xa ng instruction.. i tried emailing diac pero hindi sila makapagbigay ng direct information sa akin kasi hindi ako authorized to receive information directly from their department.. i authorized the agent to communicate with diac on my behalf kaya dapat daw sa agent ako magtanong.. kng madedenied ang application ko makikita ko nmn yun sa online status ng visa application ko dba? so far hindi pa nmn denied.. abpf pa din nmn.. alam ko nmn dati pa na complicated ang case ko compared sa iba.. for prio 4 applications diac is estimating 18 months yata for completion (http://www.immi.gov.au/about/charters/client-services-charter/visas/8.0.htm#b) , sa akin 15 months pa but i'm really hoping it would be sooner na.. i'll try getting back to my agent at sana nmn hindi xa makulitan at magbigay pa xa ng additional info.. =((

    Nominated Occupation: Software Engineer (261313) - Husband is the primary applicant.

    10.21.2012 - Arrived in Melbourne. This is the day that the Lord has made. :)
    03.26.2012 - Visa granted. God is good, all the time! All the time, God is good! :)
    03.23.2012 - PCC submitted and medicals finalized
    03.02.2012 - Application being processed further / CO assigned
    06.26.2011 - Lodged Visa 175 application

  • JClemJClem Melbourne
    Posts: 528Member
    Joined: Jan 08, 2011
    edited December 2011
    Hi All and to @onesilvertwo! :) Got this from another forum. Reply ni DIAC sa inquiry nung isang forumer dun.

    "This year the Department of Immigration and Citizenship (Adelaide office) will be closed Monday 26 December 2011, Tuesday 27 December 2011 and Wednesday 28 December 2011. It will re-open on Thursday 29 December 2011 and Friday 30 December 2011.

    The office will then be closed again on Monday 2 January 2011. Normal services will resume on Tuesday 3 January 2012."


    I had mixed emotions when I learned about their holidays. First, inggit ako sa haba ng Christmas holiday nila. Hehe! Sa atin di man lang declared kahit Dec. 26 and Jan.2 na holiday. Parang ordinary weekends lang tuloy ang Christmas and New Year. :-S Second, I was wishing na before sila mag-holiday, sana magkaron ng update application namin and lahat ng June applicants. Meron na kasi sila pinaprocess na mga nagsubmit ng June. :)

    Nominated Occupation: Software Engineer (261313) - Husband is the primary applicant.

    10.21.2012 - Arrived in Melbourne. This is the day that the Lord has made. :)
    03.26.2012 - Visa granted. God is good, all the time! All the time, God is good! :)
    03.23.2012 - PCC submitted and medicals finalized
    03.02.2012 - Application being processed further / CO assigned
    06.26.2011 - Lodged Visa 175 application

  • itchanitchan Phoenix
    Posts: 213Member
    Joined: Jun 24, 2011
    @tootzkie

    Napansin ko ang bilis pala ng progress ng application mo dude... May bearing ba ang nominated occupation? Or sobra sobra ka sa points kaya process agad?

    27.08.2011 - Submitted ACS Assessment via Fedex. Nominated Occupation : Systems Analyst (261112)
    10.10.2011 - ACS assessment received (PIM3 / Group A)
    17.11.2011 - IELTS General Training Exam (BC) Take 1
    30.11.2011 - IELTS General Training Exam (BC) Take 1 Result Received L- 9, R-9, W-7.5, S-8, OB-8.5
    04.12.2011 - Lodged 175(Online)
    17.04.2012 - Submitted request for FBI clearance (Me)
    02.05.2012 - Application being processed further
    29.05.2012 - Followed up CO Allocation
    01.06.2012 - CO Allocated, requesting for PCC and Meds
    02.06.2012 - Received FBI clearance. My middle name is misspelled (toink!)
    13.06.2012 - Submitted form 1022 and supporting documents to add spouse as dependent.
    15.06.2012 - Submit request for FBI clearance (Me and Spouse). 8-week wait time begins
    22.06.2012 - Uploaded NBI clearance
    22.06.2012 - Medicals @ SLEC (Wifey and Me)
    28.06.2012 - 28th DAY MILESTONE
    16.07.2012 - All Medicals Finalized
    26.07.2012 - Uploaded FBI clearance
    02.08.2012 - APRUB!!

    Freedom aint cheap mate! (lol)

  • p0rn5taRp0rn5taR Melbourne
    Posts: 147Member
    Joined: Aug 02, 2011
    @JClem salamat po sa lahat.. iba talaga pag dumadaan sa similar na proseso yung kausap mo kasi makakarelate talaga.. gudlak nlng sa ating lahat.. feeling ko nga baka mas mauuna pa yung progress ng application mo kaysa sa akin.. complicated lng talaga xa.. =(( God bless sa ating lahat at sana mabigyan tau ng mas mahaba-haba pang pasenxa.. at sana hindi tau maloka kakaintay sa progress ng applications natin.. sana dumating ang araw na makapagsabi akong "see you in AU" =))

    AUSTRALIA MIGRATION TIMELINE:

    Visa Subclass 190 † Computer Network & Systems Engineer (ANZSCO 263111) † Age: 30pts (25-32) † Educ: 15pts (Bachelors) † English: 10pts (Proficient) † State Sponsorship: 5pts (Victoria) † Work Exp: 0pts || TOTAL: 60pts

    August 17, 2013: IELTS exam
    August 29, 2013: IELTS results (L:7.5; R8.5; W:8.5; S:7.5; O:8)

    ----- Decided to gain more experience -----

    October 20, 2015: Submitted for ACS skills for Computer Network & Systems Engineer

    • ACS Stage 1
      October 21, 2015: ACS Stage 2&4
      October 27, 2015: ACS Results: AQF Bachelors degree with a major in computing (4 yrs deducted; only 2 yrs credited);

    • Submitted EOI (190 for all states)
      October 28, 2015: Submitted Victoria State Nomination
      November 3, 2015: Booked PTE-Academic Exam on Dec 4 with the hopes of obtaining 20pts
      November 18, 2015: Victoria State Nomination approved

    • Received invitation to lodge visa 190
      November 20, 2015: NBI fingerprinting appointment at Philippine Embassy in SG & Sent to Philippines for processing
      November 24, 2015: Lodged Visa 190

    • Cancelled PTE-Academic Exam as application for visa 190 has already been submitted
      November 27, 2015: Processed SG CoC
      December 2, 2015: Medical at SATA Chai Chee
      December 3, 2015: Medical requirements finalized
      December 4, 2015: CO Allocated and requested for Form 80 & PCC

    • Claimed and uploaded SG CoC

    • Uploaded Form 80
      December 12, 2015: NBI results received and uploaded
      December 24, 2015: Best Christmas gift ever! :D
      February 6, 2016: Initial entry (Melbourne)
      March 31, 2016: Big Move

    "When you want something, all the universe conspires in helping you to achieve it." ~Paulo Coelho

  • LokiJrLokiJr Quezon City
    Posts: 2,616Member, Moderator
    Joined: Jan 13, 2011
    @jclem, KJ si pnoy noh? hindi man lang binigay sa atin yung 26 hehe
    @p0rn5taR, I understand the feeling...nakakapraning yung maghintay :( hingi ka second opinion sa ibang migration agents tungkol sa kaso niyo...kadalasan naman libre yung unang consultation tapos yung mga susunod di naman kamahalan kung second opinion lang naman kukunin nyo :)
  • onesilvertwoonesilvertwo Kuala Lumpur
    Posts: 131Member
    Joined: Aug 17, 2011
    @JClem salamat sa update. :) don't worry, pag pasok ng taon, sure sa inyo na ang ipoprocess.
    it may seem nakakainip (dahil excited ka. haha!), pero mabilis lang lilipas ang araw. enjoy the holiday nalang muna and ipagpray ang application. :)

    Good luck and God bless.

    Visa Subclass 175 - Skilled Independent
    Nominated Occupation : Analyst Programmer (261311)
    20/06/2011 - ACS Received the Application (via Courier)
    03/08/2011 - ACS Finalised the Case (PIM3, Group A)
    03/09/2011 - IELTS General Examination (BC)
    14/09/2011 - IELTS Result Received L- 7.5, R-7.5, W-7.0, S-8.0
    27/10/2011 - Lodged the Visa Application (Online)
    13/04/2012 - CO Allocated (Team 7)
    14/04/2012 to 20/06/2012 - processing on hold, waiting for wife to deliver
    13/07/2012 - PCCs submitted
    21/07/2012 - Medicals Conducted
    23/07/2012 - Medicals Finalised
    25/07/2012 - Visa Granted!

  • LokiJrLokiJr Quezon City
    Posts: 2,616Member, Moderator
    Joined: Jan 13, 2011
    Uy umusad uli!
    Visa 175, 176, 475 - May 5, 2011 na
    Visa 495, 496, 880, 881 - All Applications Allocated
    Visa 885, 886, 487 - Within 4 Weeks of Lodgement
  • BryannBryann Sydney
    Posts: 854Member
    Joined: May 27, 2011
    Nice, so malaki talaga possibility na ma-approve ang visa within 1 year. Kasi 8 months behind lang sila. Hehe. :D

    Occupation: ICT Software Engineer (ANZSCO 261313)
    Dec 13 2011 - ACS: Suitable (AQF Diploma)
    Feb 03 2012 - IELTS #1 Failed (W-6.5)
    Mar 02 2012 - IELTS #2 Passed
    Apr 21 2012 - 175 Visa Lodged Online
    May 29 2012 - CO Assigned
    Jun 25 2012 - Visa Grant (IED: Dec 14 2012)
    Aug 19 2012 - Arrived in Sydney
    Sept 10 2012 - Start @ 1st Job (Web Developer)

  • JClemJClem Melbourne
    Posts: 528Member
    Joined: Jan 08, 2011
    Yes, @Bryann! :) Actually sa 175, marami na ding June applicants ang pino-process. :)
    Nice, so malaki talaga possibility na ma-approve ang visa within 1 year. Kasi 8 months behind lang sila. Hehe. :D

    Nominated Occupation: Software Engineer (261313) - Husband is the primary applicant.

    10.21.2012 - Arrived in Melbourne. This is the day that the Lord has made. :)
    03.26.2012 - Visa granted. God is good, all the time! All the time, God is good! :)
    03.23.2012 - PCC submitted and medicals finalized
    03.02.2012 - Application being processed further / CO assigned
    06.26.2011 - Lodged Visa 175 application

  • JClemJClem Melbourne
    Posts: 528Member
    Joined: Jan 08, 2011
    175 Visa Application Allocation Updates:

    As of Jan. 06 - May 15, 2011 (latest update)
    As of Dec. 23 - May 05, 2011
    As of Dec. 09 - Apr. 30, 2011
    As of Dec. 02 - Apr. 28, 2011
    As of Nov. 21 - Mar. 22, 2011
    As of Nov. 04 - Feb. 28, 2011
    As of Oct. 21 - Feb. 01, 2011
    As of Oct. 07 - Jan. 01, 2011
    As of Sep. 23 - Dec. 10, 2010
    As of Sep. 09 - Dec. 01, 2010
    As of Aug. 26 - Sep. 09, 2010
    As of Aug. 12 - Aug. 26, 2010

    For other GSM visa processing timelines, you can refer to this site: http://www.immi.gov.au/skilled/general-skilled-migration/estimated-allocation-times.htm#b

    Nominated Occupation: Software Engineer (261313) - Husband is the primary applicant.

    10.21.2012 - Arrived in Melbourne. This is the day that the Lord has made. :)
    03.26.2012 - Visa granted. God is good, all the time! All the time, God is good! :)
    03.23.2012 - PCC submitted and medicals finalized
    03.02.2012 - Application being processed further / CO assigned
    06.26.2011 - Lodged Visa 175 application

  • RClemRClem Los Angeles
    Posts: 31Member
    Joined: Jan 16, 2012
    Konti na lang...wag bibitaw! image
  • Brian83Brian83 Mandaluyong
    Posts: 14Member
    Joined: Jan 12, 2012
    Hi,

    Anyone here familiar with skills assessment for accountants? Im a management accounting grad, with more than 5 years accounting experience. Will they recognize my undergrad degree? thanks.
  • JClemJClem Melbourne
    Posts: 528Member
    Joined: Jan 08, 2011
    Hi @Brian83! Kindly repost your question in this thread: http://pinoyau.info/discussion/97/accountant. :)
    Hi,

    Anyone here familiar with skills assessment for accountants? Im a management accounting grad, with more than 5 years accounting experience. Will they recognize my undergrad degree? thanks.

    Nominated Occupation: Software Engineer (261313) - Husband is the primary applicant.

    10.21.2012 - Arrived in Melbourne. This is the day that the Lord has made. :)
    03.26.2012 - Visa granted. God is good, all the time! All the time, God is good! :)
    03.23.2012 - PCC submitted and medicals finalized
    03.02.2012 - Application being processed further / CO assigned
    06.26.2011 - Lodged Visa 175 application

  • unanimous21unanimous21 Brisbane
    Posts: 172Member
    Joined: Apr 23, 2011
    got an email today. me CO na kami and she's requesting PCCs!

    April 16, 2011 - took IELTS (L:8, R:7.5, W:8, S:7.5 OBS:8) I June 2, 2011 - submitted skills assessment to EA I October 26, 2011 - applied for Victoria State Sponsorship I December 03, 2011 - fiancee took IELTS I December 26, 2011 - lodged visa 176 (Victoria SS/Melbourne) I January 23,2012 - CO Allocation (Team 6) I February 20, 2012 - Submitted Police Clearances (Philippines, India & Maldives) I February 26, 2012 - finished medicals I March 13, 2012 - VISA GRANT! THANK YOU LORD!!! I December 04,2012 - initial entry as stated in the visa grant notification

  • mikaimikai Lexington
    Posts: 73Member
    Joined: Mar 28, 2011
    got an email today. me CO na kami and she's requesting PCCs!
    congrats unanimous21! kelan ka nag submit ng application?

    Aug 15, 2011 - Visa 175 Lodged (Mechanical Engr)
    Feb 21, 2012 - Application Being Processed Further
    Mar 30, 2012 - Contacted by C.O.
    Apr 14, 2012 - Med and PCC sent
    May 10, 2012 - Visa Granted! Thank you Lord!

Sign In or Register to comment.
LATEST 10 ACTIVE DISCUSSION THREAD
angel_iq4

Waiting for GRANTS

most recent by CBD

angel_iq4

EOI Concerns

most recent by fruitsalad

angel_iq4

Welcome to Pinoy AU Community!

The longest running Pinoy-Australian Forum site in the history. We are connecting Pinoys "in" and "to" Australia since 2010! If you want to join in, click one of these buttons!

Categories

Random Members
(55222)

roenacortez19Geriecalizomaxabbyrabiputapeteng123poohdinimartoiiiRafiyellRonaldupSekMarouselleEngrJDrinMarvingorumzugsfirmaRSSalandananneptuneghena23nok07YJLarlan09pinoyau122689
Browse Members

Members Online (5) + Guest (170)

baikencrashbandicootpiwanaims2023whimpeegravytrain

Top Active Contributors

Top Posters