Australian Computer Society Skills Application
most recent by DBCooper
most recent by kimgilbie
most recent by NicoTheDoggo
most recent by MidnightPanda12
General Skilled Immigration Visa - Step By Step Process
most recent by Jake23
Western Australia Immigration Matters FY 2024-2025
most recent by Ozdrims
VICTORIA STATES SPONSORSHIP 2024-2025
most recent by Ozdrims
most recent by jamiemax
VETASSES VS EA SKILL ASSESSMENT
most recent by Ozdrims
The longest running Pinoy-Australian Forum site in the history. We are connecting Pinoys "in" and "to" Australia since 2010! If you want to join in, click one of these buttons!
Comments
Posts: 1,770Administrator
Joined: Dec 29, 2010
2010-06 : Lurker at philippines.com.au (previously the #1 Pinoy Australian Forum)
2010-06 : Started researching on Visa 175 - Target 120pts
2011-08 : Started prev employer document gathering for ACS skill assessment (0/4)
2010-12 : Philippines.com.au went offline and created www.pinoyau.info
2011-03 : 1st child born - AU dream halted
2014-03 : ACS document - 1/5 emp ref completed
2015-01: Promoted at work - AU dream halted
2015-11: ACS document - 1/6 emp ref completed
2016-09: 2nd child born - AU dream halted
2018-09: ACS document - 6/8 emp ref completed
2018-09: Revised all employment references and affidavit from scratch
2019-03: Completed Revised 8/8 emp ref
2019-03: PTE Exam - L59,R75,S62,W64 (no preparation)
2019-07: Favorable Skills Assessment result for Software Eng
2019-11: PTE Exam - L70,R68,S79,W68 (competent only)
2020-02: PTE Exam - L79,R79,S86,W76 (grr lack 3pts on Writing)
2020-03: PTE Exam - L85,R75,S87,W86 (Mar 4 - grr nag increase L, S and W but bumaba 4pts si R!!!!!)
2020-03 PTE Exam - L81 R79 S90 W81 (Mar 9 - Salamat Lord!!!!)
Posts: 471Member
Joined: Jun 24, 2013
Nov 2012 ACS Assessment positive results (analyst programmer)
Dec 2012 IELTS results
July 4, 2013 Sent docs thru courier (door to door)
July 8, 2013 received ack letter from nsw
July 29, 2013 received skillselect invitation
July 31, 2013 received ss approval
Aug 11, 2013 lodged visa
Aug 22, 2013 medicals slec global (uploaded: Aug 24 Son; Aug 27 wife; Aug 28 primary applicant)
Sept 2, 2013 completed upload of docs including NBI clearances, Forms 80 and 1221
Sept. 12, 2013 CO assigned from Adelaide (Team 6, MB)
Sept. 13, 2013 (Uploaded additional docs: diploma of secondary applicant)
Sept 18, 2013 medicals referred to MOC according to CO
Sept 24, 2013 medicals finalised
Sept 25, 2013 visa grant (IED Aug 23, 2014)! Thank you Lord!
Do your best and God will do the rest
Posts: 1,770Administrator
Joined: Dec 29, 2010
2010-06 : Lurker at philippines.com.au (previously the #1 Pinoy Australian Forum)
2010-06 : Started researching on Visa 175 - Target 120pts
2011-08 : Started prev employer document gathering for ACS skill assessment (0/4)
2010-12 : Philippines.com.au went offline and created www.pinoyau.info
2011-03 : 1st child born - AU dream halted
2014-03 : ACS document - 1/5 emp ref completed
2015-01: Promoted at work - AU dream halted
2015-11: ACS document - 1/6 emp ref completed
2016-09: 2nd child born - AU dream halted
2018-09: ACS document - 6/8 emp ref completed
2018-09: Revised all employment references and affidavit from scratch
2019-03: Completed Revised 8/8 emp ref
2019-03: PTE Exam - L59,R75,S62,W64 (no preparation)
2019-07: Favorable Skills Assessment result for Software Eng
2019-11: PTE Exam - L70,R68,S79,W68 (competent only)
2020-02: PTE Exam - L79,R79,S86,W76 (grr lack 3pts on Writing)
2020-03: PTE Exam - L85,R75,S87,W86 (Mar 4 - grr nag increase L, S and W but bumaba 4pts si R!!!!!)
2020-03 PTE Exam - L81 R79 S90 W81 (Mar 9 - Salamat Lord!!!!)
Posts: 1,770Administrator
Joined: Dec 29, 2010
@JCsantos Binalik ko na po ung Reply, reply just auto add "@" to the author of the comment you want to reply to, while quote, will quote the whole comment po
2010-06 : Lurker at philippines.com.au (previously the #1 Pinoy Australian Forum)
2010-06 : Started researching on Visa 175 - Target 120pts
2011-08 : Started prev employer document gathering for ACS skill assessment (0/4)
2010-12 : Philippines.com.au went offline and created www.pinoyau.info
2011-03 : 1st child born - AU dream halted
2014-03 : ACS document - 1/5 emp ref completed
2015-01: Promoted at work - AU dream halted
2015-11: ACS document - 1/6 emp ref completed
2016-09: 2nd child born - AU dream halted
2018-09: ACS document - 6/8 emp ref completed
2018-09: Revised all employment references and affidavit from scratch
2019-03: Completed Revised 8/8 emp ref
2019-03: PTE Exam - L59,R75,S62,W64 (no preparation)
2019-07: Favorable Skills Assessment result for Software Eng
2019-11: PTE Exam - L70,R68,S79,W68 (competent only)
2020-02: PTE Exam - L79,R79,S86,W76 (grr lack 3pts on Writing)
2020-03: PTE Exam - L85,R75,S87,W86 (Mar 4 - grr nag increase L, S and W but bumaba 4pts si R!!!!!)
2020-03 PTE Exam - L81 R79 S90 W81 (Mar 9 - Salamat Lord!!!!)
Posts: 471Member
Joined: Jun 24, 2013
Nov 2012 ACS Assessment positive results (analyst programmer)
Dec 2012 IELTS results
July 4, 2013 Sent docs thru courier (door to door)
July 8, 2013 received ack letter from nsw
July 29, 2013 received skillselect invitation
July 31, 2013 received ss approval
Aug 11, 2013 lodged visa
Aug 22, 2013 medicals slec global (uploaded: Aug 24 Son; Aug 27 wife; Aug 28 primary applicant)
Sept 2, 2013 completed upload of docs including NBI clearances, Forms 80 and 1221
Sept. 12, 2013 CO assigned from Adelaide (Team 6, MB)
Sept. 13, 2013 (Uploaded additional docs: diploma of secondary applicant)
Sept 18, 2013 medicals referred to MOC according to CO
Sept 24, 2013 medicals finalised
Sept 25, 2013 visa grant (IED Aug 23, 2014)! Thank you Lord!
Do your best and God will do the rest
Posts: 1,770Administrator
Joined: Dec 29, 2010
2010-06 : Lurker at philippines.com.au (previously the #1 Pinoy Australian Forum)
2010-06 : Started researching on Visa 175 - Target 120pts
2011-08 : Started prev employer document gathering for ACS skill assessment (0/4)
2010-12 : Philippines.com.au went offline and created www.pinoyau.info
2011-03 : 1st child born - AU dream halted
2014-03 : ACS document - 1/5 emp ref completed
2015-01: Promoted at work - AU dream halted
2015-11: ACS document - 1/6 emp ref completed
2016-09: 2nd child born - AU dream halted
2018-09: ACS document - 6/8 emp ref completed
2018-09: Revised all employment references and affidavit from scratch
2019-03: Completed Revised 8/8 emp ref
2019-03: PTE Exam - L59,R75,S62,W64 (no preparation)
2019-07: Favorable Skills Assessment result for Software Eng
2019-11: PTE Exam - L70,R68,S79,W68 (competent only)
2020-02: PTE Exam - L79,R79,S86,W76 (grr lack 3pts on Writing)
2020-03: PTE Exam - L85,R75,S87,W86 (Mar 4 - grr nag increase L, S and W but bumaba 4pts si R!!!!!)
2020-03 PTE Exam - L81 R79 S90 W81 (Mar 9 - Salamat Lord!!!!)
Posts: 1,770Administrator
Joined: Dec 29, 2010
2010-06 : Lurker at philippines.com.au (previously the #1 Pinoy Australian Forum)
2010-06 : Started researching on Visa 175 - Target 120pts
2011-08 : Started prev employer document gathering for ACS skill assessment (0/4)
2010-12 : Philippines.com.au went offline and created www.pinoyau.info
2011-03 : 1st child born - AU dream halted
2014-03 : ACS document - 1/5 emp ref completed
2015-01: Promoted at work - AU dream halted
2015-11: ACS document - 1/6 emp ref completed
2016-09: 2nd child born - AU dream halted
2018-09: ACS document - 6/8 emp ref completed
2018-09: Revised all employment references and affidavit from scratch
2019-03: Completed Revised 8/8 emp ref
2019-03: PTE Exam - L59,R75,S62,W64 (no preparation)
2019-07: Favorable Skills Assessment result for Software Eng
2019-11: PTE Exam - L70,R68,S79,W68 (competent only)
2020-02: PTE Exam - L79,R79,S86,W76 (grr lack 3pts on Writing)
2020-03: PTE Exam - L85,R75,S87,W86 (Mar 4 - grr nag increase L, S and W but bumaba 4pts si R!!!!!)
2020-03 PTE Exam - L81 R79 S90 W81 (Mar 9 - Salamat Lord!!!!)
Posts: 738Member
Joined: Aug 07, 2012
Skilled Migration (261112 Systems Analyst)
November 20, 2013 - Visa Grant (IED: July 22, 2014)
April 19, 2014 - Arrived in Melbourne
May 2, 2014 - Job offer
May 7, 2014 - First day of work
It is only through GOD that we can achieve success..
Posts: 232Member
Joined: Jan 30, 2013
Analyst Programmer (ANZSCO Code 261311)
03/18/2013 - ACS submitted
04/06/2013 - IELTS (BC) - L-7.5 R-7.0 W-7.0 S-6.5
06/20/2013 - Received ACS positive result (AQF Diploma)
07/27/2013 - IELTS (BC) - L-7.5 R-9.0 W-6.0 S-7.5
09/21/2013 - IELTS (IDP) - L-8.5 R-8.5 W-8.0 S-7.0 (Thank God!)
10/08/2013 - VIC SS application
10/24/2013 - VIC SS approved/Skillselect Invitation
10/30/2013 - Lodge Online Visa 190
10/31/2013 - NBI
11/15/2013 - Medicals Done (w/ wife and 2 kids)
12/05/2013 - CO Team 7 Adelaide (LM)
01/16/2014 - CO asked additional documents (contract, ITR, payslip, wife's form 80)
01/24/2014 - Uploaded additional documents
02/10/2014 - Visa Granted! Glory to God (IED - Jun. 11 2014)
03/16/2014 - Arrived in Melbourne
04/30/2014 - Started Job as Web Developer
For nothing is impossible with God. - Luke 1:37
Posts: 1,770Administrator
Joined: Dec 29, 2010
2010-06 : Lurker at philippines.com.au (previously the #1 Pinoy Australian Forum)
2010-06 : Started researching on Visa 175 - Target 120pts
2011-08 : Started prev employer document gathering for ACS skill assessment (0/4)
2010-12 : Philippines.com.au went offline and created www.pinoyau.info
2011-03 : 1st child born - AU dream halted
2014-03 : ACS document - 1/5 emp ref completed
2015-01: Promoted at work - AU dream halted
2015-11: ACS document - 1/6 emp ref completed
2016-09: 2nd child born - AU dream halted
2018-09: ACS document - 6/8 emp ref completed
2018-09: Revised all employment references and affidavit from scratch
2019-03: Completed Revised 8/8 emp ref
2019-03: PTE Exam - L59,R75,S62,W64 (no preparation)
2019-07: Favorable Skills Assessment result for Software Eng
2019-11: PTE Exam - L70,R68,S79,W68 (competent only)
2020-02: PTE Exam - L79,R79,S86,W76 (grr lack 3pts on Writing)
2020-03: PTE Exam - L85,R75,S87,W86 (Mar 4 - grr nag increase L, S and W but bumaba 4pts si R!!!!!)
2020-03 PTE Exam - L81 R79 S90 W81 (Mar 9 - Salamat Lord!!!!)
Posts: 195Member
Joined: Sep 29, 2013
CPA (Australia)
Chartered Accountant (Singapore)
CPA (Philippines)
Posts: 1,770Administrator
Joined: Dec 29, 2010
2010-06 : Lurker at philippines.com.au (previously the #1 Pinoy Australian Forum)
2010-06 : Started researching on Visa 175 - Target 120pts
2011-08 : Started prev employer document gathering for ACS skill assessment (0/4)
2010-12 : Philippines.com.au went offline and created www.pinoyau.info
2011-03 : 1st child born - AU dream halted
2014-03 : ACS document - 1/5 emp ref completed
2015-01: Promoted at work - AU dream halted
2015-11: ACS document - 1/6 emp ref completed
2016-09: 2nd child born - AU dream halted
2018-09: ACS document - 6/8 emp ref completed
2018-09: Revised all employment references and affidavit from scratch
2019-03: Completed Revised 8/8 emp ref
2019-03: PTE Exam - L59,R75,S62,W64 (no preparation)
2019-07: Favorable Skills Assessment result for Software Eng
2019-11: PTE Exam - L70,R68,S79,W68 (competent only)
2020-02: PTE Exam - L79,R79,S86,W76 (grr lack 3pts on Writing)
2020-03: PTE Exam - L85,R75,S87,W86 (Mar 4 - grr nag increase L, S and W but bumaba 4pts si R!!!!!)
2020-03 PTE Exam - L81 R79 S90 W81 (Mar 9 - Salamat Lord!!!!)
Posts: 195Member
Joined: Sep 29, 2013
CPA (Australia)
Chartered Accountant (Singapore)
CPA (Philippines)
Posts: 64Member
Joined: Jun 10, 2012
http://www.ucb.com.au/listen_online | http://acctv.com.au/watch.php
December 2013
– I praise and thank You my Lord God and my Creator!!!!! You alone deserve all the glory!!!!!
– visa grant!!! (after about 3 weeks, after uploading all required documents (after about 5 weeks of waiting since CO allocation))
November 2013
– Form 80, Form 1221, résumé, and third PCC uploaded; copies of payslips and skills assessment results reuploaded—e-mail sent to CO as well (My Father, thank You for allowing me to pass through this stage!)
October 2013
– CO allocated (GSM Adelaide – Team 06); additional documents requested by CO
– health exams done ("No health examinations are required...") — Thank You once again!
September 2013
– lodged visa application—Lord, thank You for allowing me to pass through this stage!
– positive response from WA; negative from VIC
– applied for VIC state nomination; invited to apply for QLD and WA state nominations too—eventually declined QLD invitation after much thought, careful consideration, and prayers
– obtained positive VETASSESS skills assessment and subsequently submitted EOI
July 2013 – IELTS at the British Council; first take — thank You!
May 2013 – applied for VETASSESS skills assessment
— Matthew 6:33 (http://www.esvbible.org/Matthew+6:33) | — Psalm 37:4 (http://www.esvbible.org/Psalm+37:4)
— 1 Corinthians 10:31 (http://www.esvbible.org/1 Corinthians+10:31) | — 1 Peter 5:6–11 (http://www.esvbible.org/1 Peter+5:6-11)
Posts: 1,770Administrator
Joined: Dec 29, 2010
2010-06 : Lurker at philippines.com.au (previously the #1 Pinoy Australian Forum)
2010-06 : Started researching on Visa 175 - Target 120pts
2011-08 : Started prev employer document gathering for ACS skill assessment (0/4)
2010-12 : Philippines.com.au went offline and created www.pinoyau.info
2011-03 : 1st child born - AU dream halted
2014-03 : ACS document - 1/5 emp ref completed
2015-01: Promoted at work - AU dream halted
2015-11: ACS document - 1/6 emp ref completed
2016-09: 2nd child born - AU dream halted
2018-09: ACS document - 6/8 emp ref completed
2018-09: Revised all employment references and affidavit from scratch
2019-03: Completed Revised 8/8 emp ref
2019-03: PTE Exam - L59,R75,S62,W64 (no preparation)
2019-07: Favorable Skills Assessment result for Software Eng
2019-11: PTE Exam - L70,R68,S79,W68 (competent only)
2020-02: PTE Exam - L79,R79,S86,W76 (grr lack 3pts on Writing)
2020-03: PTE Exam - L85,R75,S87,W86 (Mar 4 - grr nag increase L, S and W but bumaba 4pts si R!!!!!)
2020-03 PTE Exam - L81 R79 S90 W81 (Mar 9 - Salamat Lord!!!!)
Posts: 64Member
Joined: Jun 10, 2012
Wala pong lumabas na entries/results. (Gamit ko pong browser ay Firefox 25.0.1, running under Windows 7 environment.) :-S
Pero kapag sa Google Chrome (version 31.0.1650.57 m) at Internet Explorer 10 (version 10.0.9200.16736), gumagana naman po 'yung search box natin. Either dito sa dalawang browser na lang po muna ako gagamit ng ating forum. Salamat po
http://www.ucb.com.au/listen_online | http://acctv.com.au/watch.php
December 2013
– I praise and thank You my Lord God and my Creator!!!!! You alone deserve all the glory!!!!!
– visa grant!!! (after about 3 weeks, after uploading all required documents (after about 5 weeks of waiting since CO allocation))
November 2013
– Form 80, Form 1221, résumé, and third PCC uploaded; copies of payslips and skills assessment results reuploaded—e-mail sent to CO as well (My Father, thank You for allowing me to pass through this stage!)
October 2013
– CO allocated (GSM Adelaide – Team 06); additional documents requested by CO
– health exams done ("No health examinations are required...") — Thank You once again!
September 2013
– lodged visa application—Lord, thank You for allowing me to pass through this stage!
– positive response from WA; negative from VIC
– applied for VIC state nomination; invited to apply for QLD and WA state nominations too—eventually declined QLD invitation after much thought, careful consideration, and prayers
– obtained positive VETASSESS skills assessment and subsequently submitted EOI
July 2013 – IELTS at the British Council; first take — thank You!
May 2013 – applied for VETASSESS skills assessment
— Matthew 6:33 (http://www.esvbible.org/Matthew+6:33) | — Psalm 37:4 (http://www.esvbible.org/Psalm+37:4)
— 1 Corinthians 10:31 (http://www.esvbible.org/1 Corinthians+10:31) | — 1 Peter 5:6–11 (http://www.esvbible.org/1 Peter+5:6-11)
Posts: 1,416Member, Moderator
Joined: Jan 11, 2011
Google for Everything !!!
Posts: 1,770Administrator
Joined: Dec 29, 2010
2010-06 : Lurker at philippines.com.au (previously the #1 Pinoy Australian Forum)
2010-06 : Started researching on Visa 175 - Target 120pts
2011-08 : Started prev employer document gathering for ACS skill assessment (0/4)
2010-12 : Philippines.com.au went offline and created www.pinoyau.info
2011-03 : 1st child born - AU dream halted
2014-03 : ACS document - 1/5 emp ref completed
2015-01: Promoted at work - AU dream halted
2015-11: ACS document - 1/6 emp ref completed
2016-09: 2nd child born - AU dream halted
2018-09: ACS document - 6/8 emp ref completed
2018-09: Revised all employment references and affidavit from scratch
2019-03: Completed Revised 8/8 emp ref
2019-03: PTE Exam - L59,R75,S62,W64 (no preparation)
2019-07: Favorable Skills Assessment result for Software Eng
2019-11: PTE Exam - L70,R68,S79,W68 (competent only)
2020-02: PTE Exam - L79,R79,S86,W76 (grr lack 3pts on Writing)
2020-03: PTE Exam - L85,R75,S87,W86 (Mar 4 - grr nag increase L, S and W but bumaba 4pts si R!!!!!)
2020-03 PTE Exam - L81 R79 S90 W81 (Mar 9 - Salamat Lord!!!!)
Posts: 1,770Administrator
Joined: Dec 29, 2010
@alchemicus pwede po makisuyo ma check kung ok na po sa side nyo?
2010-06 : Lurker at philippines.com.au (previously the #1 Pinoy Australian Forum)
2010-06 : Started researching on Visa 175 - Target 120pts
2011-08 : Started prev employer document gathering for ACS skill assessment (0/4)
2010-12 : Philippines.com.au went offline and created www.pinoyau.info
2011-03 : 1st child born - AU dream halted
2014-03 : ACS document - 1/5 emp ref completed
2015-01: Promoted at work - AU dream halted
2015-11: ACS document - 1/6 emp ref completed
2016-09: 2nd child born - AU dream halted
2018-09: ACS document - 6/8 emp ref completed
2018-09: Revised all employment references and affidavit from scratch
2019-03: Completed Revised 8/8 emp ref
2019-03: PTE Exam - L59,R75,S62,W64 (no preparation)
2019-07: Favorable Skills Assessment result for Software Eng
2019-11: PTE Exam - L70,R68,S79,W68 (competent only)
2020-02: PTE Exam - L79,R79,S86,W76 (grr lack 3pts on Writing)
2020-03: PTE Exam - L85,R75,S87,W86 (Mar 4 - grr nag increase L, S and W but bumaba 4pts si R!!!!!)
2020-03 PTE Exam - L81 R79 S90 W81 (Mar 9 - Salamat Lord!!!!)
Posts: 1,770Administrator
Joined: Dec 29, 2010
2010-06 : Lurker at philippines.com.au (previously the #1 Pinoy Australian Forum)
2010-06 : Started researching on Visa 175 - Target 120pts
2011-08 : Started prev employer document gathering for ACS skill assessment (0/4)
2010-12 : Philippines.com.au went offline and created www.pinoyau.info
2011-03 : 1st child born - AU dream halted
2014-03 : ACS document - 1/5 emp ref completed
2015-01: Promoted at work - AU dream halted
2015-11: ACS document - 1/6 emp ref completed
2016-09: 2nd child born - AU dream halted
2018-09: ACS document - 6/8 emp ref completed
2018-09: Revised all employment references and affidavit from scratch
2019-03: Completed Revised 8/8 emp ref
2019-03: PTE Exam - L59,R75,S62,W64 (no preparation)
2019-07: Favorable Skills Assessment result for Software Eng
2019-11: PTE Exam - L70,R68,S79,W68 (competent only)
2020-02: PTE Exam - L79,R79,S86,W76 (grr lack 3pts on Writing)
2020-03: PTE Exam - L85,R75,S87,W86 (Mar 4 - grr nag increase L, S and W but bumaba 4pts si R!!!!!)
2020-03 PTE Exam - L81 R79 S90 W81 (Mar 9 - Salamat Lord!!!!)
Posts: 409Member
Joined: Oct 03, 2012
Posts: 471Member
Joined: Jun 24, 2013
Nov 2012 ACS Assessment positive results (analyst programmer)
Dec 2012 IELTS results
July 4, 2013 Sent docs thru courier (door to door)
July 8, 2013 received ack letter from nsw
July 29, 2013 received skillselect invitation
July 31, 2013 received ss approval
Aug 11, 2013 lodged visa
Aug 22, 2013 medicals slec global (uploaded: Aug 24 Son; Aug 27 wife; Aug 28 primary applicant)
Sept 2, 2013 completed upload of docs including NBI clearances, Forms 80 and 1221
Sept. 12, 2013 CO assigned from Adelaide (Team 6, MB)
Sept. 13, 2013 (Uploaded additional docs: diploma of secondary applicant)
Sept 18, 2013 medicals referred to MOC according to CO
Sept 24, 2013 medicals finalised
Sept 25, 2013 visa grant (IED Aug 23, 2014)! Thank you Lord!
Do your best and God will do the rest
Posts: 1,770Administrator
Joined: Dec 29, 2010
2010-06 : Lurker at philippines.com.au (previously the #1 Pinoy Australian Forum)
2010-06 : Started researching on Visa 175 - Target 120pts
2011-08 : Started prev employer document gathering for ACS skill assessment (0/4)
2010-12 : Philippines.com.au went offline and created www.pinoyau.info
2011-03 : 1st child born - AU dream halted
2014-03 : ACS document - 1/5 emp ref completed
2015-01: Promoted at work - AU dream halted
2015-11: ACS document - 1/6 emp ref completed
2016-09: 2nd child born - AU dream halted
2018-09: ACS document - 6/8 emp ref completed
2018-09: Revised all employment references and affidavit from scratch
2019-03: Completed Revised 8/8 emp ref
2019-03: PTE Exam - L59,R75,S62,W64 (no preparation)
2019-07: Favorable Skills Assessment result for Software Eng
2019-11: PTE Exam - L70,R68,S79,W68 (competent only)
2020-02: PTE Exam - L79,R79,S86,W76 (grr lack 3pts on Writing)
2020-03: PTE Exam - L85,R75,S87,W86 (Mar 4 - grr nag increase L, S and W but bumaba 4pts si R!!!!!)
2020-03 PTE Exam - L81 R79 S90 W81 (Mar 9 - Salamat Lord!!!!)
Posts: 5,037Member, De-activated
Joined: Feb 23, 2012
pero nakikita ko ang timeline ng iba...
Sep 24, 2011 - IELTS (L-8 R-8 W-8 S-7.5 : OBS-8)
Jan 04, 2012 - EA application submitted | Feb 23, 2012 - EA assessment result (IE ANZSCO 233511)
May 8, 2012 - Lodged GSM 175 online application | June 4, 2012 - CO Allocated
June 22, 2012 - Medicals Finalized | Aug 30, 2012 - PCCs Completed (PH, UAE, USA)
Sep 3, 2012 - Visa Granted (IED Jun 11, 2013) Thank You Lord!
Oct 16-28, 2012 - Initial Entry Completed - Sydney
July 28, 2013 - Final move to Perth
Sep 9, 2013 - Started work with the same company i worked for in UAE/USA
Oct 28, 2013 - Moved to another company..
Posts: 1,416Member, Moderator
Joined: Jan 11, 2011
From my count it is 35 per page .... maybe you can add 10-20 more?
Google for Everything !!!
Posts: 1,770Administrator
Joined: Dec 29, 2010
@jc boss will adjust it also po. Thanks.
2010-06 : Lurker at philippines.com.au (previously the #1 Pinoy Australian Forum)
2010-06 : Started researching on Visa 175 - Target 120pts
2011-08 : Started prev employer document gathering for ACS skill assessment (0/4)
2010-12 : Philippines.com.au went offline and created www.pinoyau.info
2011-03 : 1st child born - AU dream halted
2014-03 : ACS document - 1/5 emp ref completed
2015-01: Promoted at work - AU dream halted
2015-11: ACS document - 1/6 emp ref completed
2016-09: 2nd child born - AU dream halted
2018-09: ACS document - 6/8 emp ref completed
2018-09: Revised all employment references and affidavit from scratch
2019-03: Completed Revised 8/8 emp ref
2019-03: PTE Exam - L59,R75,S62,W64 (no preparation)
2019-07: Favorable Skills Assessment result for Software Eng
2019-11: PTE Exam - L70,R68,S79,W68 (competent only)
2020-02: PTE Exam - L79,R79,S86,W76 (grr lack 3pts on Writing)
2020-03: PTE Exam - L85,R75,S87,W86 (Mar 4 - grr nag increase L, S and W but bumaba 4pts si R!!!!!)
2020-03 PTE Exam - L81 R79 S90 W81 (Mar 9 - Salamat Lord!!!!)
Posts: 462Member
Joined: Jul 29, 2013
"DiscussionController->Discussion not found."
Last time, nireport ko pala, some avatars are blank. i think sa chrome lang un or IE, sa Safari ok naman
Nominated Occupation: ANZSCO 261112 - Systems Analyst
Timeline:
Jul 01, 2013 - ACS Skill Assessment
Jul 19, 2013 - IELTS Results (L:8, R:8.5, W:7, S:8)
Oct 02, 2013 - ACS result received (suitable)
Oct 02, 2013 - submitted EOI for Visa 189 (65 pts).
Oct 05, 2013 - submitted Victoria SS for Visa 190 (70 pts, for backup)
Oct 18, 2013 - Victoria SS approved/Received invitation to apply for Visa 190 from Skillselect.
Oct 20, 2013 - lodged VISA 190 application.
Nov 20, 2013 - CO allocated | GSM Adelaide Team 6
Nov 27, 2013 - VISA GRANT! Thank you Lord! IED: NOV 12, 2014
Jul 03, 2014 - arrival in Melbourne
Aug 07, 2014 - started work
Jul 24, 2015 - left 1st job
Jul 27, 2015 - joined 2nd job
Posts: 1,770Administrator
Joined: Dec 29, 2010
@Lock_code can you help check kung may signature ka na po?
@JCSantos will fix the query tonight
@rooroo - actually it works, however it throws an error message despite the successful bookmarking. it's a known bug in the core. but i will look into it. baka matagalan ang fix pag inantay natin ang author ng forum mag release ng fix for this. Thanks.
2010-06 : Lurker at philippines.com.au (previously the #1 Pinoy Australian Forum)
2010-06 : Started researching on Visa 175 - Target 120pts
2011-08 : Started prev employer document gathering for ACS skill assessment (0/4)
2010-12 : Philippines.com.au went offline and created www.pinoyau.info
2011-03 : 1st child born - AU dream halted
2014-03 : ACS document - 1/5 emp ref completed
2015-01: Promoted at work - AU dream halted
2015-11: ACS document - 1/6 emp ref completed
2016-09: 2nd child born - AU dream halted
2018-09: ACS document - 6/8 emp ref completed
2018-09: Revised all employment references and affidavit from scratch
2019-03: Completed Revised 8/8 emp ref
2019-03: PTE Exam - L59,R75,S62,W64 (no preparation)
2019-07: Favorable Skills Assessment result for Software Eng
2019-11: PTE Exam - L70,R68,S79,W68 (competent only)
2020-02: PTE Exam - L79,R79,S86,W76 (grr lack 3pts on Writing)
2020-03: PTE Exam - L85,R75,S87,W86 (Mar 4 - grr nag increase L, S and W but bumaba 4pts si R!!!!!)
2020-03 PTE Exam - L81 R79 S90 W81 (Mar 9 - Salamat Lord!!!!)
Posts: 1,770Administrator
Joined: Dec 29, 2010
2010-06 : Lurker at philippines.com.au (previously the #1 Pinoy Australian Forum)
2010-06 : Started researching on Visa 175 - Target 120pts
2011-08 : Started prev employer document gathering for ACS skill assessment (0/4)
2010-12 : Philippines.com.au went offline and created www.pinoyau.info
2011-03 : 1st child born - AU dream halted
2014-03 : ACS document - 1/5 emp ref completed
2015-01: Promoted at work - AU dream halted
2015-11: ACS document - 1/6 emp ref completed
2016-09: 2nd child born - AU dream halted
2018-09: ACS document - 6/8 emp ref completed
2018-09: Revised all employment references and affidavit from scratch
2019-03: Completed Revised 8/8 emp ref
2019-03: PTE Exam - L59,R75,S62,W64 (no preparation)
2019-07: Favorable Skills Assessment result for Software Eng
2019-11: PTE Exam - L70,R68,S79,W68 (competent only)
2020-02: PTE Exam - L79,R79,S86,W76 (grr lack 3pts on Writing)
2020-03: PTE Exam - L85,R75,S87,W86 (Mar 4 - grr nag increase L, S and W but bumaba 4pts si R!!!!!)
2020-03 PTE Exam - L81 R79 S90 W81 (Mar 9 - Salamat Lord!!!!)
Posts: 471Member
Joined: Jun 24, 2013
Nov 2012 ACS Assessment positive results (analyst programmer)
Dec 2012 IELTS results
July 4, 2013 Sent docs thru courier (door to door)
July 8, 2013 received ack letter from nsw
July 29, 2013 received skillselect invitation
July 31, 2013 received ss approval
Aug 11, 2013 lodged visa
Aug 22, 2013 medicals slec global (uploaded: Aug 24 Son; Aug 27 wife; Aug 28 primary applicant)
Sept 2, 2013 completed upload of docs including NBI clearances, Forms 80 and 1221
Sept. 12, 2013 CO assigned from Adelaide (Team 6, MB)
Sept. 13, 2013 (Uploaded additional docs: diploma of secondary applicant)
Sept 18, 2013 medicals referred to MOC according to CO
Sept 24, 2013 medicals finalised
Sept 25, 2013 visa grant (IED Aug 23, 2014)! Thank you Lord!
Do your best and God will do the rest