Ad space available
reach us at [email protected].
Major update has been completed. Please help to report any abnormality that you are facing (in case there is any) to [email protected] . Thank you for your continued support guys!

October 2015- Visa 189/190

1262729313234

Comments

  • moss0805moss0805 nsw
    Posts: 78Member
    Joined: Feb 04, 2015
    @mirasa good luck on your journey down under! keep in touch.
  • simpleplansimpleplan Sydney
    Posts: 80Member
    Joined: Apr 09, 2014
    sino sydney bound? Feb 29 ang big move ko.

    ANZSCO CODE: 233914 || Engineering Technologist
    13.11.2014 || IELTS - 2nd take
    01.01.2015 || Started preparing CDR
    14.06.2015 || CDR submitted online
    17.08.2015 || PTE-A - 10 points
    23.09.2015 || Positive result of EA assessment
    25.09.2015 || EOI lodgement - 65 points, 189 visa
    09.10.2015 || ITA
    16.10.2015 || Lodgement of 189 visa
    31.10.2015 || Medicals
    02.11.2015 || CO assigned - asking for PCC, medicals and form 80
    12.11.2015 || submitted form 80
    13.11.2015 || submitted PCC singapore
    20.11.2015 || submitted NBI clearance
    28.11.2015 || Grant
    29.02.2016 || Big move

    Thank you Jesus for all the Graces I have received!

  • kittykitkat18kittykitkat18 Sydney
    Posts: 908Member
    Joined: May 13, 2015
    @mirasa goodluck! All the best

    Computer network and systems engineer (263111) - Hubby is main applicant - Mapua (BS-ECE)
    07.23.15 - submitted ACS
    07.27.15 - ACS result - suitable..AQF Bachelor. 2 yrs deduction. 5yrs and 10 mos credited
    09.28.15 - PTE scheduled exam (Sg)
    09.29.15 - PTE Results. L - 90, R - 86, S - 90, W - 86. Overall = 90
    09.30.15 - Submitted EOI Visa 189 - 70 pts
    10.09.15 - Invitation received
    10.28.15 - medicals (me & hubby) @ Point Medical Sg
    11.11.15 - NBI (me, hubby and mother)
    11.16.15 - medicals of mother @ St Lukes BGC
    11.22.15 - Lodged Visa
    11.25.15 - Frontloaded docs and requested SG CoC
    12.01.15 - CO Allocated. Request form 47a for mother
    12.02.15 - Frontloaded SG CoC (me & hubby) and form 47a
    02.09.16 - called GSM Adelaide for follow-up (71 days from CO contact)
    02.15.16 - granted! Thank you for the Blessings
    Dependent parent rejected. CO not satisfied with one of the requirements for dependency (part of household unit)
    07.28.16 - Big move! Sydney here we go!
    09.19.16 - Start of work
    09.22.16 - Hubby start of work
    06.19.17 - Hubby's new work
    11.16.17 - hello Baby!
    Jesus, I Trust In You

  • moss0805moss0805 nsw
    Posts: 78Member
    Joined: Feb 04, 2015
    @simpleplan ako bro! sa May. Kitakits at balitaan mo ko sa job oppurtunity meron sa sydney. Good luck!
  • amb3r795amb3r795 Sydney
    Posts: 115Member
    Joined: May 08, 2014
    @simpleplan ako din sa Sydney sa June. keep in touch at update ka din pag nandun ka na po. God Bless!

    261313 Software Engineer (VISA 189)
    09/08/14 - ACS completed
    10/02/14 - IELTS Exam (L-6.5 R-7 W-6.5 S -6.5)
    11/21/14 - IELTS Exam (L-6.5 R-6.5 W-6.0 S -6.0)
    02/28/15 - IELTS Exam (L-6.5 R-7 W-6.5 S -6.5)
    04/30/15 - IELTS Exam (L-7.0 R-6.5 W-6.0 S -7.0)
    06/03/15 - PTE Exam (L-71 R-72 W-74 S -67)
    06/08/15 - Submitted EOI (60 points)

  • ed_lupeeted_lupeet Melbourne
    Posts: 207Member
    Joined: Aug 19, 2014
    nakapag book na ko ticket april 8. pasyal muna sa sydney bago punta sa melbourne.
  • amb3r795amb3r795 Sydney
    Posts: 115Member
    Joined: May 08, 2014
    @ed_lupeet buti ka pa may ticket na. wala pa akong pang book nang ticket.hehe

    261313 Software Engineer (VISA 189)
    09/08/14 - ACS completed
    10/02/14 - IELTS Exam (L-6.5 R-7 W-6.5 S -6.5)
    11/21/14 - IELTS Exam (L-6.5 R-6.5 W-6.0 S -6.0)
    02/28/15 - IELTS Exam (L-6.5 R-7 W-6.5 S -6.5)
    04/30/15 - IELTS Exam (L-7.0 R-6.5 W-6.0 S -7.0)
    06/03/15 - PTE Exam (L-71 R-72 W-74 S -67)
    06/08/15 - Submitted EOI (60 points)

  • ed_lupeeted_lupeet Melbourne
    Posts: 207Member
    Joined: Aug 19, 2014
    @amb3r795 hanap ka lang ng sale baka maka tsamba
  • kittykitkat18kittykitkat18 Sydney
    Posts: 908Member
    Joined: May 13, 2015
    Grabe..ala pa din..hu hu hu..aabutan nko ng valentines

    Computer network and systems engineer (263111) - Hubby is main applicant - Mapua (BS-ECE)
    07.23.15 - submitted ACS
    07.27.15 - ACS result - suitable..AQF Bachelor. 2 yrs deduction. 5yrs and 10 mos credited
    09.28.15 - PTE scheduled exam (Sg)
    09.29.15 - PTE Results. L - 90, R - 86, S - 90, W - 86. Overall = 90
    09.30.15 - Submitted EOI Visa 189 - 70 pts
    10.09.15 - Invitation received
    10.28.15 - medicals (me & hubby) @ Point Medical Sg
    11.11.15 - NBI (me, hubby and mother)
    11.16.15 - medicals of mother @ St Lukes BGC
    11.22.15 - Lodged Visa
    11.25.15 - Frontloaded docs and requested SG CoC
    12.01.15 - CO Allocated. Request form 47a for mother
    12.02.15 - Frontloaded SG CoC (me & hubby) and form 47a
    02.09.16 - called GSM Adelaide for follow-up (71 days from CO contact)
    02.15.16 - granted! Thank you for the Blessings
    Dependent parent rejected. CO not satisfied with one of the requirements for dependency (part of household unit)
    07.28.16 - Big move! Sydney here we go!
    09.19.16 - Start of work
    09.22.16 - Hubby start of work
    06.19.17 - Hubby's new work
    11.16.17 - hello Baby!
    Jesus, I Trust In You

  • amb3r795amb3r795 Sydney
    Posts: 115Member
    Joined: May 08, 2014
    edited February 2016
    @kittykitkat18 lapit na yan sis. ako nga umabot nang 67 days yung grant counting from the last contact nang CO

    261313 Software Engineer (VISA 189)
    09/08/14 - ACS completed
    10/02/14 - IELTS Exam (L-6.5 R-7 W-6.5 S -6.5)
    11/21/14 - IELTS Exam (L-6.5 R-6.5 W-6.0 S -6.0)
    02/28/15 - IELTS Exam (L-6.5 R-7 W-6.5 S -6.5)
    04/30/15 - IELTS Exam (L-7.0 R-6.5 W-6.0 S -7.0)
    06/03/15 - PTE Exam (L-71 R-72 W-74 S -67)
    06/08/15 - Submitted EOI (60 points)

  • ed_lupeeted_lupeet Melbourne
    Posts: 207Member
    Joined: Aug 19, 2014
    @kittykitkat18 malay mo ayan na ang valentines gift para sayo

    kakatapos ko lang mag pdos. ok din naman pala un kahit papaano may natutunan naman ako na bago. hehe

  • kittykitkat18kittykitkat18 Sydney
    Posts: 908Member
    Joined: May 13, 2015
    edited February 2016
    @amb3r795 wow tgal din..cge abang pko ng onti.hehe

    Computer network and systems engineer (263111) - Hubby is main applicant - Mapua (BS-ECE)
    07.23.15 - submitted ACS
    07.27.15 - ACS result - suitable..AQF Bachelor. 2 yrs deduction. 5yrs and 10 mos credited
    09.28.15 - PTE scheduled exam (Sg)
    09.29.15 - PTE Results. L - 90, R - 86, S - 90, W - 86. Overall = 90
    09.30.15 - Submitted EOI Visa 189 - 70 pts
    10.09.15 - Invitation received
    10.28.15 - medicals (me & hubby) @ Point Medical Sg
    11.11.15 - NBI (me, hubby and mother)
    11.16.15 - medicals of mother @ St Lukes BGC
    11.22.15 - Lodged Visa
    11.25.15 - Frontloaded docs and requested SG CoC
    12.01.15 - CO Allocated. Request form 47a for mother
    12.02.15 - Frontloaded SG CoC (me & hubby) and form 47a
    02.09.16 - called GSM Adelaide for follow-up (71 days from CO contact)
    02.15.16 - granted! Thank you for the Blessings
    Dependent parent rejected. CO not satisfied with one of the requirements for dependency (part of household unit)
    07.28.16 - Big move! Sydney here we go!
    09.19.16 - Start of work
    09.22.16 - Hubby start of work
    06.19.17 - Hubby's new work
    11.16.17 - hello Baby!
    Jesus, I Trust In You

  • kittykitkat18kittykitkat18 Sydney
    Posts: 908Member
    Joined: May 13, 2015
    edited February 2016
    @ed_lupeet sna nga valentines na to..ala nko maisip na occasion sa mArch.hehe

    Computer network and systems engineer (263111) - Hubby is main applicant - Mapua (BS-ECE)
    07.23.15 - submitted ACS
    07.27.15 - ACS result - suitable..AQF Bachelor. 2 yrs deduction. 5yrs and 10 mos credited
    09.28.15 - PTE scheduled exam (Sg)
    09.29.15 - PTE Results. L - 90, R - 86, S - 90, W - 86. Overall = 90
    09.30.15 - Submitted EOI Visa 189 - 70 pts
    10.09.15 - Invitation received
    10.28.15 - medicals (me & hubby) @ Point Medical Sg
    11.11.15 - NBI (me, hubby and mother)
    11.16.15 - medicals of mother @ St Lukes BGC
    11.22.15 - Lodged Visa
    11.25.15 - Frontloaded docs and requested SG CoC
    12.01.15 - CO Allocated. Request form 47a for mother
    12.02.15 - Frontloaded SG CoC (me & hubby) and form 47a
    02.09.16 - called GSM Adelaide for follow-up (71 days from CO contact)
    02.15.16 - granted! Thank you for the Blessings
    Dependent parent rejected. CO not satisfied with one of the requirements for dependency (part of household unit)
    07.28.16 - Big move! Sydney here we go!
    09.19.16 - Start of work
    09.22.16 - Hubby start of work
    06.19.17 - Hubby's new work
    11.16.17 - hello Baby!
    Jesus, I Trust In You

  • jandmjandm Sydney
    Posts: 281Member
    Joined: Aug 27, 2015
    @kittykitkat18 lapit na yan sis! :)

    Software Engineer 261313
    Aug 1 2015 : IELTS L-8.5 R-8.5 W-7.5 S-7.5
    Oct 6 2015 : ACS Assessment Application
    Oct 13 2015 : ACS Result
    Oct 13 2015 : EOI Application (visa 189 - 60pts, visa 190 - 65 pts)
    Dec 1 2015: ACS Re-assessment (added work exp)
    Dec 8 2015: ACS Result
    Dec 8 2015: Updated EOI (visa 189 - 65pts, visa 190 - 70 pts)
    Dec 18 2015: Received ITA for visa 189 and visa 190 (NSW)
    Dec 21 2015: Lodged visa 189 application
    Jan 14 2016: CO Allocated - GSM Brisbane (requesting for PCC and Form 815)
    Jan 28 2016: Uploaded docs requested
    Feb 6 2016: Visa Grant :)

  • ram071312ram071312 Perth, Western Australia
    Posts: 749Member
    Joined: Sep 21, 2015
    @kittykitkat18 graduation chos! parating na yan sis.. natraffic lang :)

    Chemical Engineer || ANZSCO 233111
    Aug.29.2015 - IELTS Schedule
    Sep.11.2015 - Received IELTS Result - [L8.5|R7.5|W6.5|S7]
    Sep.15.2015 - Submitted requirements to EA for assessment
    Sep.19.2015 - Applied for Remarking at IDP Makati
    Nov.04.2015 - Received Remarking Result - Successful: Writing Module changed to Band 7
    Nov.27.2015 - Applied for NBI with husband (with HIT)Dec.14.2015 - Received EA Positive Outcome Letter
    Dec.15.2015 - Submitted EOI Visa 189- 70 points
    Dec.18.2015 - Received ITA
    Dec.19.2015 - Medical at Nationwide Makati (with husband and daughter)
    Dec.22.2015 - Additional test required for daughter : X-ray due to positive PPD skin test
    Dec.22.2015 - Husband's Medical Status: Health Clearance Provided - No Action Required
    Dec.23.2015 - My Medical Status: Health Clearance Provided - No Action Required
    Jan.12.2016 - Lodged Visa Application
    Jan.12.2016 - Front loaded all documents (including Form 80)
    Jan.13.2016 - Daughter's Medical Status: Health Clearance Provided - No Action Required (Thank you Lord!)
    Jan.28.2016 - CO Allocated - GSM Adelaide, requesting for signed Form 815: Health Undertaking Form for my daughter [Day 16]
    Jan.28.2016 - Submitted signed Form 815 for my daughter [Day 16]
    Mar.18.2016 - Visa Grant, Thank you Lord! [Day 50, from Visa Lodgment] IED - Jul.13.2016
    Mar.18.2016 - Booked flight to Brisbane, QLD (via Qantas) for Initial Entry with family on May.29.2016
    Mar.29.2016 - PDOS at CFO
    May.29.2016 - Initial Entry in Brisbane, QLD fulfilled
    Jan.17, 2017 - Hired by an Au company while still in PH
    Jan. 19, 2017 - Resigned from work in PH
    Feb.10.2017 - Big move to Perth, WA with hubby and daughter
    Feb.13.2017 - 1st day of Full Time Work
    Aug 04.2017 - Start of husband's casual work
    Aug.16.2017 - End of Probationary Period, permanent full time employment confirmed
    Oct. 09.2017 - Start of husband's fulltime work (probationary)

  • kittykitkat18kittykitkat18 Sydney
    Posts: 908Member
    Joined: May 13, 2015
    @ram071312 @jandm sna nga dis wk na.target date kasi nmin is june.natatamad na nga ko magcheck ng email e.hehe

    Computer network and systems engineer (263111) - Hubby is main applicant - Mapua (BS-ECE)
    07.23.15 - submitted ACS
    07.27.15 - ACS result - suitable..AQF Bachelor. 2 yrs deduction. 5yrs and 10 mos credited
    09.28.15 - PTE scheduled exam (Sg)
    09.29.15 - PTE Results. L - 90, R - 86, S - 90, W - 86. Overall = 90
    09.30.15 - Submitted EOI Visa 189 - 70 pts
    10.09.15 - Invitation received
    10.28.15 - medicals (me & hubby) @ Point Medical Sg
    11.11.15 - NBI (me, hubby and mother)
    11.16.15 - medicals of mother @ St Lukes BGC
    11.22.15 - Lodged Visa
    11.25.15 - Frontloaded docs and requested SG CoC
    12.01.15 - CO Allocated. Request form 47a for mother
    12.02.15 - Frontloaded SG CoC (me & hubby) and form 47a
    02.09.16 - called GSM Adelaide for follow-up (71 days from CO contact)
    02.15.16 - granted! Thank you for the Blessings
    Dependent parent rejected. CO not satisfied with one of the requirements for dependency (part of household unit)
    07.28.16 - Big move! Sydney here we go!
    09.19.16 - Start of work
    09.22.16 - Hubby start of work
    06.19.17 - Hubby's new work
    11.16.17 - hello Baby!
    Jesus, I Trust In You

  • sweetheartsweetheart Adelaide
    Posts: 93Member
    Joined: Apr 23, 2015
    @kittykitkat18 hello po hindi po kayo nag-iisa kami rin nag-antay din.karamay nyo kami: :-h

    sa lahat po na na grant na congrats po sa inyo! :)

    Our Dreamland Journey Application to "the land down under" starts here:
    May 28, 2015 - Submitted MSA application - TRA
    June 4, 2015 - Received Acknowledgement Letter
    August 17,2015 - received SUCCESSFUL assessment (thanks to "Jesus Christ, SON of GOD, our Lord and our Saviour" )
    August 18, 2015 - EOI submitted ( 60 points)
    August 29, 2015 - SS application submitted
    October 16, 2015- Invited
    November 10,2015 - Lodged subclass 190
    December 10,2015 -CO allocated/Request additional docs
    December 15, 2015 - Additional docs uploaded
    February 23,2016 - Visa Granted! "Lord, saying Thank You is not enough but we will dare to SAY-THANK YOU SO MUCH!!!

    All Glory & Power are Yours, LORD JESUS, OUR GOD!!!

    "We put our lives in the hands of GOD" & "in HIM we T-R-U-S-T!"

  • kittykitkat18kittykitkat18 Sydney
    Posts: 908Member
    Joined: May 13, 2015
    @sweetheart kapit bisig tyo.hehe..darating din yan..paranoid lng..d ko lam kng may kulang ba or what

    Computer network and systems engineer (263111) - Hubby is main applicant - Mapua (BS-ECE)
    07.23.15 - submitted ACS
    07.27.15 - ACS result - suitable..AQF Bachelor. 2 yrs deduction. 5yrs and 10 mos credited
    09.28.15 - PTE scheduled exam (Sg)
    09.29.15 - PTE Results. L - 90, R - 86, S - 90, W - 86. Overall = 90
    09.30.15 - Submitted EOI Visa 189 - 70 pts
    10.09.15 - Invitation received
    10.28.15 - medicals (me & hubby) @ Point Medical Sg
    11.11.15 - NBI (me, hubby and mother)
    11.16.15 - medicals of mother @ St Lukes BGC
    11.22.15 - Lodged Visa
    11.25.15 - Frontloaded docs and requested SG CoC
    12.01.15 - CO Allocated. Request form 47a for mother
    12.02.15 - Frontloaded SG CoC (me & hubby) and form 47a
    02.09.16 - called GSM Adelaide for follow-up (71 days from CO contact)
    02.15.16 - granted! Thank you for the Blessings
    Dependent parent rejected. CO not satisfied with one of the requirements for dependency (part of household unit)
    07.28.16 - Big move! Sydney here we go!
    09.19.16 - Start of work
    09.22.16 - Hubby start of work
    06.19.17 - Hubby's new work
    11.16.17 - hello Baby!
    Jesus, I Trust In You

  • sweetheartsweetheart Adelaide
    Posts: 93Member
    Joined: Apr 23, 2015
    @ kittykitkat18~~ masyado kasi tayong excited hehehe.grabeh naman kasi pinagdadaanan natin sa paghihintay from d start noh huhuhu tapos finals na..hehe.kayo na susunod nyan! dec.10 na kami nagka CO..kapitbisig tayo sa pagdadasal :)>-

    Our Dreamland Journey Application to "the land down under" starts here:
    May 28, 2015 - Submitted MSA application - TRA
    June 4, 2015 - Received Acknowledgement Letter
    August 17,2015 - received SUCCESSFUL assessment (thanks to "Jesus Christ, SON of GOD, our Lord and our Saviour" )
    August 18, 2015 - EOI submitted ( 60 points)
    August 29, 2015 - SS application submitted
    October 16, 2015- Invited
    November 10,2015 - Lodged subclass 190
    December 10,2015 -CO allocated/Request additional docs
    December 15, 2015 - Additional docs uploaded
    February 23,2016 - Visa Granted! "Lord, saying Thank You is not enough but we will dare to SAY-THANK YOU SO MUCH!!!

    All Glory & Power are Yours, LORD JESUS, OUR GOD!!!

    "We put our lives in the hands of GOD" & "in HIM we T-R-U-S-T!"

  • ccanda77ccanda77 Melbourne
    Posts: 47Member
    Joined: Sep 12, 2013
    Guys finally the waiting is over. Grant na po ako ngayon lang.

    @kittykitkat18 at @sweetheart kayo na susunod nyan dasal lang.

    @kittykitkat18 SG based kayo? SG based din ako.
  • kittykitkat18kittykitkat18 Sydney
    Posts: 908Member
    Joined: May 13, 2015
    @ccanda77 congrats sis! Grabe natuwa ako it means umuusad na october..sg based din..off ko ngyn kya window shopping sa ion.haha..pra malibang

    Computer network and systems engineer (263111) - Hubby is main applicant - Mapua (BS-ECE)
    07.23.15 - submitted ACS
    07.27.15 - ACS result - suitable..AQF Bachelor. 2 yrs deduction. 5yrs and 10 mos credited
    09.28.15 - PTE scheduled exam (Sg)
    09.29.15 - PTE Results. L - 90, R - 86, S - 90, W - 86. Overall = 90
    09.30.15 - Submitted EOI Visa 189 - 70 pts
    10.09.15 - Invitation received
    10.28.15 - medicals (me & hubby) @ Point Medical Sg
    11.11.15 - NBI (me, hubby and mother)
    11.16.15 - medicals of mother @ St Lukes BGC
    11.22.15 - Lodged Visa
    11.25.15 - Frontloaded docs and requested SG CoC
    12.01.15 - CO Allocated. Request form 47a for mother
    12.02.15 - Frontloaded SG CoC (me & hubby) and form 47a
    02.09.16 - called GSM Adelaide for follow-up (71 days from CO contact)
    02.15.16 - granted! Thank you for the Blessings
    Dependent parent rejected. CO not satisfied with one of the requirements for dependency (part of household unit)
    07.28.16 - Big move! Sydney here we go!
    09.19.16 - Start of work
    09.22.16 - Hubby start of work
    06.19.17 - Hubby's new work
    11.16.17 - hello Baby!
    Jesus, I Trust In You

  • sweetheartsweetheart Adelaide
    Posts: 93Member
    Joined: Apr 23, 2015
    @kittykitkat18 mag busy-busyhan muna tayo para makalimutan ang oras..hehehe panay kasi silip sa email..hehe :)

    Our Dreamland Journey Application to "the land down under" starts here:
    May 28, 2015 - Submitted MSA application - TRA
    June 4, 2015 - Received Acknowledgement Letter
    August 17,2015 - received SUCCESSFUL assessment (thanks to "Jesus Christ, SON of GOD, our Lord and our Saviour" )
    August 18, 2015 - EOI submitted ( 60 points)
    August 29, 2015 - SS application submitted
    October 16, 2015- Invited
    November 10,2015 - Lodged subclass 190
    December 10,2015 -CO allocated/Request additional docs
    December 15, 2015 - Additional docs uploaded
    February 23,2016 - Visa Granted! "Lord, saying Thank You is not enough but we will dare to SAY-THANK YOU SO MUCH!!!

    All Glory & Power are Yours, LORD JESUS, OUR GOD!!!

    "We put our lives in the hands of GOD" & "in HIM we T-R-U-S-T!"

  • ccanda77ccanda77 Melbourne
    Posts: 47Member
    Joined: Sep 12, 2013
  • kittykitkat18kittykitkat18 Sydney
    Posts: 908Member
    Joined: May 13, 2015
    @sweetheart kailangan maging busy.inaaway nko ni hubby kasi lakas ko daw sa net.lol..sbi ko onting tiis nlng at makakamit na.lol

    Computer network and systems engineer (263111) - Hubby is main applicant - Mapua (BS-ECE)
    07.23.15 - submitted ACS
    07.27.15 - ACS result - suitable..AQF Bachelor. 2 yrs deduction. 5yrs and 10 mos credited
    09.28.15 - PTE scheduled exam (Sg)
    09.29.15 - PTE Results. L - 90, R - 86, S - 90, W - 86. Overall = 90
    09.30.15 - Submitted EOI Visa 189 - 70 pts
    10.09.15 - Invitation received
    10.28.15 - medicals (me & hubby) @ Point Medical Sg
    11.11.15 - NBI (me, hubby and mother)
    11.16.15 - medicals of mother @ St Lukes BGC
    11.22.15 - Lodged Visa
    11.25.15 - Frontloaded docs and requested SG CoC
    12.01.15 - CO Allocated. Request form 47a for mother
    12.02.15 - Frontloaded SG CoC (me & hubby) and form 47a
    02.09.16 - called GSM Adelaide for follow-up (71 days from CO contact)
    02.15.16 - granted! Thank you for the Blessings
    Dependent parent rejected. CO not satisfied with one of the requirements for dependency (part of household unit)
    07.28.16 - Big move! Sydney here we go!
    09.19.16 - Start of work
    09.22.16 - Hubby start of work
    06.19.17 - Hubby's new work
    11.16.17 - hello Baby!
    Jesus, I Trust In You

  • sweetheartsweetheart Adelaide
    Posts: 93Member
    Joined: Apr 23, 2015
    @ccanda77 WoW congrats!!! so happy for you!!! All the best sa journey!!!

    @kittykitkat18 kayo na talaga ang susunod konting tiis nalang!oks lng yan..hindi lng pinahalata ng hubby mo na excited rin sya.hehe..

    Our Dreamland Journey Application to "the land down under" starts here:
    May 28, 2015 - Submitted MSA application - TRA
    June 4, 2015 - Received Acknowledgement Letter
    August 17,2015 - received SUCCESSFUL assessment (thanks to "Jesus Christ, SON of GOD, our Lord and our Saviour" )
    August 18, 2015 - EOI submitted ( 60 points)
    August 29, 2015 - SS application submitted
    October 16, 2015- Invited
    November 10,2015 - Lodged subclass 190
    December 10,2015 -CO allocated/Request additional docs
    December 15, 2015 - Additional docs uploaded
    February 23,2016 - Visa Granted! "Lord, saying Thank You is not enough but we will dare to SAY-THANK YOU SO MUCH!!!

    All Glory & Power are Yours, LORD JESUS, OUR GOD!!!

    "We put our lives in the hands of GOD" & "in HIM we T-R-U-S-T!"

  • kittykitkat18kittykitkat18 Sydney
    Posts: 908Member
    Joined: May 13, 2015
    @sweetheart korek excited na din malamang si hubby. Sbi ko dpat magcelebrate kme pag may grant.hehe..kya lng austerity program..kailangan magtipid for AU

    Computer network and systems engineer (263111) - Hubby is main applicant - Mapua (BS-ECE)
    07.23.15 - submitted ACS
    07.27.15 - ACS result - suitable..AQF Bachelor. 2 yrs deduction. 5yrs and 10 mos credited
    09.28.15 - PTE scheduled exam (Sg)
    09.29.15 - PTE Results. L - 90, R - 86, S - 90, W - 86. Overall = 90
    09.30.15 - Submitted EOI Visa 189 - 70 pts
    10.09.15 - Invitation received
    10.28.15 - medicals (me & hubby) @ Point Medical Sg
    11.11.15 - NBI (me, hubby and mother)
    11.16.15 - medicals of mother @ St Lukes BGC
    11.22.15 - Lodged Visa
    11.25.15 - Frontloaded docs and requested SG CoC
    12.01.15 - CO Allocated. Request form 47a for mother
    12.02.15 - Frontloaded SG CoC (me & hubby) and form 47a
    02.09.16 - called GSM Adelaide for follow-up (71 days from CO contact)
    02.15.16 - granted! Thank you for the Blessings
    Dependent parent rejected. CO not satisfied with one of the requirements for dependency (part of household unit)
    07.28.16 - Big move! Sydney here we go!
    09.19.16 - Start of work
    09.22.16 - Hubby start of work
    06.19.17 - Hubby's new work
    11.16.17 - hello Baby!
    Jesus, I Trust In You

  • sweetheartsweetheart Adelaide
    Posts: 93Member
    Joined: Apr 23, 2015
    @kittykitkat18~ dapat lng talaga e celebrate pag may visa nah hehe..wag lng masyado magastos...sa AU nalang 2nd celebration pag may work na :)

    Our Dreamland Journey Application to "the land down under" starts here:
    May 28, 2015 - Submitted MSA application - TRA
    June 4, 2015 - Received Acknowledgement Letter
    August 17,2015 - received SUCCESSFUL assessment (thanks to "Jesus Christ, SON of GOD, our Lord and our Saviour" )
    August 18, 2015 - EOI submitted ( 60 points)
    August 29, 2015 - SS application submitted
    October 16, 2015- Invited
    November 10,2015 - Lodged subclass 190
    December 10,2015 -CO allocated/Request additional docs
    December 15, 2015 - Additional docs uploaded
    February 23,2016 - Visa Granted! "Lord, saying Thank You is not enough but we will dare to SAY-THANK YOU SO MUCH!!!

    All Glory & Power are Yours, LORD JESUS, OUR GOD!!!

    "We put our lives in the hands of GOD" & "in HIM we T-R-U-S-T!"

  • ccanda77ccanda77 Melbourne
    Posts: 47Member
    Joined: Sep 12, 2013
  • kaizer23kaizer23 Sydney
    Posts: 148Member
    Joined: Oct 27, 2015
    Guys Sino Na ung nasa Sydney Dyan? Baka my available sa inyo Na room for sharing? I'll be moving to Sydney on March 18. Tnx
  • mariemmariem Australia
    Posts: 523Member
    Joined: Sep 01, 2015
    @sweetheart hi! you may add your timeline in November 2015 batch :) para ma tra k mo rin ang mga kasabay mo sa application. Thanks

    http://pinoyau.info/discussion/5473/november-2015-visa-189-190/#Item_819

    ANZSCO CODE: 261311 - Analyst Programmer (Hubby-Principal applicant)
    28.10.2105 EOI Submitted (75 Points)
    06.11.2015 Received Invitation
    28.11.2015 Lodge Visa Application | Uploaded Documents
    21.03.2016 Praise the Lord! Visa Grant! IED : June 8, 2016
    28.05.2016 BIG MOVE to Sydney!
    22.09.2021 Citizenship Grant
    To God be the glory!

Sign In or Register to comment.
LATEST 10 ACTIVE DISCUSSION THREAD
angel_iq4

Waiting for GRANTS

most recent by CBD

angel_iq4

EOI Concerns

most recent by fruitsalad

angel_iq4

Welcome to Pinoy AU Community!

The longest running Pinoy-Australian Forum site in the history. We are connecting Pinoys "in" and "to" Australia since 2010! If you want to join in, click one of these buttons!

Categories

Random Members
(55223)

successmarkjoy64rovdc31chachalala21deleonkat07toyang88rpantzmadomingo1985raz72076rtuazon002dbmrnPsychatogratelead89noisenut15lorin_25juan@lalajuli09battletune51dancewaste25maevic
Browse Members

Members Online (14) + Guest (139)

Hunter_08von1xxfruitsaladmathilde9mark_trent10piwanaims2023whimpeeonieandresbr00dling365soufflecakerurumemeamdlaguilargravytrainmanubsx

Top Active Contributors

Top Posters