Ad space available
reach us at [email protected].
Major update has been completed. Please help to report any abnormality that you are facing (in case there is any) to [email protected] . Thank you for your continued support guys!

E health Server Downtime

mikaela_7mikaela_7 AtlantaPosts: 82Member
edited August 2012 in Other Migration Topic
Good day forumers!

I started this thread para naman ma-aware yung mga affected applicants sa nangyayari ngayon sa ehealth server. Kami ay super affected dito since yung sa baby na lang namin ang hindi finalised kasi hindi pa na-upload. Since last week pa daw ito nangyari at ewan ko ba kung bakit inabot ito ng ganun katagal to fix it. But maybe they have their valid reasons behind it diba. So if ever may makasagap ng balita na up na yung server ng ehealth, pakipost naman dito. Yung mga affected applicants may share there sentiments too. Kasi kami nasasayangan talaga sa oras, visa grant na sana..tsk...tsk..tsk..

Pasensya na pala sa tagalog ko...bisaya po kasi ako.. :)

Dec 28 2011 - 175 online application (Mechanical Engr.)
May 15 2012 - CO Allocation
May 30 2012 - Medical Exams
June 19 2012 - Health requirements finalised (husband as person 3)
June 20 2012 - my Health requirements finalised (primary applicant), other documents Met
June 26 2012 - Further medical results received (baby as person 2)
June 27 2012 - Health requirements finalised (All)
June 28 2012 - Visa grant...Thank you Lord!!!
August 17 2012 - Perth touchdown...Australia here we come...

«1

Comments

  • aoleeaolee Singapore
    Posts: 571Member, De-activated
    Joined: Dec 29, 2010
    Any news that will help our fellow members is welcome! Thanks for sharing about this issue. \m/

    Please contact admin if you need anything from me, I dont often login to this account.

    Please spare some time to read our "Rules" located at the bottom of the page.

  • mikaela_7mikaela_7 Atlanta
    Posts: 82Member
    Joined: Jun 13, 2012
    @aolee ur welcome...may nagPM sa husband ko dito at sabi daw ng Nationwide Clinic dito sa Cebu, down pa rin hanggang ngayon...

    Dec 28 2011 - 175 online application (Mechanical Engr.)
    May 15 2012 - CO Allocation
    May 30 2012 - Medical Exams
    June 19 2012 - Health requirements finalised (husband as person 3)
    June 20 2012 - my Health requirements finalised (primary applicant), other documents Met
    June 26 2012 - Further medical results received (baby as person 2)
    June 27 2012 - Health requirements finalised (All)
    June 28 2012 - Visa grant...Thank you Lord!!!
    August 17 2012 - Perth touchdown...Australia here we come...

  • lock_code2004lock_code2004 Perth
    Posts: 5,037Member, De-activated
    Joined: Feb 23, 2012
    nagpamedical ako nung friday June 15 at pagtingin ko today Jun20 (Wed), na send ng clinic ang medical results ko.. so baka nmn hindi ang ehealth ang down? kundi ang connection ng clinic sa cebu?

    Sep 24, 2011 - IELTS (L-8 R-8 W-8 S-7.5 : OBS-8)
    Jan 04, 2012 - EA application submitted | Feb 23, 2012 - EA assessment result (IE ANZSCO 233511)
    May 8, 2012 - Lodged GSM 175 online application | June 4, 2012 - CO Allocated
    June 22, 2012 - Medicals Finalized | Aug 30, 2012 - PCCs Completed (PH, UAE, USA)
    Sep 3, 2012 - Visa Granted (IED Jun 11, 2013) Thank You Lord!
    Oct 16-28, 2012 - Initial Entry Completed - Sydney
    July 28, 2013 - Final move to Perth
    Sep 9, 2013 - Started work with the same company i worked for in UAE/USA
    Oct 28, 2013 - Moved to another company.. ;)

  • BryanBryan North Ryde
    Posts: 53Member
    Joined: Jun 13, 2012
    nagpamedical ako nung friday June 15 at pagtingin ko today Jun20 (Wed), na send ng clinic ang medical results ko.. so baka nmn hindi ang ehealth ang down? kundi ang connection ng clinic sa cebu?
    saan location mo sir? bakanaputulan ng internet connection ang nationwide cebu. parang niloloko lang kami ng nationwide cebu ah.

    God is Good!

  • BryanBryan North Ryde
    Posts: 53Member
    Joined: Jun 13, 2012
    sino pa dito nagpa medical sa nationwide cebu?

    God is Good!

  • mikaela_7mikaela_7 Atlanta
    Posts: 82Member
    Joined: Jun 13, 2012
    @lock_code2004 ganun po ba? cge ask ko ulit ang clinic kung sa Cebu lang ba may downtime. Salamat po sa info....

    Dec 28 2011 - 175 online application (Mechanical Engr.)
    May 15 2012 - CO Allocation
    May 30 2012 - Medical Exams
    June 19 2012 - Health requirements finalised (husband as person 3)
    June 20 2012 - my Health requirements finalised (primary applicant), other documents Met
    June 26 2012 - Further medical results received (baby as person 2)
    June 27 2012 - Health requirements finalised (All)
    June 28 2012 - Visa grant...Thank you Lord!!!
    August 17 2012 - Perth touchdown...Australia here we come...

  • lock_code2004lock_code2004 Perth
    Posts: 5,037Member, De-activated
    Joined: Feb 23, 2012
    nasa US po ako..

    Sep 24, 2011 - IELTS (L-8 R-8 W-8 S-7.5 : OBS-8)
    Jan 04, 2012 - EA application submitted | Feb 23, 2012 - EA assessment result (IE ANZSCO 233511)
    May 8, 2012 - Lodged GSM 175 online application | June 4, 2012 - CO Allocated
    June 22, 2012 - Medicals Finalized | Aug 30, 2012 - PCCs Completed (PH, UAE, USA)
    Sep 3, 2012 - Visa Granted (IED Jun 11, 2013) Thank You Lord!
    Oct 16-28, 2012 - Initial Entry Completed - Sydney
    July 28, 2013 - Final move to Perth
    Sep 9, 2013 - Started work with the same company i worked for in UAE/USA
    Oct 28, 2013 - Moved to another company.. ;)

  • BryanBryan North Ryde
    Posts: 53Member
    Joined: Jun 13, 2012
    kung pwede lang sana kami nalang magsend ng medicals. masmabilis pa yata ang DHL kaysa nationawide cebu.

    God is Good!

  • mikaela_7mikaela_7 Atlanta
    Posts: 82Member
    Joined: Jun 13, 2012
    Gud news sa mga nagpamedical sa Nationwide Cebu...pagktapos ko mag follow-up a few minutes ago...sabi nila okay na daw...mga 1 week na since sinabi nila na down ang server... Sana ma upload agad ang mga results natin...ThanK God at okay na... :)

    Dec 28 2011 - 175 online application (Mechanical Engr.)
    May 15 2012 - CO Allocation
    May 30 2012 - Medical Exams
    June 19 2012 - Health requirements finalised (husband as person 3)
    June 20 2012 - my Health requirements finalised (primary applicant), other documents Met
    June 26 2012 - Further medical results received (baby as person 2)
    June 27 2012 - Health requirements finalised (All)
    June 28 2012 - Visa grant...Thank you Lord!!!
    August 17 2012 - Perth touchdown...Australia here we come...

  • lock_code2004lock_code2004 Perth
    Posts: 5,037Member, De-activated
    Joined: Feb 23, 2012
    great news!! lapit na ang visa grant..

    Sep 24, 2011 - IELTS (L-8 R-8 W-8 S-7.5 : OBS-8)
    Jan 04, 2012 - EA application submitted | Feb 23, 2012 - EA assessment result (IE ANZSCO 233511)
    May 8, 2012 - Lodged GSM 175 online application | June 4, 2012 - CO Allocated
    June 22, 2012 - Medicals Finalized | Aug 30, 2012 - PCCs Completed (PH, UAE, USA)
    Sep 3, 2012 - Visa Granted (IED Jun 11, 2013) Thank You Lord!
    Oct 16-28, 2012 - Initial Entry Completed - Sydney
    July 28, 2013 - Final move to Perth
    Sep 9, 2013 - Started work with the same company i worked for in UAE/USA
    Oct 28, 2013 - Moved to another company.. ;)

  • mikaela_7mikaela_7 Atlanta
    Posts: 82Member
    Joined: Jun 13, 2012
    @lock_code2004 oo nga...sana this week na... ;)

    Dec 28 2011 - 175 online application (Mechanical Engr.)
    May 15 2012 - CO Allocation
    May 30 2012 - Medical Exams
    June 19 2012 - Health requirements finalised (husband as person 3)
    June 20 2012 - my Health requirements finalised (primary applicant), other documents Met
    June 26 2012 - Further medical results received (baby as person 2)
    June 27 2012 - Health requirements finalised (All)
    June 28 2012 - Visa grant...Thank you Lord!!!
    August 17 2012 - Perth touchdown...Australia here we come...

  • mikaela01mikaela01 Sydney
    Posts: 265Member
    Joined: Jan 21, 2011
    Ang st. Lukes down din daw since june 18. Kaya ung sakin di pa uploaded, june 8 pa kami ngpamedical.

    29 May 2012 - lodged 176 online application
    (Civil Engineer 233211;WA State Sponsored)
    2 June 2012 - CO allocation
    6 June 2012 - PCC uploaded
    8 June 2012 - Medicals
    21 June 2012 - further medical results received
    25 June 2012 - Health requirements finalised
    27 June 2012 - Visa Granted!! To God be the glory!
    19 Aug 2012 - Landed in AU
    Believe in the power of prayers!
    When challenges are so big that we feel our strength is not enough to carry them , keep on going. The extra mile is where the GRACE OF GOD begins.

  • hotshothotshot Sydney
    Posts: 1,643Member
    Joined: Nov 10, 2011
    mukang di lang ata sa pinas ito ha. we had our medical last Friday (June 15th) here in SG. tumawag ako just now to ask the status...then sabi sa akin may problema daw dun sa online kaya di pa daw nauupdate ng doctor yung results. waaaahhhh!

    Occupation: Analyst Programmer (ANZSCO Code 261311)
    May 21 2012 - lodged visa 176 (NSW) online application
    May 30 2012 - CO allocation
    Jul 16 2012 - Visa Granted! (IED Deadline: May 16, 2013)
    Jan 19 2013 - Arrived in Sydney
    Jan 20 2013 - Started our job hunt
    Mar 11 2013 - Officially became a "HOUSE-BAND" :)
    Apr 22 2013 - End of my "HOUSE-BAND" career :)

  • mikaela_7mikaela_7 Atlanta
    Posts: 82Member
    Joined: Jun 13, 2012
    @hotshot sabi ng clinic dito sa cebu okay na daw...sana ma upload agad yung sa atin...

    Dec 28 2011 - 175 online application (Mechanical Engr.)
    May 15 2012 - CO Allocation
    May 30 2012 - Medical Exams
    June 19 2012 - Health requirements finalised (husband as person 3)
    June 20 2012 - my Health requirements finalised (primary applicant), other documents Met
    June 26 2012 - Further medical results received (baby as person 2)
    June 27 2012 - Health requirements finalised (All)
    June 28 2012 - Visa grant...Thank you Lord!!!
    August 17 2012 - Perth touchdown...Australia here we come...

  • hotshothotshot Sydney
    Posts: 1,643Member
    Joined: Nov 10, 2011
    @mikaela_7 : sana! sana!

    Occupation: Analyst Programmer (ANZSCO Code 261311)
    May 21 2012 - lodged visa 176 (NSW) online application
    May 30 2012 - CO allocation
    Jul 16 2012 - Visa Granted! (IED Deadline: May 16, 2013)
    Jan 19 2013 - Arrived in Sydney
    Jan 20 2013 - Started our job hunt
    Mar 11 2013 - Officially became a "HOUSE-BAND" :)
    Apr 22 2013 - End of my "HOUSE-BAND" career :)

  • Vincex01Vincex01 Dinalupihan
    Posts: 8Member
    Joined: Jun 20, 2012
    Hi guys! Im new here, will take my medical on Friday, just wanna ask though, how and where do you view the results? Can anyone give me the address? Thanks and God Bless!

    Mar 17 - IELTS
    Mar 30 - IELTS results
    Apr 2 - Lodged school application
    May 13 - Received school offer letter
    May 28 - Submitted additional requirement (Visa agreement)
    May 30 - Finalized school offer
    May 31 - Paid tuition
    June 4 - Received COE
    June 8 - Lodged visa application thru IDP
    June 13 - Acknowledgement letter from the Australian Embassy
    June 20 - Received request to undergo medical
    June 22 - Medical at Nationwide
    June 26 - Submitted add'l requirements for medical clearance
    July 10 - Health Undertaking
    July 12 - Visa Grant

  • stolich18stolich18 Sydney
    Posts: 993Member
    Joined: Feb 15, 2012
    @Vincex01 welcome to pinoyau! Sa evisa link where you input your TRN.
    link : https://www.ecom.immi.gov.au/inquiry

    261313 (Software Engineer)

    Feb.15.2012 - started working on ACS requirements
    Mar.02.2012 - submitted online ACS application and sent documents to ACS via Fedex
    Mar.05.2012 - ACS acknowledged actual documents
    Mar.21.2012 - ACS finalised assessment: Suitable
    Mar.31.2012 - IELTS exam with BC
    Apr.13.2012 - IELTS Results (L:8.5 R:7 W: 7 S: 8 OB: 7.5) Thank you LORD!
    Apr.14.2012 - Lodged 175 Online Application
    Apr.20.2012 - Completed Online Attachments
    May.24.2012 - "Application being processed further"
    May.29.2012 - CO Assigned :-)
    Jun.07.2012 - Uploaded NBI Clearance
    Jun.13.2012 - Medical/Health Requirements Finalised
    Jun.14.2012 - VISA GRANT! Thank you, LORD! :-)
    Jun.07.2013 - Initial Entry Date Deadline
    Apr.28.2013 - Initial Entry (Sydney)
    Jun.28.2013 - Verbal Job Offer (Melbourne)
    Jul.08.2013 - First day of Work and first day of child care for my son (Melbourne)
    Aug.21.2013 - First day of Work in Sydney

    "Great is the LORD and most worthy of praise; his greatness no one can fathom." Psalm 145:3

  • donkingdonking Melbourne
    Posts: 258Member
    Joined: May 24, 2012
    oo ngA yamot na yamot na nga kami... 2 weeks na eh... nung 18 pa down connection sa nationwide manila.

    April 24, 2011 - Submitted CDR to EA
    May 6, 2011 - IELTS BC OBS 7.0
    August 25, 2011 - Received positive assessment from EA
    February 22, 2012 - Resat IELTS IDP OBS 7.5
    April 13, 2012 - Applied SS SA
    May 1, 2012 - Received positive response from SA
    May 10, 2012 - Pre-lodgement to DIAC
    May 31, 2012 - Lodgement to DIAC
    May 31, 2012 - South Australia sent form 1100 to DIAC
    June 4, 2012 - application being processed further...
    June 4, 2012 - C.O. allocated
    June 4, 2012 - request for PCC and medicals
    June 6, 2012 - Medicals done
    June 7, 2012 - NBI
    June 8, 2012 - further medical results received
    June 27, 2012 - All medicals finalised
    July 2, 2012 - Visa Grant

  • BryanBryan North Ryde
    Posts: 53Member
    Joined: Jun 13, 2012
    ano na balita dito? sa nationwide manila at St. Lukes ok naba ang uploading nila?

    God is Good!

  • mikaela01mikaela01 Sydney
    Posts: 265Member
    Joined: Jan 21, 2011
    ok na sa st. lukes, uploaded na ung medicals naming lahat including HIV blood test
    @donking: konting tiis, ung samin din almost 2 weeks din bago ma upload eh..

    29 May 2012 - lodged 176 online application
    (Civil Engineer 233211;WA State Sponsored)
    2 June 2012 - CO allocation
    6 June 2012 - PCC uploaded
    8 June 2012 - Medicals
    21 June 2012 - further medical results received
    25 June 2012 - Health requirements finalised
    27 June 2012 - Visa Granted!! To God be the glory!
    19 Aug 2012 - Landed in AU
    Believe in the power of prayers!
    When challenges are so big that we feel our strength is not enough to carry them , keep on going. The extra mile is where the GRACE OF GOD begins.

  • lock_code2004lock_code2004 Perth
    Posts: 5,037Member, De-activated
    Joined: Feb 23, 2012
    edited June 2012
    Reply to @donking: haha.. ang lalim ng "yamot"... taga quezon, batangas or laguna ka?

    Sep 24, 2011 - IELTS (L-8 R-8 W-8 S-7.5 : OBS-8)
    Jan 04, 2012 - EA application submitted | Feb 23, 2012 - EA assessment result (IE ANZSCO 233511)
    May 8, 2012 - Lodged GSM 175 online application | June 4, 2012 - CO Allocated
    June 22, 2012 - Medicals Finalized | Aug 30, 2012 - PCCs Completed (PH, UAE, USA)
    Sep 3, 2012 - Visa Granted (IED Jun 11, 2013) Thank You Lord!
    Oct 16-28, 2012 - Initial Entry Completed - Sydney
    July 28, 2013 - Final move to Perth
    Sep 9, 2013 - Started work with the same company i worked for in UAE/USA
    Oct 28, 2013 - Moved to another company.. ;)

  • BryanBryan North Ryde
    Posts: 53Member
    Joined: Jun 13, 2012
    buti pa ang St Lukes...
    ang nationwide manila ok na kaya? kukulitin ko na naman ang nationwide dito sa amin. :)]

    God is Good!

  • mikaela_7mikaela_7 Atlanta
    Posts: 82Member
    Joined: Jun 13, 2012
    @mikaela01 buti pa kayo...sa amin wala pang sumasagot kasi kinukulit din namin...

    Dec 28 2011 - 175 online application (Mechanical Engr.)
    May 15 2012 - CO Allocation
    May 30 2012 - Medical Exams
    June 19 2012 - Health requirements finalised (husband as person 3)
    June 20 2012 - my Health requirements finalised (primary applicant), other documents Met
    June 26 2012 - Further medical results received (baby as person 2)
    June 27 2012 - Health requirements finalised (All)
    June 28 2012 - Visa grant...Thank you Lord!!!
    August 17 2012 - Perth touchdown...Australia here we come...

  • siparekosipareko Melbourne
    Posts: 74Member
    Joined: Oct 17, 2011
    I emailed Nationwide (Makati) for the status and this was the reply:

    "Our doctors will be in Singapore from June 20 to June 23, 2012
    To attend the Australian Panel Physician Training Conference.
    We will resume transmittal of files on June 25, 2012"

    Weird :-O

    NOMINATED OCCUPATION: Analyst Programmer (261311)
    10/12/2011 - IELTS Exam #1 - Failed (L-8.5; R-8.0; S-7.5; W-6.5) | 20/12/2011 - ACS received documents | 23/12/2011 - Applied for IELTS Remarking | 27/01/2012 - ACS assessment: Suitable (AQF Bachelor Degree with a major in computing) | 20/02/2012 - Remarking Failed | 31/03/2012 - IELTS Exam #2 - Passed (L-8.0; R-7.0; S-8.0; W-7.0) | 27/04/2012 - NSW SS received documents | 15/05/2012 - NSW SS approval received | 21/05/2012 - Lodged Online Application | 30/05/2012 - Application being processed further | 30/05/2012 - CO Assigned | 02/06/2012 - Medical Exam at Nationwide Makati | 11/06/2012 - Submitted NBI clearance | 14/06/2012 - Health requirements finalised (Wifey's) | 26/06/2012 - Health requirements finalised | 27/06/2012 - VISA Granted (Initial Entry Date Deadline - 11/06/2013)
    08/09/2012 - Arrived in Sydney

  • BryanBryan North Ryde
    Posts: 53Member
    Joined: Jun 13, 2012
    what?? walang papalit na doctor? how about sa downtime ng ehealth? sinabi rin nila?

    God is Good!

  • mikaela_7mikaela_7 Atlanta
    Posts: 82Member
    Joined: Jun 13, 2012
    may bagong info regarding dito...parang hindi pa rin yata na resolve yung downtime ng ehealth. I dont know if applicable ba ito sa lahat ng location. Kasi nagtanong kami ulit a few minutes ago at sabi nila na nag-email daw ang ehealth sa kanila. Sabi daw ay i-email nalang sa kanila yung mga urgent para yung ehealth na daw ang bahala na mag-upload ng results. Sa baby daw namin ay na send na yesterday.

    So pwede cguro i-contact nyo ang clinic ngayon thru email or text para ma send din ang sa inyo sa ehealth.

    Dec 28 2011 - 175 online application (Mechanical Engr.)
    May 15 2012 - CO Allocation
    May 30 2012 - Medical Exams
    June 19 2012 - Health requirements finalised (husband as person 3)
    June 20 2012 - my Health requirements finalised (primary applicant), other documents Met
    June 26 2012 - Further medical results received (baby as person 2)
    June 27 2012 - Health requirements finalised (All)
    June 28 2012 - Visa grant...Thank you Lord!!!
    August 17 2012 - Perth touchdown...Australia here we come...

  • hotshothotshot Sydney
    Posts: 1,643Member
    Joined: Nov 10, 2011
    katatawag lang namin sa Raffles Hospital here in SG at eto ang sabi sa amin...up na daw ang e-Health pero unfortunately di pa din uploaded ang results namin. Pero pipilitin daw nila iupload lahat today at pinapatawag ulit kami bukas to ask for the status. So sa mga taga-SG...no need to worry (hopefully di na mag-down ang server). :)

    Occupation: Analyst Programmer (ANZSCO Code 261311)
    May 21 2012 - lodged visa 176 (NSW) online application
    May 30 2012 - CO allocation
    Jul 16 2012 - Visa Granted! (IED Deadline: May 16, 2013)
    Jan 19 2013 - Arrived in Sydney
    Jan 20 2013 - Started our job hunt
    Mar 11 2013 - Officially became a "HOUSE-BAND" :)
    Apr 22 2013 - End of my "HOUSE-BAND" career :)

  • donkingdonking Melbourne
    Posts: 258Member
    Joined: May 24, 2012
    Reply to @sipareko: pre yan lang din yung nirereply sakin... bad trip... dapat sa st.lukes na lang nagpapamedical ang migrants....

    April 24, 2011 - Submitted CDR to EA
    May 6, 2011 - IELTS BC OBS 7.0
    August 25, 2011 - Received positive assessment from EA
    February 22, 2012 - Resat IELTS IDP OBS 7.5
    April 13, 2012 - Applied SS SA
    May 1, 2012 - Received positive response from SA
    May 10, 2012 - Pre-lodgement to DIAC
    May 31, 2012 - Lodgement to DIAC
    May 31, 2012 - South Australia sent form 1100 to DIAC
    June 4, 2012 - application being processed further...
    June 4, 2012 - C.O. allocated
    June 4, 2012 - request for PCC and medicals
    June 6, 2012 - Medicals done
    June 7, 2012 - NBI
    June 8, 2012 - further medical results received
    June 27, 2012 - All medicals finalised
    July 2, 2012 - Visa Grant

  • donkingdonking Melbourne
    Posts: 258Member
    Joined: May 24, 2012
    Reply to @mikaela_7: pupuntahan ko na lang nationwide....pwede ba irequest sa kanila na iemail na lang results sa ehealth?

    April 24, 2011 - Submitted CDR to EA
    May 6, 2011 - IELTS BC OBS 7.0
    August 25, 2011 - Received positive assessment from EA
    February 22, 2012 - Resat IELTS IDP OBS 7.5
    April 13, 2012 - Applied SS SA
    May 1, 2012 - Received positive response from SA
    May 10, 2012 - Pre-lodgement to DIAC
    May 31, 2012 - Lodgement to DIAC
    May 31, 2012 - South Australia sent form 1100 to DIAC
    June 4, 2012 - application being processed further...
    June 4, 2012 - C.O. allocated
    June 4, 2012 - request for PCC and medicals
    June 6, 2012 - Medicals done
    June 7, 2012 - NBI
    June 8, 2012 - further medical results received
    June 27, 2012 - All medicals finalised
    July 2, 2012 - Visa Grant

  • mikaela_7mikaela_7 Atlanta
    Posts: 82Member
    Joined: Jun 13, 2012
    Reply to @donking:
    sa tingin ko po pwede...sabihin nyo na lang na ganun ang ginawa ng mga personnel dito sa Nationwide Cebu...sa Manila ka diba?

    Dec 28 2011 - 175 online application (Mechanical Engr.)
    May 15 2012 - CO Allocation
    May 30 2012 - Medical Exams
    June 19 2012 - Health requirements finalised (husband as person 3)
    June 20 2012 - my Health requirements finalised (primary applicant), other documents Met
    June 26 2012 - Further medical results received (baby as person 2)
    June 27 2012 - Health requirements finalised (All)
    June 28 2012 - Visa grant...Thank you Lord!!!
    August 17 2012 - Perth touchdown...Australia here we come...

Sign In or Register to comment.
LATEST 10 ACTIVE DISCUSSION THREAD
angel_iq4

Waiting for GRANTS

most recent by CBD

angel_iq4

EOI Concerns

most recent by fruitsalad

angel_iq4

Welcome to Pinoy AU Community!

The longest running Pinoy-Australian Forum site in the history. We are connecting Pinoys "in" and "to" Australia since 2010! If you want to join in, click one of these buttons!

Categories

Random Members
(55222)

nomercypercyoodilontumangkrizzia08ladygaga111DellCopelanewventurewealthevogelo21queeniexxcathydacasinhannahhhhlalalisa123Stepanie81jmdmelfyangrheadaveKgtdeleonehcon272ervingAmersonVerzon13
Browse Members

Members Online (4) + Guest (153)

baikenTheRealMe24Cerberus13gravytrain

Top Active Contributors

Top Posters