most recent by hanah
Australian Computer Society Skills Application
most recent by karabaschikoy0121
most recent by casssie
AUSTRALIAN CITIZENSHIP TIMELINE
most recent by xiaolico
QUEENSLAND STATES SPONSORSHIP FY 2024-2025
most recent by Ozdrims
most recent by Ozdrims
most recent by eel_kram025
How long did it take you to get a job?
most recent by Conboyboy
The longest running Pinoy-Australian Forum site in the history. We are connecting Pinoys "in" and "to" Australia since 2010! If you want to join in, click one of these buttons!
Comments
Posts: 735Member
Joined: Jun 19, 2015
CONSTRUCTION PROJECT MANAGER
Age - 25pts
Experience - 5pts
Education - 15pts
PTE - 10pts
SS - 5pts
TOTAL = 60 POINTS (VISA 190)
November 2014 = Decided to pursue family migration to Australia
January 2015 = Took the IELTS @ British Council (S:7.5,W:6.5,L:7.5,R:7.5)
February - July 2015 = Gather Necessary Documents For Assessment
August 3, 2015 = Submitted documents to Vetassess
October 15, 2015 = Vetassess called our landline to verify my submitted documents
October 21, 2015 = Positive and Negative Result from Vetassess.....out of 10 years of employment 2.7 years lang ang credited sa akin....
October 23, 2015 = Scheduled for PTE-A on November 6...aiming to get 20 points..wish me luck
November 7, 2015 = I took the PTE-A Exam
November 8, 2015 = Results of PTE-A (Listening:80;Reading:63;Speaking:84;Writing:75) 2 Points na lang hindi pa ako pinagbigyan....huhuhu
November 13, 2015 = Baba ng 5 points at the same time schedule din ng PTE-A exam ko
November 13, 2015 = Result of PTE Take 2 (Listening:69; Reading:63; Speaking:79;Writing:78) Sablay na naman
December 2, 2015 = PTE 3rd Retake (sana pumasa na)
December 4, 2015 = PTE Result (Listening:65; Reading: 67; Speaking:68; Writing: 67) Sa wakas
December 4, 2015 = Submitted EOI Visa 190
December 11, 2015 = Received ITA
December 12, 2015 = Lodged NSW Nomination
January 11, 2015 = NSW Approved
January 25, 2016 = Medical @ Nationwide Makati
February 15, 2016 = Lodged Visa (Waiting Game)
March 15, 2016 = CO reuqested for PTE results
*****Sana maging okay ang lahat****
Joined: Nov 30, 2015
(partner) 60 points
Lodged 489 provisional visa w/ de facto : Jan 2016
CO Allocated (GSM Brisbane): Feb 2016
PC/NBI Uploaded : Feb 2016
Grant: April 2016
Lodged 887 PR - July 2018
887 PR Granted - Direct Grant Sept 2019
Posts: 75Member
Joined: Sep 12, 2015
Posts: 1,002Member
Joined: Jun 05, 2014
Anyways, Nagstart ako magapply about a week after we arrived in Sydney. That same week nakareceive ako ng interview schedule, direct hire. After the interview, binigyan ako ng exam. Pero hindi naging ok ang result . apply pa more...
Second ko naman, nagsend ako ng application through seek and then sa hapon tinawagan ako direct hire din ito. Interviewed pero may mas fit daw. rejected nanaman
Third, got a call from recruiter, this time para sa start up. Medyo mahirap at madugo at umuwing luhaan nanaman ako.
Forth, meron nanaman direct hire pero contract role. eto yong hinahantay ko ngayon. Bale one month na kung susumahin since they contacted me.
Fifth, naschedule naman ako for a start up uli pero nahirapan ako uli sa exam and di ko na masyado naayos kasi nga hinihintay ko tong forth na position...
Parang every week since dumating kami ay may schedule ako ng interview. May mga tumatawag din na recruiters pero hanggang dun lang, medyo di pa ako sanay makipagusap pero sa tingin ko dapat sa calls na yon mabenta mo agad skills mo. Dalawa lang sa recruiter ang tumawag sakin and naset ako for interview sa client pero the rest hanggang tawag lang.
Madami rin ako rejection letters sa seek hehe. Pero ang napansin ko mas mabilis tumawag kapag direct ka nagapply sa company.
Recently, may tumatawag sakin mga recruiters kahit di na ako nagpapasa. Sign to na meron paring mga trabaho na available siguro hindi lang talaga para sakin at di rin fit ang skills ko. Or medyo tanga rin ako sa interviews
Wala parin ako work pero maganda naman ang experience ko sa paghahanap ng work dito. Kasi nung una ineexpect ko wala talaga tatawag sayo or papansin, pero meron din pala. Need lang magprepare ng sobra sobra para kapag may interview e maging ok.
Sa ngayon waiting parin.... itutuloy ang susunod na kwento hihi...
Developer Programmer (261312)
08.25.2014: Completed gathering of documents
08.29.2014: ACS Skills Assessment
09.09.2014: ACS Result - OK - Thank you Lord!
10.18.2014: IELTS IDP Makati
10.31.2014: IELTS- R:8.5 L:7.5 S:7 W:7 - OBS:7.5) - Thank you Lord!
02.03.2015: Submitted EOI
02.26.2015: Received ITA 189
04.24.2015: Lodged Visa - Day 1
04.25.2015: Uploaded docs - Day 2
05.08.2015: Wife NBI Clearance - Day 15 || 05.25.2015: Uploaded NBI Clearance - Day 32
05.28.2015: Medicals @ SLEC BGC Day 35
05.30.2015: Medicals Finalised - Day 37
06.11.2015: CO Allocated - Day 48
07.02.2015 - Visa Granted! Thank you LORD! Glory to God!
10.15.2015 - Arrived in SYD - Jer 29:11
Posts: 583Member
Joined: Oct 09, 2015
Mechanical Engineer || ANZSCO 233512 ||Age: 30pts || Educ: 15pts || Work Exp: 5pts || English: 20pts || TOTAL: 70pts
08.29.2015 - IELTS Schedule
09.11.2015 - Received IELTS Result - FAILED [L8|R7.5|S6|W6.5]
09.14.2015 - submitted requirements to EA for assessment
10.19.2015 - PTE-A Schedule // Received PTE Result - PASSED! [L79|R83|S79|W89]
11.03.2015 - NBI schedule
11.18.2015 - Received EA Positive Result // Submitted EOI - Visa 189
11.22.2015 - Received ITA
11.26.2015 - Lodged Visa 189 application
11.27.2015 - Uploaded Documents, frontloaded NBI [Me and Wife]
12.04.2015 - Medical Exam @ SLEC
12.07.2015 - CO Allocated (GSM Adelaide) -- Requesting Medical Exam Result
12.14.2015 - Medical (Primary) uploaded
07.28.2016 - Medical (Spouse) uploaded
08.01.2016 - Medical (Spouse) cleared
08.09.2016 - Visa Grant finally
IED: October 28, 2016
A river cuts through a rock not because of its POWER but its PERSISTENCE.
Posts: 1,002Member
Joined: Jun 05, 2014
Developer Programmer (261312)
08.25.2014: Completed gathering of documents
08.29.2014: ACS Skills Assessment
09.09.2014: ACS Result - OK - Thank you Lord!
10.18.2014: IELTS IDP Makati
10.31.2014: IELTS- R:8.5 L:7.5 S:7 W:7 - OBS:7.5) - Thank you Lord!
02.03.2015: Submitted EOI
02.26.2015: Received ITA 189
04.24.2015: Lodged Visa - Day 1
04.25.2015: Uploaded docs - Day 2
05.08.2015: Wife NBI Clearance - Day 15 || 05.25.2015: Uploaded NBI Clearance - Day 32
05.28.2015: Medicals @ SLEC BGC Day 35
05.30.2015: Medicals Finalised - Day 37
06.11.2015: CO Allocated - Day 48
07.02.2015 - Visa Granted! Thank you LORD! Glory to God!
10.15.2015 - Arrived in SYD - Jer 29:11
Posts: 387Member
Joined: Apr 29, 2014
261313 Software Engineer
12 Sep 2014 - Completed Docs for ACS Assesment
15 Sep 2014 - Submitted Docs to ACS
22 Sep 2014 - AQF Diploma (deducted 5 yrs exp)
07 Feb 2015 - IELTS IDP SG (L:8.0 R:8.0 W:6.5 S:6.5)
23 Feb 2015 - Paid for Remarking
28 Feb 2015 - IELTS IDP SG (L:9.0 R:8.5 W:6.5 S:7.0)
16 Mar 2015 - Paid for Remarking again =(
27 Mar 2015 - 1st Remarking result (unchanged)
07 Apr 2015 - Booked another IELTS exam
09 Apr 2015 - 2nd Remarking result (W:6.5 -> 7.0, S:7.0 -> 7.5)
Finally!!
15 Apr 2015 - EOI Submitted (189 - 60 points)
13 May 2015 - Will Receive Invitation (BIL! BIL!) - Nothing happened here
09 Jun 2015 - Modified EOI to include 190-NSW (65pts)
18 Jun 2015 - ITA for NSW Nomination
19 Jun 2015 - Paid NSW Nomination App Fee
22 Jun 2015 - ITA for Visa, NSW Nomination Approved
26 Jun 2015 - LODGED
26 Jun 2015 - CTC and Uploaded all Docs
28 Jun 2015 - Upload photos
29 Jun 2015 - Applied SG COC
01 Jul 2015 - Medical done, son's medical uploaded
03 Jul 2015 - Claim SG COC, CTC and Upload remaining Docs
03 Jul 2015 - Wife Medical Uploaded
04 Jul 2015 - My Medical Uploaded
19 Aug 2015 - Direct Grant!!! Basta Ikaw Lord! (IED: 03 Jul 2016)
20 Aug 2015 - Job hunting begins
30 Aug 2015 - Initial Entry (alone)
21 Oct 2015 - First day! BIL!
Posts: 1,002Member
Joined: Jun 05, 2014
Anyway, thanks for this info
Developer Programmer (261312)
08.25.2014: Completed gathering of documents
08.29.2014: ACS Skills Assessment
09.09.2014: ACS Result - OK - Thank you Lord!
10.18.2014: IELTS IDP Makati
10.31.2014: IELTS- R:8.5 L:7.5 S:7 W:7 - OBS:7.5) - Thank you Lord!
02.03.2015: Submitted EOI
02.26.2015: Received ITA 189
04.24.2015: Lodged Visa - Day 1
04.25.2015: Uploaded docs - Day 2
05.08.2015: Wife NBI Clearance - Day 15 || 05.25.2015: Uploaded NBI Clearance - Day 32
05.28.2015: Medicals @ SLEC BGC Day 35
05.30.2015: Medicals Finalised - Day 37
06.11.2015: CO Allocated - Day 48
07.02.2015 - Visa Granted! Thank you LORD! Glory to God!
10.15.2015 - Arrived in SYD - Jer 29:11
Posts: 387Member
Joined: Apr 29, 2014
261313 Software Engineer
12 Sep 2014 - Completed Docs for ACS Assesment
15 Sep 2014 - Submitted Docs to ACS
22 Sep 2014 - AQF Diploma (deducted 5 yrs exp)
07 Feb 2015 - IELTS IDP SG (L:8.0 R:8.0 W:6.5 S:6.5)
23 Feb 2015 - Paid for Remarking
28 Feb 2015 - IELTS IDP SG (L:9.0 R:8.5 W:6.5 S:7.0)
16 Mar 2015 - Paid for Remarking again =(
27 Mar 2015 - 1st Remarking result (unchanged)
07 Apr 2015 - Booked another IELTS exam
09 Apr 2015 - 2nd Remarking result (W:6.5 -> 7.0, S:7.0 -> 7.5)
Finally!!
15 Apr 2015 - EOI Submitted (189 - 60 points)
13 May 2015 - Will Receive Invitation (BIL! BIL!) - Nothing happened here
09 Jun 2015 - Modified EOI to include 190-NSW (65pts)
18 Jun 2015 - ITA for NSW Nomination
19 Jun 2015 - Paid NSW Nomination App Fee
22 Jun 2015 - ITA for Visa, NSW Nomination Approved
26 Jun 2015 - LODGED
26 Jun 2015 - CTC and Uploaded all Docs
28 Jun 2015 - Upload photos
29 Jun 2015 - Applied SG COC
01 Jul 2015 - Medical done, son's medical uploaded
03 Jul 2015 - Claim SG COC, CTC and Upload remaining Docs
03 Jul 2015 - Wife Medical Uploaded
04 Jul 2015 - My Medical Uploaded
19 Aug 2015 - Direct Grant!!! Basta Ikaw Lord! (IED: 03 Jul 2016)
20 Aug 2015 - Job hunting begins
30 Aug 2015 - Initial Entry (alone)
21 Oct 2015 - First day! BIL!
Posts: 3Member
Joined: Dec 19, 2015
Sharing my experience here. I arrived last quater of 2013 on a 190 visa. Learned from the experience of friends who went here before me and prepared a plan for myself.
Didnt get a job for my skill (considered a generalist job) but was able to get into odd jobs on my first month -as a cleaner.
To make the long story short, 2 years later I'm still a cleaner. Was able to move out of my house share 3 months into the job. I was lucky because although I was on a casual post, my roster manager gave me full time hours 5-6 days a week. Got my own unit to rent (250/week) and is able to send money and save. I was able to travel to Europe this year visiting friends.
After 7 months I was offered permanenet part time role. Whilst working, I have one other casual job also as a cleaner. My employer paid for certificates in special cleaning that I added on my resume immediatey and then the offers came in to work in other facilities.
Looking back, I never knew I would make a career as a professional cleaner before I came here. All these in my first 2 years. I still once in a while browse through Seek to look for jobs related to my original skill. I dont mind carrying on working as a cleaner, pero sa mga papunta pa lang dito or sa mga andito na at naghahanap pa rin ng trabaho, don't lose hope. Who knows you might like what you do outside your comfort zone.
Totoo din ang mga sinabi ng iba dito sa forum, you build networks with the Aussies. They're nice people. You occasionally meet the rude ones, but then again, may mga rude din naman na pinoys. Huwag mashado dibdibin. I was lucky I was given this break by my bosses. They like our work ethic as pinoys.
I still hope one day to get into my skill. But for now, I would say I'm ok.
Goodluck sa mga job hunters Tiwala lang lagi.
Posts: 692Member
Joined: Jul 18, 2012
October 6, 2012 - Passed IELTS - Academic (W 6 S 6 L 8 R 7 OBS 7.0) pwde na yan!
October 16, 2012 - Submitted CDR to EA
February 27, 2013 - Received Favorable letter from EA (Mechanical Engineer - ANZSCO 233512) Thank you Lord!
March 8, 2013 - Applied WA SS
March 25, 2013 - Received Letter for WA SS (delaying/maximising 28 days; waiting for civil wedding)
May 31, 2013 - Submitted Visa Application (with everything; PCC Saudi, NBI, Marriage certificate, etc)
July 11, 2013 - CO Assigned / Team 7 Adelaide
August 17, 2013 - Done with the Medicals
September 4, 2013 - Visa Grant (Subclass 190 / ANZCO233515 - Mechanical Engineer) Thank you Lord! / IED August 23, 2014
August 8, 2014 - Flight to Oz, No turning Back, This is it!
May 2015 - End of relationship
June 2015 - Wife found new partner (aussie)
October 2015 - Wife filed for divorce (That cunt)
January 2016 - Divorced
August 2018 - Lodged Citizenship
March 2019 - Sit in Citizenship Exam/Interview
May 2019 - Citizenship Ceremony
June 2019 - Au Passport received
Posts: 1,085Member, De-activated
Joined: Jan 24, 2013
2013-Jan : Decided to pursue my OZ dream
2013-Nov : 1st Ielts-GT @ BC Manila: L-8;R-6.5;W-7.5;S-7.5
2014-Mar : 2nd Ielts-GT @ BC Manila: L-8;R-8.5;W-6.5;S-7.5
Pahinga muna. Sakit sa puso at bulsa!
2015-May : 1st PTE-A @ Bright Center: L-85;R-70;S-45;W-90
2015-May : 2nd PTE-A @Bright Center; L-90;R-70;S-47; W-90
2015-July : 3rd PTE-A @Pearson: L-90;R-77;S-83; W-90
2015-July 20 - Lodged docs to Vetassess
2015-Oct 1: VET Positive outcome
2015-Oct 1: Submitted EOI 190 visa to NSW (55+5)
2015-Oct 4: Submitted EOI 190 visa to QLD (55+5)
2015-Oct 5: QLD responded, rejected 190 due to change in occupation list but offered ITA for 489 visa instead
2015-Nov 2: DIBP points adjusted to 60+5 (due to additional 1 year working experience)
2015-Nov 26: ITA for SS NSW
2015-Nov 28: Submitted SS application
2015-Dec 17: SS Approved + Received 190 ITA
2015-Dec 23: Lodged 190
2016-Jan 5: Medical @ Nationwide (Php5,600 na ang fee!!)
2016-Jan 8: Medical Clearance Provided - no action required (Thank you Lord!)
2016-Jan 18: Applied for Driving SP and Direct Visa Grant!!! (Thank You Lord!)
2016-Jan 26: PDOS @ CFO Manila + Enrolled at A1 Driving
2016-Mar 14: BIG MOVE!:)
PRAY HARD, WORK HARDER!
Compilation of tips/resources/stories for PTE Academic Preparation: pteacademicreview.wordpress.com
Template or "cheat sheet" as called by many: https://drive.google.com/file/d/0B1OZBrQj0i5LWU1EYVZTaDF4VzA/view?usp=sharing
sana po makatulong.. God bless!
Posts: 391Member
Joined: Mar 24, 2013
as for sharing, it took me 4 months to get my first job which is not on my previous field of engineering. di ko ineexpect na aabutin ng ganun katagal tapos di pa sa engineering field, medyo mataas ang competition, kulang sa skills and di pa sineswerte. hehe. sa mga naghahanap ng work, good luck sa inyo and don't lose hope
13-06-07 IELTS Take 1 (Failed)
13-06-22 Shipped Documents to Engineers Australia
13-08-09 IELTS Take 2 (Failed)
13-09-20 IELTS Take 3 (Failed)
13-10-05 Received Skill Assessment, Electronics Engineer (ANZSCO 233411)
13-10-05 Submitted EOI for190 (60 points) & 489 (65 points)
14-02-25 Suspend EOI (change of plans)
14-07-25 Updated EOI to 189 (60 points)
14-08-10 Received Invitation to apply for 189
14-08-23 Lodge Application
14-10-23 CO Assigned
14-11-05 Visa Grant - Thank you Lord
15-08-03 Initial entry in Perth
Posts: 210Member
Joined: Aug 05, 2014
To answer this thread, it took me 8 months to get a job.
I arrived here April 2015. The first few weeks, chill lang ako mag pasa ng CV online through SEEK. Then after a month, wala pa din akong na receive na mga reply. I started to worry. Although I've heard stories before dito sa forum na mahirap maghanap ng work dito, I never realized that it is really that tough and frustrating. Days turn into weeks, then months. Left and right ang rejections ang inabot ko. Plus the pressure from my friends checking me from time to time if I already landed a job. Na stress ako lalo. Kahit mga hospitality jobs mahirap din maghanap. Cleaning naman wala din ako mahanap.
July 2015 nag decide ako mag take ng short course sa TAFE (Cert III). Gamble talaga yung savings ko. While studying, continue pa din ang apply ko ng jobs. I could send 100 + applications in a week. As usual, kumakain na naman ako ng 'i regret to inform you...'.
Nov 2015 - habang patapos na yung course ko , I got a call for an interview. This is the same company I applied for last May 2015, but failed the interview. Back then, I prepared naman and practice for interview. I was even confident pa, pero nung nag ask ako ng feedback, they wanted to hear 'more' related dun role (Application Support/ Service Desk). So nung nakita ko na nag post sila ulet and the same role, sabi ko this time, i will take into consideration yung mga feedbacks. Sila lang kasi ang tumawag sakin for interview. This is a government post, so I had to prepare the lengthy 2 pages 'statement based on selection criteria', apart from the CV. When I got a call for an interview, I asked to be scheduled 4 days later. In that 4 days, I looked and paid for a professional consultant that advice and gave me mock interviews ($290 - ang mahal for 2 hours!!). For government post kasi, based on merit, kaya the more you talk about the role based on your past experience, mas high ang chances mo. Nakatulong talaga yung advice na binigay ng professional. Inde lang pala talaga puro confidence lang, dapat may content din when it comes to interviews.
December 2015, I got a call from them na i was unsuccessful for the permanent role BUT they offered a temporary full time job for 6 months with possibility of extension. Yung feeling na inde mo ma explain, parang napa tears of joy talaga ako that day. Iba pala talaga pag sobrang na deprived ka. I could only feel the same way sa mga kapwa ko pinoy na struggling din maghanap ng trabaho dito. Like you, i underwent into depression (pero yung inde naman na ma aaning hahaha), nag stress eating ako. Ayun yung mga business shirts ko inde na kasya kaya napabili ako nung boxing day sale. I'm just so lucky that I got my family here. Pano pa kaya yung iba na wala at nag gamble talaga,tas may family pa with kids.
I will start to work this Monday na, 11 January 2016. I hope my story will inspire others, to never give up. I could only speak for myself. Yung cert III ko sa TAFE (IT networking) nakatulong na maging preoccupied yung mind ko with assignments and practical activities plus you get to be surrounded with people whom you could talk to. And the interview coaching, I can share yung slides na binigay sakin to those who would like. Just pm me
Happy 2016 sa lahat!
Nominated Occupation : Analyst Programmer 261311
25/02/2014: ACS Assessment and Certification Application Preparation
23/04/2014: ACS Requested Employment References from the 2 company in Statutory Declaration Format (as not in official letterhead)
21/05/2014: Positive assessment from ACS. Suitable for migration and comparable to AQF Bachelor.
03/06/2014: Registered IELTS
19/07/2014: Exam day for General Training Module
01/08/2014: L-7.5 R-7.0 W-7.0 S-8.0 OBS-7.5
01/08/2014: Submitted EOI online - 65 points
10/08/2014: Received an invitation to lodge a Skilled - Independent (Subclass 189) (Permanent) visa application
11/08/2014: Lodge Visa Application
15/08/2014: Withdawn Application as there is a mistake with the lodged EOI points (from 65 to 60)
16/09/2014: Application was successfully withdrawn.
12/10/2014: EOI Invitation for 60 points and lodged on the same day.
27/10/2014: Medical Exam
05/12/2014: Visa Granted, IED 18 Aug 2015
Posts: 212Member
Joined: Feb 24, 2015
ANZSCO code: 263311 (Telecommunication Engineer)
02.14.2013 - IELTS
Feb 2013 - Dec 2014 - Prioritizing others, realizing I need to pursue it again.
Jan 25, 2015 - Completed all documents
Jan 26, 2015 - Submitted to EA for Assessment (13 weeks to wait)
Apr 27, 2015 - Received EA Assessment (Praise GOD)
Apr 28, 2015 - Submission of EOI (60 points)
May 22, 2015 - Received Invitation (thanks GOD, another milestone)
May 26, 2015 - Lodged Visa
July 8, 2015 - Medicals at SLMC BGC (praying that it will be alright)
..... since my secondary sponsor has an on-going medication (PTB), we need to wait to complete all the series of Sputum and X-Ray.
Oct 27, 2015 - My secondary sponsor all cleared from PTB (all results are negative).
Nov 12, 2015 - CO requested form 815 (Health Undertaking)
Waiting for the visa grant.
Dec 23, 2015 - And our journey begins here, VISA granted. GOD gave us a very special gift!
Feb 28, 2016 - Flight to Sydney alone
Mar 1 - May 1, 2016 - Apply for Engineering job and attended Skillmax to gain more knowledge in finding job, creating CV and CL and correct way of answering interviews. The most difficult and frustrating months. Many rejections..
Apr 10, 2016 - My wife and my son arrived!
May 2 - 6, 2016 - Phone interview, face to face interview and job offer! Got Engineering job. Worth the wait.
May 9, 2016 - Start my first day of Work in Australia as an RF Engineer.
Philippians 4:13 - "I can do all things through Christ who strengthens me"
Posts: 212Member
Joined: Feb 24, 2015
ANZSCO code: 263311 (Telecommunication Engineer)
02.14.2013 - IELTS
Feb 2013 - Dec 2014 - Prioritizing others, realizing I need to pursue it again.
Jan 25, 2015 - Completed all documents
Jan 26, 2015 - Submitted to EA for Assessment (13 weeks to wait)
Apr 27, 2015 - Received EA Assessment (Praise GOD)
Apr 28, 2015 - Submission of EOI (60 points)
May 22, 2015 - Received Invitation (thanks GOD, another milestone)
May 26, 2015 - Lodged Visa
July 8, 2015 - Medicals at SLMC BGC (praying that it will be alright)
..... since my secondary sponsor has an on-going medication (PTB), we need to wait to complete all the series of Sputum and X-Ray.
Oct 27, 2015 - My secondary sponsor all cleared from PTB (all results are negative).
Nov 12, 2015 - CO requested form 815 (Health Undertaking)
Waiting for the visa grant.
Dec 23, 2015 - And our journey begins here, VISA granted. GOD gave us a very special gift!
Feb 28, 2016 - Flight to Sydney alone
Mar 1 - May 1, 2016 - Apply for Engineering job and attended Skillmax to gain more knowledge in finding job, creating CV and CL and correct way of answering interviews. The most difficult and frustrating months. Many rejections..
Apr 10, 2016 - My wife and my son arrived!
May 2 - 6, 2016 - Phone interview, face to face interview and job offer! Got Engineering job. Worth the wait.
May 9, 2016 - Start my first day of Work in Australia as an RF Engineer.
Philippians 4:13 - "I can do all things through Christ who strengthens me"
Posts: 1,342Member
Joined: Feb 19, 2013
Pero kidding aside, thank you for sharing your story... mas mamumulat mga mata naming migrants na papadating pa lang, and those who are in the visa application stage, sa harsh reality ng paghahanap ng trabaho dyan... to prepare our skills and finances bago pumunta ng Oz... Hindi enough na puro lakas ng loob lang
Sa Sydney kaba? Magkita tayo.. dyan na ko this Feb hehehe
Nominated Occupation: Plant or Production Engineer (ANZSCO 233513)
03/23/13: IELTS GT Exam (British Council)
04/05/13: IELTS Results L:7.0/R:7.5/W:7.5/S:8.5 OBS: 7.5
makalipas ang isang taon....
04/20/14: CDR Application sent to EA
07/09/14: EA started reviewing my CDR
08/08/14: EA Assessment Positive Results (Thank you LORD!!!)
09/16/14: Requested EA for a Duplicate Letter (Original Outcome Letter lost during mail delivery to PH)
09/21/14: Duplicate Assessment Letter received (Finally!!)
09/21/14: EOI Lodged (70 pts)
09/22/14: Invited to lodge Skilled - Independent (Subclass 189) visa
09/23/14: Obtained Overseas PCC
09/29/14: Obtained NBI Clearance
10/12/14: Lodged application - Visa Subclass 189
10/12/14: Uploaded docs
10/20/14: Medicals Done
12/06/14: Direct Grant! To GOD Be the Glory!
12/13/14: Completed Initial Entry - Sydney
Posts: 1,002Member
Joined: Jun 05, 2014
@lurker2014 congrats Tama keep moving forward and never forget to pray. Sipag at tiyaga lang hehe
Developer Programmer (261312)
08.25.2014: Completed gathering of documents
08.29.2014: ACS Skills Assessment
09.09.2014: ACS Result - OK - Thank you Lord!
10.18.2014: IELTS IDP Makati
10.31.2014: IELTS- R:8.5 L:7.5 S:7 W:7 - OBS:7.5) - Thank you Lord!
02.03.2015: Submitted EOI
02.26.2015: Received ITA 189
04.24.2015: Lodged Visa - Day 1
04.25.2015: Uploaded docs - Day 2
05.08.2015: Wife NBI Clearance - Day 15 || 05.25.2015: Uploaded NBI Clearance - Day 32
05.28.2015: Medicals @ SLEC BGC Day 35
05.30.2015: Medicals Finalised - Day 37
06.11.2015: CO Allocated - Day 48
07.02.2015 - Visa Granted! Thank you LORD! Glory to God!
10.15.2015 - Arrived in SYD - Jer 29:11
Posts: 9Member
Joined: Aug 05, 2014
221111 - Accountant General
20 Sep 2014 - IELTS Exam
13 Oct 2014 - IELTS results (L-8, R-8.5, W-7, S-8)
9 Feb 2015 - sent docs to CPAA
9 Mar 2015 - received positive assessment from CPAA
10 Mar 2015 - submitted EOI (70 pts)
12 Mar 2015 - received invitation
14 Mar 2015 - lodged visa /uploaded initial docs
21 Mar 2015 - medical at SATA Bedok
7 Apr 2015 - uploaded SG CoC, NBI and Form 80
6 May 2015 - Visa granted - subclass 189! Thank you Lord!
Posts: 3,520Member, Moderator
Joined: Oct 04, 2011
221213 External Auditor|489 - 70pts - SS NT
21|07|16 - Applied CPAA membership assessment
31|07|16 - PTE-A L|S|W|R (73|79|78|77)
01|08|16 - Submitted CPAA migration assessment
20|09|17 - EOI 190 - NT (delayed due to show money req.)
- collating requirements for NT SS application
18|10|17 - Submitted NT SS application (praying for + result)
24|04|18 - 190 not successful,
- was offered 489 instead and accepted the offer
- engaged with visa consort agency for visa application submission.
26|04|18 - Invited to apply for SS visa 489 - Northern Territory
02|05|18 - PCC processing
20|05|18 - Medical
06|06|18 - Visa payment
15|09|18 - happy na birthday pa, visa grant pa.. TYL
09|02|19 - Big move
11|02|19 - First job interview
12|02|19 - Received a job offer
13|02|19 - Accepted job offer
13|08|19 - Accepted a new job offer - new employer
16|10|20 - Started new job - a better opportunity
01|01|21 - Started CPA Australia qualification
10|02|21 - Lodged 887 visa application
June 2021 - First CPA subject passed
Nov 2021 - 2nd CPA Subject passed
June 2022 - 3rd and 4th CPA subject passed
Nov 2022 - 5th subject passed (failed the other one)
Feb 2023 - PR visa granted
June 2023 - Officially a CPA Australia member.
July 2023 - Purchased a land where to build our home
Posts: 3,520Member, Moderator
Joined: Oct 04, 2011
221213 External Auditor|489 - 70pts - SS NT
21|07|16 - Applied CPAA membership assessment
31|07|16 - PTE-A L|S|W|R (73|79|78|77)
01|08|16 - Submitted CPAA migration assessment
20|09|17 - EOI 190 - NT (delayed due to show money req.)
- collating requirements for NT SS application
18|10|17 - Submitted NT SS application (praying for + result)
24|04|18 - 190 not successful,
- was offered 489 instead and accepted the offer
- engaged with visa consort agency for visa application submission.
26|04|18 - Invited to apply for SS visa 489 - Northern Territory
02|05|18 - PCC processing
20|05|18 - Medical
06|06|18 - Visa payment
15|09|18 - happy na birthday pa, visa grant pa.. TYL
09|02|19 - Big move
11|02|19 - First job interview
12|02|19 - Received a job offer
13|02|19 - Accepted job offer
13|08|19 - Accepted a new job offer - new employer
16|10|20 - Started new job - a better opportunity
01|01|21 - Started CPA Australia qualification
10|02|21 - Lodged 887 visa application
June 2021 - First CPA subject passed
Nov 2021 - 2nd CPA Subject passed
June 2022 - 3rd and 4th CPA subject passed
Nov 2022 - 5th subject passed (failed the other one)
Feb 2023 - PR visa granted
June 2023 - Officially a CPA Australia member.
July 2023 - Purchased a land where to build our home
Posts: 212Member
Joined: Feb 24, 2015
ANZSCO code: 263311 (Telecommunication Engineer)
02.14.2013 - IELTS
Feb 2013 - Dec 2014 - Prioritizing others, realizing I need to pursue it again.
Jan 25, 2015 - Completed all documents
Jan 26, 2015 - Submitted to EA for Assessment (13 weeks to wait)
Apr 27, 2015 - Received EA Assessment (Praise GOD)
Apr 28, 2015 - Submission of EOI (60 points)
May 22, 2015 - Received Invitation (thanks GOD, another milestone)
May 26, 2015 - Lodged Visa
July 8, 2015 - Medicals at SLMC BGC (praying that it will be alright)
..... since my secondary sponsor has an on-going medication (PTB), we need to wait to complete all the series of Sputum and X-Ray.
Oct 27, 2015 - My secondary sponsor all cleared from PTB (all results are negative).
Nov 12, 2015 - CO requested form 815 (Health Undertaking)
Waiting for the visa grant.
Dec 23, 2015 - And our journey begins here, VISA granted. GOD gave us a very special gift!
Feb 28, 2016 - Flight to Sydney alone
Mar 1 - May 1, 2016 - Apply for Engineering job and attended Skillmax to gain more knowledge in finding job, creating CV and CL and correct way of answering interviews. The most difficult and frustrating months. Many rejections..
Apr 10, 2016 - My wife and my son arrived!
May 2 - 6, 2016 - Phone interview, face to face interview and job offer! Got Engineering job. Worth the wait.
May 9, 2016 - Start my first day of Work in Australia as an RF Engineer.
Philippians 4:13 - "I can do all things through Christ who strengthens me"
Posts: 391Member
Joined: Mar 24, 2013
13-06-07 IELTS Take 1 (Failed)
13-06-22 Shipped Documents to Engineers Australia
13-08-09 IELTS Take 2 (Failed)
13-09-20 IELTS Take 3 (Failed)
13-10-05 Received Skill Assessment, Electronics Engineer (ANZSCO 233411)
13-10-05 Submitted EOI for190 (60 points) & 489 (65 points)
14-02-25 Suspend EOI (change of plans)
14-07-25 Updated EOI to 189 (60 points)
14-08-10 Received Invitation to apply for 189
14-08-23 Lodge Application
14-10-23 CO Assigned
14-11-05 Visa Grant - Thank you Lord
15-08-03 Initial entry in Perth
Posts: 1,085Member, De-activated
Joined: Jan 24, 2013
2013-Jan : Decided to pursue my OZ dream
2013-Nov : 1st Ielts-GT @ BC Manila: L-8;R-6.5;W-7.5;S-7.5
2014-Mar : 2nd Ielts-GT @ BC Manila: L-8;R-8.5;W-6.5;S-7.5
Pahinga muna. Sakit sa puso at bulsa!
2015-May : 1st PTE-A @ Bright Center: L-85;R-70;S-45;W-90
2015-May : 2nd PTE-A @Bright Center; L-90;R-70;S-47; W-90
2015-July : 3rd PTE-A @Pearson: L-90;R-77;S-83; W-90
2015-July 20 - Lodged docs to Vetassess
2015-Oct 1: VET Positive outcome
2015-Oct 1: Submitted EOI 190 visa to NSW (55+5)
2015-Oct 4: Submitted EOI 190 visa to QLD (55+5)
2015-Oct 5: QLD responded, rejected 190 due to change in occupation list but offered ITA for 489 visa instead
2015-Nov 2: DIBP points adjusted to 60+5 (due to additional 1 year working experience)
2015-Nov 26: ITA for SS NSW
2015-Nov 28: Submitted SS application
2015-Dec 17: SS Approved + Received 190 ITA
2015-Dec 23: Lodged 190
2016-Jan 5: Medical @ Nationwide (Php5,600 na ang fee!!)
2016-Jan 8: Medical Clearance Provided - no action required (Thank you Lord!)
2016-Jan 18: Applied for Driving SP and Direct Visa Grant!!! (Thank You Lord!)
2016-Jan 26: PDOS @ CFO Manila + Enrolled at A1 Driving
2016-Mar 14: BIG MOVE!:)
PRAY HARD, WORK HARDER!
Compilation of tips/resources/stories for PTE Academic Preparation: pteacademicreview.wordpress.com
Template or "cheat sheet" as called by many: https://drive.google.com/file/d/0B1OZBrQj0i5LWU1EYVZTaDF4VzA/view?usp=sharing
sana po makatulong.. God bless!
Posts: 233Member
Joined: Sep 09, 2015
31-July-2014: IELTS IDP - 1st Take
30-Oct-2014: IELTS IDP - 2nd Take
10-Jan-2015: IELTS BC - 3rd Take
11-Feb-2015: Submitted CDR to EA
07-July-2015: Received positive assessment from EA
08-July-2015: EOI submitted for Visa 190(SS)
31-July-2015: 1st take PTE (failed)
23-Aug-2015: 2nd take PTE(failed)
09-Sept-2015: 3rd take PTE results: Pass(finally!!!). Score converted to IELTS is 7.5 in each band
09-Sept-2015: Updated EOI for Visa 189 (Total points: 65)
09-Oct-2015: ITA received for Visa 189
11-Oct-2015: Visa Lodge
22-Oct-2015: Uploaded COC
04-Nov-2015: Medicals uploaded
10-Nov-2015: Visa Grant - Thank you Lord! ..
April-2016: Initial Entry Sydney
Posts: 9Member
Joined: Aug 05, 2014
221111 - Accountant General
20 Sep 2014 - IELTS Exam
13 Oct 2014 - IELTS results (L-8, R-8.5, W-7, S-8)
9 Feb 2015 - sent docs to CPAA
9 Mar 2015 - received positive assessment from CPAA
10 Mar 2015 - submitted EOI (70 pts)
12 Mar 2015 - received invitation
14 Mar 2015 - lodged visa /uploaded initial docs
21 Mar 2015 - medical at SATA Bedok
7 Apr 2015 - uploaded SG CoC, NBI and Form 80
6 May 2015 - Visa granted - subclass 189! Thank you Lord!
Posts: 9Member
Joined: Aug 05, 2014
221111 - Accountant General
20 Sep 2014 - IELTS Exam
13 Oct 2014 - IELTS results (L-8, R-8.5, W-7, S-8)
9 Feb 2015 - sent docs to CPAA
9 Mar 2015 - received positive assessment from CPAA
10 Mar 2015 - submitted EOI (70 pts)
12 Mar 2015 - received invitation
14 Mar 2015 - lodged visa /uploaded initial docs
21 Mar 2015 - medical at SATA Bedok
7 Apr 2015 - uploaded SG CoC, NBI and Form 80
6 May 2015 - Visa granted - subclass 189! Thank you Lord!
Posts: 735Member
Joined: Jun 19, 2015
CONSTRUCTION PROJECT MANAGER
Age - 25pts
Experience - 5pts
Education - 15pts
PTE - 10pts
SS - 5pts
TOTAL = 60 POINTS (VISA 190)
November 2014 = Decided to pursue family migration to Australia
January 2015 = Took the IELTS @ British Council (S:7.5,W:6.5,L:7.5,R:7.5)
February - July 2015 = Gather Necessary Documents For Assessment
August 3, 2015 = Submitted documents to Vetassess
October 15, 2015 = Vetassess called our landline to verify my submitted documents
October 21, 2015 = Positive and Negative Result from Vetassess.....out of 10 years of employment 2.7 years lang ang credited sa akin....
October 23, 2015 = Scheduled for PTE-A on November 6...aiming to get 20 points..wish me luck
November 7, 2015 = I took the PTE-A Exam
November 8, 2015 = Results of PTE-A (Listening:80;Reading:63;Speaking:84;Writing:75) 2 Points na lang hindi pa ako pinagbigyan....huhuhu
November 13, 2015 = Baba ng 5 points at the same time schedule din ng PTE-A exam ko
November 13, 2015 = Result of PTE Take 2 (Listening:69; Reading:63; Speaking:79;Writing:78) Sablay na naman
December 2, 2015 = PTE 3rd Retake (sana pumasa na)
December 4, 2015 = PTE Result (Listening:65; Reading: 67; Speaking:68; Writing: 67) Sa wakas
December 4, 2015 = Submitted EOI Visa 190
December 11, 2015 = Received ITA
December 12, 2015 = Lodged NSW Nomination
January 11, 2015 = NSW Approved
January 25, 2016 = Medical @ Nationwide Makati
February 15, 2016 = Lodged Visa (Waiting Game)
March 15, 2016 = CO reuqested for PTE results
*****Sana maging okay ang lahat****
Posts: 188Member
Joined: Jul 03, 2015
INDUSTRIAL DESIGNER (ANZSCO 232312)
28/11/2013 - Pursued the Oz dream
08/02/2014 - Hired AIMS
12/03/2014 - IELTS Test
19/03/2014 - IELTS Results L-7.5 R-7.5 W-6.0 S-7.0
30/12/2014 - Skills Assessment Application lodged
24/03/2015 - Vetassess Skills Assessment Outcome
28/03/2015 - IELTS Test
12/04/2015 - IELTS Results L-8.5 R-8.0 W-7.0 S-7.5
06/07/2015 - SA application lodged
11/08/2015 - Recieved SA nomination
01/09/2015 - Submitted 190 Visa Application
15/09/2015 - Submitted NBI, SG COC, Medical
15/10/2015 - Visa granted!
08/02/2016 - IED with whole family in Sydney
14/05/2016 - Big move
15/07/2016 - 1st work
with God all things are possible!
Posts: 57Member
Joined: Nov 19, 2013
2014.04.07 - Starts Preparing Documents
2014.05.02 - Submitted ACS Skills Assessment
2014.06.06 - ACS assessed skills as suitable
2014.12.13 - IELTS L-8.5, R-9, W-7.5, S-7
2015.03.11 - EOI Submission (NSW SS)
2015.04.02 - NSW SS Invitation (Withdrew due to and pursue 189)
2015.04.24 - 189 Invitation
2015.05.25 - 189 Application Submitted
2015.07.04 - Medical Completed
2015.07.05 - Apply NBI at PCC
2015.07.13 - Received NBI application in PH
2015.07.14 - First CO contact
2015.07.15 - Apply PCC
2015.08.03 - Uploaded Form 80 and NBI Clearance
2015.08.05 - Police sent CNCC to AU
2015.08.25 - Visa Grant