most recent by eel_kram025
The Best Vegan Eats in San Diego: El Avocado
most recent by RosieHockm
VICTORIA STATES SPONSORSHIP 2024-2025
most recent by Ozdrims
QUEENSLAND STATES SPONSORSHIP FY 2024-2025
most recent by Ozdrims
Australian Computer Society Skills Application
most recent by Ozdrims
most recent by Cerberus13
NSW STATE SPONSORSHIP 2024~2025
most recent by Ozdrims
Highly suggested Migration Agency
most recent by Marionittes40
most recent by Marionittes40
The longest running Pinoy-Australian Forum site in the history. We are connecting Pinoys "in" and "to" Australia since 2010! If you want to join in, click one of these buttons!
Comments
Posts: 698Member
Joined: Apr 17, 2013
ANZSCO 149311
31 May 13 - Vetassess Requirements Acknowledge
22 June 13 - IELTS Exam at IDP Singapore
5 July 13 - IELTS Passed
30 Aug 13 - Vetassess Results - Positive + EOI Submitted
4 Sept 13 - Initial Contact WA SS
5 Sept 13 - Invited to apply for WA SS
9 Sept 13 - WA SS approved!
12 Sept 13 - Lodged Visa 190
23 Sept 13 - Medical Examination - SATA Bedok SG
27 Sept 13 - Medicals Uploaded
21 Oct 13 - CO allocated (Adelaide GSM Team 6, MN)
1 Nov 13 - SG PCC submitted
5 Dec 13 - Visa Granted! To God be the Glory!
IED: 26 Sep 14
1 May 14 - Touchdown Perth!
12 June 14 - First day of work. God will always provide.
Psalm 37:4 Delight yourself in the Lord;
And He will give you the desires of your heart.
Posts: 357Member
Joined: Jun 04, 2013
Hi, ask ko lang po. Nag re-require po ba ng proof of sufficient fund ang WA? if so, how much po, what source or forms of funds are accepted, and when is it needed?
Thanks po,
Bogs
ANZSCO 233513
Mar 2013 - IELTS Results - Pass but no points.
04 June 2013 - EA Recieved CDR application.
13 Aug 2013 - Got results from EA from the mailbox :-D
04 Oct 2013 - Ielts results = Pass with +10 points.
04 Oct 2013 - Lodged Subclass 189 with 65 Points
07 Oct 2013 - Invited for Visa 189 :-D
13 Nov 2013 - FBI Clearance delivered to USA Address
24 Nov 2013 - Lodged Subclass 189. Waiting for CO.
17 Dec 2013 - CO assigned. Team 34 Brisbane
23 Jan 2014 - Medicals Cleared
24 Jan 2014 - NBI clearance uploaded.
30 Jan 2014 - VISA GRANT. EID: 04 Nov 2014
27 Sept 2014 - Initial Entry - Brisbane
30 Sept 2014 - Open DL R/C
Posts: 89Member
Joined: Dec 30, 2012
I hope and I pray dumating na papers ko asap. [-O<
Visa 190
1 March 2013 - VETASSESS Submitted
22 April 2013 - IELTS Results (OBS-8)
21 June 2013 - VETASSESS Results: Positive
26 June 2013 - EOI Submitted
27 June 2013 - WA SS Application
28 June 2013 - WA SS Approved
02 July 2013 - Invitation To Apply for Visa 190
04 July 2013 - Visa Lodged
10 July 2013 - Medicals
23 July 2013 - CO Allocated
1 Aug 2013 - Form 80 Submitted
14 Aug 2013 - SG COC Issued and Submitted
15 Aug 2013 - Visa Grant
Posts: 255Member
Joined: Mar 05, 2013
March 2012-IELTS results! | 31 January 2013-Skills assessment "Successful" , EOI submitted in Skillselect |14 March 2013- SS WA approved! |30 April 2013-Lodged Visa190 | 3 May 2013-Uploaded documents | 22 May 2013-CO allocated |2 July 2013 -Medicals done |12 July- Uploaded SG PCC | 28 Aug 2013 - VISA GRANT!
Posts: 5,037Member, De-activated
Joined: Feb 23, 2012
at may minimum requirement sila depende kung ilan kayo sa family included in the application..
- but then, wala pa akong nakitang hinigian ng proof of funds..
- i think its just a matter of declaration, pero wala talagang hinihinging proof..
Sep 24, 2011 - IELTS (L-8 R-8 W-8 S-7.5 : OBS-8)
Jan 04, 2012 - EA application submitted | Feb 23, 2012 - EA assessment result (IE ANZSCO 233511)
May 8, 2012 - Lodged GSM 175 online application | June 4, 2012 - CO Allocated
June 22, 2012 - Medicals Finalized | Aug 30, 2012 - PCCs Completed (PH, UAE, USA)
Sep 3, 2012 - Visa Granted (IED Jun 11, 2013) Thank You Lord!
Oct 16-28, 2012 - Initial Entry Completed - Sydney
July 28, 2013 - Final move to Perth
Sep 9, 2013 - Started work with the same company i worked for in UAE/USA
Oct 28, 2013 - Moved to another company..
Posts: 89Member
Joined: Dec 30, 2012
What I did was I emailed my officer in Vetassess and requested for a copy. I explained to her my predicament and the urgency of the matter.
And thankfully she replied agad and she faxed the letter. Whew! And finally nakuha ko din. Laking pasalamat ko sa kanilang lahat. And of course sa inyo dito sa forum. Malaking support system ito.
Visa 190
1 March 2013 - VETASSESS Submitted
22 April 2013 - IELTS Results (OBS-8)
21 June 2013 - VETASSESS Results: Positive
26 June 2013 - EOI Submitted
27 June 2013 - WA SS Application
28 June 2013 - WA SS Approved
02 July 2013 - Invitation To Apply for Visa 190
04 July 2013 - Visa Lodged
10 July 2013 - Medicals
23 July 2013 - CO Allocated
1 Aug 2013 - Form 80 Submitted
14 Aug 2013 - SG COC Issued and Submitted
15 Aug 2013 - Visa Grant
Posts: 255Member
Joined: Mar 05, 2013
March 2012-IELTS results! | 31 January 2013-Skills assessment "Successful" , EOI submitted in Skillselect |14 March 2013- SS WA approved! |30 April 2013-Lodged Visa190 | 3 May 2013-Uploaded documents | 22 May 2013-CO allocated |2 July 2013 -Medicals done |12 July- Uploaded SG PCC | 28 Aug 2013 - VISA GRANT!
Posts: 5,037Member, De-activated
Joined: Feb 23, 2012
No proof of funds required..
Just sharing..
Sep 24, 2011 - IELTS (L-8 R-8 W-8 S-7.5 : OBS-8)
Jan 04, 2012 - EA application submitted | Feb 23, 2012 - EA assessment result (IE ANZSCO 233511)
May 8, 2012 - Lodged GSM 175 online application | June 4, 2012 - CO Allocated
June 22, 2012 - Medicals Finalized | Aug 30, 2012 - PCCs Completed (PH, UAE, USA)
Sep 3, 2012 - Visa Granted (IED Jun 11, 2013) Thank You Lord!
Oct 16-28, 2012 - Initial Entry Completed - Sydney
July 28, 2013 - Final move to Perth
Sep 9, 2013 - Started work with the same company i worked for in UAE/USA
Oct 28, 2013 - Moved to another company..
Posts: 698Member
Joined: Apr 17, 2013
ANZSCO 149311
31 May 13 - Vetassess Requirements Acknowledge
22 June 13 - IELTS Exam at IDP Singapore
5 July 13 - IELTS Passed
30 Aug 13 - Vetassess Results - Positive + EOI Submitted
4 Sept 13 - Initial Contact WA SS
5 Sept 13 - Invited to apply for WA SS
9 Sept 13 - WA SS approved!
12 Sept 13 - Lodged Visa 190
23 Sept 13 - Medical Examination - SATA Bedok SG
27 Sept 13 - Medicals Uploaded
21 Oct 13 - CO allocated (Adelaide GSM Team 6, MN)
1 Nov 13 - SG PCC submitted
5 Dec 13 - Visa Granted! To God be the Glory!
IED: 26 Sep 14
1 May 14 - Touchdown Perth!
12 June 14 - First day of work. God will always provide.
Psalm 37:4 Delight yourself in the Lord;
And He will give you the desires of your heart.
Posts: 112Member
Joined: Jan 30, 2013
Profession: QS / Estimator / Civil Engineer
Visa 190/WA sponsored/Vettassess (Nom. Occupation :Estimator)
08 Nov 2013 - VISA GRANT! IED Sept 2014
06 April 2014 - Moved to Perth permanently
Posts: 357Member
Joined: Jun 04, 2013
ANZSCO 233513
Mar 2013 - IELTS Results - Pass but no points.
04 June 2013 - EA Recieved CDR application.
13 Aug 2013 - Got results from EA from the mailbox :-D
04 Oct 2013 - Ielts results = Pass with +10 points.
04 Oct 2013 - Lodged Subclass 189 with 65 Points
07 Oct 2013 - Invited for Visa 189 :-D
13 Nov 2013 - FBI Clearance delivered to USA Address
24 Nov 2013 - Lodged Subclass 189. Waiting for CO.
17 Dec 2013 - CO assigned. Team 34 Brisbane
23 Jan 2014 - Medicals Cleared
24 Jan 2014 - NBI clearance uploaded.
30 Jan 2014 - VISA GRANT. EID: 04 Nov 2014
27 Sept 2014 - Initial Entry - Brisbane
30 Sept 2014 - Open DL R/C
Posts: 89Member
Joined: Dec 30, 2012
Papayag un, ito yung email ko. Pwede mo copy pero ibahin mo na lang ung style ng letter mamaya pareho pala tayo ng officer.
Thank you for processing my Vetassess application last.... but I am still waiting for the documents to reach my address. So I would like to ask if you could kindly send me an advance copy of my assessment via email. My email address is ....
The reason for this is that I need to meet the deadline this 30 June 2013, Sunday for my State Sponsorship application. Failure to meet this deadline would mean longer processing time and extra costs to my application.
I hope you understand my situation. I am hoping for your consideration and your reply.
They replied promptly and instead of emailing me the letter, they just faxed it to me instead. Kaya yan, gawin mo na! Good luck!
Visa 190
1 March 2013 - VETASSESS Submitted
22 April 2013 - IELTS Results (OBS-8)
21 June 2013 - VETASSESS Results: Positive
26 June 2013 - EOI Submitted
27 June 2013 - WA SS Application
28 June 2013 - WA SS Approved
02 July 2013 - Invitation To Apply for Visa 190
04 July 2013 - Visa Lodged
10 July 2013 - Medicals
23 July 2013 - CO Allocated
1 Aug 2013 - Form 80 Submitted
14 Aug 2013 - SG COC Issued and Submitted
15 Aug 2013 - Visa Grant
Posts: 89Member
Joined: Dec 30, 2012
But wait, I just read the post above and may cases ba na nag re require ang WA SS ng proof of funds? Alam ko wala naman diba?
Visa 190
1 March 2013 - VETASSESS Submitted
22 April 2013 - IELTS Results (OBS-8)
21 June 2013 - VETASSESS Results: Positive
26 June 2013 - EOI Submitted
27 June 2013 - WA SS Application
28 June 2013 - WA SS Approved
02 July 2013 - Invitation To Apply for Visa 190
04 July 2013 - Visa Lodged
10 July 2013 - Medicals
23 July 2013 - CO Allocated
1 Aug 2013 - Form 80 Submitted
14 Aug 2013 - SG COC Issued and Submitted
15 Aug 2013 - Visa Grant
Posts: 89Member
Joined: Dec 30, 2012
Visa 190
1 March 2013 - VETASSESS Submitted
22 April 2013 - IELTS Results (OBS-8)
21 June 2013 - VETASSESS Results: Positive
26 June 2013 - EOI Submitted
27 June 2013 - WA SS Application
28 June 2013 - WA SS Approved
02 July 2013 - Invitation To Apply for Visa 190
04 July 2013 - Visa Lodged
10 July 2013 - Medicals
23 July 2013 - CO Allocated
1 Aug 2013 - Form 80 Submitted
14 Aug 2013 - SG COC Issued and Submitted
15 Aug 2013 - Visa Grant
Posts: 501Member
Joined: Jan 22, 2013
Batchmate pala tayo. pareho pa tayo ng occupation
Occupation: Architectural Drafstperson (ANZSCO Code 312111)
Feb 2013 - Started collecting Vetassess requirements; March 29, 2013 - Lodged for Vetassess skills assessment; June 8, 2013 - took IELTS (BC, UAE); June 14, 2013 - received VETASSESS positive skills assessment; June 21, 2013 - got ielts results OBS 7.0 (l-7.5, r-7, w-7, s-7); June 24, 2013 - submitted EOI; June 27, 2013 - submitted WA state sponsorship application; July 03, 2013 - WA state sponsorship application approved; July 05, 2013 - received from DIAC invitation to lodge; July 14, 2013 - lodge visa application; August 13, 2013 - CO allocated, Team 7 GSM Adelaide; August 20, 2013 - submitted Form 80, NBI, PCC, bank statements for me, hubby and daughter and additional docs for hubby in lieu of Saudi PCC (statutory declaration, exit visa and end of service contract); August 22, 2013 - Medical check done; August 26, 2013 - uploaded hubby's Saudi PCC.... finally!; Sept 27, 2013 - visa grant daw but unofficial, hindi namin alam granted na pala.... long story…; Oct 10, 2013 - when we learned that our case was granted but no official confirmation.; Oct 11, 2013 - Official VISA Grant! Finally!!!! Thank God. End of the 1st journey, start of the new beginning; July 10, 2014 - IED
You may not always understand why God allows certain things to happen, but you can be certain that God is not making any mistakes.
Proverbs 3:5-6
"Trust in the Lord with all your heart and lean not on your own understanding; in all your ways submit to him, and he will make your paths straight
Posts: 27Member
Joined: Oct 16, 2012
Posts: 89Member
Joined: Dec 30, 2012
Good luck sa ating dalawa!
Visa 190
1 March 2013 - VETASSESS Submitted
22 April 2013 - IELTS Results (OBS-8)
21 June 2013 - VETASSESS Results: Positive
26 June 2013 - EOI Submitted
27 June 2013 - WA SS Application
28 June 2013 - WA SS Approved
02 July 2013 - Invitation To Apply for Visa 190
04 July 2013 - Visa Lodged
10 July 2013 - Medicals
23 July 2013 - CO Allocated
1 Aug 2013 - Form 80 Submitted
14 Aug 2013 - SG COC Issued and Submitted
15 Aug 2013 - Visa Grant
Posts: 112Member
Joined: Jan 30, 2013
Profession: QS / Estimator / Civil Engineer
Visa 190/WA sponsored/Vettassess (Nom. Occupation :Estimator)
08 Nov 2013 - VISA GRANT! IED Sept 2014
06 April 2014 - Moved to Perth permanently
Posts: 324Member
Joined: Jun 20, 2012
Wow..so good po umabot kayo...just called WA..need po 60 points at EOI bago maka apply ng WA SS..50pts lang kasi sakin..need magtetake ng IELTS to gain 10pts...Hopefully positive change for us nmga di aabot bago s July1:)...
Nominated Occupation- Electronic Engineering Technician (TRA312412)
April 1, 2012- Submitted TRA Skills Assessment Requirements
April 5, 2012- TRA Acknowledgment
May 26, 2012- TRA Skills Assessment "POSITIVE"
June 7, 2013- IELTS @ BC L-6.5/ R-8/ W-6 / S-6
August 17, 2013- IELTS @IDP L-7,/R/W-6 S-6.5
July 30, 2014- Applied SA SS/ EOI 60pts
September 1, 2014- SA SS Apprroved
September 2, 2014- Lodged Visa 190/ Upload Requirements
October 30, 2014 - Visa Grant
Posts: 89Member
Joined: Dec 30, 2012
Mabilis na ata yan. Kse I was contacted by WA SS and request sila ng Funds Info Request. They want the TOTAL amount of funds.
Alam ko nilagay ko yun but ask pa din sila.
And I don't know how to reply. Do I just simply reply back sa email nila?
Hindi ko sure what to do, does anyone know how?
Visa 190
1 March 2013 - VETASSESS Submitted
22 April 2013 - IELTS Results (OBS-8)
21 June 2013 - VETASSESS Results: Positive
26 June 2013 - EOI Submitted
27 June 2013 - WA SS Application
28 June 2013 - WA SS Approved
02 July 2013 - Invitation To Apply for Visa 190
04 July 2013 - Visa Lodged
10 July 2013 - Medicals
23 July 2013 - CO Allocated
1 Aug 2013 - Form 80 Submitted
14 Aug 2013 - SG COC Issued and Submitted
15 Aug 2013 - Visa Grant
Posts: 5,037Member, De-activated
Joined: Feb 23, 2012
same thing happened to my friend..
after 2 days from her reply... SS approved na..
goodluck..
Sep 24, 2011 - IELTS (L-8 R-8 W-8 S-7.5 : OBS-8)
Jan 04, 2012 - EA application submitted | Feb 23, 2012 - EA assessment result (IE ANZSCO 233511)
May 8, 2012 - Lodged GSM 175 online application | June 4, 2012 - CO Allocated
June 22, 2012 - Medicals Finalized | Aug 30, 2012 - PCCs Completed (PH, UAE, USA)
Sep 3, 2012 - Visa Granted (IED Jun 11, 2013) Thank You Lord!
Oct 16-28, 2012 - Initial Entry Completed - Sydney
July 28, 2013 - Final move to Perth
Sep 9, 2013 - Started work with the same company i worked for in UAE/USA
Oct 28, 2013 - Moved to another company..
Posts: 112Member
Joined: Jan 30, 2013
relocation cost aud8k (3mos expenses including airfare)
estimated monthly budget aud2500
extra fund aside from relocation cost aud 11k
any idea kung enough yan?
Profession: QS / Estimator / Civil Engineer
Visa 190/WA sponsored/Vettassess (Nom. Occupation :Estimator)
08 Nov 2013 - VISA GRANT! IED Sept 2014
06 April 2014 - Moved to Perth permanently
Posts: 112Member
Joined: Jan 30, 2013
Profession: QS / Estimator / Civil Engineer
Visa 190/WA sponsored/Vettassess (Nom. Occupation :Estimator)
08 Nov 2013 - VISA GRANT! IED Sept 2014
06 April 2014 - Moved to Perth permanently
Posts: 112Member
Joined: Jan 30, 2013
Profession: QS / Estimator / Civil Engineer
Visa 190/WA sponsored/Vettassess (Nom. Occupation :Estimator)
08 Nov 2013 - VISA GRANT! IED Sept 2014
06 April 2014 - Moved to Perth permanently
Posts: 5,037Member, De-activated
Joined: Feb 23, 2012
----------------------------------------------
Applicants are expected to have sufficient funds to enable them to maintain a lifestyle for themselves and any family members for a period of at least three months or until you secure employment. The minimum amount of liquid funds required for settlement is:
· Single - $20,000
· Couple - $30,000
· $5,000 for every additional dependent.
---------------------------------------------
Source: email received from WA SS Case officer..
Sep 24, 2011 - IELTS (L-8 R-8 W-8 S-7.5 : OBS-8)
Jan 04, 2012 - EA application submitted | Feb 23, 2012 - EA assessment result (IE ANZSCO 233511)
May 8, 2012 - Lodged GSM 175 online application | June 4, 2012 - CO Allocated
June 22, 2012 - Medicals Finalized | Aug 30, 2012 - PCCs Completed (PH, UAE, USA)
Sep 3, 2012 - Visa Granted (IED Jun 11, 2013) Thank You Lord!
Oct 16-28, 2012 - Initial Entry Completed - Sydney
July 28, 2013 - Final move to Perth
Sep 9, 2013 - Started work with the same company i worked for in UAE/USA
Oct 28, 2013 - Moved to another company..
Posts: 112Member
Joined: Jan 30, 2013
pano un, 19k lang nilagay ko na fund nmin.. sa email nya e dapat 40k..
pde maging ground ng rejection un?
Profession: QS / Estimator / Civil Engineer
Visa 190/WA sponsored/Vettassess (Nom. Occupation :Estimator)
08 Nov 2013 - VISA GRANT! IED Sept 2014
06 April 2014 - Moved to Perth permanently
Posts: 89Member
Joined: Dec 30, 2012
@rei_ya i think d naman reject yan baka mag email din sila sa iyo.
I put in enough funds but wala breakdown. I called them and they said gawa daw ako breakdown.
Visa 190
1 March 2013 - VETASSESS Submitted
22 April 2013 - IELTS Results (OBS-8)
21 June 2013 - VETASSESS Results: Positive
26 June 2013 - EOI Submitted
27 June 2013 - WA SS Application
28 June 2013 - WA SS Approved
02 July 2013 - Invitation To Apply for Visa 190
04 July 2013 - Visa Lodged
10 July 2013 - Medicals
23 July 2013 - CO Allocated
1 Aug 2013 - Form 80 Submitted
14 Aug 2013 - SG COC Issued and Submitted
15 Aug 2013 - Visa Grant
Posts: 5,037Member, De-activated
Joined: Feb 23, 2012
just like my friend, konti lang declare nya initially,
then they asked her to modify it... after 2 days.. approved na..
Sep 24, 2011 - IELTS (L-8 R-8 W-8 S-7.5 : OBS-8)
Jan 04, 2012 - EA application submitted | Feb 23, 2012 - EA assessment result (IE ANZSCO 233511)
May 8, 2012 - Lodged GSM 175 online application | June 4, 2012 - CO Allocated
June 22, 2012 - Medicals Finalized | Aug 30, 2012 - PCCs Completed (PH, UAE, USA)
Sep 3, 2012 - Visa Granted (IED Jun 11, 2013) Thank You Lord!
Oct 16-28, 2012 - Initial Entry Completed - Sydney
July 28, 2013 - Final move to Perth
Sep 9, 2013 - Started work with the same company i worked for in UAE/USA
Oct 28, 2013 - Moved to another company..
Posts: 112Member
Joined: Jan 30, 2013
sna di ka nagugutom bka kakareply mo di ka na nkakain
Profession: QS / Estimator / Civil Engineer
Visa 190/WA sponsored/Vettassess (Nom. Occupation :Estimator)
08 Nov 2013 - VISA GRANT! IED Sept 2014
06 April 2014 - Moved to Perth permanently
Posts: 5,037Member, De-activated
Joined: Feb 23, 2012
it's good to know that we can help even in small ways..
nag didiet nga ako.. etong forum ang exercise ko.. lol..
Sep 24, 2011 - IELTS (L-8 R-8 W-8 S-7.5 : OBS-8)
Jan 04, 2012 - EA application submitted | Feb 23, 2012 - EA assessment result (IE ANZSCO 233511)
May 8, 2012 - Lodged GSM 175 online application | June 4, 2012 - CO Allocated
June 22, 2012 - Medicals Finalized | Aug 30, 2012 - PCCs Completed (PH, UAE, USA)
Sep 3, 2012 - Visa Granted (IED Jun 11, 2013) Thank You Lord!
Oct 16-28, 2012 - Initial Entry Completed - Sydney
July 28, 2013 - Final move to Perth
Sep 9, 2013 - Started work with the same company i worked for in UAE/USA
Oct 28, 2013 - Moved to another company..