261313 (Software Engineer)
Feb.15.2012 - started working on ACS requirements
Mar.02.2012 - submitted online ACS application and sent documents to ACS via Fedex
Mar.05.2012 - ACS acknowledged actual documents
Mar.21.2012 - ACS finalised assessment: Suitable
Mar.31.2012 - IELTS exam with BC
Apr.13.2012 - IELTS Results (L:8.5 R:7 W: 7 S: 8 OB: 7.5) Thank you LORD!
Apr.14.2012 - Lodged 175 Online Application
Apr.20.2012 - Completed Online Attachments
May.24.2012 - "Application being processed further"
May.29.2012 - CO Assigned :-)
Jun.07.2012 - Uploaded NBI Clearance
Jun.13.2012 - Medical/Health Requirements Finalised
Jun.14.2012 - VISA GRANT! Thank you, LORD! :-)
Jun.07.2013 - Initial Entry Date Deadline
Apr.28.2013 - Initial Entry (Sydney)
Jun.28.2013 - Verbal Job Offer (Melbourne)
Jul.08.2013 - First day of Work and first day of child care for my son (Melbourne)
Aug.21.2013 - First day of Work in Sydney
"Great is the LORD and most worthy of praise; his greatness no one can fathom." Psalm 145:3
VICTORIA STATES SPONSORSHIP 2024-2025
most recent by rainmaker
most recent by CBD
AUSTRALIAN CITIZENSHIP TIMELINE
most recent by crashbandicoot
Ph Vacation with One Month Visa Validity
most recent by Ozdrims
NSW STATE SPONSORSHIP 2024~2025
most recent by Roberto21
most recent by fruitsalad
most recent by RheaMARN1171933
most recent by kimgilbie
Western Australia Immigration Matters FY 2024-2025
most recent by Roberto21
The longest running Pinoy-Australian Forum site in the history. We are connecting Pinoys "in" and "to" Australia since 2010! If you want to join in, click one of these buttons!
Comments
Posts: 5,037Member, De-activated
Joined: Feb 23, 2012
click the link to show different states...and then click your desired state...
http://www.immi.gov.au/skilled/general-skilled-migration/176/nom-state-terr.htm
your concerns now would be;
1) points - do you need the additional points for SS
2) time - will time allow you to apply for SS given the due date of July 2012
Sep 24, 2011 - IELTS (L-8 R-8 W-8 S-7.5 : OBS-8)
Jan 04, 2012 - EA application submitted | Feb 23, 2012 - EA assessment result (IE ANZSCO 233511)
May 8, 2012 - Lodged GSM 175 online application | June 4, 2012 - CO Allocated
June 22, 2012 - Medicals Finalized | Aug 30, 2012 - PCCs Completed (PH, UAE, USA)
Sep 3, 2012 - Visa Granted (IED Jun 11, 2013) Thank You Lord!
Oct 16-28, 2012 - Initial Entry Completed - Sydney
July 28, 2013 - Final move to Perth
Sep 9, 2013 - Started work with the same company i worked for in UAE/USA
Oct 28, 2013 - Moved to another company..
Posts: 993Member
Joined: Feb 15, 2012
Right now I'm still waiting for my ACS certification. I'll be taking the IELTS exam on March 31. I'm praying hard for favorable results, especially with IELTS so I can already focus with submitting the requirements to NSW for State Sponsorship, and of course DIAC.
Thanks a lot! ;-)
261313 (Software Engineer)
Feb.15.2012 - started working on ACS requirements
Mar.02.2012 - submitted online ACS application and sent documents to ACS via Fedex
Mar.05.2012 - ACS acknowledged actual documents
Mar.21.2012 - ACS finalised assessment: Suitable
Mar.31.2012 - IELTS exam with BC
Apr.13.2012 - IELTS Results (L:8.5 R:7 W: 7 S: 8 OB: 7.5) Thank you LORD!
Apr.14.2012 - Lodged 175 Online Application
Apr.20.2012 - Completed Online Attachments
May.24.2012 - "Application being processed further"
May.29.2012 - CO Assigned :-)
Jun.07.2012 - Uploaded NBI Clearance
Jun.13.2012 - Medical/Health Requirements Finalised
Jun.14.2012 - VISA GRANT! Thank you, LORD! :-)
Jun.07.2013 - Initial Entry Date Deadline
Apr.28.2013 - Initial Entry (Sydney)
Jun.28.2013 - Verbal Job Offer (Melbourne)
Jul.08.2013 - First day of Work and first day of child care for my son (Melbourne)
Aug.21.2013 - First day of Work in Sydney
"Great is the LORD and most worthy of praise; his greatness no one can fathom." Psalm 145:3
Posts: 243Member
Joined: Jan 10, 2012
“We can make our own plans, but the Lord gives the right answer. – Proverbs 16:1”
Occupation: 261111 (ICT Business Analyst)
Apr 29, 2012 - Lodged 175 Online Application
June 4, 2012 - CO Allocation. CO requested Medical and Police Clearance
June 30, 2012 - Medical finalized
July 05, 2012 - VISA GRANT!!!!
IED: June 13, 2013
Thank you so much Lord!!!!
Posts: 172Member
Joined: Apr 23, 2011
April 16, 2011 - took IELTS (L:8, R:7.5, W:8, S:7.5 OBS:8) I June 2, 2011 - submitted skills assessment to EA I October 26, 2011 - applied for Victoria State Sponsorship I December 03, 2011 - fiancee took IELTS I December 26, 2011 - lodged visa 176 (Victoria SS/Melbourne) I January 23,2012 - CO Allocation (Team 6) I February 20, 2012 - Submitted Police Clearances (Philippines, India & Maldives) I February 26, 2012 - finished medicals I March 13, 2012 - VISA GRANT! THANK YOU LORD!!! I December 04,2012 - initial entry as stated in the visa grant notification
Posts: 993Member
Joined: Feb 15, 2012
By the way, I just saw an e-mail from ACS! I didn't expect it since Fedex told me that the expected date of arrival of the documents is tomorrow... My application is now in Stage 4.
@unanimous21 whooaaah that's great. Will try to consider that, especially with my current company willing to transfer me to their office in WA once I have the visa already. Thing is my husband and I prefer NSW... ;-) Thanks anyway! I appreciate getting that new information from you.
261313 (Software Engineer)
Feb.15.2012 - started working on ACS requirements
Mar.02.2012 - submitted online ACS application and sent documents to ACS via Fedex
Mar.05.2012 - ACS acknowledged actual documents
Mar.21.2012 - ACS finalised assessment: Suitable
Mar.31.2012 - IELTS exam with BC
Apr.13.2012 - IELTS Results (L:8.5 R:7 W: 7 S: 8 OB: 7.5) Thank you LORD!
Apr.14.2012 - Lodged 175 Online Application
Apr.20.2012 - Completed Online Attachments
May.24.2012 - "Application being processed further"
May.29.2012 - CO Assigned :-)
Jun.07.2012 - Uploaded NBI Clearance
Jun.13.2012 - Medical/Health Requirements Finalised
Jun.14.2012 - VISA GRANT! Thank you, LORD! :-)
Jun.07.2013 - Initial Entry Date Deadline
Apr.28.2013 - Initial Entry (Sydney)
Jun.28.2013 - Verbal Job Offer (Melbourne)
Jul.08.2013 - First day of Work and first day of child care for my son (Melbourne)
Aug.21.2013 - First day of Work in Sydney
"Great is the LORD and most worthy of praise; his greatness no one can fathom." Psalm 145:3
Posts: 200Member
Joined: Jan 15, 2011
Processing of visa 175 is faster these days especially that July 2012 is near approaching.
Posts: 993Member
Joined: Feb 15, 2012
1. Wag daw namin masyado i-rush since magiipon pa kami pamasahe. hahaha
2. Enjoy daw muna namin current work namin dito. Sayang yung mga bonuses and benefits etc. hehehhe
3. As you've said, better if mas flexible. Tska di rin daw naman kami tlga nagmamadali...
Kaya malamang 175 na ang ipapasa ko, un nga lang additional points kase pag may SS. Yung self-assessment ko kase, saktong 65 or 70 points lang ata ako sa points system. 70 points kapag counted yung sa professional year (eto ba ung working on the nominated occupation within the last 2 years ba un? hehe)
Ang galing mo naman! ang bilis na-grant ng visa mo! :-) After 1.5 months, may Case officer ka na agad! Naghanap ka ba ng work before you went there? Or jan ka na lang naghanap? thanks!
261313 (Software Engineer)
Feb.15.2012 - started working on ACS requirements
Mar.02.2012 - submitted online ACS application and sent documents to ACS via Fedex
Mar.05.2012 - ACS acknowledged actual documents
Mar.21.2012 - ACS finalised assessment: Suitable
Mar.31.2012 - IELTS exam with BC
Apr.13.2012 - IELTS Results (L:8.5 R:7 W: 7 S: 8 OB: 7.5) Thank you LORD!
Apr.14.2012 - Lodged 175 Online Application
Apr.20.2012 - Completed Online Attachments
May.24.2012 - "Application being processed further"
May.29.2012 - CO Assigned :-)
Jun.07.2012 - Uploaded NBI Clearance
Jun.13.2012 - Medical/Health Requirements Finalised
Jun.14.2012 - VISA GRANT! Thank you, LORD! :-)
Jun.07.2013 - Initial Entry Date Deadline
Apr.28.2013 - Initial Entry (Sydney)
Jun.28.2013 - Verbal Job Offer (Melbourne)
Jul.08.2013 - First day of Work and first day of child care for my son (Melbourne)
Aug.21.2013 - First day of Work in Sydney
"Great is the LORD and most worthy of praise; his greatness no one can fathom." Psalm 145:3
Posts: 243Member
Joined: Oct 05, 2011
Nominated Occupation: ICT BA
Assessment: July 2014
EOI created: Feb 2015 applied SS to NSW but failed (waited for year pero ayaw pa din)
PTE Test: Took July 2015 failed
Retake PTE Dec 2015: Passed
Got invited Feb 2016
March 22: :Paid visa fee
Posts: 243Member
Joined: Jan 10, 2012
I'm really praying na pumasa kame ni hubby sa ielts.. He'll have his skills assessed by ACS too, para mei dagdag na 5 points for partner skills
Actually, my husband and I were in a dilemma over whether to apply for 175 or 176, but then we decided na lang na to try and apply for WA SS and if by 2nd week of May wala pang result, apply na lang kame 175. Good Luck saten
@cinnamon20- oo nga at sana mabilis lang ang pagprocess nila. Exam na namen ni hubby sa March 10... I need prayers hahahaha sana talaga makapasa kame...
“We can make our own plans, but the Lord gives the right answer. – Proverbs 16:1”
Occupation: 261111 (ICT Business Analyst)
Apr 29, 2012 - Lodged 175 Online Application
June 4, 2012 - CO Allocation. CO requested Medical and Police Clearance
June 30, 2012 - Medical finalized
July 05, 2012 - VISA GRANT!!!!
IED: June 13, 2013
Thank you so much Lord!!!!
Posts: 993Member
Joined: Feb 15, 2012
261313 (Software Engineer)
Feb.15.2012 - started working on ACS requirements
Mar.02.2012 - submitted online ACS application and sent documents to ACS via Fedex
Mar.05.2012 - ACS acknowledged actual documents
Mar.21.2012 - ACS finalised assessment: Suitable
Mar.31.2012 - IELTS exam with BC
Apr.13.2012 - IELTS Results (L:8.5 R:7 W: 7 S: 8 OB: 7.5) Thank you LORD!
Apr.14.2012 - Lodged 175 Online Application
Apr.20.2012 - Completed Online Attachments
May.24.2012 - "Application being processed further"
May.29.2012 - CO Assigned :-)
Jun.07.2012 - Uploaded NBI Clearance
Jun.13.2012 - Medical/Health Requirements Finalised
Jun.14.2012 - VISA GRANT! Thank you, LORD! :-)
Jun.07.2013 - Initial Entry Date Deadline
Apr.28.2013 - Initial Entry (Sydney)
Jun.28.2013 - Verbal Job Offer (Melbourne)
Jul.08.2013 - First day of Work and first day of child care for my son (Melbourne)
Aug.21.2013 - First day of Work in Sydney
"Great is the LORD and most worthy of praise; his greatness no one can fathom." Psalm 145:3
Posts: 243Member
Joined: Jan 10, 2012
“We can make our own plans, but the Lord gives the right answer. – Proverbs 16:1”
Occupation: 261111 (ICT Business Analyst)
Apr 29, 2012 - Lodged 175 Online Application
June 4, 2012 - CO Allocation. CO requested Medical and Police Clearance
June 30, 2012 - Medical finalized
July 05, 2012 - VISA GRANT!!!!
IED: June 13, 2013
Thank you so much Lord!!!!
Posts: 2,616Member, Moderator
Joined: Jan 13, 2011
June 13 rin ang mga nasa visa 176 pero kung classified under Priority 3 kayo, within 4 weeks lodgement, processed na ang visa.
So depende rin sa State na aapplyan niyo ang bilis...kung mas kailangan ng tao ng state na iyon, 4 weeks lang ang itatagal ng visa 176...pero kung populated o maraming applicants ang nasabing state...may lead time na 8 - 9 months
Posts: 712Member
Joined: May 30, 2011
“We can make our own plans, but the LORD gives the right answer.”
Posts: 712Member
Joined: May 30, 2011
“We can make our own plans, but the LORD gives the right answer.”
Posts: 213Member
Joined: Jun 24, 2011
For me advantage and disadvantage ng 176 are as follows (disadvantage nito is in contrast to 175, so advantage ng 175 naman yun)
advantage:
- higher priority / quicker processing time
- additional 5 pts para sa sponsorship (kung kulang ka ng pts sa 175
disadvantage
- kelangan mo magstay sa sponsoring state (may discussion around going around this restriction akong nakita sa forum na to couple of days back)... but then again, ang importante lang e, makapasok ka sa au, tiis tiis na lang muna sa first few years if ever
- additional step which could take significant amount of time to cmplete
27.08.2011 - Submitted ACS Assessment via Fedex. Nominated Occupation : Systems Analyst (261112)
10.10.2011 - ACS assessment received (PIM3 / Group A)
17.11.2011 - IELTS General Training Exam (BC) Take 1
30.11.2011 - IELTS General Training Exam (BC) Take 1 Result Received L- 9, R-9, W-7.5, S-8, OB-8.5
04.12.2011 - Lodged 175(Online)
17.04.2012 - Submitted request for FBI clearance (Me)
02.05.2012 - Application being processed further
29.05.2012 - Followed up CO Allocation
01.06.2012 - CO Allocated, requesting for PCC and Meds
02.06.2012 - Received FBI clearance. My middle name is misspelled (toink!)
13.06.2012 - Submitted form 1022 and supporting documents to add spouse as dependent.
15.06.2012 - Submit request for FBI clearance (Me and Spouse). 8-week wait time begins
22.06.2012 - Uploaded NBI clearance
22.06.2012 - Medicals @ SLEC (Wifey and Me)
28.06.2012 - 28th DAY MILESTONE
16.07.2012 - All Medicals Finalized
26.07.2012 - Uploaded FBI clearance
02.08.2012 - APRUB!!
Freedom aint cheap mate! (lol)
Posts: 993Member
Joined: Feb 15, 2012
@itchan thanks for enumerating the advantages and disadvantages. Kelangan tlga pag-isipan din namin ni hubby ano ba tlga priority namin. heehehe
Thanks sa mga nagreply sa discussion thread na ito. At least ngayon mas marami na information regarding 175 and 176 so we can make a sound decision. Thanks! :-)
261313 (Software Engineer)
Feb.15.2012 - started working on ACS requirements
Mar.02.2012 - submitted online ACS application and sent documents to ACS via Fedex
Mar.05.2012 - ACS acknowledged actual documents
Mar.21.2012 - ACS finalised assessment: Suitable
Mar.31.2012 - IELTS exam with BC
Apr.13.2012 - IELTS Results (L:8.5 R:7 W: 7 S: 8 OB: 7.5) Thank you LORD!
Apr.14.2012 - Lodged 175 Online Application
Apr.20.2012 - Completed Online Attachments
May.24.2012 - "Application being processed further"
May.29.2012 - CO Assigned :-)
Jun.07.2012 - Uploaded NBI Clearance
Jun.13.2012 - Medical/Health Requirements Finalised
Jun.14.2012 - VISA GRANT! Thank you, LORD! :-)
Jun.07.2013 - Initial Entry Date Deadline
Apr.28.2013 - Initial Entry (Sydney)
Jun.28.2013 - Verbal Job Offer (Melbourne)
Jul.08.2013 - First day of Work and first day of child care for my son (Melbourne)
Aug.21.2013 - First day of Work in Sydney
"Great is the LORD and most worthy of praise; his greatness no one can fathom." Psalm 145:3
Posts: 243Member
Joined: Oct 05, 2011
Nominated Occupation: ICT BA
Assessment: July 2014
EOI created: Feb 2015 applied SS to NSW but failed (waited for year pero ayaw pa din)
PTE Test: Took July 2015 failed
Retake PTE Dec 2015: Passed
Got invited Feb 2016
March 22: :Paid visa fee
Posts: 854Member
Joined: May 27, 2011
@stolich18
I suggest kuha na po kayo asap ng IELTS. Ako nga po nataranta eh, kasi nga hindi natin alam if mapapasa agad natin yun the 1st take. If you will notice the exam schedules, and if General test ang take mo, twice a month lang siya. Tapos 13 days makukuha result.. if remark, 10 weeks.. do the math. If hindi mo makuha ng 1st or 2nd take magagahol sa oras.
Although I understand your side, ako din naman hinintay ko muna yun ACS results ko para sure na meron patutunguhan yun gastos at pagod ko. Kasi aanhin mo nga naman yun IELTS if hindi ka naman successful sa ACS right? Hehe. Then again, it's your call to make.
Occupation: ICT Software Engineer (ANZSCO 261313)
Dec 13 2011 - ACS: Suitable (AQF Diploma)
Feb 03 2012 - IELTS #1 Failed (W-6.5)
Mar 02 2012 - IELTS #2 Passed
Apr 21 2012 - 175 Visa Lodged Online
May 29 2012 - CO Assigned
Jun 25 2012 - Visa Grant (IED: Dec 14 2012)
Aug 19 2012 - Arrived in Sydney
Sept 10 2012 - Start @ 1st Job (Web Developer)
Posts: 221Member
Joined: Oct 07, 2011
"If you have a dream, protect it. Love it. Chase it. And one day you will live it"
Posts: 712Member
Joined: May 30, 2011
“We can make our own plans, but the LORD gives the right answer.”
Posts: 5,037Member, De-activated
Joined: Feb 23, 2012
gusto ko rin sana sa WA, kaso IE ang na-assessed ko.. wala na sya sa SOL nila.. pero mostly manf/prod engr ako.. at willing din ako itransfer ng company namin sa either perth, adelaide or melbourne...
pero hindi nmn ako nagmamadali din pumunta dun.. so i guess im leaning towards 175...
goodluck to all of us buzzer beaters ng june 30 2012... heheh
Sep 24, 2011 - IELTS (L-8 R-8 W-8 S-7.5 : OBS-8)
Jan 04, 2012 - EA application submitted | Feb 23, 2012 - EA assessment result (IE ANZSCO 233511)
May 8, 2012 - Lodged GSM 175 online application | June 4, 2012 - CO Allocated
June 22, 2012 - Medicals Finalized | Aug 30, 2012 - PCCs Completed (PH, UAE, USA)
Sep 3, 2012 - Visa Granted (IED Jun 11, 2013) Thank You Lord!
Oct 16-28, 2012 - Initial Entry Completed - Sydney
July 28, 2013 - Final move to Perth
Sep 9, 2013 - Started work with the same company i worked for in UAE/USA
Oct 28, 2013 - Moved to another company..
Posts: 243Member
Joined: Jan 10, 2012
“We can make our own plans, but the Lord gives the right answer. – Proverbs 16:1”
Occupation: 261111 (ICT Business Analyst)
Apr 29, 2012 - Lodged 175 Online Application
June 4, 2012 - CO Allocation. CO requested Medical and Police Clearance
June 30, 2012 - Medical finalized
July 05, 2012 - VISA GRANT!!!!
IED: June 13, 2013
Thank you so much Lord!!!!
Posts: 105Member
Joined: Feb 20, 2012
nla may chance naman daw and right now were are waiting for the result of our assessment from vetasses. Nag worry lang po., may case po ba na ganito na kahit hindi inline yung course sa experience na approve pa rin? pls enlighten.. thank you
Posts: 993Member
Joined: Feb 15, 2012
@k_mavs I definitely agree. Sabi ng friend ko, madali lang daw IELTS eh. heheheh Pero you'll never know. heheh
@lock_code2004 same here. Di rin kami tlga nagmamadali. Plan namin next year pa umalis. May mga sayang kase.... hehehe Kung di kami aalis, wala rin akong plan talaga umalis sa current company ko. hehe Pero syempre better ang opportunities sa AU. Mas madaling makkaipon. yes buzzer beater din kami. hahhaha kaya natin to!
@KTP this saturday na yun. Kaya mo yan! ;-)
261313 (Software Engineer)
Feb.15.2012 - started working on ACS requirements
Mar.02.2012 - submitted online ACS application and sent documents to ACS via Fedex
Mar.05.2012 - ACS acknowledged actual documents
Mar.21.2012 - ACS finalised assessment: Suitable
Mar.31.2012 - IELTS exam with BC
Apr.13.2012 - IELTS Results (L:8.5 R:7 W: 7 S: 8 OB: 7.5) Thank you LORD!
Apr.14.2012 - Lodged 175 Online Application
Apr.20.2012 - Completed Online Attachments
May.24.2012 - "Application being processed further"
May.29.2012 - CO Assigned :-)
Jun.07.2012 - Uploaded NBI Clearance
Jun.13.2012 - Medical/Health Requirements Finalised
Jun.14.2012 - VISA GRANT! Thank you, LORD! :-)
Jun.07.2013 - Initial Entry Date Deadline
Apr.28.2013 - Initial Entry (Sydney)
Jun.28.2013 - Verbal Job Offer (Melbourne)
Jul.08.2013 - First day of Work and first day of child care for my son (Melbourne)
Aug.21.2013 - First day of Work in Sydney
"Great is the LORD and most worthy of praise; his greatness no one can fathom." Psalm 145:3
Posts: 854Member
Joined: May 27, 2011
Yup I guess so. Since moral obligation lang naman siya, meaning kunsensya mo na lang daw if umalis ka ng sponsoring state mo within the 2 year period. Haha.
@stolich18
Haha pareho pala tayo, kapagod ang preparation ng bday party. Kakatapos lang nun amin, last weekend. 1st baby din namin. Hehe. 1st birthday.
Occupation: ICT Software Engineer (ANZSCO 261313)
Dec 13 2011 - ACS: Suitable (AQF Diploma)
Feb 03 2012 - IELTS #1 Failed (W-6.5)
Mar 02 2012 - IELTS #2 Passed
Apr 21 2012 - 175 Visa Lodged Online
May 29 2012 - CO Assigned
Jun 25 2012 - Visa Grant (IED: Dec 14 2012)
Aug 19 2012 - Arrived in Sydney
Sept 10 2012 - Start @ 1st Job (Web Developer)
Posts: 221Member
Joined: Oct 07, 2011
"If you have a dream, protect it. Love it. Chase it. And one day you will live it"
Posts: 243Member
Joined: Jan 10, 2012
“We can make our own plans, but the Lord gives the right answer. – Proverbs 16:1”
Occupation: 261111 (ICT Business Analyst)
Apr 29, 2012 - Lodged 175 Online Application
June 4, 2012 - CO Allocation. CO requested Medical and Police Clearance
June 30, 2012 - Medical finalized
July 05, 2012 - VISA GRANT!!!!
IED: June 13, 2013
Thank you so much Lord!!!!
Posts: 2,616Member, Moderator
Joined: Jan 13, 2011
But more importantly, let's not panic and rush things
Magkakaroon lang naman ng 'ticketing system' silang iimplement pero parehong application process pa rin naman...so kung hindi talaga aabot, puwede pa rin kayo magpasa ng visa application after July 2012...malay niyo mas mapabilis pa lalo ang processing by then
Posts: 993Member
Joined: Feb 15, 2012
261313 (Software Engineer)
Feb.15.2012 - started working on ACS requirements
Mar.02.2012 - submitted online ACS application and sent documents to ACS via Fedex
Mar.05.2012 - ACS acknowledged actual documents
Mar.21.2012 - ACS finalised assessment: Suitable
Mar.31.2012 - IELTS exam with BC
Apr.13.2012 - IELTS Results (L:8.5 R:7 W: 7 S: 8 OB: 7.5) Thank you LORD!
Apr.14.2012 - Lodged 175 Online Application
Apr.20.2012 - Completed Online Attachments
May.24.2012 - "Application being processed further"
May.29.2012 - CO Assigned :-)
Jun.07.2012 - Uploaded NBI Clearance
Jun.13.2012 - Medical/Health Requirements Finalised
Jun.14.2012 - VISA GRANT! Thank you, LORD! :-)
Jun.07.2013 - Initial Entry Date Deadline
Apr.28.2013 - Initial Entry (Sydney)
Jun.28.2013 - Verbal Job Offer (Melbourne)
Jul.08.2013 - First day of Work and first day of child care for my son (Melbourne)
Aug.21.2013 - First day of Work in Sydney