waaahhh parang ang bagal ng araw! question, di ko pa kasi natatanggap aknowledgement receipt from EA, is it ok if I will email them? TIA.
Occupation: Civil Engineer (ANZSCO 233211)
Main Applicant: Moi
February 02, 2013 - IELTS - passed
August 27, 2013 - Sent CDR to EA for Assessment
January 15, 2014 - Received Positive Assessment
February 24, 2014 - Submitted EOI
March 10, 2014 - Received Invitation to Apply for Visa
March 31, 2014 - Lodged Visa 189 (but system reflected application lodged on April 1, 2014 due to time diff)
April 19, 2014 - Medicals done and all documents uploaded
May 2014 - CO Allocated
June 2014 - SSS and Pagibig documents for 2009-2010 requested
July 2014 - Visa Grant! God is Great!
September 2014 - IED
August 2015 - Big move
----countdown mode ----
lock_code2004Perth Posts: 5,037Member, De-activated Joined: Feb 23, 2012
Boss @lock_code2004 I've read from a previous page that you sent someone a sample of CDR for CE. Civil Engineer ba 'to? If it is, or not, I would appreciate if you could also send me. Salamat!
Sep 24, 2011 - IELTS (L-8 R-8 W-8 S-7.5 : OBS-8)
Jan 04, 2012 - EA application submitted | Feb 23, 2012 - EA assessment result (IE ANZSCO 233511)
May 8, 2012 - Lodged GSM 175 online application | June 4, 2012 - CO Allocated
June 22, 2012 - Medicals Finalized | Aug 30, 2012 - PCCs Completed (PH, UAE, USA)
Sep 3, 2012 - Visa Granted (IED Jun 11, 2013) Thank You Lord!
Oct 16-28, 2012 - Initial Entry Completed - Sydney
July 28, 2013 - Final move to Perth
Sep 9, 2013 - Started work with the same company i worked for in UAE/USA
Oct 28, 2013 - Moved to another company..
ShaySheyWoolloongabba Posts: 184Member Joined: Jun 10, 2013
@btarroja213 wow atleast ilang araw na lang pala ang hinihintay mo... buti ka pa! hehe
Nominated Occupation : Production / Plant Engineer
17-Aug-13 IELTS BC L/R-7.5 S-6.5 W-6.0
05-Sept-13 EA received assessment documents
14-Dec-13 IELTS IDP L-6.5 R-8.0 S/W 7.0
06- Feb-14 EA confirmed positive skills assessment through email
15-Feb-14 IELTS IDP L-9.0 R-8.0 S-7.5 W-7.0 (Finally)
08-Mar-14 Submitted EOI
10- Mar-14 Received invitation to lodge visa 189
14- Mar- 14 Received EA assessment letter
31- Mar- 14 Lodge visa
05- Apr- 14 Uploaded documents
16- Apr- 14 Uploaded medicals
01- May- 14 CO allocated - GSM Adelaide Team 06
22-May- 14 Uploaded all requested documents (Form80 / Police Clearance)
04-June- 14 VISA GRANT!! Thank u Lord!
29-July - 14 Initial entry Melbourne
27 - Dec - 14 Big move
Proverbs 16:9 "The heart of man plans his way, but the Lord establishes his steps."
joestrummerPerth Posts: 147Member Joined: Aug 19, 2012
I think it is ok. But make sure that the time that has been spent on waiting is at least or more than the turnaround time given by EA otherwise waiting for it might be a better idea. Did you try to check the current turnaround times through msastatus? Sabi nga nila e patience is a virtue. Hihi!
October 27, 2012 - IELTS GT Module
November 9, 2012 - IELTS Result (L-9 : R-8 : W-8 : S-7.5: OBS - 8)
December 27, 2012 - EA Documents Sent for Assessment
May 18, 2013 - Positive Assessment from EA
May 20, 2013 - Invitation to Lodge 189
May 26, 2013 - Lodged 189 and IMMI Acknowledgement
July 2, 2013 - Medicals
July 12, 2013 - CO Allocated Adelaide GSM Team 7
(Requested for Form 80, PCCs, Marriage Certificate and Additional Evidences of Overseas Employment)
August 1, 2013 - Visa Grant (Salamat po sa Panginoon, at siyempre sa mga idol sa pinoyau)
February 23, 2014 - Arrived in Perth, WA
Hello everyone! Baguhan ako dito, but I have been reading the threads. Let me just say all posters here are doing God's work. Galing! Ito na ata ang pinaka informative na forum na nakita ko. Good job!
Anyways, I am a civil engineer here in Manila. I have been working since 2006. I am currently preparing my CDR and hoping I can get samples so I can compare.
So, if anyone can give me samples of their CDR's, preferably, for Civil Engineer, I'll be most thankful.
@joestrummer: sorry po ano yung msastatus? ano ba laman ng acknowledgement receipt? is it important? Kasi alam ko namn na nadebit na siya sa account. so meaning nagstart na assessment ko. di ko lang alam ano next gawin or what to expect while waiting for the next few months.
enlighten me please. thanks thanks.
Occupation: Civil Engineer (ANZSCO 233211)
Main Applicant: Moi
February 02, 2013 - IELTS - passed
August 27, 2013 - Sent CDR to EA for Assessment
January 15, 2014 - Received Positive Assessment
February 24, 2014 - Submitted EOI
March 10, 2014 - Received Invitation to Apply for Visa
March 31, 2014 - Lodged Visa 189 (but system reflected application lodged on April 1, 2014 due to time diff)
April 19, 2014 - Medicals done and all documents uploaded
May 2014 - CO Allocated
June 2014 - SSS and Pagibig documents for 2009-2010 requested
July 2014 - Visa Grant! God is Great!
September 2014 - IED
August 2015 - Big move
----countdown mode ----
jepoy527Sydney Posts: 243Member Joined: Nov 08, 2012
currently 16 weeks ang turnaround time. sa akin hopefully by mid of november dumating na...
what to expect? asahan mong tatawagan nila ang current employer mo kung kasama ang experience mo sa current company mo sa CDR and sa skilled employment assessment. expect mong mas mamahalin ka na ng boss mo pag nalaman nilang may plano kang mag migrate sa Au
04/27/13 IELTS GT Exam
07/25/13 CDR sent to EA
12/03/13 Positive EA Assessment
01/28/14 Submitted EOI (VISA Subclass 189, 70 Points)
02/10/14 Received invitation from SkillSelect
03/01/14 Lodged VISA Subclass 189 Application
04/29/14 VISA GRANT!!! Thank you Lord!
02/13/15 Started to work
“A ship is always safe at the shore - but that is NOT what it is built for.”
― Albert Einstein
"You have to leave the city of your comfort and go into the wilderness of your intuition.You can’t get there by bus, only by hard work and risk and by not quite knowing what you’re doing. What you’ll discover will be wonderful. What you’ll discover will be yourself."
― Alan Alda
karl_amogawinSydney Posts: 306Member Joined: Aug 24, 2013
Hello mga sir, Im preparing my CDR. Kung ok lang pahiram naman po ng cdr nyo just a guide lang. Im a civil engineer in singapore. Salamat ng marami! [email protected]
2013 - 1st IELTS L 7.5 R 7.5 W 5.5 S 7.5
April 2014 - 2nd IELTS L 7.5 R 7.0 W 6.0 S 7.0
14 May 2014 - CDR sent via DHL Singapore
16 May 2014 - Delivered at EA
19 May 2014 - 870 AUD charged to my credit card. Waiting game starts now
7 August 2014 - EOR for my IELTS L 7.5 R 7 W 7 S 6
26 August 2014 - EA Positive results Civil Engineer
11 October 2014 EOR Speaking 6 to 6.5
28 Feb IELTS success! 10 pts! L 7.5 R 8 W 7 S 7.5
13 March 2015 EOI submitted visa 189 65 pts.
27 March Invited
27 March Lodged! At long last. In His perfect timing. Scan documents and obtain clearances and medical
11 May VISA GRANT! Direct grant. Did not upload form 80
joestrummerPerth Posts: 147Member Joined: Aug 19, 2012
Thanks idol @jepoy527 for answering for @piglet24 's benefit. With that answered, expect your results to be released in approximately 16weeks from the time your documents were received by EA (this may change though from time to time) and yes the time you should start counting is the date of your acknowledgment receipt or simply the date where the charges are deducted from your credit card.
Also take note that the date you'll receive the results may probably be a couple more days because they have to send it through post.
Mine was dated May 8, 2013 and I got the letter May 18, 2013. This may also vary as per address.
Well for now, all you can do is wait and pray that there'll be no delays in your assessment.
God Bless!
October 27, 2012 - IELTS GT Module
November 9, 2012 - IELTS Result (L-9 : R-8 : W-8 : S-7.5: OBS - 8)
December 27, 2012 - EA Documents Sent for Assessment
May 18, 2013 - Positive Assessment from EA
May 20, 2013 - Invitation to Lodge 189
May 26, 2013 - Lodged 189 and IMMI Acknowledgement
July 2, 2013 - Medicals
July 12, 2013 - CO Allocated Adelaide GSM Team 7
(Requested for Form 80, PCCs, Marriage Certificate and Additional Evidences of Overseas Employment)
August 1, 2013 - Visa Grant (Salamat po sa Panginoon, at siyempre sa mga idol sa pinoyau)
February 23, 2014 - Arrived in Perth, WA
@jepoy527 and @joestrummer: salamat sa advice and information. i need to think about other things pala para makalimutan ang assessment for the next 16 weeks. or 14 weeks to be exact. teehee. the waiting game is torture. anyway, for the acknowledgement receipt where my CID is indicated will check with the post office as soon as possible. two weeks na kasi since nag deduct sa credit card. tenchu guys!
Occupation: Civil Engineer (ANZSCO 233211)
Main Applicant: Moi
February 02, 2013 - IELTS - passed
August 27, 2013 - Sent CDR to EA for Assessment
January 15, 2014 - Received Positive Assessment
February 24, 2014 - Submitted EOI
March 10, 2014 - Received Invitation to Apply for Visa
March 31, 2014 - Lodged Visa 189 (but system reflected application lodged on April 1, 2014 due to time diff)
April 19, 2014 - Medicals done and all documents uploaded
May 2014 - CO Allocated
June 2014 - SSS and Pagibig documents for 2009-2010 requested
July 2014 - Visa Grant! God is Great!
September 2014 - IED
August 2015 - Big move
Hi all! Im a newbie here and I was encouraged to post inquiry coz ang dami kong nbabasang helpful tips from you guys. I want to get advice sna about my EA Application. Ang narequest ko kc is Standard Assessment lng. Nareceive ko ung EA letter stating that my qualification is comparable to AU. Then I've learned na need ko pla ang Additional Services kung gusto ko mag-claim ng points sa DIAC regarding working experience. I know pde ako magrequest for additional assessment but my questions:
1) How long ang turnaround time pag magpa-additional assessment ako? ANyone experienced it before? 2) Ang kailangan ko lng ba pra mkapag-claim ng points for EOI eh ung letter ng EA regarding qualification and work experiences? 3) I believe may letter akong matatanggap from EA stating na inacknowledge nila ako as professional engr right? Need ba ito pra sa visa application?
Hope anyone can advice me. Thanks in advance!
ANZSCO 233311
02 Oct 2013 - EA Positive Assessment
05 Oct 2013 - Submit EOI
11 Oct 2013 - WA SS invitation
21 Oct 2013 - Visa 189 invitation
23 Oct 2013 - Lodge Visa Subclass 189
28 Oct 2013 - SG PCC applied / Medicals done
31 Oct 2013 - Medical Result -No health examinations required
18 Nov 2013 - SG PCC uploaded
25 Nov 2013 - Form 80 uploaded
26 Nov 2013 - VISA GRANT (GSM Brisbane Team 33) To God be all the Glory!!!! (24 Oct 2014 - IED)
01 May 2014 - Arrival to Perth
"...and the Lord your God will bless you in the land you are entering to possess." -Deuteronomy 30:16
RichardQMelbourne Posts: 59Member Joined: Jun 29, 2012
Hi @peterpan07, I replied on your other thread.:-)
@lock_code2004 sir pede po ba paki-send ng sample CDR for CE sa akin? we initially opted for student visa kaso na-realize po nmin na mas wise siguro kung direct migration na process nmin...civil engineer ang husband ko. eto po email add ko: [email protected] madaming salamat!
Nov 29, 2013 - IELTS (L-7.0 R-7.0 W-6.5 S-6.5 OBS-7.0)
June 18, 2014 – CDR sent to EA via DHL Singapore
June 20, 2014 – Payment acknowledgement from EA
Oct. 13, 2014 - EA Assessment Positive Results (thank you Lord!!!)
"He has made everything beautiful in its time." – Ecclesiastes 3:11
@dan78 sir pede din po ba makahingi ng sample CDR for CE? Ang una po nming plano talaga is mag-student visa me kaso nagkaproblema po kme sa process (as you can see in my timeline). My husband is a CE po, baka pede nyo po kme masendan ng sample letter din po. Eto po email add ko: [email protected] madaming salamat!!!
Nov 29, 2013 - IELTS (L-7.0 R-7.0 W-6.5 S-6.5 OBS-7.0)
June 18, 2014 – CDR sent to EA via DHL Singapore
June 20, 2014 – Payment acknowledgement from EA
Oct. 13, 2014 - EA Assessment Positive Results (thank you Lord!!!)
"He has made everything beautiful in its time." – Ecclesiastes 3:11
lock_code2004Perth Posts: 5,037Member, De-activated Joined: Feb 23, 2012
Sep 24, 2011 - IELTS (L-8 R-8 W-8 S-7.5 : OBS-8)
Jan 04, 2012 - EA application submitted | Feb 23, 2012 - EA assessment result (IE ANZSCO 233511)
May 8, 2012 - Lodged GSM 175 online application | June 4, 2012 - CO Allocated
June 22, 2012 - Medicals Finalized | Aug 30, 2012 - PCCs Completed (PH, UAE, USA)
Sep 3, 2012 - Visa Granted (IED Jun 11, 2013) Thank You Lord!
Oct 16-28, 2012 - Initial Entry Completed - Sydney
July 28, 2013 - Final move to Perth
Sep 9, 2013 - Started work with the same company i worked for in UAE/USA
Oct 28, 2013 - Moved to another company..
Nov 29, 2013 - IELTS (L-7.0 R-7.0 W-6.5 S-6.5 OBS-7.0)
June 18, 2014 – CDR sent to EA via DHL Singapore
June 20, 2014 – Payment acknowledgement from EA
Oct. 13, 2014 - EA Assessment Positive Results (thank you Lord!!!)
"He has made everything beautiful in its time." – Ecclesiastes 3:11
karl_amogawinSydney Posts: 306Member Joined: Aug 24, 2013
@lock_code2004 Pde pasend din po? CE rin ako. Im starting to draft na. Oct 26 Ielts exam ko. salamat ng marami! [email protected]
2013 - 1st IELTS L 7.5 R 7.5 W 5.5 S 7.5
April 2014 - 2nd IELTS L 7.5 R 7.0 W 6.0 S 7.0
14 May 2014 - CDR sent via DHL Singapore
16 May 2014 - Delivered at EA
19 May 2014 - 870 AUD charged to my credit card. Waiting game starts now
7 August 2014 - EOR for my IELTS L 7.5 R 7 W 7 S 6
26 August 2014 - EA Positive results Civil Engineer
11 October 2014 EOR Speaking 6 to 6.5
28 Feb IELTS success! 10 pts! L 7.5 R 8 W 7 S 7.5
13 March 2015 EOI submitted visa 189 65 pts.
27 March Invited
27 March Lodged! At long last. In His perfect timing. Scan documents and obtain clearances and medical
11 May VISA GRANT! Direct grant. Did not upload form 80
lock_code2004Perth Posts: 5,037Member, De-activated Joined: Feb 23, 2012
Sep 24, 2011 - IELTS (L-8 R-8 W-8 S-7.5 : OBS-8)
Jan 04, 2012 - EA application submitted | Feb 23, 2012 - EA assessment result (IE ANZSCO 233511)
May 8, 2012 - Lodged GSM 175 online application | June 4, 2012 - CO Allocated
June 22, 2012 - Medicals Finalized | Aug 30, 2012 - PCCs Completed (PH, UAE, USA)
Sep 3, 2012 - Visa Granted (IED Jun 11, 2013) Thank You Lord!
Oct 16-28, 2012 - Initial Entry Completed - Sydney
July 28, 2013 - Final move to Perth
Sep 9, 2013 - Started work with the same company i worked for in UAE/USA
Oct 28, 2013 - Moved to another company..
karl_amogawinSydney Posts: 306Member Joined: Aug 24, 2013
2013 - 1st IELTS L 7.5 R 7.5 W 5.5 S 7.5
April 2014 - 2nd IELTS L 7.5 R 7.0 W 6.0 S 7.0
14 May 2014 - CDR sent via DHL Singapore
16 May 2014 - Delivered at EA
19 May 2014 - 870 AUD charged to my credit card. Waiting game starts now
7 August 2014 - EOR for my IELTS L 7.5 R 7 W 7 S 6
26 August 2014 - EA Positive results Civil Engineer
11 October 2014 EOR Speaking 6 to 6.5
28 Feb IELTS success! 10 pts! L 7.5 R 8 W 7 S 7.5
13 March 2015 EOI submitted visa 189 65 pts.
27 March Invited
27 March Lodged! At long last. In His perfect timing. Scan documents and obtain clearances and medical
11 May VISA GRANT! Direct grant. Did not upload form 80
karl_amogawinSydney Posts: 306Member Joined: Aug 24, 2013
Guys, Papasign ko un job description ko sa previous Project manager ko, pumayag siya. (medyo close kami hehe) un COE ko dated dec 2009 pa, Un job description ko papagawa ko next week. ano un format kelangan? format as letter?
"to whom it may concern.... Company: Project: Designation: Duties:
Sincerely yours PM details" ?
Thanks!
2013 - 1st IELTS L 7.5 R 7.5 W 5.5 S 7.5
April 2014 - 2nd IELTS L 7.5 R 7.0 W 6.0 S 7.0
14 May 2014 - CDR sent via DHL Singapore
16 May 2014 - Delivered at EA
19 May 2014 - 870 AUD charged to my credit card. Waiting game starts now
7 August 2014 - EOR for my IELTS L 7.5 R 7 W 7 S 6
26 August 2014 - EA Positive results Civil Engineer
11 October 2014 EOR Speaking 6 to 6.5
28 Feb IELTS success! 10 pts! L 7.5 R 8 W 7 S 7.5
13 March 2015 EOI submitted visa 189 65 pts.
27 March Invited
27 March Lodged! At long last. In His perfect timing. Scan documents and obtain clearances and medical
11 May VISA GRANT! Direct grant. Did not upload form 80
Hello! I'm new here and recently lang namin na decide na mag try sa Australia, mga around July lang. We are applying for a Skilled Migrant Visa for our family (hubby, myself and 1 kid) and we are doing this via an agent (Same agent my friend who is a CPA used when she was getting her Skilled Migrant Visa. Nakaalis na sya for Australia a year ago). Mechanical Engineer si hubby. Any Mech Eng here who has received a positive assessment from EA or who are currently writing their CDR/in the process of waiting for assessment?
How was your experience with this? Mabilis ba yung assessment? How are you planning to go about finding a job in Au? Yung agent kse is a migration agent, so they do not assist with job placements.
Any help/opinions are welcome.
Thanks!
lock_code2004Perth Posts: 5,037Member, De-activated Joined: Feb 23, 2012
Guys, Papasign ko un job description ko sa previous Project manager ko, pumayag siya. (medyo close kami hehe) un COE ko dated dec 2009 pa, Un job description ko papagawa ko next week. ano un format kelangan? format as letter?
"to whom it may concern.... Company: Project: Designation: Duties:
Sincerely yours PM details" ?
Thanks!
yes.. mas okay kung i-print sa official company letterhead.. job description lang yan.. what about your salary? meron ka bang generic COE from HR? kung meron then it would be fine..
Generic COE + Job Description = success.. lol..
Sep 24, 2011 - IELTS (L-8 R-8 W-8 S-7.5 : OBS-8)
Jan 04, 2012 - EA application submitted | Feb 23, 2012 - EA assessment result (IE ANZSCO 233511)
May 8, 2012 - Lodged GSM 175 online application | June 4, 2012 - CO Allocated
June 22, 2012 - Medicals Finalized | Aug 30, 2012 - PCCs Completed (PH, UAE, USA)
Sep 3, 2012 - Visa Granted (IED Jun 11, 2013) Thank You Lord!
Oct 16-28, 2012 - Initial Entry Completed - Sydney
July 28, 2013 - Final move to Perth
Sep 9, 2013 - Started work with the same company i worked for in UAE/USA
Oct 28, 2013 - Moved to another company..
lock_code2004Perth Posts: 5,037Member, De-activated Joined: Feb 23, 2012
@AnnieIngles - welcome po sa forum.. basa basa lang po dito sa forum.. especially mga timelines ng mga member.. you will know kung gano katagal/kabilis ang mga applications..
as of now, alam ko between 12-16weeks ang application process sa EA... goodluck..
Sep 24, 2011 - IELTS (L-8 R-8 W-8 S-7.5 : OBS-8)
Jan 04, 2012 - EA application submitted | Feb 23, 2012 - EA assessment result (IE ANZSCO 233511)
May 8, 2012 - Lodged GSM 175 online application | June 4, 2012 - CO Allocated
June 22, 2012 - Medicals Finalized | Aug 30, 2012 - PCCs Completed (PH, UAE, USA)
Sep 3, 2012 - Visa Granted (IED Jun 11, 2013) Thank You Lord!
Oct 16-28, 2012 - Initial Entry Completed - Sydney
July 28, 2013 - Final move to Perth
Sep 9, 2013 - Started work with the same company i worked for in UAE/USA
Oct 28, 2013 - Moved to another company..
karl_amogawinSydney Posts: 306Member Joined: Aug 24, 2013
@lock_code2004 Un generic meron ako. un salary wla na sir. 2 employers ko sa pinas to. Pasign ko sa manager with contact details, Print with the company's letter head.
2013 - 1st IELTS L 7.5 R 7.5 W 5.5 S 7.5
April 2014 - 2nd IELTS L 7.5 R 7.0 W 6.0 S 7.0
14 May 2014 - CDR sent via DHL Singapore
16 May 2014 - Delivered at EA
19 May 2014 - 870 AUD charged to my credit card. Waiting game starts now
7 August 2014 - EOR for my IELTS L 7.5 R 7 W 7 S 6
26 August 2014 - EA Positive results Civil Engineer
11 October 2014 EOR Speaking 6 to 6.5
28 Feb IELTS success! 10 pts! L 7.5 R 8 W 7 S 7.5
13 March 2015 EOI submitted visa 189 65 pts.
27 March Invited
27 March Lodged! At long last. In His perfect timing. Scan documents and obtain clearances and medical
11 May VISA GRANT! Direct grant. Did not upload form 80
lock_code2004Perth Posts: 5,037Member, De-activated Joined: Feb 23, 2012
@lock_code2004 Un generic meron ako. un salary wla na sir. 2 employers ko sa pinas to. Pasign ko sa manager with contact details, Print with the company's letter head.
what i mean, yung generic COE mo dapat naka-indicate dun kung magkano ang salary mo.. you need to prove that it's a paid employment..
Sep 24, 2011 - IELTS (L-8 R-8 W-8 S-7.5 : OBS-8)
Jan 04, 2012 - EA application submitted | Feb 23, 2012 - EA assessment result (IE ANZSCO 233511)
May 8, 2012 - Lodged GSM 175 online application | June 4, 2012 - CO Allocated
June 22, 2012 - Medicals Finalized | Aug 30, 2012 - PCCs Completed (PH, UAE, USA)
Sep 3, 2012 - Visa Granted (IED Jun 11, 2013) Thank You Lord!
Oct 16-28, 2012 - Initial Entry Completed - Sydney
July 28, 2013 - Final move to Perth
Sep 9, 2013 - Started work with the same company i worked for in UAE/USA
Oct 28, 2013 - Moved to another company..
karl_amogawinSydney Posts: 306Member Joined: Aug 24, 2013
@lock_code2004 ohh okay. I get you sir. Hindi ko naisip un ha. Kuha na lang ako bank statements
2013 - 1st IELTS L 7.5 R 7.5 W 5.5 S 7.5
April 2014 - 2nd IELTS L 7.5 R 7.0 W 6.0 S 7.0
14 May 2014 - CDR sent via DHL Singapore
16 May 2014 - Delivered at EA
19 May 2014 - 870 AUD charged to my credit card. Waiting game starts now
7 August 2014 - EOR for my IELTS L 7.5 R 7 W 7 S 6
26 August 2014 - EA Positive results Civil Engineer
11 October 2014 EOR Speaking 6 to 6.5
28 Feb IELTS success! 10 pts! L 7.5 R 8 W 7 S 7.5
13 March 2015 EOI submitted visa 189 65 pts.
27 March Invited
27 March Lodged! At long last. In His perfect timing. Scan documents and obtain clearances and medical
11 May VISA GRANT! Direct grant. Did not upload form 80
lock_code2004Perth Posts: 5,037Member, De-activated Joined: Feb 23, 2012
@lock_code2004 ohh okay. I get you sir. Hindi ko naisip un ha. Kuha na lang ako bank statements
payslip or ITR.. if you have..
Sep 24, 2011 - IELTS (L-8 R-8 W-8 S-7.5 : OBS-8)
Jan 04, 2012 - EA application submitted | Feb 23, 2012 - EA assessment result (IE ANZSCO 233511)
May 8, 2012 - Lodged GSM 175 online application | June 4, 2012 - CO Allocated
June 22, 2012 - Medicals Finalized | Aug 30, 2012 - PCCs Completed (PH, UAE, USA)
Sep 3, 2012 - Visa Granted (IED Jun 11, 2013) Thank You Lord!
Oct 16-28, 2012 - Initial Entry Completed - Sydney
July 28, 2013 - Final move to Perth
Sep 9, 2013 - Started work with the same company i worked for in UAE/USA
Oct 28, 2013 - Moved to another company..
sonsi_03Sydney Posts: 1,084Member Joined: Feb 14, 2013
edited September 2013
@karl_amogawin sir, mag-request ka na rin ng updated namecard ni project manager for standby maski yung papel eh me letterhead na, panigurado lang.
09-07-14 - Visa Grant! Thank you so much, Lord! IED 03-03-15
15-09-14 - Landed in Radelaide! South Australia
29-09-14 - Started working in Adelaide South Australia
28-09-15 - Left the first job
06-10-15 - Started the second job
18-09-16 - Moved to Sydney
2013 - 1st IELTS L 7.5 R 7.5 W 5.5 S 7.5
April 2014 - 2nd IELTS L 7.5 R 7.0 W 6.0 S 7.0
14 May 2014 - CDR sent via DHL Singapore
16 May 2014 - Delivered at EA
19 May 2014 - 870 AUD charged to my credit card. Waiting game starts now
7 August 2014 - EOR for my IELTS L 7.5 R 7 W 7 S 6
26 August 2014 - EA Positive results Civil Engineer
11 October 2014 EOR Speaking 6 to 6.5
28 Feb IELTS success! 10 pts! L 7.5 R 8 W 7 S 7.5
13 March 2015 EOI submitted visa 189 65 pts.
27 March Invited
27 March Lodged! At long last. In His perfect timing. Scan documents and obtain clearances and medical
11 May VISA GRANT! Direct grant. Did not upload form 80
karl_amogawinSydney Posts: 306Member Joined: Aug 24, 2013
@sonsi_03 Bukas pla result ng IELTS mo hehe goodluck!
2013 - 1st IELTS L 7.5 R 7.5 W 5.5 S 7.5
April 2014 - 2nd IELTS L 7.5 R 7.0 W 6.0 S 7.0
14 May 2014 - CDR sent via DHL Singapore
16 May 2014 - Delivered at EA
19 May 2014 - 870 AUD charged to my credit card. Waiting game starts now
7 August 2014 - EOR for my IELTS L 7.5 R 7 W 7 S 6
26 August 2014 - EA Positive results Civil Engineer
11 October 2014 EOR Speaking 6 to 6.5
28 Feb IELTS success! 10 pts! L 7.5 R 8 W 7 S 7.5
13 March 2015 EOI submitted visa 189 65 pts.
27 March Invited
27 March Lodged! At long last. In His perfect timing. Scan documents and obtain clearances and medical
11 May VISA GRANT! Direct grant. Did not upload form 80
The longest running Pinoy-Australian Forum site in the history. We are connecting Pinoys "in" and "to" Australia since 2010! If you want to join in, click one of these buttons!
Comments
Posts: 334Member
Joined: Sep 09, 2012
Occupation: Civil Engineer (ANZSCO 233211)
Main Applicant: Moi
February 02, 2013 - IELTS - passed
August 27, 2013 - Sent CDR to EA for Assessment
January 15, 2014 - Received Positive Assessment
February 24, 2014 - Submitted EOI
March 10, 2014 - Received Invitation to Apply for Visa
March 31, 2014 - Lodged Visa 189 (but system reflected application lodged on April 1, 2014 due to time diff)
April 19, 2014 - Medicals done and all documents uploaded
May 2014 - CO Allocated
June 2014 - SSS and Pagibig documents for 2009-2010 requested
July 2014 - Visa Grant! God is Great!
September 2014 - IED
August 2015 - Big move
----countdown mode ----
Posts: 5,037Member, De-activated
Joined: Feb 23, 2012
Sep 24, 2011 - IELTS (L-8 R-8 W-8 S-7.5 : OBS-8)
Jan 04, 2012 - EA application submitted | Feb 23, 2012 - EA assessment result (IE ANZSCO 233511)
May 8, 2012 - Lodged GSM 175 online application | June 4, 2012 - CO Allocated
June 22, 2012 - Medicals Finalized | Aug 30, 2012 - PCCs Completed (PH, UAE, USA)
Sep 3, 2012 - Visa Granted (IED Jun 11, 2013) Thank You Lord!
Oct 16-28, 2012 - Initial Entry Completed - Sydney
July 28, 2013 - Final move to Perth
Sep 9, 2013 - Started work with the same company i worked for in UAE/USA
Oct 28, 2013 - Moved to another company..
Posts: 184Member
Joined: Jun 10, 2013
Nominated Occupation : Production / Plant Engineer
17-Aug-13 IELTS BC L/R-7.5 S-6.5 W-6.0
05-Sept-13 EA received assessment documents
14-Dec-13 IELTS IDP L-6.5 R-8.0 S/W 7.0
06- Feb-14 EA confirmed positive skills assessment through email
15-Feb-14 IELTS IDP L-9.0 R-8.0 S-7.5 W-7.0 (Finally)
08-Mar-14 Submitted EOI
10- Mar-14 Received invitation to lodge visa 189
14- Mar- 14 Received EA assessment letter
31- Mar- 14 Lodge visa
05- Apr- 14 Uploaded documents
16- Apr- 14 Uploaded medicals
01- May- 14 CO allocated - GSM Adelaide Team 06
22-May- 14 Uploaded all requested documents (Form80 / Police Clearance)
04-June- 14 VISA GRANT!! Thank u Lord!
29-July - 14 Initial entry Melbourne
27 - Dec - 14 Big move
Proverbs 16:9 "The heart of man plans his way, but the Lord establishes his steps."
Posts: 147Member
Joined: Aug 19, 2012
I think it is ok. But make sure that the time that has been spent on waiting is at least or more than the turnaround time given by EA otherwise waiting for it might be a better idea. Did you try to check the current turnaround times through msastatus? Sabi nga nila e patience is a virtue. Hihi!
October 27, 2012 - IELTS GT Module
November 9, 2012 - IELTS Result (L-9 : R-8 : W-8 : S-7.5: OBS - 8)
December 27, 2012 - EA Documents Sent for Assessment
May 18, 2013 - Positive Assessment from EA
May 20, 2013 - Invitation to Lodge 189
May 26, 2013 - Lodged 189 and IMMI Acknowledgement
July 2, 2013 - Medicals
July 12, 2013 - CO Allocated Adelaide GSM Team 7
(Requested for Form 80, PCCs, Marriage Certificate and Additional Evidences of Overseas Employment)
August 1, 2013 - Visa Grant (Salamat po sa Panginoon, at siyempre sa mga idol sa pinoyau)
February 23, 2014 - Arrived in Perth, WA
Posts: 44Member
Joined: Jan 07, 2013
please check your email.
233211 Civil Engineer
05/08/15 - EA Results
07/11/16 - PTE Exam
11/11/16 - PTE Results (L-73/R-70/S-70/W-75
17/11/16 - Lodged EOI 189(60pts)
08/01/16 - Received 189 ITA
14/02/16 - PCC
20/02/16 - Visa Application Lodged (189)
11/03/16 - 1st CO GSM Adelaide
16/03/16-Medicals Result-No actions required
20/04/16 - 2ND CO asking to update form 80 address gap
20/05/16-Visa Grant.Praise the Lord!
17/01/17-EID
Posts: 334Member
Joined: Sep 09, 2012
enlighten me please. thanks thanks.
Occupation: Civil Engineer (ANZSCO 233211)
Main Applicant: Moi
February 02, 2013 - IELTS - passed
August 27, 2013 - Sent CDR to EA for Assessment
January 15, 2014 - Received Positive Assessment
February 24, 2014 - Submitted EOI
March 10, 2014 - Received Invitation to Apply for Visa
March 31, 2014 - Lodged Visa 189 (but system reflected application lodged on April 1, 2014 due to time diff)
April 19, 2014 - Medicals done and all documents uploaded
May 2014 - CO Allocated
June 2014 - SSS and Pagibig documents for 2009-2010 requested
July 2014 - Visa Grant! God is Great!
September 2014 - IED
August 2015 - Big move
----countdown mode ----
Posts: 243Member
Joined: Nov 08, 2012
currently 16 weeks ang turnaround time. sa akin hopefully by mid of november dumating na...
what to expect? asahan mong tatawagan nila ang current employer mo kung kasama ang experience mo sa current company mo sa CDR and sa skilled employment assessment. expect mong mas mamahalin ka na ng boss mo pag nalaman nilang may plano kang mag migrate sa Au
04/27/13 IELTS GT Exam
07/25/13 CDR sent to EA
12/03/13 Positive EA Assessment
01/28/14 Submitted EOI (VISA Subclass 189, 70 Points)
02/10/14 Received invitation from SkillSelect
03/01/14 Lodged VISA Subclass 189 Application
04/29/14 VISA GRANT!!! Thank you Lord!
02/13/15 Started to work
“A ship is always safe at the shore - but that is NOT what it is built for.”
― Albert Einstein
"You have to leave the city of your comfort and go into the wilderness of your intuition.You can’t get there by bus, only by hard work and risk and by not quite knowing what you’re doing. What you’ll discover will be wonderful. What you’ll discover will be yourself."
― Alan Alda
Posts: 306Member
Joined: Aug 24, 2013
2013 - 1st IELTS L 7.5 R 7.5 W 5.5 S 7.5
April 2014 - 2nd IELTS L 7.5 R 7.0 W 6.0 S 7.0
14 May 2014 - CDR sent via DHL Singapore
16 May 2014 - Delivered at EA
19 May 2014 - 870 AUD charged to my credit card. Waiting game starts now
7 August 2014 - EOR for my IELTS L 7.5 R 7 W 7 S 6
26 August 2014 - EA Positive results Civil Engineer
11 October 2014 EOR Speaking 6 to 6.5
28 Feb IELTS success! 10 pts! L 7.5 R 8 W 7 S 7.5
13 March 2015 EOI submitted visa 189 65 pts.
27 March Invited
27 March Lodged! At long last. In His perfect timing. Scan documents and obtain clearances and medical
11 May VISA GRANT! Direct grant. Did not upload form 80
Posts: 147Member
Joined: Aug 19, 2012
Also take note that the date you'll receive the results may probably be a couple more days because they have to send it through post.
Mine was dated May 8, 2013 and I got the letter May 18, 2013. This may also vary as per address.
Well for now, all you can do is wait and pray that there'll be no delays in your assessment.
God Bless!
October 27, 2012 - IELTS GT Module
November 9, 2012 - IELTS Result (L-9 : R-8 : W-8 : S-7.5: OBS - 8)
December 27, 2012 - EA Documents Sent for Assessment
May 18, 2013 - Positive Assessment from EA
May 20, 2013 - Invitation to Lodge 189
May 26, 2013 - Lodged 189 and IMMI Acknowledgement
July 2, 2013 - Medicals
July 12, 2013 - CO Allocated Adelaide GSM Team 7
(Requested for Form 80, PCCs, Marriage Certificate and Additional Evidences of Overseas Employment)
August 1, 2013 - Visa Grant (Salamat po sa Panginoon, at siyempre sa mga idol sa pinoyau)
February 23, 2014 - Arrived in Perth, WA
Posts: 334Member
Joined: Sep 09, 2012
Occupation: Civil Engineer (ANZSCO 233211)
Main Applicant: Moi
February 02, 2013 - IELTS - passed
August 27, 2013 - Sent CDR to EA for Assessment
January 15, 2014 - Received Positive Assessment
February 24, 2014 - Submitted EOI
March 10, 2014 - Received Invitation to Apply for Visa
March 31, 2014 - Lodged Visa 189 (but system reflected application lodged on April 1, 2014 due to time diff)
April 19, 2014 - Medicals done and all documents uploaded
May 2014 - CO Allocated
June 2014 - SSS and Pagibig documents for 2009-2010 requested
July 2014 - Visa Grant! God is Great!
September 2014 - IED
August 2015 - Big move
----countdown mode ----
Posts: 290Member
Joined: Sep 14, 2013
Im a newbie here and I was encouraged to post inquiry coz ang dami kong nbabasang helpful tips from you guys.
I want to get advice sna about my EA Application. Ang narequest ko kc is Standard Assessment lng. Nareceive ko ung EA letter stating that my qualification is comparable to AU. Then I've learned na need ko pla ang Additional Services kung gusto ko mag-claim ng points sa DIAC regarding working experience. I know pde ako magrequest for additional assessment but my questions:
1) How long ang turnaround time pag magpa-additional assessment ako? ANyone experienced it before?
2) Ang kailangan ko lng ba pra mkapag-claim ng points for EOI eh ung letter ng EA regarding qualification and work experiences?
3) I believe may letter akong matatanggap from EA stating na inacknowledge nila ako as professional engr right? Need ba ito pra sa visa application?
Hope anyone can advice me. Thanks in advance!
ANZSCO 233311
02 Oct 2013 - EA Positive Assessment
05 Oct 2013 - Submit EOI
11 Oct 2013 - WA SS invitation
21 Oct 2013 - Visa 189 invitation
23 Oct 2013 - Lodge Visa Subclass 189
28 Oct 2013 - SG PCC applied / Medicals done
31 Oct 2013 - Medical Result -No health examinations required
18 Nov 2013 - SG PCC uploaded
25 Nov 2013 - Form 80 uploaded
26 Nov 2013 - VISA GRANT (GSM Brisbane Team 33) To God be all the Glory!!!! (24 Oct 2014 - IED)
01 May 2014 - Arrival to Perth
"...and the Lord your God will bless you in the land you are entering to possess." -Deuteronomy 30:16
Posts: 59Member
Joined: Jun 29, 2012
Posts: 81Member
Joined: Sep 16, 2013
Nominated Occupation: Civil Engineer
Primary applicant: husband + wife
Nov 29, 2013 - IELTS (L-7.0 R-7.0 W-6.5 S-6.5 OBS-7.0)
June 18, 2014 – CDR sent to EA via DHL Singapore
June 20, 2014 – Payment acknowledgement from EA
Oct. 13, 2014 - EA Assessment Positive Results (thank you Lord!!!)
"He has made everything beautiful in its time." – Ecclesiastes 3:11
Posts: 81Member
Joined: Sep 16, 2013
Nominated Occupation: Civil Engineer
Primary applicant: husband + wife
Nov 29, 2013 - IELTS (L-7.0 R-7.0 W-6.5 S-6.5 OBS-7.0)
June 18, 2014 – CDR sent to EA via DHL Singapore
June 20, 2014 – Payment acknowledgement from EA
Oct. 13, 2014 - EA Assessment Positive Results (thank you Lord!!!)
"He has made everything beautiful in its time." – Ecclesiastes 3:11
Posts: 5,037Member, De-activated
Joined: Feb 23, 2012
Sep 24, 2011 - IELTS (L-8 R-8 W-8 S-7.5 : OBS-8)
Jan 04, 2012 - EA application submitted | Feb 23, 2012 - EA assessment result (IE ANZSCO 233511)
May 8, 2012 - Lodged GSM 175 online application | June 4, 2012 - CO Allocated
June 22, 2012 - Medicals Finalized | Aug 30, 2012 - PCCs Completed (PH, UAE, USA)
Sep 3, 2012 - Visa Granted (IED Jun 11, 2013) Thank You Lord!
Oct 16-28, 2012 - Initial Entry Completed - Sydney
July 28, 2013 - Final move to Perth
Sep 9, 2013 - Started work with the same company i worked for in UAE/USA
Oct 28, 2013 - Moved to another company..
Posts: 81Member
Joined: Sep 16, 2013
Nominated Occupation: Civil Engineer
Primary applicant: husband + wife
Nov 29, 2013 - IELTS (L-7.0 R-7.0 W-6.5 S-6.5 OBS-7.0)
June 18, 2014 – CDR sent to EA via DHL Singapore
June 20, 2014 – Payment acknowledgement from EA
Oct. 13, 2014 - EA Assessment Positive Results (thank you Lord!!!)
"He has made everything beautiful in its time." – Ecclesiastes 3:11
Posts: 306Member
Joined: Aug 24, 2013
2013 - 1st IELTS L 7.5 R 7.5 W 5.5 S 7.5
April 2014 - 2nd IELTS L 7.5 R 7.0 W 6.0 S 7.0
14 May 2014 - CDR sent via DHL Singapore
16 May 2014 - Delivered at EA
19 May 2014 - 870 AUD charged to my credit card. Waiting game starts now
7 August 2014 - EOR for my IELTS L 7.5 R 7 W 7 S 6
26 August 2014 - EA Positive results Civil Engineer
11 October 2014 EOR Speaking 6 to 6.5
28 Feb IELTS success! 10 pts! L 7.5 R 8 W 7 S 7.5
13 March 2015 EOI submitted visa 189 65 pts.
27 March Invited
27 March Lodged! At long last. In His perfect timing. Scan documents and obtain clearances and medical
11 May VISA GRANT! Direct grant. Did not upload form 80
Posts: 5,037Member, De-activated
Joined: Feb 23, 2012
Sep 24, 2011 - IELTS (L-8 R-8 W-8 S-7.5 : OBS-8)
Jan 04, 2012 - EA application submitted | Feb 23, 2012 - EA assessment result (IE ANZSCO 233511)
May 8, 2012 - Lodged GSM 175 online application | June 4, 2012 - CO Allocated
June 22, 2012 - Medicals Finalized | Aug 30, 2012 - PCCs Completed (PH, UAE, USA)
Sep 3, 2012 - Visa Granted (IED Jun 11, 2013) Thank You Lord!
Oct 16-28, 2012 - Initial Entry Completed - Sydney
July 28, 2013 - Final move to Perth
Sep 9, 2013 - Started work with the same company i worked for in UAE/USA
Oct 28, 2013 - Moved to another company..
Posts: 306Member
Joined: Aug 24, 2013
2013 - 1st IELTS L 7.5 R 7.5 W 5.5 S 7.5
April 2014 - 2nd IELTS L 7.5 R 7.0 W 6.0 S 7.0
14 May 2014 - CDR sent via DHL Singapore
16 May 2014 - Delivered at EA
19 May 2014 - 870 AUD charged to my credit card. Waiting game starts now
7 August 2014 - EOR for my IELTS L 7.5 R 7 W 7 S 6
26 August 2014 - EA Positive results Civil Engineer
11 October 2014 EOR Speaking 6 to 6.5
28 Feb IELTS success! 10 pts! L 7.5 R 8 W 7 S 7.5
13 March 2015 EOI submitted visa 189 65 pts.
27 March Invited
27 March Lodged! At long last. In His perfect timing. Scan documents and obtain clearances and medical
11 May VISA GRANT! Direct grant. Did not upload form 80
Posts: 306Member
Joined: Aug 24, 2013
"to whom it may concern....
Company:
Project:
Designation:
Duties:
Sincerely yours
PM details" ?
Thanks!
2013 - 1st IELTS L 7.5 R 7.5 W 5.5 S 7.5
April 2014 - 2nd IELTS L 7.5 R 7.0 W 6.0 S 7.0
14 May 2014 - CDR sent via DHL Singapore
16 May 2014 - Delivered at EA
19 May 2014 - 870 AUD charged to my credit card. Waiting game starts now
7 August 2014 - EOR for my IELTS L 7.5 R 7 W 7 S 6
26 August 2014 - EA Positive results Civil Engineer
11 October 2014 EOR Speaking 6 to 6.5
28 Feb IELTS success! 10 pts! L 7.5 R 8 W 7 S 7.5
13 March 2015 EOI submitted visa 189 65 pts.
27 March Invited
27 March Lodged! At long last. In His perfect timing. Scan documents and obtain clearances and medical
11 May VISA GRANT! Direct grant. Did not upload form 80
Posts: 44Member
Joined: Sep 18, 2013
How was your experience with this? Mabilis ba yung assessment? How are you planning to go about finding a job in Au? Yung agent kse is a migration agent, so they do not assist with job placements.
Any help/opinions are welcome.
Thanks!
Posts: 5,037Member, De-activated
Joined: Feb 23, 2012
job description lang yan..
what about your salary? meron ka bang generic COE from HR? kung meron then it would be fine..
Generic COE + Job Description = success.. lol..
Sep 24, 2011 - IELTS (L-8 R-8 W-8 S-7.5 : OBS-8)
Jan 04, 2012 - EA application submitted | Feb 23, 2012 - EA assessment result (IE ANZSCO 233511)
May 8, 2012 - Lodged GSM 175 online application | June 4, 2012 - CO Allocated
June 22, 2012 - Medicals Finalized | Aug 30, 2012 - PCCs Completed (PH, UAE, USA)
Sep 3, 2012 - Visa Granted (IED Jun 11, 2013) Thank You Lord!
Oct 16-28, 2012 - Initial Entry Completed - Sydney
July 28, 2013 - Final move to Perth
Sep 9, 2013 - Started work with the same company i worked for in UAE/USA
Oct 28, 2013 - Moved to another company..
Posts: 5,037Member, De-activated
Joined: Feb 23, 2012
basa basa lang po dito sa forum.. especially mga timelines ng mga member..
you will know kung gano katagal/kabilis ang mga applications..
as of now, alam ko between 12-16weeks ang application process sa EA...
goodluck..
Sep 24, 2011 - IELTS (L-8 R-8 W-8 S-7.5 : OBS-8)
Jan 04, 2012 - EA application submitted | Feb 23, 2012 - EA assessment result (IE ANZSCO 233511)
May 8, 2012 - Lodged GSM 175 online application | June 4, 2012 - CO Allocated
June 22, 2012 - Medicals Finalized | Aug 30, 2012 - PCCs Completed (PH, UAE, USA)
Sep 3, 2012 - Visa Granted (IED Jun 11, 2013) Thank You Lord!
Oct 16-28, 2012 - Initial Entry Completed - Sydney
July 28, 2013 - Final move to Perth
Sep 9, 2013 - Started work with the same company i worked for in UAE/USA
Oct 28, 2013 - Moved to another company..
Posts: 306Member
Joined: Aug 24, 2013
2013 - 1st IELTS L 7.5 R 7.5 W 5.5 S 7.5
April 2014 - 2nd IELTS L 7.5 R 7.0 W 6.0 S 7.0
14 May 2014 - CDR sent via DHL Singapore
16 May 2014 - Delivered at EA
19 May 2014 - 870 AUD charged to my credit card. Waiting game starts now
7 August 2014 - EOR for my IELTS L 7.5 R 7 W 7 S 6
26 August 2014 - EA Positive results Civil Engineer
11 October 2014 EOR Speaking 6 to 6.5
28 Feb IELTS success! 10 pts! L 7.5 R 8 W 7 S 7.5
13 March 2015 EOI submitted visa 189 65 pts.
27 March Invited
27 March Lodged! At long last. In His perfect timing. Scan documents and obtain clearances and medical
11 May VISA GRANT! Direct grant. Did not upload form 80
Posts: 5,037Member, De-activated
Joined: Feb 23, 2012
you need to prove that it's a paid employment..
Sep 24, 2011 - IELTS (L-8 R-8 W-8 S-7.5 : OBS-8)
Jan 04, 2012 - EA application submitted | Feb 23, 2012 - EA assessment result (IE ANZSCO 233511)
May 8, 2012 - Lodged GSM 175 online application | June 4, 2012 - CO Allocated
June 22, 2012 - Medicals Finalized | Aug 30, 2012 - PCCs Completed (PH, UAE, USA)
Sep 3, 2012 - Visa Granted (IED Jun 11, 2013) Thank You Lord!
Oct 16-28, 2012 - Initial Entry Completed - Sydney
July 28, 2013 - Final move to Perth
Sep 9, 2013 - Started work with the same company i worked for in UAE/USA
Oct 28, 2013 - Moved to another company..
Posts: 306Member
Joined: Aug 24, 2013
2013 - 1st IELTS L 7.5 R 7.5 W 5.5 S 7.5
April 2014 - 2nd IELTS L 7.5 R 7.0 W 6.0 S 7.0
14 May 2014 - CDR sent via DHL Singapore
16 May 2014 - Delivered at EA
19 May 2014 - 870 AUD charged to my credit card. Waiting game starts now
7 August 2014 - EOR for my IELTS L 7.5 R 7 W 7 S 6
26 August 2014 - EA Positive results Civil Engineer
11 October 2014 EOR Speaking 6 to 6.5
28 Feb IELTS success! 10 pts! L 7.5 R 8 W 7 S 7.5
13 March 2015 EOI submitted visa 189 65 pts.
27 March Invited
27 March Lodged! At long last. In His perfect timing. Scan documents and obtain clearances and medical
11 May VISA GRANT! Direct grant. Did not upload form 80
Posts: 5,037Member, De-activated
Joined: Feb 23, 2012
Sep 24, 2011 - IELTS (L-8 R-8 W-8 S-7.5 : OBS-8)
Jan 04, 2012 - EA application submitted | Feb 23, 2012 - EA assessment result (IE ANZSCO 233511)
May 8, 2012 - Lodged GSM 175 online application | June 4, 2012 - CO Allocated
June 22, 2012 - Medicals Finalized | Aug 30, 2012 - PCCs Completed (PH, UAE, USA)
Sep 3, 2012 - Visa Granted (IED Jun 11, 2013) Thank You Lord!
Oct 16-28, 2012 - Initial Entry Completed - Sydney
July 28, 2013 - Final move to Perth
Sep 9, 2013 - Started work with the same company i worked for in UAE/USA
Oct 28, 2013 - Moved to another company..
Posts: 1,084Member
Joined: Feb 14, 2013
09-07-14 - Visa Grant! Thank you so much, Lord! IED 03-03-15
15-09-14 - Landed in Radelaide! South Australia
29-09-14 - Started working in Adelaide South Australia
28-09-15 - Left the first job
06-10-15 - Started the second job
18-09-16 - Moved to Sydney
"The key to everything is patience. You get the chicken by hatching the egg, not by smashing it." Arnold H. Glasow
...At sa wakas naging sisiw na nga ang itlog!
Visa lodged members please share your timelines here:
https://docs.google.com/spreadsheets/d/18d1OUvt_9wyGxVrUu-12aoo8evhMKwGFHrf2smAaoU4/edit#gid=424981924
https://www.facebook.com/groups/1490118541216428/
Posts: 306Member
Joined: Aug 24, 2013
2013 - 1st IELTS L 7.5 R 7.5 W 5.5 S 7.5
April 2014 - 2nd IELTS L 7.5 R 7.0 W 6.0 S 7.0
14 May 2014 - CDR sent via DHL Singapore
16 May 2014 - Delivered at EA
19 May 2014 - 870 AUD charged to my credit card. Waiting game starts now
7 August 2014 - EOR for my IELTS L 7.5 R 7 W 7 S 6
26 August 2014 - EA Positive results Civil Engineer
11 October 2014 EOR Speaking 6 to 6.5
28 Feb IELTS success! 10 pts! L 7.5 R 8 W 7 S 7.5
13 March 2015 EOI submitted visa 189 65 pts.
27 March Invited
27 March Lodged! At long last. In His perfect timing. Scan documents and obtain clearances and medical
11 May VISA GRANT! Direct grant. Did not upload form 80
Posts: 306Member
Joined: Aug 24, 2013
2013 - 1st IELTS L 7.5 R 7.5 W 5.5 S 7.5
April 2014 - 2nd IELTS L 7.5 R 7.0 W 6.0 S 7.0
14 May 2014 - CDR sent via DHL Singapore
16 May 2014 - Delivered at EA
19 May 2014 - 870 AUD charged to my credit card. Waiting game starts now
7 August 2014 - EOR for my IELTS L 7.5 R 7 W 7 S 6
26 August 2014 - EA Positive results Civil Engineer
11 October 2014 EOR Speaking 6 to 6.5
28 Feb IELTS success! 10 pts! L 7.5 R 8 W 7 S 7.5
13 March 2015 EOI submitted visa 189 65 pts.
27 March Invited
27 March Lodged! At long last. In His perfect timing. Scan documents and obtain clearances and medical
11 May VISA GRANT! Direct grant. Did not upload form 80