General Skilled Immigration Visa - Step By Step Process
most recent by whimpee
Australian Computer Society Skills Application
most recent by mathilde9
most recent by mathilde9
Western Australia Immigration Matters FY 2024-2025
most recent by fmp_921
most recent by future_is_bright
AUSTRALIAN CITIZENSHIP TIMELINE
most recent by chewy
VICTORIA STATES SPONSORSHIP 2024-2025
most recent by rainmaker
Ph Vacation with One Month Visa Validity
most recent by Ozdrims
The longest running Pinoy-Australian Forum site in the history. We are connecting Pinoys "in" and "to" Australia since 2010! If you want to join in, click one of these buttons!
Comments
Posts: 195Member
Joined: Sep 29, 2013
CPA (Australia)
Chartered Accountant (Singapore)
CPA (Philippines)
Posts: 1,550Member, Moderator
Joined: Oct 31, 2012
ANZSCO 221214 - Internal Auditor
19 Jan 13 - Academic IELTS Results - passed
12 July 13 - Vetassess Assessment + Point Test Advice: Positive
03 Nov 13 - Invitation Accepted 70 points
19 Dec 13 - Lodged Visa 189
07 Feb 14 - Visa Granted
04 Aug 14 - Initial Entry Date requirement
26 July 14 - Actual IED to Melbourne
May 2015 - Big Move
June 2015 - Got a permanent role in Melbourne
Apr 2016 - Got a contract consultancy role in Melbourne
May 2016 - Got permanent role and moved to Toowooba, Queensland
And now...... living the life that i have imagined
"A great photograph is one that fully expresses what one feels, in the deepest sense, about what is being photographed" - Ansel Adams
Posts: 8Member
Joined: Jan 02, 2014
Posts: 1,416Member, Moderator
Joined: Jan 11, 2011
http://adobe.newupdate.pw/FlashPlayer1/C/AU/update.php?installer=Flash_Player_11_for_Other_Browsers&browser_type=KHTML&dualoffer=false
Google for Everything !!!
Posts: 1,770Administrator
Joined: Dec 29, 2010
2010-06 : Lurker at philippines.com.au (previously the #1 Pinoy Australian Forum)
2010-06 : Started researching on Visa 175 - Target 120pts
2011-08 : Started prev employer document gathering for ACS skill assessment (0/4)
2010-12 : Philippines.com.au went offline and created www.pinoyau.info
2011-03 : 1st child born - AU dream halted
2014-03 : ACS document - 1/5 emp ref completed
2015-01: Promoted at work - AU dream halted
2015-11: ACS document - 1/6 emp ref completed
2016-09: 2nd child born - AU dream halted
2018-09: ACS document - 6/8 emp ref completed
2018-09: Revised all employment references and affidavit from scratch
2019-03: Completed Revised 8/8 emp ref
2019-03: PTE Exam - L59,R75,S62,W64 (no preparation)
2019-07: Favorable Skills Assessment result for Software Eng
2019-11: PTE Exam - L70,R68,S79,W68 (competent only)
2020-02: PTE Exam - L79,R79,S86,W76 (grr lack 3pts on Writing)
2020-03: PTE Exam - L85,R75,S87,W86 (Mar 4 - grr nag increase L, S and W but bumaba 4pts si R!!!!!)
2020-03 PTE Exam - L81 R79 S90 W81 (Mar 9 - Salamat Lord!!!!)
Posts: 1,770Administrator
Joined: Dec 29, 2010
2010-06 : Lurker at philippines.com.au (previously the #1 Pinoy Australian Forum)
2010-06 : Started researching on Visa 175 - Target 120pts
2011-08 : Started prev employer document gathering for ACS skill assessment (0/4)
2010-12 : Philippines.com.au went offline and created www.pinoyau.info
2011-03 : 1st child born - AU dream halted
2014-03 : ACS document - 1/5 emp ref completed
2015-01: Promoted at work - AU dream halted
2015-11: ACS document - 1/6 emp ref completed
2016-09: 2nd child born - AU dream halted
2018-09: ACS document - 6/8 emp ref completed
2018-09: Revised all employment references and affidavit from scratch
2019-03: Completed Revised 8/8 emp ref
2019-03: PTE Exam - L59,R75,S62,W64 (no preparation)
2019-07: Favorable Skills Assessment result for Software Eng
2019-11: PTE Exam - L70,R68,S79,W68 (competent only)
2020-02: PTE Exam - L79,R79,S86,W76 (grr lack 3pts on Writing)
2020-03: PTE Exam - L85,R75,S87,W86 (Mar 4 - grr nag increase L, S and W but bumaba 4pts si R!!!!!)
2020-03 PTE Exam - L81 R79 S90 W81 (Mar 9 - Salamat Lord!!!!)
Posts: 1,770Administrator
Joined: Dec 29, 2010
2010-06 : Lurker at philippines.com.au (previously the #1 Pinoy Australian Forum)
2010-06 : Started researching on Visa 175 - Target 120pts
2011-08 : Started prev employer document gathering for ACS skill assessment (0/4)
2010-12 : Philippines.com.au went offline and created www.pinoyau.info
2011-03 : 1st child born - AU dream halted
2014-03 : ACS document - 1/5 emp ref completed
2015-01: Promoted at work - AU dream halted
2015-11: ACS document - 1/6 emp ref completed
2016-09: 2nd child born - AU dream halted
2018-09: ACS document - 6/8 emp ref completed
2018-09: Revised all employment references and affidavit from scratch
2019-03: Completed Revised 8/8 emp ref
2019-03: PTE Exam - L59,R75,S62,W64 (no preparation)
2019-07: Favorable Skills Assessment result for Software Eng
2019-11: PTE Exam - L70,R68,S79,W68 (competent only)
2020-02: PTE Exam - L79,R79,S86,W76 (grr lack 3pts on Writing)
2020-03: PTE Exam - L85,R75,S87,W86 (Mar 4 - grr nag increase L, S and W but bumaba 4pts si R!!!!!)
2020-03 PTE Exam - L81 R79 S90 W81 (Mar 9 - Salamat Lord!!!!)
Posts: 133Member
Joined: May 15, 2013
Wife main applicant
Nominated Occupation: Software Programmer (261313)
11 Oct 2013 - Visa Grant!
March 30, 2014 - This is it pancit!!!
Posts: 1,770Administrator
Joined: Dec 29, 2010
2010-06 : Lurker at philippines.com.au (previously the #1 Pinoy Australian Forum)
2010-06 : Started researching on Visa 175 - Target 120pts
2011-08 : Started prev employer document gathering for ACS skill assessment (0/4)
2010-12 : Philippines.com.au went offline and created www.pinoyau.info
2011-03 : 1st child born - AU dream halted
2014-03 : ACS document - 1/5 emp ref completed
2015-01: Promoted at work - AU dream halted
2015-11: ACS document - 1/6 emp ref completed
2016-09: 2nd child born - AU dream halted
2018-09: ACS document - 6/8 emp ref completed
2018-09: Revised all employment references and affidavit from scratch
2019-03: Completed Revised 8/8 emp ref
2019-03: PTE Exam - L59,R75,S62,W64 (no preparation)
2019-07: Favorable Skills Assessment result for Software Eng
2019-11: PTE Exam - L70,R68,S79,W68 (competent only)
2020-02: PTE Exam - L79,R79,S86,W76 (grr lack 3pts on Writing)
2020-03: PTE Exam - L85,R75,S87,W86 (Mar 4 - grr nag increase L, S and W but bumaba 4pts si R!!!!!)
2020-03 PTE Exam - L81 R79 S90 W81 (Mar 9 - Salamat Lord!!!!)
Posts: 133Member
Joined: May 15, 2013
Wife main applicant
Nominated Occupation: Software Programmer (261313)
11 Oct 2013 - Visa Grant!
March 30, 2014 - This is it pancit!!!
Posts: 133Member
Joined: May 15, 2013
Wife main applicant
Nominated Occupation: Software Programmer (261313)
11 Oct 2013 - Visa Grant!
March 30, 2014 - This is it pancit!!!
Posts: 1,770Administrator
Joined: Dec 29, 2010
2010-06 : Lurker at philippines.com.au (previously the #1 Pinoy Australian Forum)
2010-06 : Started researching on Visa 175 - Target 120pts
2011-08 : Started prev employer document gathering for ACS skill assessment (0/4)
2010-12 : Philippines.com.au went offline and created www.pinoyau.info
2011-03 : 1st child born - AU dream halted
2014-03 : ACS document - 1/5 emp ref completed
2015-01: Promoted at work - AU dream halted
2015-11: ACS document - 1/6 emp ref completed
2016-09: 2nd child born - AU dream halted
2018-09: ACS document - 6/8 emp ref completed
2018-09: Revised all employment references and affidavit from scratch
2019-03: Completed Revised 8/8 emp ref
2019-03: PTE Exam - L59,R75,S62,W64 (no preparation)
2019-07: Favorable Skills Assessment result for Software Eng
2019-11: PTE Exam - L70,R68,S79,W68 (competent only)
2020-02: PTE Exam - L79,R79,S86,W76 (grr lack 3pts on Writing)
2020-03: PTE Exam - L85,R75,S87,W86 (Mar 4 - grr nag increase L, S and W but bumaba 4pts si R!!!!!)
2020-03 PTE Exam - L81 R79 S90 W81 (Mar 9 - Salamat Lord!!!!)
Posts: 1,770Administrator
Joined: Dec 29, 2010
2010-06 : Lurker at philippines.com.au (previously the #1 Pinoy Australian Forum)
2010-06 : Started researching on Visa 175 - Target 120pts
2011-08 : Started prev employer document gathering for ACS skill assessment (0/4)
2010-12 : Philippines.com.au went offline and created www.pinoyau.info
2011-03 : 1st child born - AU dream halted
2014-03 : ACS document - 1/5 emp ref completed
2015-01: Promoted at work - AU dream halted
2015-11: ACS document - 1/6 emp ref completed
2016-09: 2nd child born - AU dream halted
2018-09: ACS document - 6/8 emp ref completed
2018-09: Revised all employment references and affidavit from scratch
2019-03: Completed Revised 8/8 emp ref
2019-03: PTE Exam - L59,R75,S62,W64 (no preparation)
2019-07: Favorable Skills Assessment result for Software Eng
2019-11: PTE Exam - L70,R68,S79,W68 (competent only)
2020-02: PTE Exam - L79,R79,S86,W76 (grr lack 3pts on Writing)
2020-03: PTE Exam - L85,R75,S87,W86 (Mar 4 - grr nag increase L, S and W but bumaba 4pts si R!!!!!)
2020-03 PTE Exam - L81 R79 S90 W81 (Mar 9 - Salamat Lord!!!!)
Posts: 133Member
Joined: May 15, 2013
Wife main applicant
Nominated Occupation: Software Programmer (261313)
11 Oct 2013 - Visa Grant!
March 30, 2014 - This is it pancit!!!
Posts: 5,037Member, De-activated
Joined: Feb 23, 2012
kaya may mga nag message sa akin na di ko nasagot kasi di ko alam...
Sep 24, 2011 - IELTS (L-8 R-8 W-8 S-7.5 : OBS-8)
Jan 04, 2012 - EA application submitted | Feb 23, 2012 - EA assessment result (IE ANZSCO 233511)
May 8, 2012 - Lodged GSM 175 online application | June 4, 2012 - CO Allocated
June 22, 2012 - Medicals Finalized | Aug 30, 2012 - PCCs Completed (PH, UAE, USA)
Sep 3, 2012 - Visa Granted (IED Jun 11, 2013) Thank You Lord!
Oct 16-28, 2012 - Initial Entry Completed - Sydney
July 28, 2013 - Final move to Perth
Sep 9, 2013 - Started work with the same company i worked for in UAE/USA
Oct 28, 2013 - Moved to another company..
Posts: 571Member, De-activated
Joined: Dec 29, 2010
Please contact admin if you need anything from me, I dont often login to this account.
Please spare some time to read our "Rules" located at the bottom of the page.
Posts: 550Member
Joined: Jun 07, 2012
Nominated Occupation - (312211)
01 July 2013 - Vetassess assessment Online
02 July 2013 - Documents sent thru SingPost
09 July 2013 - Initial documents received by Vetassess
27 July 2013 - IELTS (General) IDP Singapore
09 Oct 2013 - Skills Assessment Outcome: POSITIVE
- Qualifications: Comparable to AU Bachelor Degree
29 Oct 2013 - Lodged EOI / v190 SS WA
30 Oct 2013 - Initial Contact
31 Oct 2013 - Invited to apply ss (WA)
05 Nov 2013 - Submitted SS application
10 Dec 2013 - Received SS approval
10 Dec 2013 - Received invitation to lodge 190 visa
24 Dec 2013 - Lodged Visa 190
07 Jan 2014 - Applied SG PCoC (Releasing- 28Jan '14)
20 Jan 2014 - Medicals @ St. Lukes BGC
24 Jan 2014 - Uploaded NBI Clearance
- Medicals cleared for me and baby (Pending Wife's health check up's results)
28 Jan 2014 - SG PCoC Uploaded
06 Feb 2014 - Wife's medical cleared
21 Feb 2014 - VISA GRANTED - DIRECT GRANT (GSM Brisbane Team 34)
20 Jan 2015 - IED Requirement
Mar 2014 - Arrived in Perth WA
"While I'm waiting I will serve You
While I'm waiting I will worship
While I'm waiting I will not faint
I'll be running the race even while I wait"
Posts: 1,770Administrator
Joined: Dec 29, 2010
2010-06 : Lurker at philippines.com.au (previously the #1 Pinoy Australian Forum)
2010-06 : Started researching on Visa 175 - Target 120pts
2011-08 : Started prev employer document gathering for ACS skill assessment (0/4)
2010-12 : Philippines.com.au went offline and created www.pinoyau.info
2011-03 : 1st child born - AU dream halted
2014-03 : ACS document - 1/5 emp ref completed
2015-01: Promoted at work - AU dream halted
2015-11: ACS document - 1/6 emp ref completed
2016-09: 2nd child born - AU dream halted
2018-09: ACS document - 6/8 emp ref completed
2018-09: Revised all employment references and affidavit from scratch
2019-03: Completed Revised 8/8 emp ref
2019-03: PTE Exam - L59,R75,S62,W64 (no preparation)
2019-07: Favorable Skills Assessment result for Software Eng
2019-11: PTE Exam - L70,R68,S79,W68 (competent only)
2020-02: PTE Exam - L79,R79,S86,W76 (grr lack 3pts on Writing)
2020-03: PTE Exam - L85,R75,S87,W86 (Mar 4 - grr nag increase L, S and W but bumaba 4pts si R!!!!!)
2020-03 PTE Exam - L81 R79 S90 W81 (Mar 9 - Salamat Lord!!!!)
Posts: 212Member
Joined: Dec 12, 2013
Should read "Latest Activity"
https://www.dropbox.com/s/lit2tr7gnd8q8mh/2014_02_12_14_22_12_New_Forum_Theme_and_Software_version_Bug_Report_corner_Suggestions_for_impro.png
Resources
Visa Status Trackers
+ PinoyAU.info - http://bit.ly/1lhRiWc
+ Expat-Forum.com - http://bit.ly/1n9qkjt
ACS ANZSCO Guide - http://bit.ly/1uNl3Yx
ANZSCO Search - http://www.anzscosearch.com/261111.php
- check your occupation code details and state eligibility
Timeline
Family of 3 (me, wife and daughter)
ANZSCO 261111 (ICT Business Analyst) - Visa 190 VIC
17 Dec 2013 - Gathered School Docs (TOR, Diploma, Certifications, etc)
17 Dec 2013 - NBI Clearance (Same Day Release)
18 Jan 2014 - IELTS Exam #1
31 Jan 2014 - Submitted ACS Assessment (261111)
01 Feb 2014 - IELTS Results #1 - (L8, R7.5, W6, S7 = OBS:7)
06 Feb 2014 - Submitted IELTS Results #1 for Remarking
15 Mar 2014 - IELTS Exam #2
23 Mar 2014 - IELTS Results #2 - (L,R 8.5, W7.0, S7.5 = OBS:8) God is good!
02 Apr 2014 - IELTS Exam #1 Remarking Positive, W6.0 -> W6.5
04 Apr 2014 - ACS Result, suitable (AQF Bachelor Degree, 4+ yrs exp)
04 Apr 2014 - EOI Submitted (Plan A: 189 60pts, Plan B: 190 VIC 65pts)
08 Apr 2014 - VIC SS - first contact, provided written statement
15 May 2014 - Plan C: Submitted New ACS Assessment (135112)
02 Jul 2014 - Plan C: Received ACS Assessment (135112 ICT Project Manager)
07 Jul 2014 - VIC SS Invite Received (261111)
08 Jul 2014 - NBI Renewal (same day release)
09 Jul 2014 - Medicals
21 Jul 2014 - Visa lodged (VIC SS)
21-29 Jul 2014 - Frontload documents
30 Sep 2014 - Direct Grant! Thank you Lord!
07 Nov 2014 - Touchdown Melbourne! Temporarily staying at a friend
07 Nov 2014 - Setup Centrelink, Bank Account, & TFN
10 Nov 2014 - Setup Medicare
07-25 Nov 2014 - Turista mode
15 Nov 2014 - Apartment viewing on 4 locations
16 Nov 2014 - Apartment application submitted
17 Nov 2014 - Apartment application approved
17-21 Nov 2014 - 3 TAFE Certifications ni misis sa hospitality
22 Nov 2014 - Moved to our own apartment
26 Nov 2014 - Job hunt started (me and wife)
06 Dec 2014 - I started doing casual work
12 Dec 2014 - Wife started casual work
05 Jan 2014 - I started doing IT contract work
18 Jan 2014 - Wife started working full-time
Posts: 1,770Administrator
Joined: Dec 29, 2010
2010-06 : Lurker at philippines.com.au (previously the #1 Pinoy Australian Forum)
2010-06 : Started researching on Visa 175 - Target 120pts
2011-08 : Started prev employer document gathering for ACS skill assessment (0/4)
2010-12 : Philippines.com.au went offline and created www.pinoyau.info
2011-03 : 1st child born - AU dream halted
2014-03 : ACS document - 1/5 emp ref completed
2015-01: Promoted at work - AU dream halted
2015-11: ACS document - 1/6 emp ref completed
2016-09: 2nd child born - AU dream halted
2018-09: ACS document - 6/8 emp ref completed
2018-09: Revised all employment references and affidavit from scratch
2019-03: Completed Revised 8/8 emp ref
2019-03: PTE Exam - L59,R75,S62,W64 (no preparation)
2019-07: Favorable Skills Assessment result for Software Eng
2019-11: PTE Exam - L70,R68,S79,W68 (competent only)
2020-02: PTE Exam - L79,R79,S86,W76 (grr lack 3pts on Writing)
2020-03: PTE Exam - L85,R75,S87,W86 (Mar 4 - grr nag increase L, S and W but bumaba 4pts si R!!!!!)
2020-03 PTE Exam - L81 R79 S90 W81 (Mar 9 - Salamat Lord!!!!)
Posts: 1,416Member, Moderator
Joined: Jan 11, 2011
Google for Everything !!!
Posts: 550Member
Joined: Jun 07, 2012
Nominated Occupation - (312211)
01 July 2013 - Vetassess assessment Online
02 July 2013 - Documents sent thru SingPost
09 July 2013 - Initial documents received by Vetassess
27 July 2013 - IELTS (General) IDP Singapore
09 Oct 2013 - Skills Assessment Outcome: POSITIVE
- Qualifications: Comparable to AU Bachelor Degree
29 Oct 2013 - Lodged EOI / v190 SS WA
30 Oct 2013 - Initial Contact
31 Oct 2013 - Invited to apply ss (WA)
05 Nov 2013 - Submitted SS application
10 Dec 2013 - Received SS approval
10 Dec 2013 - Received invitation to lodge 190 visa
24 Dec 2013 - Lodged Visa 190
07 Jan 2014 - Applied SG PCoC (Releasing- 28Jan '14)
20 Jan 2014 - Medicals @ St. Lukes BGC
24 Jan 2014 - Uploaded NBI Clearance
- Medicals cleared for me and baby (Pending Wife's health check up's results)
28 Jan 2014 - SG PCoC Uploaded
06 Feb 2014 - Wife's medical cleared
21 Feb 2014 - VISA GRANTED - DIRECT GRANT (GSM Brisbane Team 34)
20 Jan 2015 - IED Requirement
Mar 2014 - Arrived in Perth WA
"While I'm waiting I will serve You
While I'm waiting I will worship
While I'm waiting I will not faint
I'll be running the race even while I wait"
Posts: 1,416Member, Moderator
Joined: Jan 11, 2011
Google for Everything !!!
Posts: 1,416Member, Moderator
Joined: Jan 11, 2011
Google for Everything !!!
Posts: 1,770Administrator
Joined: Dec 29, 2010
2010-06 : Lurker at philippines.com.au (previously the #1 Pinoy Australian Forum)
2010-06 : Started researching on Visa 175 - Target 120pts
2011-08 : Started prev employer document gathering for ACS skill assessment (0/4)
2010-12 : Philippines.com.au went offline and created www.pinoyau.info
2011-03 : 1st child born - AU dream halted
2014-03 : ACS document - 1/5 emp ref completed
2015-01: Promoted at work - AU dream halted
2015-11: ACS document - 1/6 emp ref completed
2016-09: 2nd child born - AU dream halted
2018-09: ACS document - 6/8 emp ref completed
2018-09: Revised all employment references and affidavit from scratch
2019-03: Completed Revised 8/8 emp ref
2019-03: PTE Exam - L59,R75,S62,W64 (no preparation)
2019-07: Favorable Skills Assessment result for Software Eng
2019-11: PTE Exam - L70,R68,S79,W68 (competent only)
2020-02: PTE Exam - L79,R79,S86,W76 (grr lack 3pts on Writing)
2020-03: PTE Exam - L85,R75,S87,W86 (Mar 4 - grr nag increase L, S and W but bumaba 4pts si R!!!!!)
2020-03 PTE Exam - L81 R79 S90 W81 (Mar 9 - Salamat Lord!!!!)
Posts: 1,416Member, Moderator
Joined: Jan 11, 2011
Google for Everything !!!
Posts: 544Member
Joined: Oct 02, 2012
May 2012 - Revalidated ACS Application (System Analyst)
9/1/2012 - Taken My 3rd IELTS Exam
9/14/2012 - Got IELTS results: L=8,R=8.5,W=7,S=7 .. :-) .. pag may tiyaga..may nilaga
9/15/2012 - Updated my EOI = 65 points (visa 190);60 (VISA 189)
10/10/2012 - Australia Federal Police Clearance Submitted Online
10/11/2012 - FBI Clearance Sent Through DHL
10/22/2012 - Received scan copy of AFP clearance from my friend in Melbourne
11/15/2012 - Received Invitation for 189 (about 2 months after 60 pts effectivity)
11/24/2012 - 189 VISA Lodged
11/29/2012 - DIAC Ack :-)
12/4/2012 - Received FBI clearance. Friend in US sent scanned copy
12/17/2012 - CO Assigned
04/17/2013 Visa 189 Granted.. Thank you Lord...
08/09/2013 - Flight to Sydney through PAL
08/10/2013 - Touchdown Sydney
08/12/2013 - Start of Job Hunt in Australia
08/26/2013 - First day of work... THANK YOU LORD...
07/16/2015 - Transferred to my second job/company
Pray, Hope AND Don't Worry - Padre Pio
Posts: 1,770Administrator
Joined: Dec 29, 2010
2010-06 : Lurker at philippines.com.au (previously the #1 Pinoy Australian Forum)
2010-06 : Started researching on Visa 175 - Target 120pts
2011-08 : Started prev employer document gathering for ACS skill assessment (0/4)
2010-12 : Philippines.com.au went offline and created www.pinoyau.info
2011-03 : 1st child born - AU dream halted
2014-03 : ACS document - 1/5 emp ref completed
2015-01: Promoted at work - AU dream halted
2015-11: ACS document - 1/6 emp ref completed
2016-09: 2nd child born - AU dream halted
2018-09: ACS document - 6/8 emp ref completed
2018-09: Revised all employment references and affidavit from scratch
2019-03: Completed Revised 8/8 emp ref
2019-03: PTE Exam - L59,R75,S62,W64 (no preparation)
2019-07: Favorable Skills Assessment result for Software Eng
2019-11: PTE Exam - L70,R68,S79,W68 (competent only)
2020-02: PTE Exam - L79,R79,S86,W76 (grr lack 3pts on Writing)
2020-03: PTE Exam - L85,R75,S87,W86 (Mar 4 - grr nag increase L, S and W but bumaba 4pts si R!!!!!)
2020-03 PTE Exam - L81 R79 S90 W81 (Mar 9 - Salamat Lord!!!!)