General Skilled Immigration Visa - Step By Step Process
most recent by whimpee
Australian Computer Society Skills Application
most recent by mathilde9
most recent by mathilde9
Western Australia Immigration Matters FY 2024-2025
most recent by fmp_921
most recent by future_is_bright
AUSTRALIAN CITIZENSHIP TIMELINE
most recent by chewy
VICTORIA STATES SPONSORSHIP 2024-2025
most recent by rainmaker
Ph Vacation with One Month Visa Validity
most recent by Ozdrims
The longest running Pinoy-Australian Forum site in the history. We are connecting Pinoys "in" and "to" Australia since 2010! If you want to join in, click one of these buttons!
Comments
Posts: 1,074Member
Joined: Apr 17, 2013
Occupation: Software Engineer (ANZSCO Code 261313)
Main applicant : Husband
April 29, 2013 : ACS Skills assessment
July 22, 2013 : ACS assessment result
January 3, 2014: IELTS Result (Take 1 L-8,W,R,S-7)
January 12, 2013: Lodged EOI (65points)
January 13, 2013: Invited to apply for visa 189
February 9, 2014: Lodged visa
March 1, 2014: Medicals at NHSI
March 6: email from CO requesting form 80 and hubby's NBI Clearance
March 25, 2014: visa grant. Thank you lord
June 8,2014: Hubby arrived in Sydney
Sept 11,2014: Hubby's first day of work. Thank you Lord!
Feb 7, 2015 : Baby and I arrived in Sydney
April 13, 2015: My first day of work
Posts: 459Member
Joined: Jan 25, 2013
Occupation: Software Engineer (ANZSCO Code 261313)
Feb 02, 2012 - Skill Assessment submission to ACS
Mar 23, 2013 - IELTS Result - Competent
Apr 03, 2013 - ACS Assessment Positive
Apr 06, 2013 - Submitted EOI (190)
Apr 11, 2013 - Submitted NSW SS (190)
Apr 16, 2013 - NSW SS Acknowledgment email received
July 01, 2013 - NSW SS approval letter received
July 03, 2013 - Skillselect Invite received
Aug 14, 2013 - Lodged Visa 190
Aug 16, 2013 - Upload Docs (including NBI Clearance)
Aug 25, 2013 - Gave Birth
Sep 20, 2013 - CO Allocated (GSM Adelaide Team 06)
Sep 22, 2013 - Informed CO of additional dependent (Baby)
Oct 04, 2013 - Hubby's Medical Uploaded
Oct 12, 2013 - Medical Uploaded
Oct 16, 2013 - SG PCC Collected and Uploaded
Oct 17, 2013 - Form 1022, Baby's Birth Certificate and Passport sent to CO
Oct 23, 2013 - Baby is included in eVisa
Oct 30, 2013 - Baby's Medical Uploaded
Nov 21, 2013 - VISA GRANT (IED: Aug 2014)
Feb 08, 2014 - Hubby's initial entry
Feb 13, 2014 - Hubby's Job Offer
Feb 18, 2014 - Hubby's First Day High
Apr 23, 2014 - Initial Entry (Baby and Me)
Feb 04, 2015 - My First day high (Home-based perm position)
Thank you, thank you so much Lord. Life is indeed beautiful
Posts: 1,074Member
Joined: Apr 17, 2013
Occupation: Software Engineer (ANZSCO Code 261313)
Main applicant : Husband
April 29, 2013 : ACS Skills assessment
July 22, 2013 : ACS assessment result
January 3, 2014: IELTS Result (Take 1 L-8,W,R,S-7)
January 12, 2013: Lodged EOI (65points)
January 13, 2013: Invited to apply for visa 189
February 9, 2014: Lodged visa
March 1, 2014: Medicals at NHSI
March 6: email from CO requesting form 80 and hubby's NBI Clearance
March 25, 2014: visa grant. Thank you lord
June 8,2014: Hubby arrived in Sydney
Sept 11,2014: Hubby's first day of work. Thank you Lord!
Feb 7, 2015 : Baby and I arrived in Sydney
April 13, 2015: My first day of work
Posts: 459Member
Joined: Jan 25, 2013
Occupation: Software Engineer (ANZSCO Code 261313)
Feb 02, 2012 - Skill Assessment submission to ACS
Mar 23, 2013 - IELTS Result - Competent
Apr 03, 2013 - ACS Assessment Positive
Apr 06, 2013 - Submitted EOI (190)
Apr 11, 2013 - Submitted NSW SS (190)
Apr 16, 2013 - NSW SS Acknowledgment email received
July 01, 2013 - NSW SS approval letter received
July 03, 2013 - Skillselect Invite received
Aug 14, 2013 - Lodged Visa 190
Aug 16, 2013 - Upload Docs (including NBI Clearance)
Aug 25, 2013 - Gave Birth
Sep 20, 2013 - CO Allocated (GSM Adelaide Team 06)
Sep 22, 2013 - Informed CO of additional dependent (Baby)
Oct 04, 2013 - Hubby's Medical Uploaded
Oct 12, 2013 - Medical Uploaded
Oct 16, 2013 - SG PCC Collected and Uploaded
Oct 17, 2013 - Form 1022, Baby's Birth Certificate and Passport sent to CO
Oct 23, 2013 - Baby is included in eVisa
Oct 30, 2013 - Baby's Medical Uploaded
Nov 21, 2013 - VISA GRANT (IED: Aug 2014)
Feb 08, 2014 - Hubby's initial entry
Feb 13, 2014 - Hubby's Job Offer
Feb 18, 2014 - Hubby's First Day High
Apr 23, 2014 - Initial Entry (Baby and Me)
Feb 04, 2015 - My First day high (Home-based perm position)
Thank you, thank you so much Lord. Life is indeed beautiful
Posts: 1,074Member
Joined: Apr 17, 2013
Occupation: Software Engineer (ANZSCO Code 261313)
Main applicant : Husband
April 29, 2013 : ACS Skills assessment
July 22, 2013 : ACS assessment result
January 3, 2014: IELTS Result (Take 1 L-8,W,R,S-7)
January 12, 2013: Lodged EOI (65points)
January 13, 2013: Invited to apply for visa 189
February 9, 2014: Lodged visa
March 1, 2014: Medicals at NHSI
March 6: email from CO requesting form 80 and hubby's NBI Clearance
March 25, 2014: visa grant. Thank you lord
June 8,2014: Hubby arrived in Sydney
Sept 11,2014: Hubby's first day of work. Thank you Lord!
Feb 7, 2015 : Baby and I arrived in Sydney
April 13, 2015: My first day of work
Posts: 412Member
Joined: Nov 25, 2013
Sa mga madalas mag PAL, istrikto po ba sila sa luggage weight, especially sa carry-on? 23 kgs lang kasi yung checked baggage allowance at grabe kala ko sapat na yun eh yung 2 maleta pa lang (wala pang laman) parang 5 kilos each na kumusta naman. ) Yung carry-on baggage allowance is 7kgs. lang. #poor #economyclassproblems
Student Visa 573 (SVP) Timeline:
28 Nov 2013 - submitted int'l student application to Victoria Uni
20-21 Dec 2013 - sat IELTS Academic module exam
03 Jan 2014 - received IELTS scores (L:8.5 R:8.0 W:8.0 S:8.0 OBS:8.0)
07 Jan 2014 - undertook medical exam at NHSI Makati
16 Jan 2014 - received unconditional offer from VU
13 Feb 2014 - paid 1st sem tuition fees; received e-COE from VU
13 Feb 2014 - lodged visa application at PIASI
17 Feb 2014 - received visa grant via email (thank you, Lord!)
21 Feb 2014 - first day in OZ
24 Feb 2014 - first day of classes
19 June 2015 - last of day classes!
06 Aug 2015 - received Letter of Completion from uni
14 Oct 2015 - Graduation
Journey to PR:
07 Aug 2015 - submitted skills assessment to ACS (261311 - Analyst Programmer)
12 Aug 2015 - received positive skills assessment result from ACS
12 Aug 2015 - submitted EOI for 189 (60 points), 190 (NSW-65 points), 489 (state and relative sponsored - 70 points)
29 Oct 2015 - received ITA for NSW State Nomination
03 Nov 2015 - submitted application for NSW State Nomination
19 Nov 2015 - received NSW SN approval and ITA for 190 visa
01 Dec 2015 - lodged 190 application
14 Dec 2015 - health exam at BUPA Melbourne
15 Dec 2015 - Initial (and hopefully final) CO contact, asking for PCC
22 Dec 2015 - submitted Australian PCC and NBI Clearance
16 Feb 2016 - received 190 PR visa grant
Citizenship:
Date applied: 27 March 2018
Date received the acknowledgement email: 27 March 2018
Received test invite: 11 Feb 2019 for 25 March 2019 (rescheduled to 25 Feb)
Citizenship Approval: 11 March 209
Received Ceremony Invitation: 24 May 2019
Date of Ceremony: 25 June 2019
Posts: 1,416Member, Moderator
Joined: Jan 11, 2011
Google for Everything !!!
Posts: 459Member
Joined: Jan 25, 2013
Occupation: Software Engineer (ANZSCO Code 261313)
Feb 02, 2012 - Skill Assessment submission to ACS
Mar 23, 2013 - IELTS Result - Competent
Apr 03, 2013 - ACS Assessment Positive
Apr 06, 2013 - Submitted EOI (190)
Apr 11, 2013 - Submitted NSW SS (190)
Apr 16, 2013 - NSW SS Acknowledgment email received
July 01, 2013 - NSW SS approval letter received
July 03, 2013 - Skillselect Invite received
Aug 14, 2013 - Lodged Visa 190
Aug 16, 2013 - Upload Docs (including NBI Clearance)
Aug 25, 2013 - Gave Birth
Sep 20, 2013 - CO Allocated (GSM Adelaide Team 06)
Sep 22, 2013 - Informed CO of additional dependent (Baby)
Oct 04, 2013 - Hubby's Medical Uploaded
Oct 12, 2013 - Medical Uploaded
Oct 16, 2013 - SG PCC Collected and Uploaded
Oct 17, 2013 - Form 1022, Baby's Birth Certificate and Passport sent to CO
Oct 23, 2013 - Baby is included in eVisa
Oct 30, 2013 - Baby's Medical Uploaded
Nov 21, 2013 - VISA GRANT (IED: Aug 2014)
Feb 08, 2014 - Hubby's initial entry
Feb 13, 2014 - Hubby's Job Offer
Feb 18, 2014 - Hubby's First Day High
Apr 23, 2014 - Initial Entry (Baby and Me)
Feb 04, 2015 - My First day high (Home-based perm position)
Thank you, thank you so much Lord. Life is indeed beautiful
Posts: 133Member
Joined: May 15, 2013
Wife main applicant
Nominated Occupation: Software Programmer (261313)
11 Oct 2013 - Visa Grant!
March 30, 2014 - This is it pancit!!!
Posts: 412Member
Joined: Nov 25, 2013
Student Visa 573 (SVP) Timeline:
28 Nov 2013 - submitted int'l student application to Victoria Uni
20-21 Dec 2013 - sat IELTS Academic module exam
03 Jan 2014 - received IELTS scores (L:8.5 R:8.0 W:8.0 S:8.0 OBS:8.0)
07 Jan 2014 - undertook medical exam at NHSI Makati
16 Jan 2014 - received unconditional offer from VU
13 Feb 2014 - paid 1st sem tuition fees; received e-COE from VU
13 Feb 2014 - lodged visa application at PIASI
17 Feb 2014 - received visa grant via email (thank you, Lord!)
21 Feb 2014 - first day in OZ
24 Feb 2014 - first day of classes
19 June 2015 - last of day classes!
06 Aug 2015 - received Letter of Completion from uni
14 Oct 2015 - Graduation
Journey to PR:
07 Aug 2015 - submitted skills assessment to ACS (261311 - Analyst Programmer)
12 Aug 2015 - received positive skills assessment result from ACS
12 Aug 2015 - submitted EOI for 189 (60 points), 190 (NSW-65 points), 489 (state and relative sponsored - 70 points)
29 Oct 2015 - received ITA for NSW State Nomination
03 Nov 2015 - submitted application for NSW State Nomination
19 Nov 2015 - received NSW SN approval and ITA for 190 visa
01 Dec 2015 - lodged 190 application
14 Dec 2015 - health exam at BUPA Melbourne
15 Dec 2015 - Initial (and hopefully final) CO contact, asking for PCC
22 Dec 2015 - submitted Australian PCC and NBI Clearance
16 Feb 2016 - received 190 PR visa grant
Citizenship:
Date applied: 27 March 2018
Date received the acknowledgement email: 27 March 2018
Received test invite: 11 Feb 2019 for 25 March 2019 (rescheduled to 25 Feb)
Citizenship Approval: 11 March 209
Received Ceremony Invitation: 24 May 2019
Date of Ceremony: 25 June 2019
Posts: 1,074Member
Joined: Apr 17, 2013
Occupation: Software Engineer (ANZSCO Code 261313)
Main applicant : Husband
April 29, 2013 : ACS Skills assessment
July 22, 2013 : ACS assessment result
January 3, 2014: IELTS Result (Take 1 L-8,W,R,S-7)
January 12, 2013: Lodged EOI (65points)
January 13, 2013: Invited to apply for visa 189
February 9, 2014: Lodged visa
March 1, 2014: Medicals at NHSI
March 6: email from CO requesting form 80 and hubby's NBI Clearance
March 25, 2014: visa grant. Thank you lord
June 8,2014: Hubby arrived in Sydney
Sept 11,2014: Hubby's first day of work. Thank you Lord!
Feb 7, 2015 : Baby and I arrived in Sydney
April 13, 2015: My first day of work
Posts: 1,416Member, Moderator
Joined: Jan 11, 2011
its 23kgs in 1 bag or combined
Ang solusyon lang naman jan e bring an extra empty bag .. pag sinabing sobra lipat lipat sa ibang bag para ma satisfy lang yung weight limit
Google for Everything !!!
Posts: 459Member
Joined: Jan 25, 2013
Sabi nila if parent ng PR or citizen automatic naman daw 1 year ang i.grant na tourist visa so i.try namin mag apply pag nandoon na kami ni baby.
Occupation: Software Engineer (ANZSCO Code 261313)
Feb 02, 2012 - Skill Assessment submission to ACS
Mar 23, 2013 - IELTS Result - Competent
Apr 03, 2013 - ACS Assessment Positive
Apr 06, 2013 - Submitted EOI (190)
Apr 11, 2013 - Submitted NSW SS (190)
Apr 16, 2013 - NSW SS Acknowledgment email received
July 01, 2013 - NSW SS approval letter received
July 03, 2013 - Skillselect Invite received
Aug 14, 2013 - Lodged Visa 190
Aug 16, 2013 - Upload Docs (including NBI Clearance)
Aug 25, 2013 - Gave Birth
Sep 20, 2013 - CO Allocated (GSM Adelaide Team 06)
Sep 22, 2013 - Informed CO of additional dependent (Baby)
Oct 04, 2013 - Hubby's Medical Uploaded
Oct 12, 2013 - Medical Uploaded
Oct 16, 2013 - SG PCC Collected and Uploaded
Oct 17, 2013 - Form 1022, Baby's Birth Certificate and Passport sent to CO
Oct 23, 2013 - Baby is included in eVisa
Oct 30, 2013 - Baby's Medical Uploaded
Nov 21, 2013 - VISA GRANT (IED: Aug 2014)
Feb 08, 2014 - Hubby's initial entry
Feb 13, 2014 - Hubby's Job Offer
Feb 18, 2014 - Hubby's First Day High
Apr 23, 2014 - Initial Entry (Baby and Me)
Feb 04, 2015 - My First day high (Home-based perm position)
Thank you, thank you so much Lord. Life is indeed beautiful
Posts: 459Member
Joined: Jan 25, 2013
Occupation: Software Engineer (ANZSCO Code 261313)
Feb 02, 2012 - Skill Assessment submission to ACS
Mar 23, 2013 - IELTS Result - Competent
Apr 03, 2013 - ACS Assessment Positive
Apr 06, 2013 - Submitted EOI (190)
Apr 11, 2013 - Submitted NSW SS (190)
Apr 16, 2013 - NSW SS Acknowledgment email received
July 01, 2013 - NSW SS approval letter received
July 03, 2013 - Skillselect Invite received
Aug 14, 2013 - Lodged Visa 190
Aug 16, 2013 - Upload Docs (including NBI Clearance)
Aug 25, 2013 - Gave Birth
Sep 20, 2013 - CO Allocated (GSM Adelaide Team 06)
Sep 22, 2013 - Informed CO of additional dependent (Baby)
Oct 04, 2013 - Hubby's Medical Uploaded
Oct 12, 2013 - Medical Uploaded
Oct 16, 2013 - SG PCC Collected and Uploaded
Oct 17, 2013 - Form 1022, Baby's Birth Certificate and Passport sent to CO
Oct 23, 2013 - Baby is included in eVisa
Oct 30, 2013 - Baby's Medical Uploaded
Nov 21, 2013 - VISA GRANT (IED: Aug 2014)
Feb 08, 2014 - Hubby's initial entry
Feb 13, 2014 - Hubby's Job Offer
Feb 18, 2014 - Hubby's First Day High
Apr 23, 2014 - Initial Entry (Baby and Me)
Feb 04, 2015 - My First day high (Home-based perm position)
Thank you, thank you so much Lord. Life is indeed beautiful
Posts: 1,074Member
Joined: Apr 17, 2013
Occupation: Software Engineer (ANZSCO Code 261313)
Main applicant : Husband
April 29, 2013 : ACS Skills assessment
July 22, 2013 : ACS assessment result
January 3, 2014: IELTS Result (Take 1 L-8,W,R,S-7)
January 12, 2013: Lodged EOI (65points)
January 13, 2013: Invited to apply for visa 189
February 9, 2014: Lodged visa
March 1, 2014: Medicals at NHSI
March 6: email from CO requesting form 80 and hubby's NBI Clearance
March 25, 2014: visa grant. Thank you lord
June 8,2014: Hubby arrived in Sydney
Sept 11,2014: Hubby's first day of work. Thank you Lord!
Feb 7, 2015 : Baby and I arrived in Sydney
April 13, 2015: My first day of work
Posts: 459Member
Joined: Jan 25, 2013
ikaw ba maghahanap ng work, same tayo may baby eh. nag titingin2x na nga din ako ng daycare kung sakali.
Occupation: Software Engineer (ANZSCO Code 261313)
Feb 02, 2012 - Skill Assessment submission to ACS
Mar 23, 2013 - IELTS Result - Competent
Apr 03, 2013 - ACS Assessment Positive
Apr 06, 2013 - Submitted EOI (190)
Apr 11, 2013 - Submitted NSW SS (190)
Apr 16, 2013 - NSW SS Acknowledgment email received
July 01, 2013 - NSW SS approval letter received
July 03, 2013 - Skillselect Invite received
Aug 14, 2013 - Lodged Visa 190
Aug 16, 2013 - Upload Docs (including NBI Clearance)
Aug 25, 2013 - Gave Birth
Sep 20, 2013 - CO Allocated (GSM Adelaide Team 06)
Sep 22, 2013 - Informed CO of additional dependent (Baby)
Oct 04, 2013 - Hubby's Medical Uploaded
Oct 12, 2013 - Medical Uploaded
Oct 16, 2013 - SG PCC Collected and Uploaded
Oct 17, 2013 - Form 1022, Baby's Birth Certificate and Passport sent to CO
Oct 23, 2013 - Baby is included in eVisa
Oct 30, 2013 - Baby's Medical Uploaded
Nov 21, 2013 - VISA GRANT (IED: Aug 2014)
Feb 08, 2014 - Hubby's initial entry
Feb 13, 2014 - Hubby's Job Offer
Feb 18, 2014 - Hubby's First Day High
Apr 23, 2014 - Initial Entry (Baby and Me)
Feb 04, 2015 - My First day high (Home-based perm position)
Thank you, thank you so much Lord. Life is indeed beautiful
Posts: 1,074Member
Joined: Apr 17, 2013
Occupation: Software Engineer (ANZSCO Code 261313)
Main applicant : Husband
April 29, 2013 : ACS Skills assessment
July 22, 2013 : ACS assessment result
January 3, 2014: IELTS Result (Take 1 L-8,W,R,S-7)
January 12, 2013: Lodged EOI (65points)
January 13, 2013: Invited to apply for visa 189
February 9, 2014: Lodged visa
March 1, 2014: Medicals at NHSI
March 6: email from CO requesting form 80 and hubby's NBI Clearance
March 25, 2014: visa grant. Thank you lord
June 8,2014: Hubby arrived in Sydney
Sept 11,2014: Hubby's first day of work. Thank you Lord!
Feb 7, 2015 : Baby and I arrived in Sydney
April 13, 2015: My first day of work
Posts: 459Member
Joined: Jan 25, 2013
Occupation: Software Engineer (ANZSCO Code 261313)
Feb 02, 2012 - Skill Assessment submission to ACS
Mar 23, 2013 - IELTS Result - Competent
Apr 03, 2013 - ACS Assessment Positive
Apr 06, 2013 - Submitted EOI (190)
Apr 11, 2013 - Submitted NSW SS (190)
Apr 16, 2013 - NSW SS Acknowledgment email received
July 01, 2013 - NSW SS approval letter received
July 03, 2013 - Skillselect Invite received
Aug 14, 2013 - Lodged Visa 190
Aug 16, 2013 - Upload Docs (including NBI Clearance)
Aug 25, 2013 - Gave Birth
Sep 20, 2013 - CO Allocated (GSM Adelaide Team 06)
Sep 22, 2013 - Informed CO of additional dependent (Baby)
Oct 04, 2013 - Hubby's Medical Uploaded
Oct 12, 2013 - Medical Uploaded
Oct 16, 2013 - SG PCC Collected and Uploaded
Oct 17, 2013 - Form 1022, Baby's Birth Certificate and Passport sent to CO
Oct 23, 2013 - Baby is included in eVisa
Oct 30, 2013 - Baby's Medical Uploaded
Nov 21, 2013 - VISA GRANT (IED: Aug 2014)
Feb 08, 2014 - Hubby's initial entry
Feb 13, 2014 - Hubby's Job Offer
Feb 18, 2014 - Hubby's First Day High
Apr 23, 2014 - Initial Entry (Baby and Me)
Feb 04, 2015 - My First day high (Home-based perm position)
Thank you, thank you so much Lord. Life is indeed beautiful
Posts: 1,074Member
Joined: Apr 17, 2013
Occupation: Software Engineer (ANZSCO Code 261313)
Main applicant : Husband
April 29, 2013 : ACS Skills assessment
July 22, 2013 : ACS assessment result
January 3, 2014: IELTS Result (Take 1 L-8,W,R,S-7)
January 12, 2013: Lodged EOI (65points)
January 13, 2013: Invited to apply for visa 189
February 9, 2014: Lodged visa
March 1, 2014: Medicals at NHSI
March 6: email from CO requesting form 80 and hubby's NBI Clearance
March 25, 2014: visa grant. Thank you lord
June 8,2014: Hubby arrived in Sydney
Sept 11,2014: Hubby's first day of work. Thank you Lord!
Feb 7, 2015 : Baby and I arrived in Sydney
April 13, 2015: My first day of work
Posts: 92Member
Joined: Sep 28, 2013
07 SEPT 2013 - IELTS Exam
27 SEPT 2013 - IELTS Results (L: 8.5 R: 8.5 W: 7.5 S: 7.0 OBS: 8.0)
09 OCT 2013 - CPAA Assessment Sent
18 NOV 2013 - CPAA Positive Assessment Result
20 NOV 2013 - EOI submitted with 70 points
02 DEC 2013 - Received invitation
04 DEC 2013 - Applied for 189 Visa
16 JAN 2014 - CO Allocated Brisbane GSM Team 34
22 JAN 2014 - Uploaded payslips, contracts
23 JAN 2014 - Visa GRANT (IED DEC 16, 2014)
Posts: 159Member
Joined: Dec 06, 2013
Posts: 1,684Member
Joined: Jan 13, 2013
parang last year yan na implement
wala na yung visa conditions na dapat mauuna muna ang Primary sa Secondary
9 January 2013 Received Favorable Response from EA
18 January 2013 Lodged EOI Application via SkillSelect
21 January 2013 Received Invitation to Apply for Visa Subclass 189
26 January 2013 Lodged Visa Application
18 March 2013 CO Allocated, Team 34 Brisbane
14 May 2013 Submitted Form 815
23 May 2013 Submitted updated Form 815 with new passport details
03 June 2013 VISA Grant! Thank you Jesus
Posts: 459Member
Joined: Jan 25, 2013
Occupation: Software Engineer (ANZSCO Code 261313)
Feb 02, 2012 - Skill Assessment submission to ACS
Mar 23, 2013 - IELTS Result - Competent
Apr 03, 2013 - ACS Assessment Positive
Apr 06, 2013 - Submitted EOI (190)
Apr 11, 2013 - Submitted NSW SS (190)
Apr 16, 2013 - NSW SS Acknowledgment email received
July 01, 2013 - NSW SS approval letter received
July 03, 2013 - Skillselect Invite received
Aug 14, 2013 - Lodged Visa 190
Aug 16, 2013 - Upload Docs (including NBI Clearance)
Aug 25, 2013 - Gave Birth
Sep 20, 2013 - CO Allocated (GSM Adelaide Team 06)
Sep 22, 2013 - Informed CO of additional dependent (Baby)
Oct 04, 2013 - Hubby's Medical Uploaded
Oct 12, 2013 - Medical Uploaded
Oct 16, 2013 - SG PCC Collected and Uploaded
Oct 17, 2013 - Form 1022, Baby's Birth Certificate and Passport sent to CO
Oct 23, 2013 - Baby is included in eVisa
Oct 30, 2013 - Baby's Medical Uploaded
Nov 21, 2013 - VISA GRANT (IED: Aug 2014)
Feb 08, 2014 - Hubby's initial entry
Feb 13, 2014 - Hubby's Job Offer
Feb 18, 2014 - Hubby's First Day High
Apr 23, 2014 - Initial Entry (Baby and Me)
Feb 04, 2015 - My First day high (Home-based perm position)
Thank you, thank you so much Lord. Life is indeed beautiful
Posts: 159Member
Joined: Dec 06, 2013
Posts: 459Member
Joined: Jan 25, 2013
Occupation: Software Engineer (ANZSCO Code 261313)
Feb 02, 2012 - Skill Assessment submission to ACS
Mar 23, 2013 - IELTS Result - Competent
Apr 03, 2013 - ACS Assessment Positive
Apr 06, 2013 - Submitted EOI (190)
Apr 11, 2013 - Submitted NSW SS (190)
Apr 16, 2013 - NSW SS Acknowledgment email received
July 01, 2013 - NSW SS approval letter received
July 03, 2013 - Skillselect Invite received
Aug 14, 2013 - Lodged Visa 190
Aug 16, 2013 - Upload Docs (including NBI Clearance)
Aug 25, 2013 - Gave Birth
Sep 20, 2013 - CO Allocated (GSM Adelaide Team 06)
Sep 22, 2013 - Informed CO of additional dependent (Baby)
Oct 04, 2013 - Hubby's Medical Uploaded
Oct 12, 2013 - Medical Uploaded
Oct 16, 2013 - SG PCC Collected and Uploaded
Oct 17, 2013 - Form 1022, Baby's Birth Certificate and Passport sent to CO
Oct 23, 2013 - Baby is included in eVisa
Oct 30, 2013 - Baby's Medical Uploaded
Nov 21, 2013 - VISA GRANT (IED: Aug 2014)
Feb 08, 2014 - Hubby's initial entry
Feb 13, 2014 - Hubby's Job Offer
Feb 18, 2014 - Hubby's First Day High
Apr 23, 2014 - Initial Entry (Baby and Me)
Feb 04, 2015 - My First day high (Home-based perm position)
Thank you, thank you so much Lord. Life is indeed beautiful
Posts: 159Member
Joined: Dec 06, 2013
Posts: 233Member
Joined: Jul 17, 2013
Kami visa 496 (Provisional Visa). Nagbayad ng CFO seminar, um-attend ng seminar. Pagkatapos ng seminar, kung kelan bigayan ng passport. Ayun sinabi, di kami needed mag-attend kasi nga di daw Permanent hehe. Sabi ko um-attend narin lang kami at nagbayad, lagyan na kami ng sticker but ni-refund nila para daw di magulo hehe.
Weird lang kasi ang seminar is about moving out and settling in. We'll move out of the country and settle in Australia for at least 3 years. Tapos gusto nila kung kelan actually permanent resident na, saka a-attend ng seminar na napagdaanan mo na: ano bawal dalhin, ano dapat kuning (TFN, Medicare, etc).
Sinama ko nlng ung PDOS form with their note na "refunded, not required to attend" sa flight tickets namin just in case hanapan bigla sa immigration. But sabi ng CFO, alam na daw sa immigration un. Let's see. We plan to be at the airport early baka mga 4hours cguro ahead of flight schedule para kung may issues man re CFO sticker. But sana wala.
Posts: 4,336Member
Joined: Feb 24, 2011
Kung hahanapan ka talaga, ipakain mo yung note sa immigration official.
Primary Applicant: Wife
Accountant (General): 221111
04 Aug 2012 - IELTS (Academic Module)
07 Aug 2012 - IELTS (Academic Module) Speaking Part
17 Aug 2012 - IELTS Results (L: 8.5 R: 8.5 W: 7.0 S: 7.5 OBS: 8.0)
24 Aug 2012 - CPAA Submitted (docs mailed same day via SG EMS)
25 Sep 2012 - Received +Skills Assessment from CPAA
25 Sep 2012 - Lodged EOI Application with 70pts
30 Sep 2012 - Invited by DIAC to apply for 189 Visa
01 Oct 2012 - Submitted 189 Visa Application
20 Oct 2012 - Medical Examinations
23 Oct 2012 - CO Assigned; Team 7 - SA
05 Nov 2012 - Submitted SG PCC and NBI Clearance
06 Nov 2012 - Visa Granted (IED: 23/10/2013)
03 Apr 2013 - Flight to MEL
03 Jun 2013 - started work
12 Jun 2013 - wife started work
15 Jun 2016 - applied for citizenship
29 Jul 2016 - citizenship examination
20 Oct 2016 - Aussie, Aussie, Aussie Oi Oi Oi!!
Posts: 108Member
Joined: Jul 29, 2011
Computer Network and Systems Engineer - (ANZSCO code 263111)
01/17/13 - ACS result: suitable / Bachelor Degree
09/20/13 - IELTS result (W/S=7, R=8, L=7.5) - 3rd take
09/23/13 - Submitted EOI - 65 pts
10/07/13 - Received invitation Visa Subclass 189
10/15/13 - Lodged Visa-189 Application
11/18/13 - Medical exam (SLEC)
11/26/13 - CO allocated (Adelaide GSM Team 6)
12/11/13 - VISA GRANT!!!
Posts: 4,336Member
Joined: Feb 24, 2011
Kami binura namin mga pirated items namin when we entered Australia last year; not worth the hassle if ever ma tyempohan!!
Primary Applicant: Wife
Accountant (General): 221111
04 Aug 2012 - IELTS (Academic Module)
07 Aug 2012 - IELTS (Academic Module) Speaking Part
17 Aug 2012 - IELTS Results (L: 8.5 R: 8.5 W: 7.0 S: 7.5 OBS: 8.0)
24 Aug 2012 - CPAA Submitted (docs mailed same day via SG EMS)
25 Sep 2012 - Received +Skills Assessment from CPAA
25 Sep 2012 - Lodged EOI Application with 70pts
30 Sep 2012 - Invited by DIAC to apply for 189 Visa
01 Oct 2012 - Submitted 189 Visa Application
20 Oct 2012 - Medical Examinations
23 Oct 2012 - CO Assigned; Team 7 - SA
05 Nov 2012 - Submitted SG PCC and NBI Clearance
06 Nov 2012 - Visa Granted (IED: 23/10/2013)
03 Apr 2013 - Flight to MEL
03 Jun 2013 - started work
12 Jun 2013 - wife started work
15 Jun 2016 - applied for citizenship
29 Jul 2016 - citizenship examination
20 Oct 2016 - Aussie, Aussie, Aussie Oi Oi Oi!!