most recent by fmp_921
most recent by uoieaeam
General Skilled Immigration Visa - Step By Step Process
most recent by whimpee
Australian Computer Society Skills Application
most recent by mathilde9
Western Australia Immigration Matters FY 2024-2025
most recent by fmp_921
AUSTRALIAN CITIZENSHIP TIMELINE
most recent by chewy
VICTORIA STATES SPONSORSHIP 2024-2025
most recent by rainmaker
Ph Vacation with One Month Visa Validity
most recent by Ozdrims
The longest running Pinoy-Australian Forum site in the history. We are connecting Pinoys "in" and "to" Australia since 2010! If you want to join in, click one of these buttons!
Comments
Posts: 89Member
Joined: Dec 30, 2012
I found out how to get the ITR pag wala ka sa bansa. I sent an email to them to inquire. Their email can be found at the bottom part of their website. They replied to me the following day, they told me to call the number found also at the bottom part of their website and I was told to do the following:
A. Write a Letter of Request with the following content:
1. State request for ITR
2. State reason for the request
3. Get Special Power of Attorney for the request.
B. Go to your Regional District Office (RDO) to submit request.
Fees:
Php100.00 Certificate Fee
Php 15.00 Documentary Stamp
C. Will take 5 Working Days to get the ITR.
Visa 190
1 March 2013 - VETASSESS Submitted
22 April 2013 - IELTS Results (OBS-8)
21 June 2013 - VETASSESS Results: Positive
26 June 2013 - EOI Submitted
27 June 2013 - WA SS Application
28 June 2013 - WA SS Approved
02 July 2013 - Invitation To Apply for Visa 190
04 July 2013 - Visa Lodged
10 July 2013 - Medicals
23 July 2013 - CO Allocated
1 Aug 2013 - Form 80 Submitted
14 Aug 2013 - SG COC Issued and Submitted
15 Aug 2013 - Visa Grant
Posts: 103Member
Joined: Apr 02, 2012
June 2013 - started collecting documents
Nov 2013 - completed documents (notarized and certified)
Dec 2013 - ACS Application Submission - Stage 1
Feb 2014 - Received positive ACS results - ICT Support Engineer
Posts: 89Member
Joined: Dec 30, 2012
Yes, ilagay mo sa letter of request yung years na kailangan mo.
And yung special power of attorney is, as what the BIR officer told me, notarization ng lawyer sa letter of request mo.
Ito ung helpline nila: +6329818888
Visa 190
1 March 2013 - VETASSESS Submitted
22 April 2013 - IELTS Results (OBS-8)
21 June 2013 - VETASSESS Results: Positive
26 June 2013 - EOI Submitted
27 June 2013 - WA SS Application
28 June 2013 - WA SS Approved
02 July 2013 - Invitation To Apply for Visa 190
04 July 2013 - Visa Lodged
10 July 2013 - Medicals
23 July 2013 - CO Allocated
1 Aug 2013 - Form 80 Submitted
14 Aug 2013 - SG COC Issued and Submitted
15 Aug 2013 - Visa Grant
Posts: 103Member
Joined: Apr 02, 2012
June 2013 - started collecting documents
Nov 2013 - completed documents (notarized and certified)
Dec 2013 - ACS Application Submission - Stage 1
Feb 2014 - Received positive ACS results - ICT Support Engineer
Posts: 8Member
Joined: Mar 05, 2012
I already have my COE from previous employer, kaya lang generic lang sya, walang detailed duties and responsibilities, as per my prev employer, confidential daw kaya hindi sila naglalagay sa COE (I know madaming nakaka-aalam kung anong company to).
So what I am planning to do base na din sa mga nabasa ko, I need to create a statutory declaration for that company, have it signed by previous bosses and affidavit.
Question: Pano kung madami akong naging project, syempre iba-iba ang mga boss, do I need to create one for each project? sa tingin nyo, ano mas okay na gawin...
Thanks in advance!
Posts: 103Member
Joined: Apr 02, 2012
June 2013 - started collecting documents
Nov 2013 - completed documents (notarized and certified)
Dec 2013 - ACS Application Submission - Stage 1
Feb 2014 - Received positive ACS results - ICT Support Engineer
Posts: 89Member
Joined: Dec 30, 2012
Pero tama ka din it can also be where kung saan naka register company mo. Para malaman mo exactly where RDO mo, dapat alam mo TIN Number mo and you can call them again to ask (sana mabait ung sumagot, hehe), or baka makita mo din online (I haven't tried this).
Ung letter post ko mayamaya.
Visa 190
1 March 2013 - VETASSESS Submitted
22 April 2013 - IELTS Results (OBS-8)
21 June 2013 - VETASSESS Results: Positive
26 June 2013 - EOI Submitted
27 June 2013 - WA SS Application
28 June 2013 - WA SS Approved
02 July 2013 - Invitation To Apply for Visa 190
04 July 2013 - Visa Lodged
10 July 2013 - Medicals
23 July 2013 - CO Allocated
1 Aug 2013 - Form 80 Submitted
14 Aug 2013 - SG COC Issued and Submitted
15 Aug 2013 - Visa Grant
Posts: 89Member
Joined: Dec 30, 2012
Bureau of Internal Revenue
West Avenue Building
112 West Avenue
Quezon City
Philippines
Dear Sir and/or Madam:
I, full name, would like to give authorization to Mr. , my father, to get a copy of my Income Tax Return (ITR) from the years XXXX, XXXX, etc on my behalf.
My particulars are as follows:
Full Name: Name
TIN Number: XXXXXXXXX
Date of Birth:
Address:
I cannot attend to this personally as I am currently residing in . Attached is a copy of my passport (XX XXXXXXX) attesting to this authorization.
Thank you.
Sincerely yours,
Name
HP:
Email:
Visa 190
1 March 2013 - VETASSESS Submitted
22 April 2013 - IELTS Results (OBS-8)
21 June 2013 - VETASSESS Results: Positive
26 June 2013 - EOI Submitted
27 June 2013 - WA SS Application
28 June 2013 - WA SS Approved
02 July 2013 - Invitation To Apply for Visa 190
04 July 2013 - Visa Lodged
10 July 2013 - Medicals
23 July 2013 - CO Allocated
1 Aug 2013 - Form 80 Submitted
14 Aug 2013 - SG COC Issued and Submitted
15 Aug 2013 - Visa Grant
Posts: 60Member
Joined: Feb 07, 2013
nakapag secure po ako ng COE sa 6 na company ko ng same position (Architectural Draftsperson) as what I applied for AU as per agent's advice.. nagreply po ang VETASSESS sa application ko. hinihingan po ako ng additional requirements such as payslips, taxation records, etc. ang kaso meron pong naka reflect sa mga lumang payslips na mga dating positions ko (Designer, Jr. Architect, Supervisor)....
Hindi po kaya malito ang VETASSESS nun? at lalong mahirapan po ako sa huli kung hingian din ako ng Contract of Employment, na may nakalagay din na mga original positions ko na sympre hindi ko naman ppwedeng palitan same case with the payslip.
Ano po kayang maganda, sabihin ko nlang sa kanila ang totoong original positions ko tutal qualified naman po ako OR mag stick nlang as per agent's advice sa Architectural Draftsperson position, kaso iba naman ung position na nakalagay sa payslips. Need your advice mga sir at madam... nahihirapan po ako sumugal
Occupation Nominated: Architectural Draftsperson - 312111
25th February 2013 - Submitted docs to VETASSESS
01st March 2013 - Acknowledgement from VETASSESS
25th March 2013 - IELTS band score result : 6.5 Competent
27th May 2013 - VETASSESS asked for additional documents
14th June 2013 - Forwarded to VETASSESS the additional docs
17th June 2013 - VETASSESS asked for more
19th June 2013 - Forwarded to VETASSESS the additional docs
30th June 2013 - VETASSESS- Positive (Salamat po Panginoon!)
02nd July 2013 - EOI submitted (65pts)
18th July 2013 - Received invitation to file for WA SS
07th Aug 2013 - Submitted WA SS Application
09th Aug 2013 - WA SS Approved
15th Aug 2013 - Lodge visa subclass 190
25th Sep 2013 - CO allocated - Adelaide GSM Team 7
29th Sep 2013 - PCC (PHI, QAT, BAH) uploaded, Medicals uploaded
17th Oct 2013 - Visa Grant!! Thank You Lord!!!!
Psalm 62:5 - For God alone, O my soul, wait in silence, for my hope is from him.
Posts: 103Member
Joined: Apr 02, 2012
June 2013 - started collecting documents
Nov 2013 - completed documents (notarized and certified)
Dec 2013 - ACS Application Submission - Stage 1
Feb 2014 - Received positive ACS results - ICT Support Engineer
Posts: 103Member
Joined: Apr 02, 2012
June 2013 - started collecting documents
Nov 2013 - completed documents (notarized and certified)
Dec 2013 - ACS Application Submission - Stage 1
Feb 2014 - Received positive ACS results - ICT Support Engineer
Posts: 103Member
Joined: Apr 02, 2012
June 2013 - started collecting documents
Nov 2013 - completed documents (notarized and certified)
Dec 2013 - ACS Application Submission - Stage 1
Feb 2014 - Received positive ACS results - ICT Support Engineer
Posts: 134Member
Joined: Jan 26, 2013
01-Apr-13 : Completed all requirements in Philippines
27-May-13 : Got the documents from Philippines via DHL
13-Jun-13 : Completed all requirements in Singapore
14-Jun-13 : ACS Skills Assessment - Submitted
14-Jun-13 : ACS Skills Assessment - Allocated
21-Jun-13 : ACS Skills Assessment - With Assessor
19-Jul-13 : IELTS (BC) -
16-Sep-13 : ACS Result - "Thank you lord after 12 weeks "Suitable" sya"
19-Jul-14 - Second attempt! this time IDP naman
Posts: 103Member
Joined: Apr 02, 2012
June 2013 - started collecting documents
Nov 2013 - completed documents (notarized and certified)
Dec 2013 - ACS Application Submission - Stage 1
Feb 2014 - Received positive ACS results - ICT Support Engineer
Posts: 134Member
Joined: Jan 26, 2013
Most of the notary public dito, kailangan kaharap ng Notary Public yung tao na pipirma dun sa statutory declaration (in your case, yung colleague mo) kasi un ang iwiwitness ng Notary Public.
After that, pwede mo ng ipa-Certified True Copy yung Statutory Declaration mo.
01-Apr-13 : Completed all requirements in Philippines
27-May-13 : Got the documents from Philippines via DHL
13-Jun-13 : Completed all requirements in Singapore
14-Jun-13 : ACS Skills Assessment - Submitted
14-Jun-13 : ACS Skills Assessment - Allocated
21-Jun-13 : ACS Skills Assessment - With Assessor
19-Jul-13 : IELTS (BC) -
16-Sep-13 : ACS Result - "Thank you lord after 12 weeks "Suitable" sya"
19-Jul-14 - Second attempt! this time IDP naman
Posts: 103Member
Joined: Apr 02, 2012
June 2013 - started collecting documents
Nov 2013 - completed documents (notarized and certified)
Dec 2013 - ACS Application Submission - Stage 1
Feb 2014 - Received positive ACS results - ICT Support Engineer
Posts: 5,037Member, De-activated
Joined: Feb 23, 2012
so kung ACS ka, affidavit nga kailangan... basahin mo yung post ni @hotshot sa page 1 of this thread (ACS din sya)..
Sep 24, 2011 - IELTS (L-8 R-8 W-8 S-7.5 : OBS-8)
Jan 04, 2012 - EA application submitted | Feb 23, 2012 - EA assessment result (IE ANZSCO 233511)
May 8, 2012 - Lodged GSM 175 online application | June 4, 2012 - CO Allocated
June 22, 2012 - Medicals Finalized | Aug 30, 2012 - PCCs Completed (PH, UAE, USA)
Sep 3, 2012 - Visa Granted (IED Jun 11, 2013) Thank You Lord!
Oct 16-28, 2012 - Initial Entry Completed - Sydney
July 28, 2013 - Final move to Perth
Sep 9, 2013 - Started work with the same company i worked for in UAE/USA
Oct 28, 2013 - Moved to another company..
Posts: 103Member
Joined: Apr 02, 2012
June 2013 - started collecting documents
Nov 2013 - completed documents (notarized and certified)
Dec 2013 - ACS Application Submission - Stage 1
Feb 2014 - Received positive ACS results - ICT Support Engineer
Posts: 89Member
Joined: Dec 30, 2012
But what happened sa case ko was sabi ng isang officer na tumulong sa father ko wala na daw records ko kse since 2002-2005 ang pinapakuha ko. Sabi ng officer humingi daw ako sa company ko ng form (I forgot the form number and d ko makita sa notes ko, hanapin ko and later I'll post the form number) na lang.
Ano ba ung sa case mo, you mean you already had a copy and nawala? Ask mo sa company mo baka may copy pa sila. Minsan sa kakulitan natin magbibigay din yan.
Visa 190
1 March 2013 - VETASSESS Submitted
22 April 2013 - IELTS Results (OBS-8)
21 June 2013 - VETASSESS Results: Positive
26 June 2013 - EOI Submitted
27 June 2013 - WA SS Application
28 June 2013 - WA SS Approved
02 July 2013 - Invitation To Apply for Visa 190
04 July 2013 - Visa Lodged
10 July 2013 - Medicals
23 July 2013 - CO Allocated
1 Aug 2013 - Form 80 Submitted
14 Aug 2013 - SG COC Issued and Submitted
15 Aug 2013 - Visa Grant
Posts: 103Member
Joined: Apr 02, 2012
June 2013 - started collecting documents
Nov 2013 - completed documents (notarized and certified)
Dec 2013 - ACS Application Submission - Stage 1
Feb 2014 - Received positive ACS results - ICT Support Engineer
Posts: 89Member
Joined: Dec 30, 2012
Or better yet, if may family member ka na willing pumunta dun and talk to them and explain the urgency of your requirement. Sa atin kse pag may pumupunta sa office or company mas accommodating sila. Go figure. Good luck!
Visa 190
1 March 2013 - VETASSESS Submitted
22 April 2013 - IELTS Results (OBS-8)
21 June 2013 - VETASSESS Results: Positive
26 June 2013 - EOI Submitted
27 June 2013 - WA SS Application
28 June 2013 - WA SS Approved
02 July 2013 - Invitation To Apply for Visa 190
04 July 2013 - Visa Lodged
10 July 2013 - Medicals
23 July 2013 - CO Allocated
1 Aug 2013 - Form 80 Submitted
14 Aug 2013 - SG COC Issued and Submitted
15 Aug 2013 - Visa Grant
Posts: 103Member
Joined: Apr 02, 2012
June 2013 - started collecting documents
Nov 2013 - completed documents (notarized and certified)
Dec 2013 - ACS Application Submission - Stage 1
Feb 2014 - Received positive ACS results - ICT Support Engineer
Posts: 2,127Member
Joined: Mar 01, 2011
Apr 26, 2013 ACS Result- Suitable
Feb 21,2013 Submitted ACS online assessment - Software Tester
May 9, 2016 PTE Exam Result L/R/S/W- 71/69/83/72 Passed Thank you Papa Jesus
Aug 18,2016 ACS Result- Suitable -Software Engineer
Aug 19, 2016 Lodged EOI for subclass 190
July 13, 2017 Lodged EOI and Submitted Application for subclass 489
Aug 12, 2017 ITA Received
Aug 25,2017 Scheduled Medical Test
Aug 28, 2017 Medical Cleared(No Action Required)
Aug 30, 2017 NBI Clearance PH
Sept 15, 2017 SG COC Fingerprint and Collection
Sept 20, 2017 Visa Lodge
Nov 1, 2017 CO Contact (Requesting to Send PTE Score Report to DIBP which I already did before)
Mar 6, 2018 Visa Grant
Visa 887 Timeline
July 25, 2020 Visa Lodge
Oct 12, 2020 Visa Grant
Citizenship Timeline
July 4, 2022 Submitted Citizenship Application
Dec 21, 2022 Invitation for Exam(Need to reschedule the exam)
Feb 21, 2023 Citizenship Exam
April 3, 2023 Received Approval Letter
June 22, 2023 Citizenship Ceremony
*****Dream big, think positive and Pray to God*****
Posts: 103Member
Joined: Apr 02, 2012
June 2013 - started collecting documents
Nov 2013 - completed documents (notarized and certified)
Dec 2013 - ACS Application Submission - Stage 1
Feb 2014 - Received positive ACS results - ICT Support Engineer
Posts: 2,127Member
Joined: Mar 01, 2011
Apr 26, 2013 ACS Result- Suitable
Feb 21,2013 Submitted ACS online assessment - Software Tester
May 9, 2016 PTE Exam Result L/R/S/W- 71/69/83/72 Passed Thank you Papa Jesus
Aug 18,2016 ACS Result- Suitable -Software Engineer
Aug 19, 2016 Lodged EOI for subclass 190
July 13, 2017 Lodged EOI and Submitted Application for subclass 489
Aug 12, 2017 ITA Received
Aug 25,2017 Scheduled Medical Test
Aug 28, 2017 Medical Cleared(No Action Required)
Aug 30, 2017 NBI Clearance PH
Sept 15, 2017 SG COC Fingerprint and Collection
Sept 20, 2017 Visa Lodge
Nov 1, 2017 CO Contact (Requesting to Send PTE Score Report to DIBP which I already did before)
Mar 6, 2018 Visa Grant
Visa 887 Timeline
July 25, 2020 Visa Lodge
Oct 12, 2020 Visa Grant
Citizenship Timeline
July 4, 2022 Submitted Citizenship Application
Dec 21, 2022 Invitation for Exam(Need to reschedule the exam)
Feb 21, 2023 Citizenship Exam
April 3, 2023 Received Approval Letter
June 22, 2023 Citizenship Ceremony
*****Dream big, think positive and Pray to God*****
Posts: 103Member
Joined: Apr 02, 2012
June 2013 - started collecting documents
Nov 2013 - completed documents (notarized and certified)
Dec 2013 - ACS Application Submission - Stage 1
Feb 2014 - Received positive ACS results - ICT Support Engineer
Posts: 2,127Member
Joined: Mar 01, 2011
Apr 26, 2013 ACS Result- Suitable
Feb 21,2013 Submitted ACS online assessment - Software Tester
May 9, 2016 PTE Exam Result L/R/S/W- 71/69/83/72 Passed Thank you Papa Jesus
Aug 18,2016 ACS Result- Suitable -Software Engineer
Aug 19, 2016 Lodged EOI for subclass 190
July 13, 2017 Lodged EOI and Submitted Application for subclass 489
Aug 12, 2017 ITA Received
Aug 25,2017 Scheduled Medical Test
Aug 28, 2017 Medical Cleared(No Action Required)
Aug 30, 2017 NBI Clearance PH
Sept 15, 2017 SG COC Fingerprint and Collection
Sept 20, 2017 Visa Lodge
Nov 1, 2017 CO Contact (Requesting to Send PTE Score Report to DIBP which I already did before)
Mar 6, 2018 Visa Grant
Visa 887 Timeline
July 25, 2020 Visa Lodge
Oct 12, 2020 Visa Grant
Citizenship Timeline
July 4, 2022 Submitted Citizenship Application
Dec 21, 2022 Invitation for Exam(Need to reschedule the exam)
Feb 21, 2023 Citizenship Exam
April 3, 2023 Received Approval Letter
June 22, 2023 Citizenship Ceremony
*****Dream big, think positive and Pray to God*****
Posts: 103Member
Joined: Apr 02, 2012
June 2013 - started collecting documents
Nov 2013 - completed documents (notarized and certified)
Dec 2013 - ACS Application Submission - Stage 1
Feb 2014 - Received positive ACS results - ICT Support Engineer
Posts: 4,336Member
Joined: Feb 24, 2011
It is important to take note here that sa case ni misis, nilagay talaga nya ang reason as why she sign the stat dec itself as wala na yung mga bosses nya before and HG does not issue a detailed COE..
Primary Applicant: Wife
Accountant (General): 221111
04 Aug 2012 - IELTS (Academic Module)
07 Aug 2012 - IELTS (Academic Module) Speaking Part
17 Aug 2012 - IELTS Results (L: 8.5 R: 8.5 W: 7.0 S: 7.5 OBS: 8.0)
24 Aug 2012 - CPAA Submitted (docs mailed same day via SG EMS)
25 Sep 2012 - Received +Skills Assessment from CPAA
25 Sep 2012 - Lodged EOI Application with 70pts
30 Sep 2012 - Invited by DIAC to apply for 189 Visa
01 Oct 2012 - Submitted 189 Visa Application
20 Oct 2012 - Medical Examinations
23 Oct 2012 - CO Assigned; Team 7 - SA
05 Nov 2012 - Submitted SG PCC and NBI Clearance
06 Nov 2012 - Visa Granted (IED: 23/10/2013)
03 Apr 2013 - Flight to MEL
03 Jun 2013 - started work
12 Jun 2013 - wife started work
15 Jun 2016 - applied for citizenship
29 Jul 2016 - citizenship examination
20 Oct 2016 - Aussie, Aussie, Aussie Oi Oi Oi!!
Posts: 103Member
Joined: Apr 02, 2012
June 2013 - started collecting documents
Nov 2013 - completed documents (notarized and certified)
Dec 2013 - ACS Application Submission - Stage 1
Feb 2014 - Received positive ACS results - ICT Support Engineer