@kathfrancisco08 Hello po! Nag-take na po kase ako ng IELTS before, (back in 2009) and nagamit ko po siya sa Engineer's Australia before siya mag-expire. I had to take another exam para naman sa DIAC kase expired na yung unang IELTS ko and I needed more points.
Kaya, kailangan po talaga mag-IELTS muna bago magpa-assess sa EA.
25 Jul 2011 - Applied For Skills Assessment, Engineers Australia
23 Sep 2011 - Skills Assessment Received, ANZCO Code: 233211 (Civil Engineer)
10 Mar 2012 - IELTS Exam
24 Mar 2012 - IELTS Result L-8.5; R,W,S -7
26 Apr 2012 - 175 Application lodged....
24 May 2012 - "Application Being Processed Further"
10 Jun 2012 - Applied for NBI / Dubai Police Clearance
12 Jun 2012 - Dubai Police Clearance Received
15 Jun 2012 - CO Allocated
25 Jun 2012 - Medicals
27 Jun 2012 - Medicals Finalised
30 Jun 2012 - PCCs Uploaded
02 July 2012 - Visa Grant
14-26 Mar 2013 - Initial Entry - Melbourne
30 August 2014 - Big Move
08 Sep 2014 - First day of work
@langgam37 salamat sir, i think magiging madali na lang to kung susundan ko yung steps ng mga nakalagay sa data ng nasa forum,.. next time po uli pag may di ako naintindihan..salamat uli
glaiza1210Sydney Posts: 314Member Joined: Mar 22, 2012
@langgam37 hi sir, CE din po ako,nagbaback read ako sa conversation dito sa forum, pero nanotice ko na kelangan muna tapusin yung IELTS bago makapagsubmit ng assessment sa EA, pero dun sa data nyo nakalagay,nakapasa na kayo sa assessment bago kayo kumuha ng IELTS exam.. possible po ba yun.. dun kasi sa page 1 ng discussion, dabi nila required ang IELTS bago ka makapagpaassess.. clarification lang po.. bka kasi pwede ko pagsabayin..salamat
You need to take first IELTS, requirement kse sa Engineers Australia yun. You need to have a score at least 6 in each component of the exam.
Occupation: Industrial Engineer
11/05/2011 - IELTS exam at BC (L-6.5,R-6,W-6.5,S-6.5)
02/06/2012 - EA received my CDR
04/17/2012 - Received Favorable Letter from EA
04/21/2012 - IELTS exam retake at IDP (L-8, R-6, W-6.5, S-6)
07/03/2012 - Applied online for SA Statesponsorship
08/13/2012 - SA SS approved
08/16/2012 - Received an invitation in skill select
09/11/2012 - Lodge a visa subclass 190
09/13/2012 - Acknowledgement Receipt & Medicals Requested
09/19/2012 - Medicals Done
12/11/2012 - Medicals Finalised
12/14/2012 - Visa Grant
03/18/2013 - Flight to Adelaide
04/22/2013 - Got my first Job
donkingMelbourne Posts: 258Member Joined: May 24, 2012
April 24, 2011 - Submitted CDR to EA
May 6, 2011 - IELTS BC OBS 7.0
August 25, 2011 - Received positive assessment from EA
February 22, 2012 - Resat IELTS IDP OBS 7.5
April 13, 2012 - Applied SS SA
May 1, 2012 - Received positive response from SA
May 10, 2012 - Pre-lodgement to DIAC
May 31, 2012 - Lodgement to DIAC
May 31, 2012 - South Australia sent form 1100 to DIAC
June 4, 2012 - application being processed further...
June 4, 2012 - C.O. allocated
June 4, 2012 - request for PCC and medicals
June 6, 2012 - Medicals done
June 7, 2012 - NBI
June 8, 2012 - further medical results received
June 27, 2012 - All medicals finalised
July 2, 2012 - Visa Grant
October 6, 2012 - Passed IELTS - Academic (W 6 S 6 L 8 R 7 OBS 7.0) pwde na yan!
October 16, 2012 - Submitted CDR to EA
February 27, 2013 - Received Favorable letter from EA (Mechanical Engineer - ANZSCO 233512) Thank you Lord!
March 8, 2013 - Applied WA SS
March 25, 2013 - Received Letter for WA SS (delaying/maximising 28 days; waiting for civil wedding)
May 31, 2013 - Submitted Visa Application (with everything; PCC Saudi, NBI, Marriage certificate, etc)
July 11, 2013 - CO Assigned / Team 7 Adelaide
August 17, 2013 - Done with the Medicals
September 4, 2013 - Visa Grant (Subclass 190 / ANZCO233515 - Mechanical Engineer) Thank you Lord! / IED August 23, 2014
August 8, 2014 - Flight to Oz, No turning Back, This is it!
May 2015 - End of relationship
June 2015 - Wife found new partner (aussie)
October 2015 - Wife filed for divorce (That cunt)
January 2016 - Divorced
August 2018 - Lodged Citizenship
March 2019 - Sit in Citizenship Exam/Interview
Passed same day
May 2019 - Citizenship Ceremony
June 2019 - Au Passport received
mackie21Seattle Posts: 8Member Joined: Jun 25, 2012
edited December 2012
Hello everyone!
Just wanted some advice regarding engineering practices and standards in Australia.
Student po ako, will take my masters in mechanical engineering which will start on February. Just wanted to know any website I could read through, to know more what I will be needing to get into the industry or may be a way to make myself more employable after graduation.
It's quite a risk for me to come here since I have no work experience yet from the Philippines as an engineer. So kailangan ko na mag start to get an edge even before school starts.
Aside from AutoCad, are there other softwares that are commonly used by engineering companies in Australia? I did a bit of research and found out about PDMS and PDS, ano ang madalas gamitin here sa oz? Mas maganda siguro maaga ko na sila aralin para advantage later on.
Also, any suggestions of a part time job for an engineering student that could be used for employment later on? Will I be able to get a trades assistant job or do you need to be licensed here or something to do engineering related work?
I hope someone can help me out. Any suggestions will be much appreciated!
Subclass 573 - Darwin NT
March 10, 2012 - Took IELTS Exam
March 23, 2012 - Got IELTS results Overall band of 7.5
April 17,2012 - Submitted application to Charles Darwin University
May 3, 2012 - Received letter of offer from CDU
June 14, 2012 - Payment of tuition to CDU
June 15, 2012 - COE received from CDU
June 21, 2012 - Visa Application thru IDP
June 26, 2012 - Notice for Medical Examination
June 27, 2012 - Medicals @ Nationwide Makati
July 9, 2012 - Medical Examination results forwarded to Australian Embassy
July 11, 2012 - Additional Documents requested for medical eligibility
July 13, 2012 - Hoping to submit additional documents
July 20, 2012 - documents submitted
Nov 20, 2012 - visa granted!
Dec 8, 2012 - touchdown Darwin, Australia!!!!!
lock_code2004Perth Posts: 5,037Member, De-activated Joined: Feb 23, 2012
i just checked EA's website.. and it is still 6.0 IELTS score.. i think baka they mean 6.5 if you want to get SS for some states..
Sep 24, 2011 - IELTS (L-8 R-8 W-8 S-7.5 : OBS-8)
Jan 04, 2012 - EA application submitted | Feb 23, 2012 - EA assessment result (IE ANZSCO 233511)
May 8, 2012 - Lodged GSM 175 online application | June 4, 2012 - CO Allocated
June 22, 2012 - Medicals Finalized | Aug 30, 2012 - PCCs Completed (PH, UAE, USA)
Sep 3, 2012 - Visa Granted (IED Jun 11, 2013) Thank You Lord!
Oct 16-28, 2012 - Initial Entry Completed - Sydney
July 28, 2013 - Final move to Perth
Sep 9, 2013 - Started work with the same company i worked for in UAE/USA
Oct 28, 2013 - Moved to another company..
@lock_code2004 ah ganun..OBS 7 kase ako e...tapos may 6 ako...pwede na siguro yan, sabi naman ng agency namin e pwede na daw yun... :-)
October 6, 2012 - Passed IELTS - Academic (W 6 S 6 L 8 R 7 OBS 7.0) pwde na yan!
October 16, 2012 - Submitted CDR to EA
February 27, 2013 - Received Favorable letter from EA (Mechanical Engineer - ANZSCO 233512) Thank you Lord!
March 8, 2013 - Applied WA SS
March 25, 2013 - Received Letter for WA SS (delaying/maximising 28 days; waiting for civil wedding)
May 31, 2013 - Submitted Visa Application (with everything; PCC Saudi, NBI, Marriage certificate, etc)
July 11, 2013 - CO Assigned / Team 7 Adelaide
August 17, 2013 - Done with the Medicals
September 4, 2013 - Visa Grant (Subclass 190 / ANZCO233515 - Mechanical Engineer) Thank you Lord! / IED August 23, 2014
August 8, 2014 - Flight to Oz, No turning Back, This is it!
May 2015 - End of relationship
June 2015 - Wife found new partner (aussie)
October 2015 - Wife filed for divorce (That cunt)
January 2016 - Divorced
August 2018 - Lodged Citizenship
March 2019 - Sit in Citizenship Exam/Interview
Passed same day
May 2019 - Citizenship Ceremony
June 2019 - Au Passport received
lock_code2004Perth Posts: 5,037Member, De-activated Joined: Feb 23, 2012
@lock_code2004 ah ganun..OBS 7 kase ako e...tapos may 6 ako...pwede na siguro yan, sabi naman ng agency namin e pwede na daw yun... :-)
yup, pwede na yan sa EA.. but if you are applying for SS Visa 190, you need to check requirements ng specific state for Engineers..
Sep 24, 2011 - IELTS (L-8 R-8 W-8 S-7.5 : OBS-8)
Jan 04, 2012 - EA application submitted | Feb 23, 2012 - EA assessment result (IE ANZSCO 233511)
May 8, 2012 - Lodged GSM 175 online application | June 4, 2012 - CO Allocated
June 22, 2012 - Medicals Finalized | Aug 30, 2012 - PCCs Completed (PH, UAE, USA)
Sep 3, 2012 - Visa Granted (IED Jun 11, 2013) Thank You Lord!
Oct 16-28, 2012 - Initial Entry Completed - Sydney
July 28, 2013 - Final move to Perth
Sep 9, 2013 - Started work with the same company i worked for in UAE/USA
Oct 28, 2013 - Moved to another company..
@lock_code2004 honga Sir, pero as for our agent, sa WA e okay na daw yan...sana... :-)
October 6, 2012 - Passed IELTS - Academic (W 6 S 6 L 8 R 7 OBS 7.0) pwde na yan!
October 16, 2012 - Submitted CDR to EA
February 27, 2013 - Received Favorable letter from EA (Mechanical Engineer - ANZSCO 233512) Thank you Lord!
March 8, 2013 - Applied WA SS
March 25, 2013 - Received Letter for WA SS (delaying/maximising 28 days; waiting for civil wedding)
May 31, 2013 - Submitted Visa Application (with everything; PCC Saudi, NBI, Marriage certificate, etc)
July 11, 2013 - CO Assigned / Team 7 Adelaide
August 17, 2013 - Done with the Medicals
September 4, 2013 - Visa Grant (Subclass 190 / ANZCO233515 - Mechanical Engineer) Thank you Lord! / IED August 23, 2014
August 8, 2014 - Flight to Oz, No turning Back, This is it!
May 2015 - End of relationship
June 2015 - Wife found new partner (aussie)
October 2015 - Wife filed for divorce (That cunt)
January 2016 - Divorced
August 2018 - Lodged Citizenship
March 2019 - Sit in Citizenship Exam/Interview
Passed same day
May 2019 - Citizenship Ceremony
June 2019 - Au Passport received
October 6, 2012 - Passed IELTS - Academic (W 6 S 6 L 8 R 7 OBS 7.0) pwde na yan!
October 16, 2012 - Submitted CDR to EA
February 27, 2013 - Received Favorable letter from EA (Mechanical Engineer - ANZSCO 233512) Thank you Lord!
March 8, 2013 - Applied WA SS
March 25, 2013 - Received Letter for WA SS (delaying/maximising 28 days; waiting for civil wedding)
May 31, 2013 - Submitted Visa Application (with everything; PCC Saudi, NBI, Marriage certificate, etc)
July 11, 2013 - CO Assigned / Team 7 Adelaide
August 17, 2013 - Done with the Medicals
September 4, 2013 - Visa Grant (Subclass 190 / ANZCO233515 - Mechanical Engineer) Thank you Lord! / IED August 23, 2014
August 8, 2014 - Flight to Oz, No turning Back, This is it!
May 2015 - End of relationship
June 2015 - Wife found new partner (aussie)
October 2015 - Wife filed for divorce (That cunt)
January 2016 - Divorced
August 2018 - Lodged Citizenship
March 2019 - Sit in Citizenship Exam/Interview
Passed same day
May 2019 - Citizenship Ceremony
June 2019 - Au Passport received
Question Again... Pwede bang ipakuha na lang yung Saudi Police Clearance if ever na wala na ako dito sa Saudi...
I mean e kung pwede bang yung friend ko na lang ang kukuha ng Saudi Police Clearance on my behalf?! :-)
October 6, 2012 - Passed IELTS - Academic (W 6 S 6 L 8 R 7 OBS 7.0) pwde na yan!
October 16, 2012 - Submitted CDR to EA
February 27, 2013 - Received Favorable letter from EA (Mechanical Engineer - ANZSCO 233512) Thank you Lord!
March 8, 2013 - Applied WA SS
March 25, 2013 - Received Letter for WA SS (delaying/maximising 28 days; waiting for civil wedding)
May 31, 2013 - Submitted Visa Application (with everything; PCC Saudi, NBI, Marriage certificate, etc)
July 11, 2013 - CO Assigned / Team 7 Adelaide
August 17, 2013 - Done with the Medicals
September 4, 2013 - Visa Grant (Subclass 190 / ANZCO233515 - Mechanical Engineer) Thank you Lord! / IED August 23, 2014
August 8, 2014 - Flight to Oz, No turning Back, This is it!
May 2015 - End of relationship
June 2015 - Wife found new partner (aussie)
October 2015 - Wife filed for divorce (That cunt)
January 2016 - Divorced
August 2018 - Lodged Citizenship
March 2019 - Sit in Citizenship Exam/Interview
Passed same day
May 2019 - Citizenship Ceremony
June 2019 - Au Passport received
lock_code2004Perth Posts: 5,037Member, De-activated Joined: Feb 23, 2012
May na-disapprove na ba dito from EA?! :-)
so far, wala pa naman akong nabalitaan nyan dito sa forum..
Sep 24, 2011 - IELTS (L-8 R-8 W-8 S-7.5 : OBS-8)
Jan 04, 2012 - EA application submitted | Feb 23, 2012 - EA assessment result (IE ANZSCO 233511)
May 8, 2012 - Lodged GSM 175 online application | June 4, 2012 - CO Allocated
June 22, 2012 - Medicals Finalized | Aug 30, 2012 - PCCs Completed (PH, UAE, USA)
Sep 3, 2012 - Visa Granted (IED Jun 11, 2013) Thank You Lord!
Oct 16-28, 2012 - Initial Entry Completed - Sydney
July 28, 2013 - Final move to Perth
Sep 9, 2013 - Started work with the same company i worked for in UAE/USA
Oct 28, 2013 - Moved to another company..
lock_code2004Perth Posts: 5,037Member, De-activated Joined: Feb 23, 2012
Question Again... Pwede bang ipakuha na lang yung Saudi Police Clearance if ever na wala na ako dito sa Saudi...
I mean e kung pwede bang yung friend ko na lang ang kukuha ng Saudi Police Clearance on my behalf?! :-)
hindi ako sure sa process ng Saudi Police Clearance.. pero parang sa phil embassy pa nila pinadaan, kaya sobrang tagal inabot ng ilang months..
Sep 24, 2011 - IELTS (L-8 R-8 W-8 S-7.5 : OBS-8)
Jan 04, 2012 - EA application submitted | Feb 23, 2012 - EA assessment result (IE ANZSCO 233511)
May 8, 2012 - Lodged GSM 175 online application | June 4, 2012 - CO Allocated
June 22, 2012 - Medicals Finalized | Aug 30, 2012 - PCCs Completed (PH, UAE, USA)
Sep 3, 2012 - Visa Granted (IED Jun 11, 2013) Thank You Lord!
Oct 16-28, 2012 - Initial Entry Completed - Sydney
July 28, 2013 - Final move to Perth
Sep 9, 2013 - Started work with the same company i worked for in UAE/USA
Oct 28, 2013 - Moved to another company..
hi @dhey_almighty! ung hubby ko sa NBI ngfill up ng finger print card tpos sa Dfa nya kinuha. imessage ko sau ung process na ginawa nya
Skilled – Family Sponsored (Migrant) Visa (Subclass 176)
Nominated Occupation: CHEMIST 2111-11
11/MAY/2011 - IELTS Exam
20/JUNE/2011 - Lodged Online Visa Application
15/FEB/2012 - CO Allocation
26/JUNE/2012 - VISA GRANTED! Thank you Lord!
11/APR/2013 - Initial Entry Date Deadline
10/MAR/2013 - Arrived in Sydney
donkingMelbourne Posts: 258Member Joined: May 24, 2012
Hello Deo... wala pa naman kaming naririnig na nadisapprove ng EA. Gandahan mo na lang yund CDR mo. Happy New Year na lang. Initial entry na kami by March.
April 24, 2011 - Submitted CDR to EA
May 6, 2011 - IELTS BC OBS 7.0
August 25, 2011 - Received positive assessment from EA
February 22, 2012 - Resat IELTS IDP OBS 7.5
April 13, 2012 - Applied SS SA
May 1, 2012 - Received positive response from SA
May 10, 2012 - Pre-lodgement to DIAC
May 31, 2012 - Lodgement to DIAC
May 31, 2012 - South Australia sent form 1100 to DIAC
June 4, 2012 - application being processed further...
June 4, 2012 - C.O. allocated
June 4, 2012 - request for PCC and medicals
June 6, 2012 - Medicals done
June 7, 2012 - NBI
June 8, 2012 - further medical results received
June 27, 2012 - All medicals finalised
July 2, 2012 - Visa Grant
@donking okay naman daw yung CDR ko...as far as my misis is concern, hehehe...wow, lapit na pala pre...kitakits na lang tayo sa Oz pre if ever! Happy New Year!
October 6, 2012 - Passed IELTS - Academic (W 6 S 6 L 8 R 7 OBS 7.0) pwde na yan!
October 16, 2012 - Submitted CDR to EA
February 27, 2013 - Received Favorable letter from EA (Mechanical Engineer - ANZSCO 233512) Thank you Lord!
March 8, 2013 - Applied WA SS
March 25, 2013 - Received Letter for WA SS (delaying/maximising 28 days; waiting for civil wedding)
May 31, 2013 - Submitted Visa Application (with everything; PCC Saudi, NBI, Marriage certificate, etc)
July 11, 2013 - CO Assigned / Team 7 Adelaide
August 17, 2013 - Done with the Medicals
September 4, 2013 - Visa Grant (Subclass 190 / ANZCO233515 - Mechanical Engineer) Thank you Lord! / IED August 23, 2014
August 8, 2014 - Flight to Oz, No turning Back, This is it!
May 2015 - End of relationship
June 2015 - Wife found new partner (aussie)
October 2015 - Wife filed for divorce (That cunt)
January 2016 - Divorced
August 2018 - Lodged Citizenship
March 2019 - Sit in Citizenship Exam/Interview
Passed same day
May 2019 - Citizenship Ceremony
June 2019 - Au Passport received
October 6, 2012 - Passed IELTS - Academic (W 6 S 6 L 8 R 7 OBS 7.0) pwde na yan!
October 16, 2012 - Submitted CDR to EA
February 27, 2013 - Received Favorable letter from EA (Mechanical Engineer - ANZSCO 233512) Thank you Lord!
March 8, 2013 - Applied WA SS
March 25, 2013 - Received Letter for WA SS (delaying/maximising 28 days; waiting for civil wedding)
May 31, 2013 - Submitted Visa Application (with everything; PCC Saudi, NBI, Marriage certificate, etc)
July 11, 2013 - CO Assigned / Team 7 Adelaide
August 17, 2013 - Done with the Medicals
September 4, 2013 - Visa Grant (Subclass 190 / ANZCO233515 - Mechanical Engineer) Thank you Lord! / IED August 23, 2014
August 8, 2014 - Flight to Oz, No turning Back, This is it!
May 2015 - End of relationship
June 2015 - Wife found new partner (aussie)
October 2015 - Wife filed for divorce (That cunt)
January 2016 - Divorced
August 2018 - Lodged Citizenship
March 2019 - Sit in Citizenship Exam/Interview
Passed same day
May 2019 - Citizenship Ceremony
June 2019 - Au Passport received
donkingMelbourne Posts: 258Member Joined: May 24, 2012
Dey Sa west ka d b? cge lilipad na lang ako... sa South ako eh.
April 24, 2011 - Submitted CDR to EA
May 6, 2011 - IELTS BC OBS 7.0
August 25, 2011 - Received positive assessment from EA
February 22, 2012 - Resat IELTS IDP OBS 7.5
April 13, 2012 - Applied SS SA
May 1, 2012 - Received positive response from SA
May 10, 2012 - Pre-lodgement to DIAC
May 31, 2012 - Lodgement to DIAC
May 31, 2012 - South Australia sent form 1100 to DIAC
June 4, 2012 - application being processed further...
June 4, 2012 - C.O. allocated
June 4, 2012 - request for PCC and medicals
June 6, 2012 - Medicals done
June 7, 2012 - NBI
June 8, 2012 - further medical results received
June 27, 2012 - All medicals finalised
July 2, 2012 - Visa Grant
@donking wala pang specific states pre, pero sabi namin sa agent namin e WA ang plan namin at andun mostly ang industry type ng job qualification ko...pero syempre kahit saan na rin kung saan pwede... :-)
October 6, 2012 - Passed IELTS - Academic (W 6 S 6 L 8 R 7 OBS 7.0) pwde na yan!
October 16, 2012 - Submitted CDR to EA
February 27, 2013 - Received Favorable letter from EA (Mechanical Engineer - ANZSCO 233512) Thank you Lord!
March 8, 2013 - Applied WA SS
March 25, 2013 - Received Letter for WA SS (delaying/maximising 28 days; waiting for civil wedding)
May 31, 2013 - Submitted Visa Application (with everything; PCC Saudi, NBI, Marriage certificate, etc)
July 11, 2013 - CO Assigned / Team 7 Adelaide
August 17, 2013 - Done with the Medicals
September 4, 2013 - Visa Grant (Subclass 190 / ANZCO233515 - Mechanical Engineer) Thank you Lord! / IED August 23, 2014
August 8, 2014 - Flight to Oz, No turning Back, This is it!
May 2015 - End of relationship
June 2015 - Wife found new partner (aussie)
October 2015 - Wife filed for divorce (That cunt)
January 2016 - Divorced
August 2018 - Lodged Citizenship
March 2019 - Sit in Citizenship Exam/Interview
Passed same day
May 2019 - Citizenship Ceremony
June 2019 - Au Passport received
May show money ba na requirement papuntang Oz?! :-)
October 6, 2012 - Passed IELTS - Academic (W 6 S 6 L 8 R 7 OBS 7.0) pwde na yan!
October 16, 2012 - Submitted CDR to EA
February 27, 2013 - Received Favorable letter from EA (Mechanical Engineer - ANZSCO 233512) Thank you Lord!
March 8, 2013 - Applied WA SS
March 25, 2013 - Received Letter for WA SS (delaying/maximising 28 days; waiting for civil wedding)
May 31, 2013 - Submitted Visa Application (with everything; PCC Saudi, NBI, Marriage certificate, etc)
July 11, 2013 - CO Assigned / Team 7 Adelaide
August 17, 2013 - Done with the Medicals
September 4, 2013 - Visa Grant (Subclass 190 / ANZCO233515 - Mechanical Engineer) Thank you Lord! / IED August 23, 2014
August 8, 2014 - Flight to Oz, No turning Back, This is it!
May 2015 - End of relationship
June 2015 - Wife found new partner (aussie)
October 2015 - Wife filed for divorce (That cunt)
January 2016 - Divorced
August 2018 - Lodged Citizenship
March 2019 - Sit in Citizenship Exam/Interview
Passed same day
May 2019 - Citizenship Ceremony
June 2019 - Au Passport received
FotsBarbsPasig City Posts: 3Member Joined: Apr 26, 2012
Happy new year, one and all!
This is only my second time to post here, actually, pero nadagdagan pa rin ata pagkalito ko. Our initial plan was to have my husband (ME) apply as principal, ni-ready na rin namin papers nya for EA assessment kaso we're having problems with regards to his CDR kasi nga he's with the government now and you know how it is, iba ang job title nya from his job description so what to do? Baka kasi matechnical sya? This has been his only job ever since so ano ilalagay namin sa CDR nya? Mechanical engineer sya pero iba ang job title and then buildings inspection ginagawa nya. Ngayon, dumating ang cousin namin from OZ and said na ako na lang daw ang mag principal, office manager (another thread naman ito, with VETASSESS). Nalilito na ako. Please help :-) thanks a lot!!!
@FotsBarbs hello..i think much better na ilagay niya lang ang work niya sa government as Mechanical Engineer...okay lang din naman kahit building inspector, marami rin naman relation ang building inspector sa pagiging mechanical engineer...mas astig pa nga yata.. :-)
okay rin naman kung ikaw ang primary applicant, basta pasok sa points system at pasok sa SOL nila... :-)
October 6, 2012 - Passed IELTS - Academic (W 6 S 6 L 8 R 7 OBS 7.0) pwde na yan!
October 16, 2012 - Submitted CDR to EA
February 27, 2013 - Received Favorable letter from EA (Mechanical Engineer - ANZSCO 233512) Thank you Lord!
March 8, 2013 - Applied WA SS
March 25, 2013 - Received Letter for WA SS (delaying/maximising 28 days; waiting for civil wedding)
May 31, 2013 - Submitted Visa Application (with everything; PCC Saudi, NBI, Marriage certificate, etc)
July 11, 2013 - CO Assigned / Team 7 Adelaide
August 17, 2013 - Done with the Medicals
September 4, 2013 - Visa Grant (Subclass 190 / ANZCO233515 - Mechanical Engineer) Thank you Lord! / IED August 23, 2014
August 8, 2014 - Flight to Oz, No turning Back, This is it!
May 2015 - End of relationship
June 2015 - Wife found new partner (aussie)
October 2015 - Wife filed for divorce (That cunt)
January 2016 - Divorced
August 2018 - Lodged Citizenship
March 2019 - Sit in Citizenship Exam/Interview
Passed same day
May 2019 - Citizenship Ceremony
June 2019 - Au Passport received
vangievcSydney Posts: 90Member Joined: Oct 21, 2012
@FotsBarbs Parang lumalabas Building Surveyor dito yan...mechanical engineer pa rin ilagay mo...then i- enhance mo na lang experience mo....sabihin mo na lang na aside from inspecting buildings e nagchecheck ka rin ng design to make sure that it will be as per Philippine building code standard and requirements...gusto mo maglagay ka ng letter sa application mo how the system goes in our country..talaga namang mga engineer din ang building inspector sa atin...advise lang po ito at hindi guaranteed na acceptable..my opinion is just based on my experience here...
@dhey_almighty na PM ko na sau ung process na ginawa ni hubby sa pagkuha ng Police Clearance sa Riyadh
Skilled – Family Sponsored (Migrant) Visa (Subclass 176)
Nominated Occupation: CHEMIST 2111-11
11/MAY/2011 - IELTS Exam
20/JUNE/2011 - Lodged Online Visa Application
15/FEB/2012 - CO Allocation
26/JUNE/2012 - VISA GRANTED! Thank you Lord!
11/APR/2013 - Initial Entry Date Deadline
10/MAR/2013 - Arrived in Sydney
kung halimbawa e ang PCC ko is March 2013 then ang medical ko is, let say, June 2013...and hopefully visa grant no later than December 2013...kailan ang IED ko?! :-)
October 6, 2012 - Passed IELTS - Academic (W 6 S 6 L 8 R 7 OBS 7.0) pwde na yan!
October 16, 2012 - Submitted CDR to EA
February 27, 2013 - Received Favorable letter from EA (Mechanical Engineer - ANZSCO 233512) Thank you Lord!
March 8, 2013 - Applied WA SS
March 25, 2013 - Received Letter for WA SS (delaying/maximising 28 days; waiting for civil wedding)
May 31, 2013 - Submitted Visa Application (with everything; PCC Saudi, NBI, Marriage certificate, etc)
July 11, 2013 - CO Assigned / Team 7 Adelaide
August 17, 2013 - Done with the Medicals
September 4, 2013 - Visa Grant (Subclass 190 / ANZCO233515 - Mechanical Engineer) Thank you Lord! / IED August 23, 2014
August 8, 2014 - Flight to Oz, No turning Back, This is it!
May 2015 - End of relationship
June 2015 - Wife found new partner (aussie)
October 2015 - Wife filed for divorce (That cunt)
January 2016 - Divorced
August 2018 - Lodged Citizenship
March 2019 - Sit in Citizenship Exam/Interview
Passed same day
May 2019 - Citizenship Ceremony
June 2019 - Au Passport received
lock_code2004Perth Posts: 5,037Member, De-activated Joined: Feb 23, 2012
edited January 2013
@dhey_almighty - i think na-established na before sa ibang thread na, depende sa kung aling PCC (Pinas or Saudi) mo at kung nasaan ka currently residing (Pinas or Saudi)...
Kung nasa Saudi ka, ang magdictate ng IED mo eh ung Saudi PCC date.. Kung nasa Pinas ka na, it will be the NBI date...
or the medical date expiration date, whichever is earlier..
Sep 24, 2011 - IELTS (L-8 R-8 W-8 S-7.5 : OBS-8)
Jan 04, 2012 - EA application submitted | Feb 23, 2012 - EA assessment result (IE ANZSCO 233511)
May 8, 2012 - Lodged GSM 175 online application | June 4, 2012 - CO Allocated
June 22, 2012 - Medicals Finalized | Aug 30, 2012 - PCCs Completed (PH, UAE, USA)
Sep 3, 2012 - Visa Granted (IED Jun 11, 2013) Thank You Lord!
Oct 16-28, 2012 - Initial Entry Completed - Sydney
July 28, 2013 - Final move to Perth
Sep 9, 2013 - Started work with the same company i worked for in UAE/USA
Oct 28, 2013 - Moved to another company..
@lock_code2004 honga sir, naguguluhan kase ako...planning to resign na kase this march, and stay sa pinas na lang muna while waiting for Oz...
so, if ever hinde pa kame nagaapply for visa at nasa pinas na ako while applying for visa, ang NBI na lang ang pagbabasehan ng IED?! right?! :-)
sensya na po sa kakulitan... :-)
October 6, 2012 - Passed IELTS - Academic (W 6 S 6 L 8 R 7 OBS 7.0) pwde na yan!
October 16, 2012 - Submitted CDR to EA
February 27, 2013 - Received Favorable letter from EA (Mechanical Engineer - ANZSCO 233512) Thank you Lord!
March 8, 2013 - Applied WA SS
March 25, 2013 - Received Letter for WA SS (delaying/maximising 28 days; waiting for civil wedding)
May 31, 2013 - Submitted Visa Application (with everything; PCC Saudi, NBI, Marriage certificate, etc)
July 11, 2013 - CO Assigned / Team 7 Adelaide
August 17, 2013 - Done with the Medicals
September 4, 2013 - Visa Grant (Subclass 190 / ANZCO233515 - Mechanical Engineer) Thank you Lord! / IED August 23, 2014
August 8, 2014 - Flight to Oz, No turning Back, This is it!
May 2015 - End of relationship
June 2015 - Wife found new partner (aussie)
October 2015 - Wife filed for divorce (That cunt)
January 2016 - Divorced
August 2018 - Lodged Citizenship
March 2019 - Sit in Citizenship Exam/Interview
Passed same day
May 2019 - Citizenship Ceremony
June 2019 - Au Passport received
lock_code2004Perth Posts: 5,037Member, De-activated Joined: Feb 23, 2012
@dhey_almighty - tama.. walang anuman.. ang mabuti eh nagkakaintindihan sa mga paliwanagan.. heheh...
Sep 24, 2011 - IELTS (L-8 R-8 W-8 S-7.5 : OBS-8)
Jan 04, 2012 - EA application submitted | Feb 23, 2012 - EA assessment result (IE ANZSCO 233511)
May 8, 2012 - Lodged GSM 175 online application | June 4, 2012 - CO Allocated
June 22, 2012 - Medicals Finalized | Aug 30, 2012 - PCCs Completed (PH, UAE, USA)
Sep 3, 2012 - Visa Granted (IED Jun 11, 2013) Thank You Lord!
Oct 16-28, 2012 - Initial Entry Completed - Sydney
July 28, 2013 - Final move to Perth
Sep 9, 2013 - Started work with the same company i worked for in UAE/USA
Oct 28, 2013 - Moved to another company..
The longest running Pinoy-Australian Forum site in the history. We are connecting Pinoys "in" and "to" Australia since 2010! If you want to join in, click one of these buttons!
Comments
Posts: 178Member
Joined: Apr 22, 2012
Kaya, kailangan po talaga mag-IELTS muna bago magpa-assess sa EA.
25 Jul 2011 - Applied For Skills Assessment, Engineers Australia
23 Sep 2011 - Skills Assessment Received, ANZCO Code: 233211 (Civil Engineer)
10 Mar 2012 - IELTS Exam
24 Mar 2012 - IELTS Result L-8.5; R,W,S -7
26 Apr 2012 - 175 Application lodged....
24 May 2012 - "Application Being Processed Further"
10 Jun 2012 - Applied for NBI / Dubai Police Clearance
12 Jun 2012 - Dubai Police Clearance Received
15 Jun 2012 - CO Allocated
25 Jun 2012 - Medicals
27 Jun 2012 - Medicals Finalised
30 Jun 2012 - PCCs Uploaded
02 July 2012 - Visa Grant
14-26 Mar 2013 - Initial Entry - Melbourne
30 August 2014 - Big Move
08 Sep 2014 - First day of work
Posts: 28Member
Joined: Dec 15, 2012
Posts: 314Member
Joined: Mar 22, 2012
Occupation: Industrial Engineer
11/05/2011 - IELTS exam at BC (L-6.5,R-6,W-6.5,S-6.5)
02/06/2012 - EA received my CDR
04/17/2012 - Received Favorable Letter from EA
04/21/2012 - IELTS exam retake at IDP (L-8, R-6, W-6.5, S-6)
07/03/2012 - Applied online for SA Statesponsorship
08/13/2012 - SA SS approved
08/16/2012 - Received an invitation in skill select
09/11/2012 - Lodge a visa subclass 190
09/13/2012 - Acknowledgement Receipt & Medicals Requested
09/19/2012 - Medicals Done
12/11/2012 - Medicals Finalised
12/14/2012 - Visa Grant
03/18/2013 - Flight to Adelaide
04/22/2013 - Got my first Job
Posts: 258Member
Joined: May 24, 2012
April 24, 2011 - Submitted CDR to EA
May 6, 2011 - IELTS BC OBS 7.0
August 25, 2011 - Received positive assessment from EA
February 22, 2012 - Resat IELTS IDP OBS 7.5
April 13, 2012 - Applied SS SA
May 1, 2012 - Received positive response from SA
May 10, 2012 - Pre-lodgement to DIAC
May 31, 2012 - Lodgement to DIAC
May 31, 2012 - South Australia sent form 1100 to DIAC
June 4, 2012 - application being processed further...
June 4, 2012 - C.O. allocated
June 4, 2012 - request for PCC and medicals
June 6, 2012 - Medicals done
June 7, 2012 - NBI
June 8, 2012 - further medical results received
June 27, 2012 - All medicals finalised
July 2, 2012 - Visa Grant
Posts: 692Member
Joined: Jul 18, 2012
October 6, 2012 - Passed IELTS - Academic (W 6 S 6 L 8 R 7 OBS 7.0) pwde na yan!
October 16, 2012 - Submitted CDR to EA
February 27, 2013 - Received Favorable letter from EA (Mechanical Engineer - ANZSCO 233512) Thank you Lord!
March 8, 2013 - Applied WA SS
March 25, 2013 - Received Letter for WA SS (delaying/maximising 28 days; waiting for civil wedding)
May 31, 2013 - Submitted Visa Application (with everything; PCC Saudi, NBI, Marriage certificate, etc)
July 11, 2013 - CO Assigned / Team 7 Adelaide
August 17, 2013 - Done with the Medicals
September 4, 2013 - Visa Grant (Subclass 190 / ANZCO233515 - Mechanical Engineer) Thank you Lord! / IED August 23, 2014
August 8, 2014 - Flight to Oz, No turning Back, This is it!
May 2015 - End of relationship
June 2015 - Wife found new partner (aussie)
October 2015 - Wife filed for divorce (That cunt)
January 2016 - Divorced
August 2018 - Lodged Citizenship
March 2019 - Sit in Citizenship Exam/Interview
May 2019 - Citizenship Ceremony
June 2019 - Au Passport received
Posts: 8Member
Joined: Jun 25, 2012
Just wanted some advice regarding engineering practices and standards in Australia.
Student po ako, will take my masters in mechanical engineering which will start on February. Just wanted to know any website I could read through, to know more what I will be needing to get into the industry or may be a way to make myself more employable after graduation.
It's quite a risk for me to come here since I have no work experience yet from the Philippines as an engineer. So kailangan ko na mag start to get an edge even before school starts.
Aside from AutoCad, are there other softwares that are commonly used by engineering companies in Australia? I did a bit of research and found out about PDMS and PDS, ano ang madalas gamitin here sa oz? Mas maganda siguro maaga ko na sila aralin para advantage later on.
Also, any suggestions of a part time job for an engineering student that could be used for employment later on? Will I be able to get a trades assistant job or do you need to be licensed here or something to do engineering related work?
I hope someone can help me out. Any suggestions will be much appreciated!
Subclass 573 - Darwin NT
March 10, 2012 - Took IELTS Exam
March 23, 2012 - Got IELTS results Overall band of 7.5
April 17,2012 - Submitted application to Charles Darwin University
May 3, 2012 - Received letter of offer from CDU
June 14, 2012 - Payment of tuition to CDU
June 15, 2012 - COE received from CDU
June 21, 2012 - Visa Application thru IDP
June 26, 2012 - Notice for Medical Examination
June 27, 2012 - Medicals @ Nationwide Makati
July 9, 2012 - Medical Examination results forwarded to Australian Embassy
July 11, 2012 - Additional Documents requested for medical eligibility
July 13, 2012 - Hoping to submit additional documents
July 20, 2012 - documents submitted
Nov 20, 2012 - visa granted!
Dec 8, 2012 - touchdown Darwin, Australia!!!!!
Posts: 5,037Member, De-activated
Joined: Feb 23, 2012
i think baka they mean 6.5 if you want to get SS for some states..
Sep 24, 2011 - IELTS (L-8 R-8 W-8 S-7.5 : OBS-8)
Jan 04, 2012 - EA application submitted | Feb 23, 2012 - EA assessment result (IE ANZSCO 233511)
May 8, 2012 - Lodged GSM 175 online application | June 4, 2012 - CO Allocated
June 22, 2012 - Medicals Finalized | Aug 30, 2012 - PCCs Completed (PH, UAE, USA)
Sep 3, 2012 - Visa Granted (IED Jun 11, 2013) Thank You Lord!
Oct 16-28, 2012 - Initial Entry Completed - Sydney
July 28, 2013 - Final move to Perth
Sep 9, 2013 - Started work with the same company i worked for in UAE/USA
Oct 28, 2013 - Moved to another company..
Posts: 692Member
Joined: Jul 18, 2012
October 6, 2012 - Passed IELTS - Academic (W 6 S 6 L 8 R 7 OBS 7.0) pwde na yan!
October 16, 2012 - Submitted CDR to EA
February 27, 2013 - Received Favorable letter from EA (Mechanical Engineer - ANZSCO 233512) Thank you Lord!
March 8, 2013 - Applied WA SS
March 25, 2013 - Received Letter for WA SS (delaying/maximising 28 days; waiting for civil wedding)
May 31, 2013 - Submitted Visa Application (with everything; PCC Saudi, NBI, Marriage certificate, etc)
July 11, 2013 - CO Assigned / Team 7 Adelaide
August 17, 2013 - Done with the Medicals
September 4, 2013 - Visa Grant (Subclass 190 / ANZCO233515 - Mechanical Engineer) Thank you Lord! / IED August 23, 2014
August 8, 2014 - Flight to Oz, No turning Back, This is it!
May 2015 - End of relationship
June 2015 - Wife found new partner (aussie)
October 2015 - Wife filed for divorce (That cunt)
January 2016 - Divorced
August 2018 - Lodged Citizenship
March 2019 - Sit in Citizenship Exam/Interview
May 2019 - Citizenship Ceremony
June 2019 - Au Passport received
Posts: 5,037Member, De-activated
Joined: Feb 23, 2012
but if you are applying for SS Visa 190, you need to check requirements ng specific state for Engineers..
Sep 24, 2011 - IELTS (L-8 R-8 W-8 S-7.5 : OBS-8)
Jan 04, 2012 - EA application submitted | Feb 23, 2012 - EA assessment result (IE ANZSCO 233511)
May 8, 2012 - Lodged GSM 175 online application | June 4, 2012 - CO Allocated
June 22, 2012 - Medicals Finalized | Aug 30, 2012 - PCCs Completed (PH, UAE, USA)
Sep 3, 2012 - Visa Granted (IED Jun 11, 2013) Thank You Lord!
Oct 16-28, 2012 - Initial Entry Completed - Sydney
July 28, 2013 - Final move to Perth
Sep 9, 2013 - Started work with the same company i worked for in UAE/USA
Oct 28, 2013 - Moved to another company..
Posts: 692Member
Joined: Jul 18, 2012
October 6, 2012 - Passed IELTS - Academic (W 6 S 6 L 8 R 7 OBS 7.0) pwde na yan!
October 16, 2012 - Submitted CDR to EA
February 27, 2013 - Received Favorable letter from EA (Mechanical Engineer - ANZSCO 233512) Thank you Lord!
March 8, 2013 - Applied WA SS
March 25, 2013 - Received Letter for WA SS (delaying/maximising 28 days; waiting for civil wedding)
May 31, 2013 - Submitted Visa Application (with everything; PCC Saudi, NBI, Marriage certificate, etc)
July 11, 2013 - CO Assigned / Team 7 Adelaide
August 17, 2013 - Done with the Medicals
September 4, 2013 - Visa Grant (Subclass 190 / ANZCO233515 - Mechanical Engineer) Thank you Lord! / IED August 23, 2014
August 8, 2014 - Flight to Oz, No turning Back, This is it!
May 2015 - End of relationship
June 2015 - Wife found new partner (aussie)
October 2015 - Wife filed for divorce (That cunt)
January 2016 - Divorced
August 2018 - Lodged Citizenship
March 2019 - Sit in Citizenship Exam/Interview
May 2019 - Citizenship Ceremony
June 2019 - Au Passport received
Posts: 28Member
Joined: Dec 15, 2012
Posts: 692Member
Joined: Jul 18, 2012
October 6, 2012 - Passed IELTS - Academic (W 6 S 6 L 8 R 7 OBS 7.0) pwde na yan!
October 16, 2012 - Submitted CDR to EA
February 27, 2013 - Received Favorable letter from EA (Mechanical Engineer - ANZSCO 233512) Thank you Lord!
March 8, 2013 - Applied WA SS
March 25, 2013 - Received Letter for WA SS (delaying/maximising 28 days; waiting for civil wedding)
May 31, 2013 - Submitted Visa Application (with everything; PCC Saudi, NBI, Marriage certificate, etc)
July 11, 2013 - CO Assigned / Team 7 Adelaide
August 17, 2013 - Done with the Medicals
September 4, 2013 - Visa Grant (Subclass 190 / ANZCO233515 - Mechanical Engineer) Thank you Lord! / IED August 23, 2014
August 8, 2014 - Flight to Oz, No turning Back, This is it!
May 2015 - End of relationship
June 2015 - Wife found new partner (aussie)
October 2015 - Wife filed for divorce (That cunt)
January 2016 - Divorced
August 2018 - Lodged Citizenship
March 2019 - Sit in Citizenship Exam/Interview
May 2019 - Citizenship Ceremony
June 2019 - Au Passport received
Posts: 692Member
Joined: Jul 18, 2012
I mean e kung pwede bang yung friend ko na lang ang kukuha ng Saudi Police Clearance on my behalf?! :-)
October 6, 2012 - Passed IELTS - Academic (W 6 S 6 L 8 R 7 OBS 7.0) pwde na yan!
October 16, 2012 - Submitted CDR to EA
February 27, 2013 - Received Favorable letter from EA (Mechanical Engineer - ANZSCO 233512) Thank you Lord!
March 8, 2013 - Applied WA SS
March 25, 2013 - Received Letter for WA SS (delaying/maximising 28 days; waiting for civil wedding)
May 31, 2013 - Submitted Visa Application (with everything; PCC Saudi, NBI, Marriage certificate, etc)
July 11, 2013 - CO Assigned / Team 7 Adelaide
August 17, 2013 - Done with the Medicals
September 4, 2013 - Visa Grant (Subclass 190 / ANZCO233515 - Mechanical Engineer) Thank you Lord! / IED August 23, 2014
August 8, 2014 - Flight to Oz, No turning Back, This is it!
May 2015 - End of relationship
June 2015 - Wife found new partner (aussie)
October 2015 - Wife filed for divorce (That cunt)
January 2016 - Divorced
August 2018 - Lodged Citizenship
March 2019 - Sit in Citizenship Exam/Interview
May 2019 - Citizenship Ceremony
June 2019 - Au Passport received
Posts: 5,037Member, De-activated
Joined: Feb 23, 2012
Sep 24, 2011 - IELTS (L-8 R-8 W-8 S-7.5 : OBS-8)
Jan 04, 2012 - EA application submitted | Feb 23, 2012 - EA assessment result (IE ANZSCO 233511)
May 8, 2012 - Lodged GSM 175 online application | June 4, 2012 - CO Allocated
June 22, 2012 - Medicals Finalized | Aug 30, 2012 - PCCs Completed (PH, UAE, USA)
Sep 3, 2012 - Visa Granted (IED Jun 11, 2013) Thank You Lord!
Oct 16-28, 2012 - Initial Entry Completed - Sydney
July 28, 2013 - Final move to Perth
Sep 9, 2013 - Started work with the same company i worked for in UAE/USA
Oct 28, 2013 - Moved to another company..
Posts: 5,037Member, De-activated
Joined: Feb 23, 2012
pero parang sa phil embassy pa nila pinadaan, kaya sobrang tagal inabot ng ilang months..
Hopefully sumagot ung may alam...si @faye yata..
Sep 24, 2011 - IELTS (L-8 R-8 W-8 S-7.5 : OBS-8)
Jan 04, 2012 - EA application submitted | Feb 23, 2012 - EA assessment result (IE ANZSCO 233511)
May 8, 2012 - Lodged GSM 175 online application | June 4, 2012 - CO Allocated
June 22, 2012 - Medicals Finalized | Aug 30, 2012 - PCCs Completed (PH, UAE, USA)
Sep 3, 2012 - Visa Granted (IED Jun 11, 2013) Thank You Lord!
Oct 16-28, 2012 - Initial Entry Completed - Sydney
July 28, 2013 - Final move to Perth
Sep 9, 2013 - Started work with the same company i worked for in UAE/USA
Oct 28, 2013 - Moved to another company..
Posts: 770Member
Joined: Apr 04, 2012
Skilled – Family Sponsored (Migrant) Visa (Subclass 176)
Nominated Occupation: CHEMIST 2111-11
11/MAY/2011 - IELTS Exam
20/JUNE/2011 - Lodged Online Visa Application
15/FEB/2012 - CO Allocation
26/JUNE/2012 - VISA GRANTED! Thank you Lord!
11/APR/2013 - Initial Entry Date Deadline
10/MAR/2013 - Arrived in Sydney
Posts: 258Member
Joined: May 24, 2012
April 24, 2011 - Submitted CDR to EA
May 6, 2011 - IELTS BC OBS 7.0
August 25, 2011 - Received positive assessment from EA
February 22, 2012 - Resat IELTS IDP OBS 7.5
April 13, 2012 - Applied SS SA
May 1, 2012 - Received positive response from SA
May 10, 2012 - Pre-lodgement to DIAC
May 31, 2012 - Lodgement to DIAC
May 31, 2012 - South Australia sent form 1100 to DIAC
June 4, 2012 - application being processed further...
June 4, 2012 - C.O. allocated
June 4, 2012 - request for PCC and medicals
June 6, 2012 - Medicals done
June 7, 2012 - NBI
June 8, 2012 - further medical results received
June 27, 2012 - All medicals finalised
July 2, 2012 - Visa Grant
Posts: 692Member
Joined: Jul 18, 2012
October 6, 2012 - Passed IELTS - Academic (W 6 S 6 L 8 R 7 OBS 7.0) pwde na yan!
October 16, 2012 - Submitted CDR to EA
February 27, 2013 - Received Favorable letter from EA (Mechanical Engineer - ANZSCO 233512) Thank you Lord!
March 8, 2013 - Applied WA SS
March 25, 2013 - Received Letter for WA SS (delaying/maximising 28 days; waiting for civil wedding)
May 31, 2013 - Submitted Visa Application (with everything; PCC Saudi, NBI, Marriage certificate, etc)
July 11, 2013 - CO Assigned / Team 7 Adelaide
August 17, 2013 - Done with the Medicals
September 4, 2013 - Visa Grant (Subclass 190 / ANZCO233515 - Mechanical Engineer) Thank you Lord! / IED August 23, 2014
August 8, 2014 - Flight to Oz, No turning Back, This is it!
May 2015 - End of relationship
June 2015 - Wife found new partner (aussie)
October 2015 - Wife filed for divorce (That cunt)
January 2016 - Divorced
August 2018 - Lodged Citizenship
March 2019 - Sit in Citizenship Exam/Interview
May 2019 - Citizenship Ceremony
June 2019 - Au Passport received
Posts: 692Member
Joined: Jul 18, 2012
October 6, 2012 - Passed IELTS - Academic (W 6 S 6 L 8 R 7 OBS 7.0) pwde na yan!
October 16, 2012 - Submitted CDR to EA
February 27, 2013 - Received Favorable letter from EA (Mechanical Engineer - ANZSCO 233512) Thank you Lord!
March 8, 2013 - Applied WA SS
March 25, 2013 - Received Letter for WA SS (delaying/maximising 28 days; waiting for civil wedding)
May 31, 2013 - Submitted Visa Application (with everything; PCC Saudi, NBI, Marriage certificate, etc)
July 11, 2013 - CO Assigned / Team 7 Adelaide
August 17, 2013 - Done with the Medicals
September 4, 2013 - Visa Grant (Subclass 190 / ANZCO233515 - Mechanical Engineer) Thank you Lord! / IED August 23, 2014
August 8, 2014 - Flight to Oz, No turning Back, This is it!
May 2015 - End of relationship
June 2015 - Wife found new partner (aussie)
October 2015 - Wife filed for divorce (That cunt)
January 2016 - Divorced
August 2018 - Lodged Citizenship
March 2019 - Sit in Citizenship Exam/Interview
May 2019 - Citizenship Ceremony
June 2019 - Au Passport received
Posts: 258Member
Joined: May 24, 2012
April 24, 2011 - Submitted CDR to EA
May 6, 2011 - IELTS BC OBS 7.0
August 25, 2011 - Received positive assessment from EA
February 22, 2012 - Resat IELTS IDP OBS 7.5
April 13, 2012 - Applied SS SA
May 1, 2012 - Received positive response from SA
May 10, 2012 - Pre-lodgement to DIAC
May 31, 2012 - Lodgement to DIAC
May 31, 2012 - South Australia sent form 1100 to DIAC
June 4, 2012 - application being processed further...
June 4, 2012 - C.O. allocated
June 4, 2012 - request for PCC and medicals
June 6, 2012 - Medicals done
June 7, 2012 - NBI
June 8, 2012 - further medical results received
June 27, 2012 - All medicals finalised
July 2, 2012 - Visa Grant
Posts: 692Member
Joined: Jul 18, 2012
October 6, 2012 - Passed IELTS - Academic (W 6 S 6 L 8 R 7 OBS 7.0) pwde na yan!
October 16, 2012 - Submitted CDR to EA
February 27, 2013 - Received Favorable letter from EA (Mechanical Engineer - ANZSCO 233512) Thank you Lord!
March 8, 2013 - Applied WA SS
March 25, 2013 - Received Letter for WA SS (delaying/maximising 28 days; waiting for civil wedding)
May 31, 2013 - Submitted Visa Application (with everything; PCC Saudi, NBI, Marriage certificate, etc)
July 11, 2013 - CO Assigned / Team 7 Adelaide
August 17, 2013 - Done with the Medicals
September 4, 2013 - Visa Grant (Subclass 190 / ANZCO233515 - Mechanical Engineer) Thank you Lord! / IED August 23, 2014
August 8, 2014 - Flight to Oz, No turning Back, This is it!
May 2015 - End of relationship
June 2015 - Wife found new partner (aussie)
October 2015 - Wife filed for divorce (That cunt)
January 2016 - Divorced
August 2018 - Lodged Citizenship
March 2019 - Sit in Citizenship Exam/Interview
May 2019 - Citizenship Ceremony
June 2019 - Au Passport received
Posts: 692Member
Joined: Jul 18, 2012
October 6, 2012 - Passed IELTS - Academic (W 6 S 6 L 8 R 7 OBS 7.0) pwde na yan!
October 16, 2012 - Submitted CDR to EA
February 27, 2013 - Received Favorable letter from EA (Mechanical Engineer - ANZSCO 233512) Thank you Lord!
March 8, 2013 - Applied WA SS
March 25, 2013 - Received Letter for WA SS (delaying/maximising 28 days; waiting for civil wedding)
May 31, 2013 - Submitted Visa Application (with everything; PCC Saudi, NBI, Marriage certificate, etc)
July 11, 2013 - CO Assigned / Team 7 Adelaide
August 17, 2013 - Done with the Medicals
September 4, 2013 - Visa Grant (Subclass 190 / ANZCO233515 - Mechanical Engineer) Thank you Lord! / IED August 23, 2014
August 8, 2014 - Flight to Oz, No turning Back, This is it!
May 2015 - End of relationship
June 2015 - Wife found new partner (aussie)
October 2015 - Wife filed for divorce (That cunt)
January 2016 - Divorced
August 2018 - Lodged Citizenship
March 2019 - Sit in Citizenship Exam/Interview
May 2019 - Citizenship Ceremony
June 2019 - Au Passport received
Posts: 3Member
Joined: Apr 26, 2012
This is only my second time to post here, actually, pero nadagdagan pa rin ata pagkalito ko. Our initial plan was to have my husband (ME) apply as principal, ni-ready na rin namin papers nya for EA assessment kaso we're having problems with regards to his CDR kasi nga he's with the government now and you know how it is, iba ang job title nya from his job description so what to do? Baka kasi matechnical sya? This has been his only job ever since so ano ilalagay namin sa CDR nya? Mechanical engineer sya pero iba ang job title and then buildings inspection ginagawa nya. Ngayon, dumating ang cousin namin from OZ and said na ako na lang daw ang mag principal, office manager (another thread naman ito, with VETASSESS). Nalilito na ako. Please help :-) thanks a lot!!!
Posts: 692Member
Joined: Jul 18, 2012
okay rin naman kung ikaw ang primary applicant, basta pasok sa points system at pasok sa SOL nila... :-)
October 6, 2012 - Passed IELTS - Academic (W 6 S 6 L 8 R 7 OBS 7.0) pwde na yan!
October 16, 2012 - Submitted CDR to EA
February 27, 2013 - Received Favorable letter from EA (Mechanical Engineer - ANZSCO 233512) Thank you Lord!
March 8, 2013 - Applied WA SS
March 25, 2013 - Received Letter for WA SS (delaying/maximising 28 days; waiting for civil wedding)
May 31, 2013 - Submitted Visa Application (with everything; PCC Saudi, NBI, Marriage certificate, etc)
July 11, 2013 - CO Assigned / Team 7 Adelaide
August 17, 2013 - Done with the Medicals
September 4, 2013 - Visa Grant (Subclass 190 / ANZCO233515 - Mechanical Engineer) Thank you Lord! / IED August 23, 2014
August 8, 2014 - Flight to Oz, No turning Back, This is it!
May 2015 - End of relationship
June 2015 - Wife found new partner (aussie)
October 2015 - Wife filed for divorce (That cunt)
January 2016 - Divorced
August 2018 - Lodged Citizenship
March 2019 - Sit in Citizenship Exam/Interview
May 2019 - Citizenship Ceremony
June 2019 - Au Passport received
Posts: 90Member
Joined: Oct 21, 2012
Posts: 770Member
Joined: Apr 04, 2012
Skilled – Family Sponsored (Migrant) Visa (Subclass 176)
Nominated Occupation: CHEMIST 2111-11
11/MAY/2011 - IELTS Exam
20/JUNE/2011 - Lodged Online Visa Application
15/FEB/2012 - CO Allocation
26/JUNE/2012 - VISA GRANTED! Thank you Lord!
11/APR/2013 - Initial Entry Date Deadline
10/MAR/2013 - Arrived in Sydney
Posts: 692Member
Joined: Jul 18, 2012
kung halimbawa e ang PCC ko is March 2013 then ang medical ko is, let say, June 2013...and hopefully visa grant no later than December 2013...kailan ang IED ko?! :-)
October 6, 2012 - Passed IELTS - Academic (W 6 S 6 L 8 R 7 OBS 7.0) pwde na yan!
October 16, 2012 - Submitted CDR to EA
February 27, 2013 - Received Favorable letter from EA (Mechanical Engineer - ANZSCO 233512) Thank you Lord!
March 8, 2013 - Applied WA SS
March 25, 2013 - Received Letter for WA SS (delaying/maximising 28 days; waiting for civil wedding)
May 31, 2013 - Submitted Visa Application (with everything; PCC Saudi, NBI, Marriage certificate, etc)
July 11, 2013 - CO Assigned / Team 7 Adelaide
August 17, 2013 - Done with the Medicals
September 4, 2013 - Visa Grant (Subclass 190 / ANZCO233515 - Mechanical Engineer) Thank you Lord! / IED August 23, 2014
August 8, 2014 - Flight to Oz, No turning Back, This is it!
May 2015 - End of relationship
June 2015 - Wife found new partner (aussie)
October 2015 - Wife filed for divorce (That cunt)
January 2016 - Divorced
August 2018 - Lodged Citizenship
March 2019 - Sit in Citizenship Exam/Interview
May 2019 - Citizenship Ceremony
June 2019 - Au Passport received
Posts: 5,037Member, De-activated
Joined: Feb 23, 2012
Kung nasa Saudi ka, ang magdictate ng IED mo eh ung Saudi PCC date..
Kung nasa Pinas ka na, it will be the NBI date...
or
the medical date expiration date, whichever is earlier..
Sep 24, 2011 - IELTS (L-8 R-8 W-8 S-7.5 : OBS-8)
Jan 04, 2012 - EA application submitted | Feb 23, 2012 - EA assessment result (IE ANZSCO 233511)
May 8, 2012 - Lodged GSM 175 online application | June 4, 2012 - CO Allocated
June 22, 2012 - Medicals Finalized | Aug 30, 2012 - PCCs Completed (PH, UAE, USA)
Sep 3, 2012 - Visa Granted (IED Jun 11, 2013) Thank You Lord!
Oct 16-28, 2012 - Initial Entry Completed - Sydney
July 28, 2013 - Final move to Perth
Sep 9, 2013 - Started work with the same company i worked for in UAE/USA
Oct 28, 2013 - Moved to another company..
Posts: 692Member
Joined: Jul 18, 2012
so, if ever hinde pa kame nagaapply for visa at nasa pinas na ako while applying for visa, ang NBI na lang ang pagbabasehan ng IED?! right?! :-)
sensya na po sa kakulitan... :-)
October 6, 2012 - Passed IELTS - Academic (W 6 S 6 L 8 R 7 OBS 7.0) pwde na yan!
October 16, 2012 - Submitted CDR to EA
February 27, 2013 - Received Favorable letter from EA (Mechanical Engineer - ANZSCO 233512) Thank you Lord!
March 8, 2013 - Applied WA SS
March 25, 2013 - Received Letter for WA SS (delaying/maximising 28 days; waiting for civil wedding)
May 31, 2013 - Submitted Visa Application (with everything; PCC Saudi, NBI, Marriage certificate, etc)
July 11, 2013 - CO Assigned / Team 7 Adelaide
August 17, 2013 - Done with the Medicals
September 4, 2013 - Visa Grant (Subclass 190 / ANZCO233515 - Mechanical Engineer) Thank you Lord! / IED August 23, 2014
August 8, 2014 - Flight to Oz, No turning Back, This is it!
May 2015 - End of relationship
June 2015 - Wife found new partner (aussie)
October 2015 - Wife filed for divorce (That cunt)
January 2016 - Divorced
August 2018 - Lodged Citizenship
March 2019 - Sit in Citizenship Exam/Interview
May 2019 - Citizenship Ceremony
June 2019 - Au Passport received
Posts: 5,037Member, De-activated
Joined: Feb 23, 2012
walang anuman.. ang mabuti eh nagkakaintindihan sa mga paliwanagan..
heheh...
Sep 24, 2011 - IELTS (L-8 R-8 W-8 S-7.5 : OBS-8)
Jan 04, 2012 - EA application submitted | Feb 23, 2012 - EA assessment result (IE ANZSCO 233511)
May 8, 2012 - Lodged GSM 175 online application | June 4, 2012 - CO Allocated
June 22, 2012 - Medicals Finalized | Aug 30, 2012 - PCCs Completed (PH, UAE, USA)
Sep 3, 2012 - Visa Granted (IED Jun 11, 2013) Thank You Lord!
Oct 16-28, 2012 - Initial Entry Completed - Sydney
July 28, 2013 - Final move to Perth
Sep 9, 2013 - Started work with the same company i worked for in UAE/USA
Oct 28, 2013 - Moved to another company..