    Gt lang pwede na

    ANZSCO 221214 - Internal Auditor
    19 Jan 13 - Academic IELTS Results - passed
    12 July 13 - Vetassess Assessment + Point Test Advice: Positive
    03 Nov 13 - Invitation Accepted 70 points
    19 Dec 13 - Lodged Visa 189
    07 Feb 14 - Visa Granted
    04 Aug 14 - Initial Entry Date requirement
    26 July 14 - Actual IED to Melbourne
    May 2015 - Big Move
    June 2015 - Got a permanent role in Melbourne
    Apr 2016 - Got a contract consultancy role in Melbourne
    May 2016 - Got permanent role and moved to Toowooba, Queensland

    And now...... living the life that i have imagined

    "A great photograph is one that fully expresses what one feels, in the deepest sense, about what is being photographed" - Ansel Adams

  • rachelle_gan2rachelle_gan2 Sydney
    Posts: 326Member
    Joined: Jun 12, 2013
    @vhoythoy

    Sir, nasubabayan ko po ung story mo about vetassess, ask ko lang po if my result na ung sau?

    Construction Project Manager 13311 (Hubby main applicant) 60 points, Visa 189
    17 Jul 13 : Positive skills assessment
    26 Jul 13 : Submitted EOI
    19 Aug 13 : Invitation to lodge visa 189 ( 60 points)
    23 Aug 13 : Lodge Visa
    30 Aug 13 : Medical ( Sata AMK), wife, 5 yrs old, 1 yr
    6 Sept 13 : Medical uploaded (No health examination required)
    30 Sept 13 : SG PCC application
    22 Oct 13 : SG PCC uploaded

    DIRECT GRANT: 30 Oct 2013 (GSM Brisbane T34)

    ---- Thank you God for this wonderful blessing ----

  • rachelle_gan2rachelle_gan2 Sydney
    Posts: 326Member
    Joined: Jun 12, 2013
    Hubby is the Main Applicant.

    Construction Project Manager

    April 29 2013 - Vetassess lodged online
    May 06 2013- Vetassess confirmed that they received the docs.

    So now 9 weeks na, waiting parin.. Tlaga bang 12 weeks cla nag bibigay ng result. Til now kasi quite lang cla.. wala pang hinihingi na additional docs.

    Construction Project Manager 13311 (Hubby main applicant) 60 points, Visa 189
    17 Jul 13 : Positive skills assessment
    26 Jul 13 : Submitted EOI
    19 Aug 13 : Invitation to lodge visa 189 ( 60 points)
    23 Aug 13 : Lodge Visa
    30 Aug 13 : Medical ( Sata AMK), wife, 5 yrs old, 1 yr
    6 Sept 13 : Medical uploaded (No health examination required)
    30 Sept 13 : SG PCC application
    22 Oct 13 : SG PCC uploaded

    DIRECT GRANT: 30 Oct 2013 (GSM Brisbane T34)

    ---- Thank you God for this wonderful blessing ----

  • vhoythoyvhoythoy Melbourne
    Posts: 1,550Member, Moderator
    Joined: Oct 31, 2012
    @vhoythoy

    Sir, nasubabayan ko po ung story mo about vetassess, ask ko lang po if my result na ung sau?
    Baka next week. Kakasubmit ko lang payslip ko sa dati kong company sa pinas today. Need nila yun for point test advice daw pero tapos na yata assessment. 8 years kasi claim ko. Buti nlang supportive at organised yun. Musta application m sa vetasses?

    ANZSCO 221214 - Internal Auditor
    19 Jan 13 - Academic IELTS Results - passed
    12 July 13 - Vetassess Assessment + Point Test Advice: Positive
    03 Nov 13 - Invitation Accepted 70 points
    19 Dec 13 - Lodged Visa 189
    07 Feb 14 - Visa Granted
    04 Aug 14 - Initial Entry Date requirement
    26 July 14 - Actual IED to Melbourne
    May 2015 - Big Move
    June 2015 - Got a permanent role in Melbourne
    Apr 2016 - Got a contract consultancy role in Melbourne
    May 2016 - Got permanent role and moved to Toowooba, Queensland

    And now...... living the life that i have imagined

    "A great photograph is one that fully expresses what one feels, in the deepest sense, about what is being photographed" - Ansel Adams

  • rachelle_gan2rachelle_gan2 Sydney
    Posts: 326Member
    Joined: Jun 12, 2013
    @vhoythoy So far, wala pa clang feedback at wala paring hinihingi na additional docs. As in waiting lang talaga.. Hopefully bago mag 12 weeks mag bibigay na cla ng POSITIVE RESULT.

    Ung agent namin d na cla ng hingi ng point test advise. As in 1 yr lang binigay nila sa VET. sabi nila still up to DIAC parin naman ung decision.

    Nag hire ako ng agent dto sa SG.. we are claiming for 60 points. sakto lang para sa 189. sana makuha na ung +result sa vet para maka pag EOI na..

    Sir, nasa pinas po ba kau nag process? walang agent?

    Construction Project Manager 13311 (Hubby main applicant) 60 points, Visa 189
    17 Jul 13 : Positive skills assessment
    26 Jul 13 : Submitted EOI
    19 Aug 13 : Invitation to lodge visa 189 ( 60 points)
    23 Aug 13 : Lodge Visa
    30 Aug 13 : Medical ( Sata AMK), wife, 5 yrs old, 1 yr
    6 Sept 13 : Medical uploaded (No health examination required)
    30 Sept 13 : SG PCC application
    22 Oct 13 : SG PCC uploaded

    DIRECT GRANT: 30 Oct 2013 (GSM Brisbane T34)

    ---- Thank you God for this wonderful blessing ----

  • vhoythoyvhoythoy Melbourne
    Posts: 1,550Member, Moderator
    Joined: Oct 31, 2012
    Sa sg ako nagprocess walang agent. Expecting 70 points. 10 weeks pa yata nila start asikasuhin docs mo. Sa akin 11th weeks na nagpramdam. Ika 12 weeks na ngaun going 13. Isasagad tlaga nila hanggat maari hehe

    ANZSCO 221214 - Internal Auditor
    19 Jan 13 - Academic IELTS Results - passed
    12 July 13 - Vetassess Assessment + Point Test Advice: Positive
    03 Nov 13 - Invitation Accepted 70 points
    19 Dec 13 - Lodged Visa 189
    07 Feb 14 - Visa Granted
    04 Aug 14 - Initial Entry Date requirement
    26 July 14 - Actual IED to Melbourne
    May 2015 - Big Move
    June 2015 - Got a permanent role in Melbourne
    Apr 2016 - Got a contract consultancy role in Melbourne
    May 2016 - Got permanent role and moved to Toowooba, Queensland

    And now...... living the life that i have imagined

    "A great photograph is one that fully expresses what one feels, in the deepest sense, about what is being photographed" - Ansel Adams

  • StraderStrader Philippines
    Posts: 1,004Member
    Joined: Jan 04, 2013
    Internal and external auditor ay nasa CSOL na ngayon.. meaning u need to apply state sponsorship.. ^^ correct me if im wrong guys.

    Feb. 9, 2017- SS SA application submitted
    Mar. 2, 2017- SS approval (ITA received)
    Mar. 31, 2017- Medical @ nationwide cebu
    Apr. 11- medical cleared (son)
    Apr. 12- Medical cleared (me and my spouse)
    Apr. 14- Visa Lodge
    Apr. 24- CO contact asking for certified copy of passport for my son and my evidence of overseas study. CO Ruth
    Same day - complied all requested docs.
    June 9, 2017- 2nd CO contact- no docs requested (automated email for the delay of visa grant)
    September 13, 2017 - VISA GRANT!!!! CO Ruth- team adelaide
    BM - November 2017
    TYL

  • StraderStrader Philippines
    Posts: 1,004Member
    Joined: Jan 04, 2013
    @vhoythoy malapit na yan..pagnatanggap na nila payslip mo may result na yan. ^^

    Feb. 9, 2017- SS SA application submitted
    Mar. 2, 2017- SS approval (ITA received)
    Mar. 31, 2017- Medical @ nationwide cebu
    Apr. 11- medical cleared (son)
    Apr. 12- Medical cleared (me and my spouse)
    Apr. 14- Visa Lodge
    Apr. 24- CO contact asking for certified copy of passport for my son and my evidence of overseas study. CO Ruth
    Same day - complied all requested docs.
    June 9, 2017- 2nd CO contact- no docs requested (automated email for the delay of visa grant)
    September 13, 2017 - VISA GRANT!!!! CO Ruth- team adelaide
    BM - November 2017
    TYL

  • vhoythoyvhoythoy Melbourne
    Posts: 1,550Member, Moderator
    Joined: Oct 31, 2012
    edited July 2013
    Alam ko nsa sol parin internal auditor. Check ko nga mabuti. May link ka ba, mukhang kinabahan ako tuloy

    ANZSCO 221214 - Internal Auditor
    19 Jan 13 - Academic IELTS Results - passed
    12 July 13 - Vetassess Assessment + Point Test Advice: Positive
    03 Nov 13 - Invitation Accepted 70 points
    19 Dec 13 - Lodged Visa 189
    07 Feb 14 - Visa Granted
    04 Aug 14 - Initial Entry Date requirement
    26 July 14 - Actual IED to Melbourne
    May 2015 - Big Move
    June 2015 - Got a permanent role in Melbourne
    Apr 2016 - Got a contract consultancy role in Melbourne
    May 2016 - Got permanent role and moved to Toowooba, Queensland

    And now...... living the life that i have imagined

    "A great photograph is one that fully expresses what one feels, in the deepest sense, about what is being photographed" - Ansel Adams

  • vhoythoyvhoythoy Melbourne
    Posts: 1,550Member, Moderator
    Joined: Oct 31, 2012
    edited July 2013
    Nsa sol list p rin sya july 2013 pati external audit

    ANZSCO 221214 - Internal Auditor
    19 Jan 13 - Academic IELTS Results - passed
    12 July 13 - Vetassess Assessment + Point Test Advice: Positive
    03 Nov 13 - Invitation Accepted 70 points
    19 Dec 13 - Lodged Visa 189
    07 Feb 14 - Visa Granted
    04 Aug 14 - Initial Entry Date requirement
    26 July 14 - Actual IED to Melbourne
    May 2015 - Big Move
    June 2015 - Got a permanent role in Melbourne
    Apr 2016 - Got a contract consultancy role in Melbourne
    May 2016 - Got permanent role and moved to Toowooba, Queensland

    And now...... living the life that i have imagined

    "A great photograph is one that fully expresses what one feels, in the deepest sense, about what is being photographed" - Ansel Adams

  • StraderStrader Philippines
    Posts: 1,004Member
    Joined: Jan 04, 2013
    @vhoythoy email add mo send ko pdf file sa csol july 2013.. nandito ung external at internal auditor.^^

    Feb. 9, 2017- SS SA application submitted
    Mar. 2, 2017- SS approval (ITA received)
    Mar. 31, 2017- Medical @ nationwide cebu
    Apr. 11- medical cleared (son)
    Apr. 12- Medical cleared (me and my spouse)
    Apr. 14- Visa Lodge
    Apr. 24- CO contact asking for certified copy of passport for my son and my evidence of overseas study. CO Ruth
    Same day - complied all requested docs.
    June 9, 2017- 2nd CO contact- no docs requested (automated email for the delay of visa grant)
    September 13, 2017 - VISA GRANT!!!! CO Ruth- team adelaide
    BM - November 2017
    TYL

  • vhoythoyvhoythoy Melbourne
    Posts: 1,550Member, Moderator
    Joined: Oct 31, 2012
    @vhoythoy email add mo send ko pdf file sa csol july 2013.. nandito ung external at internal auditor.^^
    [email protected] Ano magiging major implications ba kapag naging csol yan?

    ANZSCO 221214 - Internal Auditor
    19 Jan 13 - Academic IELTS Results - passed
    12 July 13 - Vetassess Assessment + Point Test Advice: Positive
    03 Nov 13 - Invitation Accepted 70 points
    19 Dec 13 - Lodged Visa 189
    07 Feb 14 - Visa Granted
    04 Aug 14 - Initial Entry Date requirement
    26 July 14 - Actual IED to Melbourne
    May 2015 - Big Move
    June 2015 - Got a permanent role in Melbourne
    Apr 2016 - Got a contract consultancy role in Melbourne
    May 2016 - Got permanent role and moved to Toowooba, Queensland

    And now...... living the life that i have imagined

    "A great photograph is one that fully expresses what one feels, in the deepest sense, about what is being photographed" - Ansel Adams

  • vhoythoyvhoythoy Melbourne
    Posts: 1,550Member, Moderator
    Joined: Oct 31, 2012
    @vhoythoy email add mo send ko pdf file sa csol july 2013.. nandito ung external at internal auditor.^^
    [email protected] Ano magiging major implications ba kapag naging csol yan?

    ANZSCO 221214 - Internal Auditor
    19 Jan 13 - Academic IELTS Results - passed
    12 July 13 - Vetassess Assessment + Point Test Advice: Positive
    03 Nov 13 - Invitation Accepted 70 points
    19 Dec 13 - Lodged Visa 189
    07 Feb 14 - Visa Granted
    04 Aug 14 - Initial Entry Date requirement
    26 July 14 - Actual IED to Melbourne
    May 2015 - Big Move
    June 2015 - Got a permanent role in Melbourne
    Apr 2016 - Got a contract consultancy role in Melbourne
    May 2016 - Got permanent role and moved to Toowooba, Queensland

    And now...... living the life that i have imagined

    "A great photograph is one that fully expresses what one feels, in the deepest sense, about what is being photographed" - Ansel Adams

  • vhoythoyvhoythoy Melbourne
    Posts: 1,550Member, Moderator
    Joined: Oct 31, 2012
    Tinignan ko ulit nasa Sol din sila. Nasa Sol at Csol parehas july 2013 sa diac website. Posible ba yan?

    ANZSCO 221214 - Internal Auditor
    19 Jan 13 - Academic IELTS Results - passed
    12 July 13 - Vetassess Assessment + Point Test Advice: Positive
    03 Nov 13 - Invitation Accepted 70 points
    19 Dec 13 - Lodged Visa 189
    07 Feb 14 - Visa Granted
    04 Aug 14 - Initial Entry Date requirement
    26 July 14 - Actual IED to Melbourne
    May 2015 - Big Move
    June 2015 - Got a permanent role in Melbourne
    Apr 2016 - Got a contract consultancy role in Melbourne
    May 2016 - Got permanent role and moved to Toowooba, Queensland

    And now...... living the life that i have imagined

    "A great photograph is one that fully expresses what one feels, in the deepest sense, about what is being photographed" - Ansel Adams

  • StraderStrader Philippines
    Posts: 1,004Member
    Joined: Jan 04, 2013
    Ah meron din pala sa sol.. nakakalito nga hehehe

    Feb. 9, 2017- SS SA application submitted
    Mar. 2, 2017- SS approval (ITA received)
    Mar. 31, 2017- Medical @ nationwide cebu
    Apr. 11- medical cleared (son)
    Apr. 12- Medical cleared (me and my spouse)
    Apr. 14- Visa Lodge
    Apr. 24- CO contact asking for certified copy of passport for my son and my evidence of overseas study. CO Ruth
    Same day - complied all requested docs.
    June 9, 2017- 2nd CO contact- no docs requested (automated email for the delay of visa grant)
    September 13, 2017 - VISA GRANT!!!! CO Ruth- team adelaide
    BM - November 2017
    TYL

  • lock_code2004lock_code2004 Perth
    Posts: 5,037Member, De-activated
    Joined: Feb 23, 2012
    edited July 2013
    @vhoythoy @Strader

    - yung SOL Sched 1 is the same as CSOL Sched 1 din... meaning may option kayong mag-apply ng SS kung gusto nyo at kung may State na open for Sponsorship for that occupation.

    - yung CSOL Sched 2 - yung ang required mag-apply ng SS..

    -------------------------------
    then i looked at the new SOL and CSOL, inalis na nila yung sched 1 and sched 2,
    pero if you look closely, yung SOL occupations, ay yun din ang nasa first few pages ng CSOL..
    so the same explanation applies..

    - yung SOL occupations is the same as occupations in the first few pages of the CSOL: meaning may option kayong mag-apply ng SS kung gusto nyo at kung may State na open for Sponsorship for that occupation.

    - the rest of the CSOL occupations (na wala sa SOL) - yung ang required mag-apply ng SS..

    Consolidated Sponsored Occupation List (CSOL) - You must nominate an occupation from the CSOL if you are nominated by a State or Territory Government,

    Sep 24, 2011 - IELTS (L-8 R-8 W-8 S-7.5 : OBS-8)
    Jan 04, 2012 - EA application submitted | Feb 23, 2012 - EA assessment result (IE ANZSCO 233511)
    May 8, 2012 - Lodged GSM 175 online application | June 4, 2012 - CO Allocated
    June 22, 2012 - Medicals Finalized | Aug 30, 2012 - PCCs Completed (PH, UAE, USA)
    Sep 3, 2012 - Visa Granted (IED Jun 11, 2013) Thank You Lord!
    Oct 16-28, 2012 - Initial Entry Completed - Sydney
    July 28, 2013 - Final move to Perth
    Sep 9, 2013 - Started work with the same company i worked for in UAE/USA
    Oct 28, 2013 - Moved to another company.. ;)

  • StraderStrader Philippines
    Posts: 1,004Member
    Joined: Jan 04, 2013
    Ah ok..thanks @lock_code2004^^

    Feb. 9, 2017- SS SA application submitted
    Mar. 2, 2017- SS approval (ITA received)
    Mar. 31, 2017- Medical @ nationwide cebu
    Apr. 11- medical cleared (son)
    Apr. 12- Medical cleared (me and my spouse)
    Apr. 14- Visa Lodge
    Apr. 24- CO contact asking for certified copy of passport for my son and my evidence of overseas study. CO Ruth
    Same day - complied all requested docs.
    June 9, 2017- 2nd CO contact- no docs requested (automated email for the delay of visa grant)
    September 13, 2017 - VISA GRANT!!!! CO Ruth- team adelaide
    BM - November 2017
    TYL

  • michel_75michel_75 Bulacan
    Posts: 409Member
    Joined: Oct 03, 2012
    @lock_code2004 lock_code2004 salamat sa link..clear na po sya sa akin.
  • vhoythoyvhoythoy Melbourne
    Posts: 1,550Member, Moderator
    Joined: Oct 31, 2012
    The ever reliable mr. Lock code hehe

    ANZSCO 221214 - Internal Auditor
    19 Jan 13 - Academic IELTS Results - passed
    12 July 13 - Vetassess Assessment + Point Test Advice: Positive
    03 Nov 13 - Invitation Accepted 70 points
    19 Dec 13 - Lodged Visa 189
    07 Feb 14 - Visa Granted
    04 Aug 14 - Initial Entry Date requirement
    26 July 14 - Actual IED to Melbourne
    May 2015 - Big Move
    June 2015 - Got a permanent role in Melbourne
    Apr 2016 - Got a contract consultancy role in Melbourne
    May 2016 - Got permanent role and moved to Toowooba, Queensland

    And now...... living the life that i have imagined

    "A great photograph is one that fully expresses what one feels, in the deepest sense, about what is being photographed" - Ansel Adams

  • michel_75michel_75 Bulacan
    Posts: 409Member
    Joined: Oct 03, 2012
    @vhoythoy salamat sa info
  • vhoythoyvhoythoy Melbourne
    Posts: 1,550Member, Moderator
    Joined: Oct 31, 2012
    @vhoythoy salamat sa info
    Internal audit din papa assess ko, parehas yata tyo. Sana ok ia jobs sa au.

    ANZSCO 221214 - Internal Auditor
    19 Jan 13 - Academic IELTS Results - passed
    12 July 13 - Vetassess Assessment + Point Test Advice: Positive
    03 Nov 13 - Invitation Accepted 70 points
    19 Dec 13 - Lodged Visa 189
    07 Feb 14 - Visa Granted
    04 Aug 14 - Initial Entry Date requirement
    26 July 14 - Actual IED to Melbourne
    May 2015 - Big Move
    June 2015 - Got a permanent role in Melbourne
    Apr 2016 - Got a contract consultancy role in Melbourne
    May 2016 - Got permanent role and moved to Toowooba, Queensland

    And now...... living the life that i have imagined

    "A great photograph is one that fully expresses what one feels, in the deepest sense, about what is being photographed" - Ansel Adams

  • rachelle_gan2rachelle_gan2 Sydney
    Posts: 326Member
    Joined: Jun 12, 2013
    Hello po.. Patulong naman. Ask ko lang kung yung Bachelor of science in Civil Engineering from the Philippines is equivalent ba cya ng Bachelors degree sa Australia.. Check ko kasi if makakapag claim kami ng 15 points sa degree.

    Vetassess ung assessing body namin, Construction Project Manager ung nominated occupation with 8 yrs above ung experience. Pang 10th weeks na ngaun and still waiting for the result.

    Highly related qualification naman ung BSCE sa pinapaassess namin, Right?

    Paki comment naman po ung opinion nyo. Thanks a lot. Big help po ung comments nyo.

    Construction Project Manager 13311 (Hubby main applicant) 60 points, Visa 189
    17 Jul 13 : Positive skills assessment
    26 Jul 13 : Submitted EOI
    19 Aug 13 : Invitation to lodge visa 189 ( 60 points)
    23 Aug 13 : Lodge Visa
    30 Aug 13 : Medical ( Sata AMK), wife, 5 yrs old, 1 yr
    6 Sept 13 : Medical uploaded (No health examination required)
    30 Sept 13 : SG PCC application
    22 Oct 13 : SG PCC uploaded

    DIRECT GRANT: 30 Oct 2013 (GSM Brisbane T34)

    ---- Thank you God for this wonderful blessing ----

  • lock_code2004lock_code2004 Perth
    Posts: 5,037Member, De-activated
    Joined: Feb 23, 2012
    @rachelle_gan2 - marami pong factors to consider: school, curiculum, PRC registration...

    one good indicator is the school. pag section 1 school, most probably it will be equivalent to AU degree.. saang school po graduate?

    Sep 24, 2011 - IELTS (L-8 R-8 W-8 S-7.5 : OBS-8)
    Jan 04, 2012 - EA application submitted | Feb 23, 2012 - EA assessment result (IE ANZSCO 233511)
    May 8, 2012 - Lodged GSM 175 online application | June 4, 2012 - CO Allocated
    June 22, 2012 - Medicals Finalized | Aug 30, 2012 - PCCs Completed (PH, UAE, USA)
    Sep 3, 2012 - Visa Granted (IED Jun 11, 2013) Thank You Lord!
    Oct 16-28, 2012 - Initial Entry Completed - Sydney
    July 28, 2013 - Final move to Perth
    Sep 9, 2013 - Started work with the same company i worked for in UAE/USA
    Oct 28, 2013 - Moved to another company.. ;)

  • jvframosjvframos Perth
    Posts: 501Member
    Joined: Jan 22, 2013
    @rachelle_gan2 , check which section your school will fall into, meron link sa taas near the title, click mo yung more tabs below the main title.

    in my case, nasa section 2 and school ko pero sinama ko na sa vet assess submission yung prc registration kya medyo nkadagdag to be considered for 15pts. but if you back read, if your school falls to section 1, 15pts na say. tama ba @lock_code2004?

    Occupation: Architectural Drafstperson (ANZSCO Code 312111)
    Feb 2013 - Started collecting Vetassess requirements; March 29, 2013 - Lodged for Vetassess skills assessment; June 8, 2013 - took IELTS (BC, UAE); June 14, 2013 - received VETASSESS positive skills assessment; June 21, 2013 - got ielts results OBS 7.0 (l-7.5, r-7, w-7, s-7); June 24, 2013 - submitted EOI; June 27, 2013 - submitted WA state sponsorship application; July 03, 2013 - WA state sponsorship application approved; July 05, 2013 - received from DIAC invitation to lodge; July 14, 2013 - lodge visa application; August 13, 2013 - CO allocated, Team 7 GSM Adelaide; August 20, 2013 - submitted Form 80, NBI, PCC, bank statements for me, hubby and daughter and additional docs for hubby in lieu of Saudi PCC (statutory declaration, exit visa and end of service contract); August 22, 2013 - Medical check done; August 26, 2013 - uploaded hubby's Saudi PCC.... finally!; Sept 27, 2013 - visa grant daw but unofficial, hindi namin alam granted na pala.... long story…; Oct 10, 2013 - when we learned that our case was granted but no official confirmation.; Oct 11, 2013 - Official VISA Grant! Finally!!!! Thank God. End of the 1st journey, start of the new beginning; July 10, 2014 - IED

    You may not always understand why God allows certain things to happen, but you can be certain that God is not making any mistakes.

    Proverbs 3:5-6
    "Trust in the Lord with all your heart and lean not on your own understanding; in all your ways submit to him, and he will make your paths straight

  • lock_code2004lock_code2004 Perth
    Posts: 5,037Member, De-activated
    Joined: Feb 23, 2012
    edited July 2013
    @jvframos @rachelle_gan2

    yes, if we are going to base sa patterns ng mga assessment results dito sa forum,

    - pag graduate ng section 1 schools, equivalent na sa AU degree...
    - pag galing sa section 2 schools, pag may PRC license, at okay ang content ng curiculum (no of units etc)... then pwedeng maging equivalent to AU degree ang results..

    Sep 24, 2011 - IELTS (L-8 R-8 W-8 S-7.5 : OBS-8)
    Jan 04, 2012 - EA application submitted | Feb 23, 2012 - EA assessment result (IE ANZSCO 233511)
    May 8, 2012 - Lodged GSM 175 online application | June 4, 2012 - CO Allocated
    June 22, 2012 - Medicals Finalized | Aug 30, 2012 - PCCs Completed (PH, UAE, USA)
    Sep 3, 2012 - Visa Granted (IED Jun 11, 2013) Thank You Lord!
    Oct 16-28, 2012 - Initial Entry Completed - Sydney
    July 28, 2013 - Final move to Perth
    Sep 9, 2013 - Started work with the same company i worked for in UAE/USA
    Oct 28, 2013 - Moved to another company.. ;)

  • rachelle_gan2rachelle_gan2 Sydney
    Posts: 326Member
    Joined: Jun 12, 2013
    Kasama narin ung PRC result at cert sa Vetassess docs namin.

    Paki paste naman ung link sa comment nyo. D ko kasi cya makita. Thanks alot

    Construction Project Manager 13311 (Hubby main applicant) 60 points, Visa 189
    17 Jul 13 : Positive skills assessment
    26 Jul 13 : Submitted EOI
    19 Aug 13 : Invitation to lodge visa 189 ( 60 points)
    23 Aug 13 : Lodge Visa
    30 Aug 13 : Medical ( Sata AMK), wife, 5 yrs old, 1 yr
    6 Sept 13 : Medical uploaded (No health examination required)
    30 Sept 13 : SG PCC application
    22 Oct 13 : SG PCC uploaded

    DIRECT GRANT: 30 Oct 2013 (GSM Brisbane T34)

    ---- Thank you God for this wonderful blessing ----

  • rachelle_gan2rachelle_gan2 Sydney
    Posts: 326Member
    Joined: Jun 12, 2013
    By the way, BSCE, University of the East, Caloocan Campus.

    Nasa anong section po cya?

    Construction Project Manager 13311 (Hubby main applicant) 60 points, Visa 189
    17 Jul 13 : Positive skills assessment
    26 Jul 13 : Submitted EOI
    19 Aug 13 : Invitation to lodge visa 189 ( 60 points)
    23 Aug 13 : Lodge Visa
    30 Aug 13 : Medical ( Sata AMK), wife, 5 yrs old, 1 yr
    6 Sept 13 : Medical uploaded (No health examination required)
    30 Sept 13 : SG PCC application
    22 Oct 13 : SG PCC uploaded

    DIRECT GRANT: 30 Oct 2013 (GSM Brisbane T34)

    ---- Thank you God for this wonderful blessing ----

  • jvframosjvframos Perth
    Posts: 501Member
    Joined: Jan 22, 2013

    Occupation: Architectural Drafstperson (ANZSCO Code 312111)
    Feb 2013 - Started collecting Vetassess requirements; March 29, 2013 - Lodged for Vetassess skills assessment; June 8, 2013 - took IELTS (BC, UAE); June 14, 2013 - received VETASSESS positive skills assessment; June 21, 2013 - got ielts results OBS 7.0 (l-7.5, r-7, w-7, s-7); June 24, 2013 - submitted EOI; June 27, 2013 - submitted WA state sponsorship application; July 03, 2013 - WA state sponsorship application approved; July 05, 2013 - received from DIAC invitation to lodge; July 14, 2013 - lodge visa application; August 13, 2013 - CO allocated, Team 7 GSM Adelaide; August 20, 2013 - submitted Form 80, NBI, PCC, bank statements for me, hubby and daughter and additional docs for hubby in lieu of Saudi PCC (statutory declaration, exit visa and end of service contract); August 22, 2013 - Medical check done; August 26, 2013 - uploaded hubby's Saudi PCC.... finally!; Sept 27, 2013 - visa grant daw but unofficial, hindi namin alam granted na pala.... long story…; Oct 10, 2013 - when we learned that our case was granted but no official confirmation.; Oct 11, 2013 - Official VISA Grant! Finally!!!! Thank God. End of the 1st journey, start of the new beginning; July 10, 2014 - IED

    You may not always understand why God allows certain things to happen, but you can be certain that God is not making any mistakes.

    Proverbs 3:5-6
    "Trust in the Lord with all your heart and lean not on your own understanding; in all your ways submit to him, and he will make your paths straight

  • rachelle_gan2rachelle_gan2 Sydney
    Posts: 326Member
    Joined: Jun 12, 2013
    Sir pag nasa section 3 anong ibig sabihin nun?

    Construction Project Manager 13311 (Hubby main applicant) 60 points, Visa 189
    17 Jul 13 : Positive skills assessment
    26 Jul 13 : Submitted EOI
    19 Aug 13 : Invitation to lodge visa 189 ( 60 points)
    23 Aug 13 : Lodge Visa
    30 Aug 13 : Medical ( Sata AMK), wife, 5 yrs old, 1 yr
    6 Sept 13 : Medical uploaded (No health examination required)
    30 Sept 13 : SG PCC application
    22 Oct 13 : SG PCC uploaded

    DIRECT GRANT: 30 Oct 2013 (GSM Brisbane T34)

    ---- Thank you God for this wonderful blessing ----

  • rachelle_gan2rachelle_gan2 Sydney
    Posts: 326Member
    Joined: Jun 12, 2013
    @jvframos Sir pag nasa section 3 anong ibig sabihin nun?

    Construction Project Manager 13311 (Hubby main applicant) 60 points, Visa 189
    17 Jul 13 : Positive skills assessment
    26 Jul 13 : Submitted EOI
    19 Aug 13 : Invitation to lodge visa 189 ( 60 points)
    23 Aug 13 : Lodge Visa
    30 Aug 13 : Medical ( Sata AMK), wife, 5 yrs old, 1 yr
    6 Sept 13 : Medical uploaded (No health examination required)
    30 Sept 13 : SG PCC application
    22 Oct 13 : SG PCC uploaded

    DIRECT GRANT: 30 Oct 2013 (GSM Brisbane T34)

    ---- Thank you God for this wonderful blessing ----

Sign In or Register to comment.
LATEST 10 ACTIVE DISCUSSION THREAD

Welcome to Pinoy AU Community!

The longest running Pinoy-Australian Forum site in the history. We are connecting Pinoys "in" and "to" Australia since 2010! If you want to join in, click one of these buttons!

Categories

Random Members
(55223)

cessmariaaaelvomirmarjaycab253jfuentesGraciees.alexcanada14RustyMeistMaluphoenix325martinixytrishaocampoyanna_vinasacaontantSherylsalve2303mseatingcakeFedoraSabineBarneraellaine15rniestar
Browse Members

Members Online (25) + Guest (116)

Hunter_08cp101030baikenZionlunarcatfruitsaladPeanutButterCinnZinnmathilde9mark_trent10piwanaims2023onieandreschimkenjar0Jake23future_is_brightnaksuyaaaaethosCantThinkAnyUserNamedeville30drex22chrxgravytraincubeCBD

Top Active Contributors

Top Posters